556-24-108 DBBV 100CD Operation_and_Maintenance 29APR25.pdf

PDF 3 MB Posted

Attached to
Y1DA--556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction (VA-26-00035322)
Solicitation number
36C25226B00350001
Issued by

About this file

This is an Operation and Maintenance Procedure document for Double Block and Bleed Valves at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois, dated April 29, 2025, under VA Contract #36C252-23-D-0061, Task Order #36C25224N0449, and VA Project #556-24-108.

The document provides comprehensive step-by-step procedures for safely isolating and re-energizing pressurized steam and condensate systems using double block and bleed valve configurations with warm-up valves for controlled re-pressurization. The De-Energizing procedure consists of five steps: closing the primary isolation valve, closing the secondary isolation valve, opening the bleed valve to vent residual pressure, and securing the system with lockout/tagout protocols. The Re-Energizing procedure includes six steps: closing the bleed valve, gradually opening warm-up valves, opening the secondary isolation valve, opening the primary isolation valve, and monitoring the system for proper operation. The document emphasizes critical safety precautions including personnel training, Activity Hazard Analysis implementation, Lockout/Tagout procedures, appropriate personal protective equipment, proper ventilation, and warning signage. It details extensive safety risks ranging from high pressure and temperature exposure to steam explosions, condensate contamination, corrosion, vibration fatigue, and human error. The document includes preventive maintenance procedures covering regular valve inspection, lubrication, valve seat inspection, and venting/draining system checks, as well as reactive maintenance for blocked vents, sticking valves, and leaking valves. Building-specific addendums identify 68 separate double block and bleed valve assemblies across 29 buildings and the 1CC steam distribution system, with detailed tags, sizes, affected areas, and downstream effects documented for each valve. Four attachments provide Piping and Instrumentation Diagrams, site distribution plans, mechanical details with manufacturer literature, Lockout/Tagout procedures, and Activity Hazard Analysis templates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Double Block and Bleed Valves VA Contract #36C252-23-D-0061 Captain James A. Lovell Federal Health Care Center (FHCC) Task Order #36C25224N0449 U.S. Department of Veterans Affairs, North Chicago, IL VA Project #556-24-108

APPENDIX 10

Operation and Maintenance Procedure

Captain James A. Lovell FHCC VA Double Block and Bleed Valves

North Chicago, IL

April 29, 2025

VA Project #556-24-108

VA A&E Contract/Task Order #36C252-23-D-0061/36C25224N0449

SES Project #23022.009

Captain James A. Lovell FHCC Double Block & Bleed Valves O&M Procedure VA Project # 556-24-108 A&E Contract # 36C252-23-D-0061 A&E Task # 36C25224N0449 www.specializedeng.com

Table of Contents April 2025 i

Table of Contents Operation and Maintenance Procedure

1. Purpose of Procedure

2. Safety Precautions

Safety Risks:

4. Isolation Procedure

De-Energizing

Re-Energizing

Double Block and Bleed Diagrams

5. Preventive and Reactive Maintenance

6. Documentation and Reporting

8. References and Definitions

Addendum

Building 1

Building 3

Building 187

Building 4

Building 5

Building 6

Building 7

Building 9

Building 11

Building 32

Building 36

Building 139

Building 37

Building 46

Building 48

Building 66

Building 131

Building 132

Building 133/133EF

O&M Procedure VA Project # 556-24-108

Table of Contents April 2025 ii

Building 133EF(133)

Building 133EF(133/133CA)

Building 133CA/134

Building 135

Building 139

Building 188

Building 1CC

Attachment 1: Piping and Instrumentation Diagram(P&ID) and Site Distribution Plan Attachment 2: Mechanical Details, Schedule and Manufacturer Literature Attachment 3: Lockout/Tagout (LOTO) Attachment 4: Activity Hazard Analysis (AHA)

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 3

1. Purpose of Procedure

The purpose of this document is to provide current and pertinent information regarding the steam and condensate systems at Captain James A. Lovell Federal Health Care Center and should be updated accordingly. This procedure provides a step-by-step approach for safely isolating and re-energizing pressurized steam and condensate systems, using a double block and bleed valve configuration, with additional warm-up valves for controlled re-pressurization. The goal is to ensure safe isolation, minimize risk, and maintain system integrity while performing necessary maintenance tasks.

The contractor is responsible for updating general and building-specific procedures and risks whenever they change. For instance, after the installation of new double block and bleed valves, the contractor should include photos and as-built drawings to create or update the building-specific operations and maintenance manuals. After construction, the task of updating and maintaining this document will fall to the department and individual that operates and maintains the system.

2. Safety Precautions

Before performing any isolation or re-energization activities, ensure the following safety items have been reviewed and implemented by all participants:

• Personnel Training: Ensure all personnel involved are trained and qualified in steam systems and valve operations.

• Activity Hazard Analysis (AHA): Implement AHA procedures to prevent incidents.

1. Refer to attachment 3

2. U.S. Army Corps of Engineers Headquarters > Missions > Safety and Occupational Health > Activity

Hazard Analysis

3. Safety Management - Hazard Identification and Assessment | OSHA.gov | Occupational Safety and

Health Administration

• Lockout/Tagout (LOTO): Implement LOTO procedures to prevent accidental re-energization.

1. Refer to attachment 4

2. Control of Hazardous Energy (Lockout/Tagout) - Overview | OSHA.gov | Occupational Safety and

Health Administration

3. 1910.147 - The control of hazardous energy (lockout/tagout). | Occupational Safety and Health

Administration

• Personal Protective Equipment (PPE): Personnel must wear appropriate personal protective equipment, including gloves, goggles, hearing protection, flame-resistant clothing, and a hard hat where required.

• Ventilation: Ensure proper ventilation, including rate of speed, when working with steam systems to avoid exposure to hazardous gases or steam burns.

• Warning Signs and Barricades: Post clear warning signs around the work area, and ensure access is restricted to authorized personnel only.

Safety Risks:

o High Pressure

▪ Steam lines often operate at very high pressures, which increases the risk of equipment failure. If the pressure exceeds the design limits, the steam line or components can burst, causing serious injuries or fatalities.

o Pressure Fluctuations

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 4

▪ While condensate lines usually operate at lower pressures, fluctuations in pressure can still occur, especially if there is a malfunction in the condensate pump or steam trap system. Pressure spikes can damage the condensate line or create safety hazards.

o High Temperature

▪ Steam in the lines is often extremely hot (typically ranging from 150°C to 600°C or higher). Direct exposure to the steam or the surfaces of the pipes can cause severe burns or scalds, and if there is a leak, the surrounding environment can become dangerously hot.

▪ Although condensate is typically at lower temperatures than steam, it can still be hot (ranging from 120°C to 200°C in some cases). Direct contact with hot condensate, especially during maintenance or repair activities, can cause severe burns or scalding injuries.

o Leaks and Spills

▪ Leaks can occur due to wear and tear, corrosion, or mechanical damage. A steam leak can cause a sudden increase in pressure and temperature in a confined space, which could lead to burns, scalds, or even explosions.

▪ Condensate lines can develop leaks due to corrosion, physical damage, or improper installation.

A leak can lead to the release of hot condensate, which may cause burns or damage to surrounding equipment. Leaks can also lead to water damage in areas that are not designed to handle moisture.

o Steam Explosions

▪ In some cases, a catastrophic failure of the steam line (e.g., due to an equipment malfunction or rupture) can lead to a steam explosion, which may cause significant property damage, injuries, or fatalities.

o Condensate Contamination

▪ Steam systems typically generate condensate (the water formed when steam cools down). If the condensate becomes contaminated with chemicals or rust, it can pose a health hazard if it leaks or comes into contact with workers.

▪ Condensate lines may carry contaminated water, especially if there are issues with the steam system, such as leaks of chemicals, rust, or oil. Contaminated condensate can affect the quality of water in the system, posing a risk to the environment or workers' health.

o Corrosion and Material Degradation

▪ Corrosion can weaken steam lines over time, particularly when the system operates in harsh environments or with untreated water. Corroded pipes are more prone to leaks, failures, and ruptures.

▪ Condensate can be corrosive, especially if it contains dissolved oxygen, carbon dioxide, or other contaminants. Corrosion of the condensate lines can lead to leaks or ruptures, potentially releasing hot water or causing system failures.

o Vibration and Fatigue

▪ The flow of high-pressure steam can cause the pipes to vibrate, leading to fatigue and potential failure of the pipe material or joints.

o Inadequate Ventilation

▪ If steam leaks occur in enclosed spaces without adequate ventilation, the rapid temperature and pressure changes can cause damage to both the steam system and the environment. Additionally, in some cases, steam could displace oxygen, creating a suffocation risk.

▪ Condensate lines that run through confined spaces or areas without proper ventilation can pose risks if leaks occur. In poorly ventilated spaces, leaks can lead to steam accumulation or condensation, increasing the risk of burns, scalding, or creating hazardous conditions.

o Human Error

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 5

▪ Mistakes during maintenance, operation, or emergency response can lead to serious accidents, including steam leaks, improper handling of high-pressure steam, or failure to follow proper shutdown procedures.

▪ Maintenance or repair work on condensate lines can be dangerous if not performed correctly. For example, workers may accidentally release trapped condensate, causing scalding injuries, or mishandle equipment, leading to leaks or pressure imbalances.

o Temperature Shock/Thermal Shock

▪ Rapid temperature changes, such as when cold water is introduced into a hot steam line, can cause thermal shock. This can result in pipe fractures, steam escapes, or mechanical failures.

o Backflow or Reverse Flow

▪ Condensate can flow back into the steam system if the condensate return system is not designed properly or if there is a failure in the condensate pump or check valves. This can lead to contamination of the steam system, potentially causing corrosion, blockages, or pressure instability.

4. Isolation Procedure

De-Energizing I. Preparation

a. Review the below steps, building-specific addendum sheet, Piping and Instrumentation Diagram(P&ID), and piping system-specific drawings for the relevant steam and condensate system.

b. Complete appropriate safety forms and procedures

c. Ensure the diagrams and drawings are up to date by locating and formalizing oneself with the area of work by location of shut-off valves, warm-up valves, pressure gauges, other relevant valves, and venting points.

d. Verify that all isolation and bleed valves are in operable condition.

e. Confirm that LOTO procedures are implemented.

II. Step 1: Close Primary Isolation Valve:

a. Ensure the warm-up valve is closed

b. Close the primary isolation valve, which is the valve closest to the steam source in the double block and bleed assembly.

c. Monitor pressure gauges downstream of the valve to ensure proper isolation of the steam system.

III. Step 2: Close Secondary Isolation Valve:

a. Ensure the warm-up valve is closed

b. Verify via pressure gauge readings that the primary isolation valve is fully closed and a reduction in system pressure has occurred.

c. Once pressure has been released from the system, close the secondary isolation valve downstream of the primary isolation valve providing a second isolation point for the steam system.

d. Similarly to Step 1, monitor pressure gauges downstream of the secondary isolation valve to verify no leakage or failure has occurred within isolation or bypass valves.

e. Signs of stress within the system should be reported to the VA immediately.

IV. Step 3: Open the Bleed Valve:

a. Once the system has been verifiably depressurized, slowly open the bleed valve to vent residual pressure between the isolation valves.

V. Step 4: Secure the System:

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 6

a. Lock out and tag all valves.

b. Ensure all piping systems are safe for personnel to work on or inspect.

Re-Energizing I. Preparation:

a. Review the steps below, the building-specific addendum sheet, the Piping and Instrumentation Diagram(P&ID), and piping system-specific drawings for the relevant steam and condensate system.

b. Complete appropriate safety forms and procedures

c. Ensure the diagrams and drawings are up to date by locating and formalizing oneself with the area of work by location of shut-off valves, warm-up valves, pressure gauges, other relevant valves, and venting points.

d. Ensure that LOTO devices are removed.

e. Confirm the warm-up valve, DBB valves, and vents are in operable condition.

f. Confirm that the pressure relief valves are properly set and functioning.

g. Perform a visual inspection for any leaks or signs of wear.

II. Step 1: Close the Bleed Valve:

a. Close the bleed valve to ensure there is no pathway for steam to escape the system.

III. Step 2: Gradually Open Warm-up Valves:

a. Slowly open the warm-up valves connected to both isolation valves for the purposes of slowly reestablishing pressure within the system.

b. Monitor pressure gauges and adjust the warm-up valve as needed to ensure gradual pressurization.

IV. Step 3: Open the Secondary Isolation Valve:

a. Once the system is pressurized to a satisfactory level, fully open the secondary isolation valve located furthest upstream from the steam source.

b. Close the warm-up valve connected to the secondary isolation valve after the isolation valve has been fully opened.

V. Step 4: Open the First Isolation Valve:

a. Verify there are no leaks or stress within the system after following Steps 1-3.

b. Once verifying that no leaks are present, slowly open the primary isolation valve allowing for full steam flow to occur throughout the system.

c. Close the warm-up valve connected to the primary isolation valve after the isolation valve has been fully opened.

d. Ensure that the system is now fully re-energized and under normal operating pressure.

VI. Step 5: Monitor the System:

a. Continuously monitor the system for any unusual pressures, temperatures, or leaks.

b. Perform a final inspection of all valve operations to ensure proper sealing and functionality.

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 7

Double Block and Bleed Diagrams

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 8

5. Preventive and Reactive Maintenance

Preventive Maintenance:

I. Regular Valve Inspection: Periodically inspect all DBB, bleed, and warm-up valves to ensure proper operation and seating integrity.

a. Clean the Valve: Remove carbon and debris from the valve and seat.

b. Visual Inspection: Check for cracks, wear, or damage on the valve and seat.

c. Check Alignment and Contact: Ensure the valve and seat align correctly and make even contact.

d. Leakage Test: Confirm proper sealing with a leakage or vacuum test.

i. Seal and Pressurize: Use a vacuum pump or pressure tester to seal the valve and apply pressure.

ii. Check for Leaks: Observe for any air or fluid escaping around the valve, indicating leakage.

II. Lubrication: Apply lubricant type, amount, and locations per the manufacturer's guidelines.

a. Clean the Valve: Remove any old oil or contaminants from the valve and its components.

b. Apply Lubricant: Apply the appropriate lubricant to the valve stem, guide, and seat.

c. Ensure Proper Distribution: Rotate or operate the valve to ensure the lubricant is evenly distributed across all moving parts.

III. Valve Seat Inspection: Procedure to prevent fouling or buildup on valve seats. Regularly inspect for signs of corrosion, erosion, or fouling.

a. Clean the Valve Seat Area: Thoroughly clean the valve seat and surrounding areas to remove debris, carbon buildup, and old gasket material.

b. Visual Inspection: Inspect the valve seat for any visible cracks, pitting, burns, or excessive wear that could affect sealing.

c. Check Seat Alignment and Condition: Use a straightedge or machinist's ruler to ensure the valve seat is aligned properly and free of warping or irregularities.

d. Measure Seat Angle and Width: Verify that the seat’s angle and width conform to manufacturer specifications using appropriate measuring tools (e.g., protractor, micrometer).

e. Test Valve Contact: Apply a blueing compound or valve grinding paste, rotate the valve, and inspect the contact pattern to ensure proper sealing. Conduct a leakage test to confirm the seat is airtight.

IV. Venting and Draining System Inspection: Check that all vents and drains are clear of obstructions. Clean regularly to prevent blockages.

a. Inspect Hoses and Lines: Check for cracks, leaks, or blockages in venting and draining hoses.

b. Check Valves: Ensure that vent and drain valves are functioning properly and not stuck or damaged.

c. Verify Drainage Flow: Test the system to ensure proper drainage and venting without any obstructions or slow drainage.

Reactive Maintenance:

VII. Blocked Vent or Drain: If vent or drain blockage is suspected, isolate the affected system and conduct a thorough inspection. Use flushing or mechanical cleaning to remove any buildup.

a. Inspect for Blockages: Visually check hoses, vents, and drains for visible obstructions.

b. Clear the Blockage: Remove any debris, dirt, or buildup causing the blockage.

c. Test the System: Ensure proper flow through the vent or drain after clearing the obstruction.

VIII. Sticking or Leaky Valves: If a valve is suspected of sticking or leaking, first isolate and depressurize the system.

Perform valve disassembly, cleaning, and reassembly with new seals or gaskets as necessary.

a. Inspect for Damage: Check the valve, seat, and guides for wear, damage, or carbon buildup.

b. Clean the Valve: Remove carbon or debris from the valve, seat, and surrounding areas.

c. Lubricate or Replace: Apply appropriate lubrication or replace worn-out components, like seals or guides.

d. Test for Proper Operation: Check the valve for smooth movement and proper sealing to ensure it no longer sticks or leaks.

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 9

6. Documentation and Reporting

Log Activities: Document each step of the isolation and re-energizing process in the maintenance log. Include:

- Time and date of isolation and re-energization.

- Personnel involved.

- Any issues or irregularities encountered during the process.

Post-Maintenance Testing: Once maintenance is completed, ensure that all systems are tested for integrity—record results of pressure tests and valve functionality checks.

Follow-Up: Schedule follow-up checks to verify the integrity of the isolated system and ensure no new issues arise.

8. References and Definitions

Definitions/Abbreviations/Acronyms

• Exposed: Piping, ductwork, and equipment are exposed to view in finished rooms.

• Cold: Equipment, ductwork, or piping handling media at design temperature of 16°C (60°F) or below.

• Density: kg/m3 - kilograms per cubic meter (Pcf - pounds per cubic foot).

• Thermal conductance: Heat flow rate through materials.

1. Flat surface: Watt per square meter (BTU per hour per square foot).

2. Pipe or Cylinder: Watt per square meter (BTU per hour per linear foot).

• Vapor Retarder (Vapor Barrier): A material which retards the transmission (migration) of water vapor. The performance of the vapor retarder is rated in terms of permeance (perms). For the purpose of this specification, vapor retarders shall have a maximum published permeance of 0.1 perms, and vapor barriers shall have a maximum published permeance of 0.001 perms.

• HPS: High-pressure steam (415 kPa [60 psig] and above).

• HPR: High-pressure steam condensate return.

• MPS: Medium pressure steam (110 kPa [16 psig] through 414 kPa [59 psig].

• MPR: Medium pressure steam condensate return.

• LPS: Low-pressure steam (103 kPa [15 psig] and below).

• LPR: Low-pressure steam condensate gravity return.

• PC: Pumped condensate.

• HWH: Hot water heating supply.

• HWHR: Hot water heating return.

• GH: Hot glycol-water heating supply.

• GHR: Hot glycol-water heating return.

• FWPD: Feedwater pump discharge.

• FWPS: Feedwater pump suction.

• CTPD: Condensate transfer pump discharge.

• CTPS: Condensate transfer pump suction.

• VR: Vacuum condensate return.

• CPD: Condensate pump discharge.

• R: Pump recirculation.

Website Sources/References

• U.S. Department of Veterans Technical Information Library o MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) - Office of Construction & Facilities Management o PG 18-10 - Plumbing Design Manual

O&M Procedure VA Project # 556-24-108

O&M Procedure April 2025 10

• Occupational Safety and Health Administration Department of Labor o Home | OSHA.gov | Occupational Safety and Health Administration

• United State Army Corps of Engineers.

o Sacramento District, U.S. Army Corps of Engineers

• American Society of Heating, Refrigerating, and Air-Conditioning Engineers o Home | ashrae.org

• Plumbing-Heating-Cooling Contractors Association o PHCC Home - PHCC

• American Society of Safety Professionals o ASSP - American Society of Safety Professionals | ASSP

• The Joint Commission o A Trusted Partner in Patient Care | The Joint Commission

O&M Procedure VA Project # 556-24-108

Addendum April 2025 11

Addendum

Building 1

Steam Valve Assembly Tag Number: DBB-HP-01-1 Size: 5” Affected Area: Building 01 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-CP-01-2 Size: 2” Affected Area: Building 01 Down Stream Effects: N/A Note: None

O&M Procedure VA Project # 556-24-108

Addendum April 2025 12

Building 3

Steam Valve Assembly Tag Number: DBB-HP-03-1 Size: 3” Affected Area: Building 03 Down Stream Effects: Building 187 Note: None

Condensate Valve assembly Tag Number: DBB-PC-03-2 Size: 1” Affected Area: Building 03

Building 187

Steam Valve Assembly Tag Number: DBB-LP-187-1 Size: 2” Affected Area: Building 187 Down Stream Affected Area: N/A

O&M Procedure VA Project # 556-24-108

Addendum April 2025 13

Building 4

Steam Valve Assembly Tag Number: DBB-HP-04-1 Size: 6” Affected Area: Building 04 Down Stream Effects: N/A Note: None

Steam Valve Assembly Tag Number: DBB-HP-04-2 Size: 2” Affected Area: Building 04 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-04-3 Size: 4” Affected Area: Building 04 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-04-4 Size: 4” Affected Area: Building 04 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-04-5 Size: 4” Affected Area: Building 04

O&M Procedure VA Project # 556-24-108

Addendum April 2025 14

Building 5

Steam Valve Assembly Tag Number: DBB-HP-05-1 Size: 3” Affected Area: Building 05

Steam Loop Steam Valve Assembly Tag Number: DBB-HP-1CC-6 Size: 6” Affected Area: 1CC East of BLDG 5 Down Stream Affected Area:

Note: None

Condensate Valve assembly Tag Number: DBB-PC-1CC-5 Size: 12” Affected Area: 1CC East of BLDG 5 Down Stream Affected Area:

O&M Procedure VA Project # 556-24-108

Addendum April 2025 15

Building 6

Steam Valve Assembly Tag Number: DBB-HP-06-1 Size: 5” Affected Area: Building 06 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-06-2 Size: 2 ½” Affected Area: Building 06

1CC South Building 6 Steam Valve Assembly Tag Number: DBB-HP-1CC-8 Size: 5” Affected Area: 1CC South of BLDG 6 Down Stream Affected Area: 6, 4, 7, & 188 Note: None

Condensate Valve assembly Tag Number: DBB-PC-1CC-7 Size: 10” Affected Area: 1CC South of BLDG 6 Down Stream Affected Area: 16, 4, 7, & 188

O&M Procedure VA Project # 556-24-108

Addendum April 2025 16

Building 7

Steam Valve Assembly Tag Number: DBB-HP-07-1 Size: 4” Affected Area: Building 07 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-07-2 Size: 2” Affected Area: Building 07

O&M Procedure VA Project # 556-24-108

Addendum April 2025 17

Building 9

Steam Valve Assembly Tag Number: DBB-HP-09-1 Size: 2 ½” Affected Area: Building 09 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-09-2 Size: 2” Affected Area: Building 09

O&M Procedure VA Project # 556-24-108

Addendum April 2025 18

Building 11

Steam Valve Assembly Tag Number: DBB-HP-11-1 Size: 2” Affected Area: Building 11 Down Stream Effects: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-11-2 Size: 1 ¼” Affected Area: Building 11 Down Stream Effects: N/A Note: None

Steam Valve Assembly Tag Number: DBB-HP-11/46-1 Size: 4” Affected Area: Building 11 & 46 Down Stream Effects: Building 11 & 46 Note: None

Condensate Valve assembly Tag Number: DBB-PC-11/46-2 Size: 2” Affected Area: Building 11 & 46 Down Stream Effects: Building 11 & 46 Note: None

Steam Valve Assembly Tag Number: DBB-HP-46-1 Size: 3” Affected Area: Building 46 Down Stream Affected Area: Building 46 Note: Remote operator due to being in manhole outside BLDG 11

O&M Procedure VA Project # 556-24-108

Addendum April 2025 19

Building 32

Steam Valve Assembly Tag Number: DBB-HP-32-1 Size: 2 ½” Affected Area: Building 32 Down Stream Affected Area: Building 37 Note: None

Condensate Valve assembly Tag Number: DBB-PC-32-2 Size: 2 ½” Affected Area: Building 32 Down Stream Affected Area: Effects: Building 37

O&M Procedure VA Project # 556-24-108

Addendum April 2025 20

Building 36

Steam Valve Assembly Tag Number: DBB-HP-36-1 Size: 3” Affected Area: Building 36 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-CP-36-2 Size: 2 ½” Affected Area: Building 36 Down Stream Affected Area: Potentially 139

Building 139

Steam Valve Assembly Tag Number: DBB-HP-139-1 Size: 1 ¼” Affected Area: Building 139

O&M Procedure VA Project # 556-24-108

Addendum April 2025 21

Building 37

Steam Valve Assembly Tag Number: DBB-LP-37-1 Size: 1 ½” Affected Area: Building 37

O&M Procedure VA Project # 556-24-108

Addendum April 2025 22

Building 46

Steam Valve Assembly Tag Number: DBB-HP-46-1 Size: 3” Affected Area: Building 46 Down Stream Affected Area: Building 46 Note: Remote operator due to being in manhole outside BLDG 11

Steam Valve Assembly Tag Number:DBB-HP-46-2 Size: 3” Affected Area: Building 46 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number:DBB-PC-46-3 Size: 2” Affected Area: Building 46

O&M Procedure VA Project # 556-24-108

Addendum April 2025 23

Building 48

Steam Valve Assembly Tag Number: DBB-HP-48-1 Size: 3” Affected Area: Building 48 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-48-2 Size: 3” Affected Area: Building 48 Down Stream Affected Area: Potentially 139 & 36

O&M Procedure VA Project # 556-24-108

Addendum April 2025 24

Building 66

Steam Valve Assembly Tag Number: DBB-HP-66-1 Size: 6” Affected Area: Building 66 (Located in Tramway by intersection) Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-66-2 Size: 2” Affected Area: Building 66 (Located in Tramway by intersection) Down Stream Affected Area: N/A Note: None

Steam Valve Assembly Tag Number: DBB-HP-66-4 Size: 6” Affected Area: Building 66 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-66-3 Size: 2” Affected Area: Building 66

O&M Procedure VA Project # 556-24-108

Addendum April 2025 25

Building 131

Steam Valve Assembly Tag Number: DBB-HP-131-1 Size: 6” Affected Area: Building 131 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-131-2 Size: 3” Affected Area: Building 131

Building 132

Steam Valve Assembly Tag Number: DBB-HP-132-1 Size: 5” Affected Area: Building 132 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-132-2 Size: 2” Affected Area: Building 132

O&M Procedure VA Project # 556-24-108

Addendum April 2025 26

Building 133/133EF

Mech Room 133-BA134 Steam Valve Assembly Tag Number: DBB-HP-133-1 Size: 4” Affected Area: Building 133 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-133-2 Size: 4” Affected Area: Building 133

Crawl Space by 133-BA134 Steam Valve Assembly Tag Number: DBB-HP-133EF-2 Size: 6” Affected Area: Building 133EF

Steam Valve Assembly Tag Number: DBB-HP-133-3 Size: 6” Affected Area: Building 133 Penthouse Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-133-4 Size: 2” Affected Area: Building 133 Penthouse

O&M Procedure VA Project # 556-24-108

Addendum April 2025 27

Building 133EF(133)

Crawl Space Under East Wining of 133 Steam Valve Assembly Tag Number: DBB-HP-133EF-3 Size: 6” Affected Area: Building 133EF Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-133EF-4 Size: 3” Affected Area: Building 133EF

O&M Procedure VA Project # 556-24-108

Addendum April 2025 28

Building 133EF(133/133CA)

Crawl Space Pipe Entrance Steam Valve Assembly Tag Number: DBB-HP-133EF-1 Size: 8” Affected Area: Building 133CA Down Stream Affected Area: Building 133 & 133EF

O&M Procedure VA Project # 556-24-108

Addendum April 2025 29

Building 133CA/134

Below Recycle 133CA-BD166A Steam Valve Assembly Tag Number: DBB-HP-134-1 Size: 5” Affected Area: Building 134 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-134-2 Size: 4” Affected Area: Building 134

Steam Valve Assembly Tag Number: DBB-HP-133CA-1 Size: 3” Affected Area: Building 133CA Down Stream Affected Area: N/A Note: None

Steam Valve Assembly Tag Number: DBB-MP-133CA-2 Size: 8” Affected Area: Building 133CA Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-133CA-3 Size: 1 ¼” Affected Area: Building 133CA Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-133CA-4 Size: 2” Affected Area: Building 133CA

O&M Procedure VA Project # 556-24-108

Addendum April 2025 30

Building 135

Steam Valve Assembly Tag Number: DBB-HP-135-1 Size: 4” Affected Area: Building 135 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-135-2 Size: 2 ½” Affected Area: Building 135

O&M Procedure VA Project # 556-24-108

Addendum April 2025 31

Building 139

Steam Valve Assembly Tag Number: DBB-HP-139-1 Size: 1 ¼” Affected Area: Building 139 (located in BLDG 36) Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-MP-139-2 Size: 1” Affected Area: Building 139

O&M Procedure VA Project # 556-24-108

Addendum April 2025 32

O&M Procedure VA Project # 556-24-108

Addendum April 2025 33

Building 188

Steam Valve Assembly Tag Number: DBB-HP-188-1 Size: 1 ½” Affected Area: Building 188 Down Stream Affected Area: N/A Note: None

Condensate Valve assembly Tag Number: DBB-PC-188-2 Size: 1” Affected Area: Building 188 Down Stream Affected Area: N/A Note: None

Steam Valve Assembly Tag Number: DBB-HP-188-3 Size: 6” Affected Area: Building 188 Down Stream Affected Area: N/A Note: Serves the steam chiller

Condensate Valve assembly Tag Number: DBB-PC-188-4 Size: 2” Affected Area: Building 188

Note: Serves the steam chiller

O&M Procedure VA Project # 556-24-108

Addendum April 2025 34

Building 1CC

Triangle Steam Valve Assembly Tag Number: DBB-HP-1CC-1 Size: 12” Affected Area: 1CC Triangle North Leg Down Stream Affected Area: Potentially 9, 4, 11, 46, 1, 48, 3, 187, 5, 36,139, 32, & 37 Note: None

Condensate Valve assembly Tag Number: DBB-PC-1CC-2 Size: 6” Affected Area: 1CC Triangle North Leg Down Stream Affected Area: Potentially 9, 4, 11, 46, 1, 48, 3, 187, 5, 36,139, 32, & 37 Note: None

Steam Valve Assembly Tag Number: DBB-HP-1CC-3 Size: 10” Affected Area: 1CC Triangle West Leg Down Stream Affected Area: 135, 66, 131, 132, 133, 133CA, 133EF, & 134 Note: None

Condensate Valve assembly Tag Number: DBB-PC-1CC-4 Size: 5” Affected Area: 1CC Triangle West Leg Down Stream Affected Area: 135, 66, 131, 132, 133, 133CA, 133EF, & 134

South Building 6 Steam Valve Assembly Tag Number: DBB-HP-1CC-8 Size: 5” Affected Area: 1CC South of BLDG 6 Down Stream Affected Area: 6, 4, 7, & 188 Note: None

Condensate Valve assembly Tag Number: DBB-PC-1CC-7 Size: 10” Affected Area: 1CC South of BLDG 6 Down Stream Affected Area: 16, 4, 7, & 188

In Building 5 Steam Valve Assembly Tag Number: DBB-HP-1CC-6 Size: 6” Affected Area: 1CC East of BLDG 5 Down Stream Affected Area:

Note: None

Condensate Valve assembly Tag Number: DBB-PC-1CC-5 Size: 12” Affected Area: 1CC East of BLDG 5 Down Stream Affected Area:

ATTACHMENT 1

BUILDING 133CA - PIPE

BASEMENT ENTRANCE

BUILDING 132

BUILDING 188

BUILDING 06

BUILDING 07

BUILDING 11

BUILDING 46

BUILDING 01

BUILDING 03

BUILDING 187

BUILDING 09

BUILDING 131

BUILDING 134

BUILDING 133CA - SPS

BUILDING 133 -

MECH ROOM BA134

BUILDING 133 -

PENTHOUSE

BUILDING 133EF

BUILDING 133CA

(EXCLUDING MECH

ROOM BD130)

D B

B -H

P -1

C C

-1

D B

B -P

C -1

C C

-2

DBB-HP-1CC-3

DBB-PC-1CC-4

D B

B -P

C -1

-4

D B

B -H

P -1

-3

D B

B -P

C -1

-2

D B

B -H

P -1

-1

D B

B -H

P -0

7-

D B

B -P

C -0

7-

DBB-PC-06-2DBB-HP-06-1

DBB-HP-04-2

DBB-

HP-01-1

DBB-PC-01-2

DBB-PC-03-2

DBB-HP-03-1

DBB-HP-48-1

DBB-PC-48-2

DBB-PC-09-2

DBB-HP-09-1

DBB-PC-66-4

DBB-HP-66-3

DBB-135-1

DBB-135-2

DBB-132-2

DBB-132-1

DBB-131-1

DBB-131-2

D B

B -H

P -3

6-

DBB-PC-36-2 DBB-HP-139-1

DBB-HP-11-1

DBB-PC-11-2

DBB-HP-46-2

DBB-PC-46-3

DBB-PC-133-4DBB-HP-133-3

DBB-HP-133-1DBB-HP-133EF-2

DBB-HP-133EF-3

DBB-PC-133EF-4

DBB-

PC-133CA-3

DBB-HP-133CA-1

DBB-PC-134-2

DBB-HP-134-1

DBB-HP-133CA-2

EXISTING DBB

EXISTING DBB DBB-PC-1CC-6

DBB-HP-05-1

COGEN PLANT

DBB-HP-133-EF-1

EXISTING DBB

EXISTING DBB

EXISTING DBB EXISTING DBB

BUILDING 66

BUILDING 135

BUILDING 05

BUILDING 04

DBB-HP-04-1

D B

B -P

C -0

4-

DBB-PC-04-3

DBB-PC-04-5

(E)

CONDENSATE

PUMPS

BUILDING 32

DBB-HP-32-1

DBB-PC-32-2

DBB-LP-37-1

BUILDING 37BUILDING 36

BUILDING 139

BUILDING 48

DBB-HP-46-1

DBB-PC-11-46-2

DBB-HP-11-46-1

DBB-LP-187-1

DBB-MP-139-2

DBB-PC-133-2

MECH ROOM

BD130

CONDENSATE

FROM

BUILDING 04

DBB-PC-133CA-4

DBB-HP-1CC-7

DBB-PC-1CC-8

DBB-HP-1CC-5

DBB-HP-66-1

DBB-PC-66-2

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :

NE Certificate Of Authorization Number: CA-1620

04/29/2025

A u to d e s k D o c s /2

.0

V A

L o v e ll D o u b le

B lo c k a n d

B le e d

V a lv e s /5

-2

-1

.B u ild in g

.E

R

.r v t

/2

/2

:3

:3

A

M

M601

SITE STEAM DISTRIBUTION DIAGRAM Double Block & Bleed Valves

3001 Green Bay Rd, N.Chicago, IL 60064

556-24-108

04/29/2025 AJA PHD

23022.009

Revisions: Date:

G R

E E

N B

A Y

R D

CAVIN DR

BUCKLEY RD

BUCKLEY RD

RETENTION POND

MEDAL OF HONOR DR

MEDAL OF HONOR DR

M E

D A

L O

F H

O N

O R

D R

M

EDAL OF HONOR DR

M E

D A

L O

F H

O N

O R

D R

H

IL

L D

R

M E

D A

L O

F H

O N

O R

D R

T R

U E

M P

E R

D R

KRYZOWSKI DR

TRUEMPER DR

WEBER DR

W E

B E

R D

R

H

IL

L D

R

HILL DR

KRYZOW

SKI D

R

M E

D A

L O

F H

O N

O R

D R

M E

D A

L O

F H

O N

O R

D R

T R

U E

M P

E R

D R

H

IL

L D

R

183184

165A

162A

185A

182A

34 33

205206

12 59

133CA

133CA

133CA

133CA

133EF

B03 - M100

B03 - M100

B04 - M100

B04 - MD100

B05 - M100

B05 - M100

B06 - M100

B06 - MD100

B07 - M100

B07 - M100

B09 - M100

B09 - M100

B11 - M100

B11 - M100

1 B32 - M100

B32 - M100

B37 - M100

B37 - M100

B36 - M100

B36 - M100

B48 - M100

B48 - M100

B11/B46 -

MS100

B11/B46 -

MSD100

B131/132 - M100

B131/132 -

MD100

B133/133CA -

MD000

B133/133CA -

MD100

B135 - M001

B135 - M001

B139 - M100

B139 - M100

B187 - M100

B187 - M100

B188 - M101

B188 - MD101

B133/133CA -

M001

B133/133CA -

M100

COGEN PLANT

B01 - M101

B01 - M101

DBB-PC-32-2

DBB-HP-32-1

DBB-

LP-37-1

DBB-HP-139-1

DBB-PC-36-2

DBB-HP-36-1

DBB-MP-139-2

DBB-

PC-07-2

DBB-HP-07-1

DBB-HP-06-1

DBB-PC-06-2

DBB-PC-04-3

DBB-PC-04-5

DBB-PC-04-4

FROM PUMPS

TO PUMPS

DBB-HP-04-2

FROM

BUILDING

DBB-04-1

DBB-HP-11-1

DBB-PC-11-2

DBB-

HP-46

-1

DBB-PC-46-3 DBB-HP-46-2

DBB-HP-11-46-1

DBB-PC-11-46-2

EXISTING

DBB VALVES

EXISTING

DBB VALVES

EXISTING

DBB VALVES

DBB-HP-01-1

DBB-PC-01-2

DBB-HP-09-1DBB-

PC-09

-2

DBB-

LP-187-1

DBB-HP-03-1

DBB-PC-03-2

DBB-PC-48-2

DBB-HP-48-1

DBB-HP-05-01

DBB-

PC-1CC-6

DBB-PC-135-2

DBB-

HP-135-1

DBB-

PC-132-2

DBB-

HP-132-1

DBB-

HP-131-1

DBB-PC-131-2

DBB-HP-66-1

DBB-PC-66-2

DBB-PC-188-4

DBB-HP-188-3

DBB-PC-188-2

DBB-HP-188-1

DBB-HP-1CC-3

DBB-PC-1CC-4

DBB-HP-1CC-1

DBB-PC-1CC-2

DBB-HP-134-1

DBB-PC-134-2

DBB-PC-133-

CA-4

DBB-PC-133-CA-3

DBB-HP-133-CA-2

DBB-HP-133-CA-1

DBB-HP-133-

EF-2

DBB-PC-133-2

DBB-PC-133-4

DBB-HP-133-3

DBB-HP-133-1

DBB-HP-133-EF-3

DBB-PC-133-EF-34

EXISTING

MANHOLE

DBB-PC-1CC-8

DBB-PC-1CC-7

DBB-

HP-1CC-5

DBB-HP-66-3

DBB-PC-66-4

DBB-

HP-133-EF-1

EXISTING

MANHOLE

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :

NE Certificate Of Authorization Number: CA-1620

04/29/2025

A u to d e s k D o c s /2

.0

V A

L o v e ll D o u b le

B lo c k a n d

B le e d

V a lv e s /5

-2

-1

.B u ild in g

.E

R

.r v t

/2

/2

:2

:1

A

M

MS100

SITE PLAN - CAMPUS DISTRIBUTION Double Block & Bleed Valves

3001 Green Bay Rd, N.Chicago, IL 60064

556-24-108

04/29/2025 AJA PHD

23022.009

1" = 100'-0"

SITE PLAN

N 100 100 200

1" = 100'-0"

FEETSCALE

SITE PLAN SYMBOL LEGEND

STEAM SUPPLY

CONDENSATE RETURN

1. CONTRACTOR TO NOTIFY VA COR IMMEDIATELY OF ANY ABESTOS

OR ABESTOS CONTAINING MATERIALS THEY ENCOUNTER DURING

CONSTRUCTION.

2. THERE IS A MEMORANDUM DATED JUNE 12, 2024 WITH THE

SUBJECT "ASBESTOS OPERATION AND MAINTENANCE INSPECTION

SUMMARY" AVAILABLE FROM THE VA ON CAMPUS ABESTOS

SURVEY FINDINGS.

ASBESTOS ENCOUNTERS

EXISTING ISOLATION

VALVE

NEW DOUBLE BLOCK

AND BLEED VALVE TAG

DBB-##-##

EXISTING CHECK

VALVE

NEW DOUBLE BLOCK

AND BLEED VALVE

NOTE: STEAM DISTRIBUTION SHOWN ON SITE PLAN IS DIAGRAMMATIC

IN NATURE AND INTENDED TO SHOW HOW BUILDINGS ARE

CONNECTED THROUGHOUT OVERALL SYSTEM. REFER TO INDIVIDUAL

BUILDING DRAWINGS FOR EXACT LOCATIONS OF VALVES AND OTHER

RELEVANT EQUIPMENT.

# CAMPUS BUILDING

UTILITY / TRANSFORMER /

GENERATOR

Revisions: Date:

ATTACHMENT 2

PRESSURE GAUGE WITH

SYPHON (TYP. x2)

OS&Y GATE VALVE (TYP. x2)

BLEED VALVE OUTLET

PIPING WITH PLUG

NOTES:

1. SEE EXISTING AND NEW MECHANICAL PLANS FOR STEAM AND CONDENSATE PIPING SIZES SERVING RESPECTIVE BUILDINGS.

2. REFER TO VALVE MANUFACTURER'S OPERATION AND MAINTENANCE MANUAL PRIOR TO INSTALLATION.

BYPASS AND GLOBE

VALVE FOR WARMUP

GLOBE VALVE

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

95% DESIGN

DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

25% Schematic Design 08-27-2024 www.specializedeng.com SES Project :

NE Certificate Of Authorization Number: CA-1620

50% Design Development 10-02-2024

75% Design Development 11-07-2024

95% Design Development 02-05-2025

A u to d e s k D o c s /2

.0

V A

L o v e ll D o u b le

B lo c k a n d

B le e d

V a lv e s /5

-2

-1

.B u ild in g

.E

R

.r v t

/5

/2

:3

:2

P M

M600

MECHANICAL DETAILS AND

SCHEDULES

Double Block & Bleed Valves

3001 Green Bay Rd, N.Chicago, IL 60064

556-24-108

02/05/2025 AJA PHD

23022.009

NO SCALE

STEAM AND CONDENSATE DOUBLE BLOCK AND BLEED VALVE

VALVE TAG BUILDING SERVED STEAM PIPE SIZE STEAM BLEED VALVE SIZE CONDENSATE PIPE SIZE CONDENSATE BLEED VALVE SIZE

DBB-HP-1CC-1 1CC - CAMPUS STEAM DISTRIBUTION 12" 2" - -

DBB-HP-1CC-2 - - 4" 1-1/2"

DBB-HP-1CC-3

DBB-HP-1CC-4

DBB-HP-01-1

DBB-PC-01-2

DBB-HP-03-1

DBB-PC-03-2

DBB-HP-04-1

DBB-HP-04-2

DBB-PC-04-3

DBB-PC-04-4

DBB-PC-04-5

DBB-HP-1CC-5

DBB-HP-1CC-6

DBB-HP-06-1

DBB-PC-06-2

DBB-HP-07-1

DBB-PC-07-2

DBB-HP-09-1

DBB-PC-09-2

DBB-HP-11-1

DBB-PC-11-2

DBB-11-46-1

DBB-11-46-2

DOUBLE BLOCK AND BLEED VALVE SCHEDULE - DEVICE LISTINGS

DBB-HP-32-1

DBB-PC-32-2

DBB-HP-36-1

DBB-PC-36-2

DBB-LP-37-1

DBB-PC-46-3

DBB-HP-48-1

DBB-PC-48-2

DBB-HP-66-1

DBB-PC-66-2

DBB-HP-131-1

DBB-HP-132-1

DBB-PC-131-2

DBB-PC-132-2

DBB-HP-133-EF-1

DBB-HP-133CA-1

DBB-HP-133CA-2

DBB-PC-133CA-3

DBB-PC-133CA-4

DBB-HP-133-1

DBB-HP-133-3

DBB-PC-133-4

DBB-HP-133-EF-2

DBB-HP-133-EF-3

DBB-PC-133-EF-4

DBB-HP-134-1

DBB-PC-134-2

BUILDING 01

BUILDING 01

BUILDING 03 & 187

BUILDING 03 & 187

BUILDING 04

BUILDING 04

BUILDING 04

BUILDING 04

BUILDING 04

BUILDING 06

BUILDING 06

BUILDING 07

BUILDING 07

BUILDING 09

BUILDING 09

BUILDING 11

BUILDING 11

BUILDING 11 & 46

BUILDING 11 & 46

BUILDING 32

BUILDING 32

BUILDING 36

BUILDING 36

BUILDING 37

BUILDING 46

BUILDING 48

BUILDING 48

BUILDING 66

BUILDING 66

BUILDING 131

BUILDING 131

BUILDING 133CA & 133EF

BUILDING 133CA - SPS

BUILDING 133

DBB-HP-135-1

DBB-PC-135-2

DBB-HP-139-1

DBB-139-2

DBB-LP-187-1

DBB-188-1

DBB-188-2

DBB-188-3

DBB-188-4

BUILDING 132

BUILDING 132

BUILDING 133CA - MECHANICAL EQUIPMENT

BUILDING 133CA - NOT INCLUDNG MECH ROOM BD130 AND SPS

BUILDING 133CA - MECH ROOM BD130

BUILDING 133 - PENTHOUSE

BUILDING 133 - PENTHOUSE

BUILDING 133EF

BUILDING 133EF

BUILDING 133EF

BUILDING 134

BUILDING 134

BUILDING 135

BUILDING 135

BUILDING 139

BUILDING 139

BUILDING 187

BUILDING 187BUILDING 188

BUILDING 188

BUILDING 188

BUILDING 188

10" 2"

5" 1-1/2"

5" 1-1/2"

2" 1-1/2"

1" 1"

3" 1-1/2"

2" 1-1/2"

3" 1-1/2"

3" 1-1/2"

6" 2"

2" 1-1/2"

4" 1-1/2"

4" 1-1/2"

4" 1-1/2"

6" 2"

12" 2"

5" 1-1/2"

2-1/2" 1-1/2"

4" 1-1/2"

1-1/2"2"

2-1/2" 1-1/2"

2" 1-1/2"

2" 1-1/2"

1-1/4" 1-1/2"

4" 1-1/2"

1-1/2"2"

1-1/2"2"

2-1/2" 1-1/2"

2-1/2" 1-1/2"

2-1/2" 1-1/2"

3" 1-1/2"

1-1/2" 1-1/2"

2" 1-1/2"

6" 2"

3" 1-1/2"

6" 2"

2" 1-1/2"

5" 1-1/2"

8" 2"

3" 1-1/2"

2" 1-1/2"

4" 1-1/2"

1-1/2"2"

4" 1-1/2"

6" 2"

6" 2"

5" 1-1/2"

1-1/2"4"

1-1/2"3"

4" 1-1/2"

1-1/2"2-1/2"

1-1/4" 1-1/4"

1" 1"

1-1/2" 1-1/2"

1" 1-1/2"

6" 2"

1-1/2"2"

1-1/4" 1-1/4"

DBB-HP-46-1 BUILDING 46 3" 1-1/2" - -

8" 2"

DBB-PC-133-2 BUILDING 133 AND 133EF - CONDENSATE PUMPING STATION 4" 1-1/2"- -

Revisions: Date:

VALVE LOCATION

1CC - BELOW TRAMWAY

1CC - BELOW TRAMWAY

1CC - BELOW TRAMWAY

1CC - BELOW TRAMWAY

1CC - CAMPUS STEAM DISTRIBUTION

1CC - CAMPUS STEAM DISTRIBUTION

1CC - CAMPUS STEAM DISTRIBUTION

BELOW TRAMWAY - SOUTH OF BUILDING 01 MAIN ENTRANCE

BELOW TRAMWAY - SOUTH OF BUILDING 01 MAIN ENTRANCE

UNEXCAVATED BASEMENT IN BUILDING 03

UNEXCAVATED BASEMENT IN BUILDING 03

UNEXCAVATED BASEMENT IN BUILDING 03

BUILDING 04 - SERVICE ROOM 247

BUILDING 04 - SERVICE ROOM 247

BUILDING 04 - SERVICE ROOM 247

BELOW TRAMWAY - NEARBY BUILDING 04 NORTHWEST ENTRANCE

BELOW TRAMWAY - DIRECTLY SOUTH OF SERVICE ROOM 247

DBB-HP-05-1 BUILDING 05

BUILDING 05 - BASEMENT MECHANICAL ROOM 011CC - CAMPUS STEAM DISTRIBUTION

1CC - CAMPUS STEAM DISTRIBUTION

BUILDING 05 - BASEMENT MECHANICAL ROOM 01

BUILDING 05 - BASEMENT MECHANICAL ROOM 01

3" 1-1/2" - -

BELOW TRAMWAY - NEARBY BUILDING 06 SOUTH ENTRANCE

BELOW TRAMWAY - NEARBY BUILDING 06 SOUTH ENTRANCE

DBB-HP-1CC-7

DBB-HP-1CC-8

1CC - CAMPUS STEAM DISTRIBUTION

1CC - CAMPUS STEAM DISTRIBUTION BELOW TRAMWAY - SOUTH OF BUILDING 06 DBB VALVES

BELOW TRAMWAY - SOUTH OF BUILDING 06 DBB VALVES 10" 2"

5" 1-1/2"- -

BELOW TRAMWAY - NEARBY ACCESS HATCH IN CORRIDOR LEADING TO

B07 MECHANICAL ROOM

BELOW TRAMWAY - NEARBY ACCESS HATCH IN CORRIDOR LEADING TO

B07 MECHANICAL ROOM

BELOW TRAMWAY - EAST OF BUILDING 09 MAIN ENTRANCE

BELOW TRAMWAY - EAST OF BUILDING 09 MAIN ENTRANCE

BUILDING 11 - CRAWL SPACE 223

BUILDING 11 - CRAWL SPACE 223

DBB-HP-46-2 BUILDING 46 3" 1-1/2" - -

BELOW TRAMWAY - UNDERNEATH WALKWAY TO BUILDING 11

BELOW TRAMWAY - UNDERNEATH WALKWAY TO BUILDING 11

BUILDING 32 - MECHANICAL ROOM 11

BUILDING 32 - MECHANICAL ROOM 11

BUILDING 36 - MECHANICAL BASEMENT 209B

BUILDING 36 - MECHANICAL BASEMENT 209B

BUILDING 36 - MECHANICAL BASEMENT 209B

BUILDING 37 - RECEPTION 01

MANHOLE IN STREET EAST OF BUILDING 11

BUILDING 46 - SPRINKLER EQUIPMENT ROOM 003

BUILDING 46 - SPRINKLER EQUIPMENT ROOM 003

BUILDING 48 - CRAWLSPACE

BUILDING 48 - CRAWLSPACE

DBB-HP-66-3

DBB-PC-66-4

BUILDING 66

BUILDING 66 2" 1-1/2"

6" 2"

BELOW TRAMWAY - UNDERNEATH SPLIT TO B66, B135, AND HOSPITAL

BELOW TRAMWAY - UNDERNEATH SPLIT TO B66, B135, AND HOSPITAL

BELOW TRAMWAY - UNDERNEATH SPLIT TO B66, B135, AND HOSPITAL

BELOW TRAMWAY - UNDERNEATH SPLIT TO B66, B135, AND HOSPITAL

BELOW TRAMWAY - NEAR EXISTING PRV WEST OF BUILDING 66

BELOW TRAMWAY - NEAR EXISTING PRV WEST OF BUILDING 66

BELOW TRAMWAY - JUST DOWNSTREAM OF BUILDING 132 STEAM TAP

BELOW TRAMWAY - JUST DOWNSTREAM OF BUILDING 132 STEAM TAP

BUILDING 132 - MECHANICAL ROOM M01

BUILDING 132 - MECHANICAL ROOM M01

BUILDING 139 - SOUTHWEST CORNER OF BUILDING

1CC - BELOW TRAMWAY

1CC - BELOW TRAMWAY

1CC - BELOW TRAMWAY

1CC - BELOW TRAMWAY

PIPE BASEMENT - IN TUNNEL IMMEDIATELY AFTER PUMP ROOM

BUILDING 133CA - RECYCLING ROOM BD166A

BUILDING 133CA - RECYCLING ROOM BD166A

BUILDING 133CA - RECYCLING ROOM BD166A

BUILDING 133CA - RECYCLING ROOM BD166A

BUILDING 133CA - RECYCLING ROOM BD166A

BUILDING 133CA - IN PLENUM SPACE ABOVE CORRIDOR CB125

BUILDING 133CA - PIPE BASEMENT WEST OF MECH ROOM BA134

BUILDING 133CA - MECH ROOM BA134

BUILDING 133CA - PIPE BASEMENT NORTH OF MECH ROOM BA134

BUILDING 133CA - PIPE BASEMENT NORTH OF MECH ROOM BA134

BUILDING 133CA - PIPE BASEMENT USING STAIRWELL 132-4 FOR ACCESS

PIPE BASEMENT - UNDERNEATH CORRIDOR CB-136 (STAIRWELL 132-2)

PIPE BASEMENT - UNDERNEATH CORRIDOR CB-136 (STAIRWELL 132-2)

www.milwaukeevalve.com

The information presented on this sheet is correct at time of publication. Milwaukee Valve reserves the right to change design and/or materials without notice. For our Installation, Operation and Maintenance Manual and the most current product information go to www.milwaukeevalve.com. State of California Prop 65 WARNING: Cancer and Reproductive Harm. For more information visit www.p65warnings.ca.gov.

BI-58

Iron Gate Valve

125 SWP - 200 WOG †

Non-Rising Stem • Solid Wedge Disc Bolted Bonnet • Flanged Ends

Conforms to: MSS SP-70

F-2882-M 2”-12”

Flange shape and drilling to specification ASME B 16.1 (125 lb.) MATERIAL LIST No. PART MATERIAL SPECIFICATION

1 Handwheel Nut Steel ASTM A307

2 Name Plate Aluminum

3 Handwheel Cast Iron ASTM A126, Class B

4 Stem Brass ASTM B16

5 Gland Follower Nut Steel ASTM A307

6 Gland Follower Ductile Iron ASTM A536

7 Gland Follower Bolt Steel ASTM A307

8 Packing Gland Cast Bronze ASTM B62

9 Stuffing Box Cast Iron ASTM A126, Class B

10 Packing Graphite

11 Stuffing Box Gasket Graphite

12 Bonnet Cast Iron ASTM A126, Class B

13 Body Bolt Steel ASTM A307

14 Body Gasket Graphite

15 Body Nut Steel ASTM A307

16 Wedge Bushing Bronze ASTM B62

17 Seat Ring Bronze ASTM B62

18 Wedge Face Ring Bronze ASTM B62

19 Wedge Cast Iron ASTM A126, Class B

20 Body Cast Iron ASTM A126, Class B

Stuffing Box Nut (not shown)

Steel ASTM A307

Rev 11

DIMENSIONS - INCHES/MILLIMETERS

Units Size A B C D E Cv Inches mm 2 7.00

12.00

7.00

6.00

0.63 16 215

Inches mm

2 1/2 7.50

13.25

7.00

7.00

0.69 17 335

Inches mm

3 8.00

13.50

8.00

7.50

0.75 19 510

Inches mm

4 9.00

17.00

10.00

9.00

0.94 24 945

Inches mm

5 10.00

18.00

12.00

10.00

0.94 24 1525

Inches mm

6 10.50

22.00

12.00

11.00

1.00 25 2250

Inches mm

8 11.50

26.50

14.00

13.50

1.13 29 4150

Inches mm

10 13.00

30.00

16.00

16.00

1.19 30 6700

Inches mm

12 14.00

35.00

18.00

19.00

1.25 32 9925

Suffix M – Signifies “MILVACO” Series International Valves.

† Non-Shock

CAST IRON GATE, GLOBE AND CHECK VALVE

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION

1) Thoroughly clean and prepare the piping system before valve installation.

2) Remove the valve end caps if present and inspect the valve ports and seating surfaces for cleanliness just prior to installation.

3) Support the valve to prevent unnecessary stresses induced by connecting pipe.

4) Be sure the rating of the valve is compatible with the intended service conditions. Recommended aptitude is with the stem in the vertical position. Horizontal stem installations can present issues for larger valves, especially in reduced pressure service such as low pressure(5-35 psi) steam.

5) Bolt flange in line per recommendations of applicable ASME/ANSI standard, e.g., ASME/ANSI B16.1. Use full face gaskets.

6) Operate the valve from the full open to closed position.

7) Verify the tightness of the packing nut/gland after installation.

8) Recommended Gate and Globe Valve installation: Stem in the vertical position with operator on top.

NOTE 1: Check valves may be installed in both horizontal and vertical lines with upward flow or in any intermediary position, as long as the hinge pin on swing checks is horizontal. Make sure they are sufficiently distant from pump outlets or other turbulence including devices. See Technical Bulletin.

NOTE 2: Check valves may be shipped with internal packaging to prevent disc damage in transit.

Remove any packing material prior to installation.

OPERATION

1) Gate and globe valves are manually operated. To open, turn the handle in a counterclockwise direction. To close, turn the handle in a clockwise direction.

2) Check valves are automatic.

INSPECTION & MAINTENANCE

1) Periodic inspection and preventative maintenance is not required other than adjustment of stem packing, and cycling of the valve from open to closed position.

2) If a valve develops a packing leak, adjust the packing gland nut to increase the pressure on the stem packing. The packing nuts should be turned in a clockwise direction approximately 1/4 turn, or until the leakage stops. Do not repack under pressure.

3) Whenever a new stem is installed, the packing should be changed also.

REPAIR PARTS

Under normal conditions, repair parts are not required. Parts that may be considered recommended spare parts are as follows:

Gate Valves-Packing, Bonnet Gasket Globe Valves-Packing, Bonnet Gasket Check Valves-Disc Kit, Hanger Kit, or Repair Kit

When ordering parts provide the figure number of the valve, size, part needed and age of the valve.

Rev 0822

ATTACHMENT 3

Developed by Reviewed by Revised by

Revn: Date: Origin Date:

ID Source Device

LOCKOUT/TAGOUT PROCEDURE

OSHA CFR 1910.147

Equipment #: Description:

Isolation Points to be

Locked and Tagged

Building:

CheckLocation

Method

ALWAYS PERFORM A MACHINE STOP BEFORE LOCKING OUT DISCONNECTS

Area:

Any machine modifications must be shown in procedure. Contact safety department to update procedure.

Safety Is Your Responsibility!

OPENING A GUARD DOES NOT CONSTITUTE A LOCKOUT

NEXT AUDIT DUE

NOV 20__

NEXT AUDIT DUE

NOV 20__

NEXT AUDIT DUE

NOV 20__

NEXT AUDIT DUE

NOV 20__

866-773-7541

North Side View

Page 1 of 1 LOTO

ATTACHMENT 4

Activity Hazard Analysis (AHA) Activity/Work Task: Overall Risk Assessment Code (RAC) (Use highest code)

Project Location: Risk Assessment Code (RAC) Matrix

Contract Number:

Severity

Probability Date Prepared:

Date Updated:

Frequent Likely Occasional Seldom Unlikely

Prepared by (Name/Title):

Catastrophic E E H H M

Critical E H H M L

Reviewed by (Name/Title):

Reviewed by

Marginal H M M L L

Negligible M L L L L Notes: (Field Notes, Review Comments, etc.)

Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC (See above)

“Probability” is the likelihood to cause an incident, near miss, or accident and identified as: Frequent, Likely, Occasional, Seldom or Unlikely. RAC Chart

“Severity” is the outcome/degree if an incident, near miss, or accident did occur and identified as: Catastrophic, Critical, Marginal, or Negligible

E = Extremely High Risk H = High Risk

Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each “Hazard” on AHA. Annotate the overall highest RAC at the top of AHA.

M = Moderate Risk

L = Low Risk

Job Steps Hazards Controls RAC

Equipment to be Used Training Requirements/Competent or

Qualified Personnel name(s) Inspection Requirements

Appendix 10
Cover Page
1.10-O&M Procedure
Attachment 1 - PnID
M601 - SITE STEAM DISTRIBUTION DIAGRAM
M601 - SITE STEAM DISTRIBUTION DIAGRAM
M601 - SITE STEAM DISTRIBUTION DIAGRAM
M601 - SITE STEAM DISTRIBUTION DIAGRAM
MS100 - SITE PLAN - CAMPUS DISTRIBUTION
MS100 - SITE PLAN - CAMPUS DISTRIBUTION
MS100 - SITE PLAN - CAMPUS DISTRIBUTION
MS100 - SITE PLAN - CAMPUS DISTRIBUTION
Attachment 1

This is the start of the file's text. The full file is on GovTribe.