556-24-108 DBBV 100CD Drawings 29APR25.pdf
PDF 9 MB Posted
- Attached to
- Y1DA--556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction (VA-26-00035322)
- Solicitation number
- 36C25226B00350001
About this file
This document is a set of 100% construction documents for a federal contracting project at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves the design and installation of double block and bleed valves throughout the VA medical campus's steam supply and condensate return distribution system. The work is identified under VA Contract Number 36C252-23-D-0061 and Task Order Number 36C25224N0449, with a project number of 556-24-108.
The project scope encompasses the complete isolation and de-energization of steam supply and condensate return connections for approximately 30 buildings connected to the campus steam distribution system using newly installed double block and bleed valves. The construction documents detail mechanical plans, details, schedules, and site coordination information organized by individual building. The work is phased across five phases, with Phase 1 addressing buildings 03, 48, and 187; Phase 2 involving a campus-wide steam shutdown affecting buildings 1CC, 05, 06, 07, 131-135, 139, 187, and 188; Phase 3 covering the south steam loop buildings; Phase 4 addressing north loop buildings 01, 03, 04, 09, 11, 46, and 187; and Phase 5 completing remaining buildings 32, 36, 37, and 139. The documents include mechanical symbols and abbreviations, site plans showing the distribution network, detailed floor plans for each affected building, valve schedules identifying 75 distinct double block and bleed valve installations with specific pipe sizes and locations, and comprehensive phasing plan narratives requiring coordination with the VA Contracting Officer Representative for building shutdowns, temporary services, and ICRA compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:0
:2
P
M
G000
COVER SHEET Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
Captain James A. Lovell Federal Health Care Center (FHCC)
FACILITY NAME:
3001 GREEN BAY RD, NORTH
CHICAGO, IL 60064
SITE ADDRESS:
VA PROJECT NUMBER:
556-24-108
VICINITY MAP:
SITE MAP:
VA CONTRACT NUMBER:
36C252-23-D-0061
VA TASK ORDER NUMBER:
36C25224N0449
Work includes enable complete and compliant isolation and de-energization of each building’s steam supply and condensate return connections with the campus distribution system using double block and bleed valves planned and installed in this project.
Double Block & Bleed Valves
PROJECT NAME:
BASE BID:
Sheet
Number Sheet Name
General
G000 COVER SHEET
Mechanical
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MS100 SITE PLAN - CAMPUS DISTRIBUTION
MS101 SITE PLAN - PHASING
B1CC - MD100 FIRST FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B1CC - M100 FIRST FLOOR PLAN - OVERALL - MECHANICAL
B01 - M101 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
B03/187 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B04 - MD100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B04 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B05 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B06 - MD100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B06 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B07 - MD100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B07 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B09 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B11 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B11/B46 - MSD100 SITE PLAN - OVERALL - MECHANICAL - DEMOLITION
B11/B46 - MS100 SITE PLAN - OVERALL - MECHANICAL
B32 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B36 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B37 - M100 FIRST FLOOR PLAN - OVERALL - MECHANICAL
B46 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B48 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B66 - MD100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B66 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B131/132 - MD100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B131/132 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B133/B133CA/133EF/134 - MD000 CRAWL SPACE PLAN - OVERALL - MECHANICAL - DEMOLITION B133/B133CA/133EF/134 - MD001 CRAWL SPACE ENLARGED PLAN - MECHANICAL - DEMOLITION B133/B133CA/133EF/134 - MD100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B133/B133CA/133EF/134 - M000 CRAWL SPACE PLAN - OVERALL - MECHANICAL
B133/B133CA/133EF/134 - M001 CRAWL SPACE ENLARGED PLAN - MECHANICAL
B133/B133CA/133EF/134 - M100 BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B135 - M001 PIPE BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
B139 - M100 FIRST FLOOR PLAN - OVERALL - MECHANICAL
B187 - M100 FIRST FLOOR PLAN - OVERALL - MECHANICAL
B188 - MD101 FIRST FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
B188 - M101 FIRST FLOOR PLAN - OVERALL - MECHANICAL
M600 MECHANICAL DETAILS AND SCHEDULES
M601 SITE STEAM DISTRIBUTION DIAGRAM
M602 PHASING PLAN NARRATIVE
Revisions: Date:
VHANCHLidD Typewritten Text (A/E)
VHANCHLidD Typewritten Text (A/E)
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION ABBREVIATION DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
GPM GALLONS PER MINUTE
TOS TOP OF STEEL
BOB BOTTOM OF BEAM
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
UNION
Y STRAINER WITH BLOWDOWN
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
GENERAL MECHANICAL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW WORK TO
EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.
SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
CONTINUATION
FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.
SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.
PLUMBING SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
AIR VENT
AUTOMATIC FLOW CONTROL VALVE
# INDICATES FLOW TO BE BALANCED IN GPM
BACKFLOW PREVENTER
CALIBRATED BALANCING VALVE
VALVE - THROTTLING SERVICE
VALVE - SHUTOFF SERVICE
P/T PORT
PIPE CAP
PIPE CONTINUATION
PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
PRESSURE REDUCING VALVE
PUMP
RELIEF VALVE
S SENSOR
SUCTION DIFFUSER
THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
VACUUM BREAKER
Y STRAINER
STEAM TRAP
CC CONTROLS CONTRACTOR
PIPING
- SINGLE DASH INDICATES DOMESTIC COLD WATER
- DOUBLE DASH INDICATES DOMESTIC HOT WATER
- TRIPLE DASH INDICATES HOT WATER
CIRCULATING
- SOLID INDICATES SANITARY ABOVE FLOOR
- CONTINUOUS DASHED INDICATES VENT
- LONG DASHED LINES INDICATE SANITARY BELOW
FLOOR
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
ABBREVIATION
PLUMBING ABBREVIATIONS
DESCRIPTION
CHEMICAL VENTCV
CHEMICAL WASTECW
BOTTLE/GLASS FILLERBF
ABBREVIATION DESCRIPTION
DOMESTIC HOT WATERDHW
DOMESTIC HOT WATER CIRCULATIONDHWC
LAVATORYL
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BACK FLOW PREVENTERBFP
BATH TUBBT
COMPRESSED AIR (NON-MEDICAL)CA
PROPANELPG
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
CONDENSATE DRAINCD
CLEANOUTCO
CONDENSATE PUMPCP
MOP SINKMS
NORMALLY CLOSEDNC
NORMALLY OPENNO
CLINICAL SINKCS
DOMESTIC COLD WATERDCW
DRINKING FOUNTAINDF
NON-POTABLE WATERNPW
POST INDICATOR VALVEPIV
PRESSURE REDUCING VALVEPRVDOUBLE GRADE CLEANOUTDGCO
DEIONIZED WATERDI
DEIONIZED WATER CIRCULATINGDIC
ROOF DRAINRD
REVERSE OSMOSIS WATERRO
DEIONIZED HOT WATERDIH
RPZ
S
REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)
SINK
DEIONIZED HOT WATER CIRCULATINGDIHC
DISTILLED WATERDIS
DISTILLED WATER CIRCULATINGDISC
SANITARY SEWERSAN
DOMESTIC SOFT COLD WATERSCW
DOMESTIC SOFT HOT WATERSHW
DIALYSIS WATER RETURNDR
DIALYSIS WATER SUPPLYDS
DRAIN TILEDT
DOMESTIC SOFT HOT WATER CIRCULATINGSHWC
SEWAGE EJECTORSE
SHOWERSH
EMERGENCY EYE WASHEEW
EMERGENCY SHOWERES
EMERGENCY SHOWER AND EYE WASH COMBOESEW
STORM OVERFLOWSO
SUMP PUMPSP
SERVICE SINKSS
EXPANSION TANKET
ELECTRIC WATER COOLEREWC
ENTERING WATER TEMPERATUREEWT
STORM SEWERST
TEMPERATURETEMP
URINALUR
FILTERF
FLOOR CLEANOUTFCO
FLOOR DRAINFD
VENTV
VENT THROUGH ROOFVTR
FLOOR SINKFS
WB
WC
WALL BOX
WATER CLOSET
NATURAL GASG
WALL CLEANOUTWCO
GRADE CLEANOUTGCO
HUB DRAINHD
WATER HEATERWH
WATER SOFTENERWS
HORSEPOWERHP
WPD
YCO
WATER PRESSURE DROP
YARD CLEANOUTGREASE VENTGV
HOSE BIBHB
GREASE WASTEGW
DOWN SPOUT NOZZLEDSN
ABBREVIATION
HVAC ABBREVIATIONS
DESCRIPTION
AIR BLENDERAB
AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC
AIR HANDLING UNITAHU
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BOILER FEED UNITBFU
BOILERBLR
CONSTANT AIR VOLUME BOXCAV
COOLING COILCC
CONDENSATE DRAINCD
CUBIC FEET PER MINUTECFM
CHILLERCH
CONDENSATE PUMPCP
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
COOLING TOWERCT
CONDENSING UNITCU
CABINET UNIT HEATERCUH
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
DIFFUSERD
DUAL DUCTDD
DIRECT EXPANSIONDX
EXHAUST AIREA
ENTERING AIR TEMPERATUREEAT
EXHAUST FANEF
EFFICIENCYEFF
ENERGY RECOVERY COILERC
ENERGY RECOVERY WHEELERW
EXPANSION TANKET
ENTERING WATER TEMPERATUREEWT
FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB
FAN COIL UNITFCU
FLOW MEASURING STATIONFMS
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
FUEL OIL VENTFOV
FIRE DAMPERFRD
FIRE SMOKE DAMPERFSD
FINNED TUBE RADIATORFTR
GRILLEG
GLYCOL CHILLED WATER RETURNGCWR
GLYCOL CHILLED WATER SUPPLYGCWS
GRAVITY EXHAUSTGE
GLYCOL HEATING HOT WATER RETURNGHWR
GLYCOL HEATING HOT WATER SUPPLYGHWS
GRAVITY INTAKEGI
HEATING COILHC
ABBREVIATION DESCRIPTION
HORSEPOWERHP
HIGH PRESSURE STEAM CONDENSATEHPC
HIGH PRESSURE STEAM SUPPLY (60 PSIG AND ABOVE)HPS
HEAT RECOVERY CHILLERHRC
HUMIDIFIERHUM
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
LOW PRESSURE STEAM CONDENSATELPC
LOW PRESSURE STEAM SUPPLY (0-15 PSIG)LPS
LOUVERLV
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
MANUAL DAMPERMD
MOTOR OPERATED DAMPERMOD
MEDIUM PRESSURE STEAM CONDENSATEMPC
MEDIUM PRESSURE STEAM SUPPLY (16-59 PSIG)MPS
NORMALLY CLOSED, NOISE CRITERIANC
NORMALLY OPEN, NUMBERNO
OUTDOOR AIROA
PUMPP
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVEPRV
PUMPED STEAM CONDENSATEPSC
REGISTERR
RETURN AIRRA
RELIEF AIRREA
REFRIGERANT DX LIQUIDREFL
REFRIGERANT DX SUCTION GASREFS
RETURN FANRF
RELATIVE HUMIDITYRH
ROOF TOP UNITRTU
SUPPLY AIRSA
SMOKE DAMPERSD
SUPPLY FANSF
STATIC PRESSURESP
STEAMSTM
TEMPERATURETEMP
TRANSFERTR
UNIT HEATERUH
VARIABLE AIR VOLUME BOXVAV
VENT THROUGH ROOFVTR
WET BULB TEMPERATUREWB
WATER COLUMNWC
WATER PRESSURE DROPWPD
WATER SOURCE HEAT PUMP RETURNWSHPR
WATER SOURCE HEAT PUMP SUPPLYWSHPS
CONTRACTOR REQUIREMENTS FOR THE
DEMOLITION OF, OR ADDITION TO, ANY PORTION
OF AIR OR HYDRONIC SYSTEMS.
COVER SHEET NOTES:
THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED
TO HVAC, EQUIPMENT, HYDRONICS, COILS AND FILTERS.
1. AIR QUALITY, QUANTITY AND PRESSURE RELATIONSHIPS SHALL COMPLY WITH THE LATEST, ANSI/ASHRAE/ASHE STANDARD 170
REQUIREMENTS.
2. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.
3. MAINTAIN EXISTING AIR QUALITY REQUIREMENTS, AIR PRESSURIZATION AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS
DURING ANY RENOVATION OR CONSTRUCTION.
4. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.
5. TAKE AIR AND OR/ WATER BALANCE READINGS OF THE SYSTEMS BEING AFFECTED.
6. IF THERE ARE SPACES BEING SERVED OUTSIDE OF THE DEMOLITION OR ADDITION AREA, THE FOLLOWING PROCEDURES MUST BE TAKEN:
a. TAKE AIR AND/OR WATER BALANCE READINGS AS NEEDED TO QUANTIFY THE AIR AND/OR WATER FLOWS DELIVERED TO THE
SYSTEMS OUTSIDE THE AFFECTED AREA.
b. DURING DEMOLITION, TAKE ALL NECESSARY MEASURES TO MAINTAIN THE CORRECT AIR AND/OR WATER FLOWS TO THE SYSTEMS
THAT ARE REMAINING.
c. AFTER THE COMPLETION OF DEMOLITION, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.
d. AFTER COMPLETING ANY ADDITIONS TO THE SYSTEM, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.
7. THE CONTRACTOR IS TO PROVIDE TEMPORARY AIR/AND OR WATER SYSTEMS AS NEEDED TO MAINTAIN PROPER TEMPERATURE AND
PRESSURE RELATIONSHIPS OF SPACES REQUIRED TO BE OCCUPIED DURING CONSTRUCTION.
8. ALL TEMPORARY AIR SUPPLY SYSTEMS MUST UTILIZE FINAL FILTERS THAT ARE A MINIMUM OF 90% EFFICIENT (MERV 14). FINAL FILTERS
MUST BE DOWNSTREAM OF ALL AIR SUPPLY COMPONENTS.
MECHANICAL GENERAL NOTES:
A. THESE NOTES APPLY TO ALL SHEETS CONTAINING PIPING WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE
PRECEDENCE OVER THE DRAWINGS.
B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL, INCLUDING EXISTING LIGHTING CONDITIONS.
BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL EXISTING PIPING. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR
SHALL NOTIFY ENGINEER.
C. IT IS MANDATORY THAT THE EXISTING BUILDING SHUTDOWN BE COORDINATED WITH THE VA COR PRIOR TO MODIFICATIONS OF THE EXISTING BUILDINGS' RESPECTIVE STEAM SYSTEMS. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT. TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED TESTING.
D. REFER TO CONSTRUCTION SEQUENCE SHOWN ON SHEET MS100 FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF
THE OWNER.
E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND
REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.
F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR
WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:
a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE
MAIN WITH MATERIAL TO MATCH EXISTING.
b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS
CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED
c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR SURROUNDING AREAS THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE
REMODELED AREA.
d. REMOVE UNUSED OR ABANDONED HANGERS AND PATCH ABANDONED PENETRATIONS TO MATCH EXISTING.
e. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY REMOVED PIPING OR DUCTWORK SHALL BE PATCHED
TO MATCH EXISTING CONSTRUCTION.
f. RE-SUPPORT ANY PIPING AND DUCTWORK THAT WAS SUPPORTED FROM BUILDING ELEMENTS REMOVED AS PART OF THE WORK.
g. MAINTAIN CONTROL WIRING OR PNEUMATIC TUBING REQUIRED FOR THE CONTINUED PROPER OPERATION OF THE BUILDING
AUTOMATION SYSTEM.
G. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE
ITEMS, REMOVING CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.
H. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT
LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING
REMOVED AND/OR REPLACED, ETC.
I. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
J. PROVIDE ACCESS DOORS IN DUCTWORK AND/OR ARCHITECTURAL ELEMENTS WHERE REQUIRED TO ACCESS ALL EQUIPMENT REQUIRING MAINTENANCE AND ADJUSTMENT. THIS EQUIPMENT INCLUDES BUT IS NOT LIMITED TO SENSORS, DAMPERS, ACTUATORS, CONTROL DEVICES, VALVES, ETC. ACCESS DOORS SHALL BE SIZED TO PROVIDE APPROPRIATE ACCESS BASED ON HEIGHT OF ACCESS REQUIRED AND ACTIVITY.
INSTALL SUCH THAT ACCESS DOOR IS FULLY OPERABLE WITHOUT THE REMOVAL OF ARCHITECTURAL ELEMENTS SUCH AS CEILING RUNNERS, SUPPORTS, ETC. INSTALL IN A LOCATION SUCH THAT STEPPING OR LEANING OVER PERMANENT EQUIPMENT OR FURNITURE IS NOT REQUIRED.
WHERE ACCESS DOORS ARE REQUIRED IN ARCHITECTURAL ELEMENTS THAT PROVIDE A FIRE AND/OR SMOKE RATING, ACCESS DOOR SHALL
MAINTAIN THE REQUIRED RATING.
K. SEAL ALL WALL PENETRATIONS (PIPING, CONTROLS, CONDUITS, ETC.) WITH NON-COMBUSTIBLE MATERIAL. SEAL PENETRATIONS INTO ROOMS THAT REQUIRE PRESSURE CONTROL OR SOUND ISOLATION WITH NON-COMBUSTIBLE MATERIAL AND CAULK.
L. PIPING SHALL NOT BE ROUTED OVER ELECTRICAL AND TELECOM ROOMS. WHERE ROUTING OVER SUCH ROOMS IS UNAVOIDABLE, CONTRACTOR SHALL COORDINATE WITH OWNER, DESIGN TEAM, AHJ, AND OTHER TRADES REGARDING LOCATION OF PANELS AND UTILITY ROUTING AND SHALL PROVIDE DRIP PANS UNDER ALL UTILITIES WITH MOISTURE SENSORS OR DRAIN PIPING AS REQUIRED BY THE SPECIFICATIONS.
M. REMOVAL AND REINSTALLATION OF CEILINGS REQUIRED FOR THE COMPLETION OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED CEILING COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.
N. SUPPORT ALL PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING.
DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR
REMOVAL FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR MAINTENANCE.
O. PROVIDE CONSTRUCTION FILTERS ON AIR MOVING EQUIPMENT SERVING THE CONSTRUCTION AREA AS WELL AS ALL RETURN/EXHAUST DUCT PENETRATIONS COMING FROM THE CONSTRUCTION AREA. AT THE COMPLETION OF WORK, REMOVE ALL TEMPORARY AND CONSTRUCTION
FILTERS AND PROVIDE NEW FILTERS FOR ALL AIR MOVING EQUIPMENT.
P. PROTECT ALL PIPING DURING CONSTRUCTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. AT A MINIMUM, DUCTWORK AND PIPING ENDS SHALL BE COVERED AND SEALED TO PREVENT THE COLLECTION OF DUST AND DEBRIS. CLEAN ALL INTERIOR SURFACES PRIOR TO INSTALLATION AND PROTECT ONCE INSTALLED. MEDICAL GAS PIPING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA 99 REQUIREMENTS.
Q. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK. ON EXISTING EQUIPMENT, COORDINATE WORK
WITH OWNER.
R. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING AND EQUIPMENT INSTALLATIONS
WHETHER OR NOT SPECIFICALLY NOTED.
S. FOR ALL PIPING, CONDUIT, AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. CONSULT WITH VA FOR EXISTING ARCHITECTURAL DRAWINGS OF RESPECTIVE BUILDINGS SHOWING LOCATIONS OF FIRE RATED
WALLS.
T. REMOVAL AND REINSTALLATION OF PIPING INSULATION REQUIRED FOR THE COMPLETION OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL REPAIR OR REPLACE ALL PIPE INSULATION COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:1
:4
A
M
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONS
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
Revisions: Date:
G R
E E
N B
A Y
R D
CAVIN DR
BUCKLEY RD
BUCKLEY RD
RETENTION POND
MEDAL OF HONOR DR
MEDAL OF HONOR DR
M E
D A
L O
F H
O N
O R
D R
M
EDAL OF HONOR DR
M E
D A
L O
F H
O N
O R
D R
H
IL
L D
R
M E
D A
L O
F H
O N
O R
D R
T R
U E
M P
E R
D R
KRYZOWSKI DR
TRUEMPER DR
WEBER DR
W E
B E
R D
R
H
IL
L D
R
HILL DR
KRYZOW
SKI D
R
M E
D A
L O
F H
O N
O R
D R
M E
D A
L O
F H
O N
O R
D R
T R
U E
M P
E R
D R
H
IL
L D
R
183184
165A
162A
185A
182A
34 33
205206
12 59
133CA
133CA
133CA
133CA
133EF
B03 - M100
B03 - M100
B04 - M100
B04 - MD100
B05 - M100
B05 - M100
B06 - M100
B06 - MD100
B07 - M100
B07 - M100
B09 - M100
B09 - M100
B11 - M100
B11 - M100
1 B32 - M100
B32 - M100
B37 - M100
B37 - M100
B36 - M100
B36 - M100
B48 - M100
B48 - M100
B11/B46 -
MS100
B11/B46 -
MSD100
B131/132 - M100
B131/132 -
MD100
B133/133CA -
MD000
B133/133CA -
MD100
B135 - M001
B135 - M001
B139 - M100
B139 - M100
B187 - M100
B187 - M100
B188 - M101
B188 - MD101
B133/133CA -
M001
B133/133CA -
M100
COGEN PLANT
B01 - M101
B01 - M101
DBB-PC-32-2
DBB-HP-32-1
DBB-
LP-37-1
DBB-HP-139-1
DBB-PC-36-2
DBB-HP-36-1
DBB-MP-139-2
DBB-
PC-07-2
DBB-HP-07-1
DBB-HP-06-1
DBB-PC-06-2
DBB-PC-04-3
DBB-PC-04-5
DBB-PC-04-4
FROM PUMPS
TO PUMPS
DBB-HP-04-2
FROM
BUILDING
DBB-04-1
DBB-HP-11-1
DBB-PC-11-2
DBB-
HP-46
-1
DBB-PC-46-3 DBB-HP-46-2
DBB-HP-11-46-1
DBB-PC-11-46-2
EXISTING
DBB VALVES
EXISTING
DBB VALVES
EXISTING
DBB VALVES
DBB-HP-01-1
DBB-PC-01-2
DBB-HP-09-1DBB-
PC-09
-2
DBB-
LP-187-1
DBB-HP-03-1
DBB-PC-03-2
DBB-PC-48-2
DBB-HP-48-1
DBB-HP-05-01
DBB-
PC-1CC-6
DBB-PC-135-2
DBB-
HP-135-1
DBB-
PC-132-2
DBB-
HP-132-1
DBB-
HP-131-1
DBB-PC-131-2
DBB-HP-66-1
DBB-PC-66-2
DBB-PC-188-4
DBB-HP-188-3
DBB-PC-188-2
DBB-HP-188-1
DBB-HP-1CC-3
DBB-PC-1CC-4
DBB-HP-1CC-1
DBB-PC-1CC-2
DBB-HP-134-1
DBB-PC-134-2
DBB-PC-133-
CA-4
DBB-PC-133-CA-3
DBB-HP-133-CA-2
DBB-HP-133-CA-1
DBB-HP-133-
EF-2
DBB-PC-133-2
DBB-PC-133-4
DBB-HP-133-3
DBB-HP-133-1
DBB-HP-133-EF-3
DBB-PC-133-EF-34
EXISTING
MANHOLE
DBB-PC-1CC-8
DBB-PC-1CC-7
DBB-
HP-1CC-5
DBB-HP-66-3
DBB-PC-66-4
DBB-
HP-133-EF-1
EXISTING
MANHOLE
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:2
:1
A
M
MS100
SITE PLAN - CAMPUS DISTRIBUTION Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
1" = 100'-0"
SITE PLAN
N 100 100 200
1" = 100'-0"
FEETSCALE
SITE PLAN SYMBOL LEGEND
STEAM SUPPLY
CONDENSATE RETURN
1. CONTRACTOR TO NOTIFY VA COR IMMEDIATELY OF ANY ABESTOS
OR ABESTOS CONTAINING MATERIALS THEY ENCOUNTER DURING
CONSTRUCTION.
2. THERE IS A MEMORANDUM DATED JUNE 12, 2024 WITH THE
SUBJECT "ASBESTOS OPERATION AND MAINTENANCE INSPECTION
SUMMARY" AVAILABLE FROM THE VA ON CAMPUS ABESTOS
SURVEY FINDINGS.
ASBESTOS ENCOUNTERS
EXISTING ISOLATION
VALVE
NEW DOUBLE BLOCK
AND BLEED VALVE TAG
DBB-##-##
EXISTING CHECK
VALVE
NEW DOUBLE BLOCK
AND BLEED VALVE
NOTE: STEAM DISTRIBUTION SHOWN ON SITE PLAN IS DIAGRAMMATIC
IN NATURE AND INTENDED TO SHOW HOW BUILDINGS ARE
CONNECTED THROUGHOUT OVERALL SYSTEM. REFER TO INDIVIDUAL
BUILDING DRAWINGS FOR EXACT LOCATIONS OF VALVES AND OTHER
RELEVANT EQUIPMENT.
# CAMPUS BUILDING
UTILITY / TRANSFORMER /
GENERATOR
G R
E E
N B
A Y
R D
CAVIN DR
BUCKLEY RD
BUCKLEY RD
RETENTION POND
MEDAL OF HONOR DR
MEDAL OF HONOR DR
M E
D A
L O
F H
O N
O R
D R
M
EDAL OF HONOR DR
M E
D A
L O
F H
O N
O R
D R
H
IL
L D
R
M E
D A
L O
F H
O N
O R
D R
T R
U E
M P
E R
D R
KRYZOWSKI DR
TRUEMPER DR
WEBER DR
W E
B E
R D
R
H
IL
L D
R
HILL DR
KRYZOW
SKI D
R
M E
D A
L O
F H
O N
O R
D R
M E
D A
L O
F H
O N
O R
D R
T R
U E
M P
E R
D R
H
IL
L D
R
183184
165A
162A
185A
182A
34 33
205206
12 59
133CA
133CA
133CA
133CA
133EF
KEY PLAN
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
ASBESTOS ENCOUNTERS
1. CONTRACTOR TO NOTIFY VA COR IMMEDIATELY OF ANY
ABESTOS OR ABESTOS CONTAINING MATERIALS THEY
ENCOUNTER DURING CONSTRUCTION.
2. THERE IS A MEMORANDUM DATED JUNE 12, 2024 WITH
THE SUBJECT "ASBESTOS OPERATION AND
MAINTENANCE INSPECTION SUMMARY" AVAILABLE FROM
THE VA ON CAMPUS ABESTOS SURVEY FINDINGS.
1CC
1. NOTE: DOUBLE ISOLATION UPSTREAM OF
CONSTRUCTION AREA IS REQUIRED BY VA TO PERFORM
ANY WORK WITHIN STEAM SYSTEM.
UNEFFECTED
CAMPUS BUILDINGS
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:2
:1
A
M
MS101
SITE PLAN - PHASING Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
PHASING PLAN:
NOTE: CONTRACTOR SHALL COORDINATE SHUTDOWN OF
STEAM SERVICES WITH COR AND VA PARTIES THAT ARE
AFFECTED PRIOR TO EACH PHASE. PHASES AND
ASSOCIATED SUBPHASES CAN BE COMBINED OR
SEPARATED FURTHER PER DISCRETION OF THE VA. SEE
SHEET M-602 FOR MORE INFORMATION ON PHASING.
PHASE 1:
• VALVES INSTALLED:
1. BUILDING 03
2. BUILDING 48
3. BUILDING 187
PHASE 2: INCLUDES A CAMPUS-WIDE STEAM SHUTDOWN.
SUBPHASES SHALL BE COMPLETED IN THE ORDER LISTED
BELOW.
• PHASE 2A
• VALVES INSTALLED:
1. BUILDING 1CC (TRAMWAY TRIANGLE)
2. BUILDING 05
A. INCLUDES BOTH DISTRIBUTION LOOP VALVES
AND SERVICE TO BUILDING 05.
3. BUILDING 134
• PHASE 2B
• VALVES INSTALLED:
1. BUILDING 66
2. BUILDING 135
• PHASE 2C
• VALVES INSTALLED:
1. BUILDING 131
2. BUILDING 132
3. BUILDING 133
4. BUILDING 133EF
5. BUILDING 133CA
NOTE: BUILDINGS UNABLE TO BE COMPLETED DURING
CAMPUS-WIDE SHUTDOWN SHALL BE COMPLETED IN THE
FUTURE USING NEWLY INSTALLED DOUBLE BLOCK AND
BLEED VALVES IN BUILDING 1CC.
PHASE 3:
• VALVES INSTALLED:
1. BUILDING 04 - CONDENSATE PUMP SERVICE ONLY
2. BUILDING 06
3. BUILDING 07
4. BUILDING 188
5. TRAMWAY - LOOP CIRCULATION VALVES LOCATED
UNDERNEATH TRAMWAY NEARBY BUILDING 06 DBB
VALVES.
A. SEE BUILDING 06 PLANS FOR SCOPE AND EXACT
LOCATIONS.
PHASE 4:
• VALVES INSTALLED:
1. BUILDING 01
2. BUILDING 04 - STEAM SERVICE ONLY
3. BUILDING 09
4. BUILDING 11
5. BUILDING 46
PHASE 5:
• VALVES INSTALLED:
1. BUILDING 32
2. BUILDING 36
3. BUILDING 37
4. BUILDING 139
CONSTRUCTION SEQUENCE
1" = 100'-0"
SITE PLAN - PHASING
N
100 100 200
1" = 100'-0"
FEETSCALE
B1CC - MD100
BUILDING 09
BUILDING 04
10" HPS
5" PC
6" PC
12" HPS
10" HPS
5" PC
B1CC - MD100
B1CC -
MD1003
(TYP)2
EXISTING B1CC
CONDENSATE
ISOLATION VALVE
EXISTING B1CC
STEAM ISOLATION
VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
C C
.E
R
.r v t
/2
/2
:4
:5
A
M
B1CC -
MD100
FIRST FLOOR PLAN - OVERALL -
MECHANICAL - DEMOLITION
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
1CC
04/29/2025 AJA PHD
23022.009
1" = 30'-0"
B1CC_FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
N
30 30 60
1" = 30'-0"
FEETSCALE
GENERAL NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING MECHANICAL
SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY
LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK
INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY VALVES INSTALLED NEARER TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT THEY SERVE. REFER TO VALVE TAGS AND SCHEDULE ON SHEET M600 FOR MORE INFORMATION.
6. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF EACH BUILDING DURING
EACH PHASE.
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
B1CC - ENLARGED TRAMWAY - MECHANICAL - DEMOLITION
NO SCALE
B1CC - EXISTING SHUTOFF VALVES
SHEET NOTES:
1. EXISTING STEAM AND CONDENSATE PIPING IS LOCATED UNDERNEATH
TRAMWAY.
2. TYPICAL FOR ALL BUILDINGS, ELEVATION MARKERS SHOW THE
APPROXIMATE LOCATION AND DIRECTION OF PHOTOS TAKEN BY
DESIGN ENGINEERS WHILE ON SITE. THE NUMBER OF THE DETAIL
REFERENCED IS NOTED WITHIN THE ARROW.
B1CC - M100
BUILDING 09
BUILDING 04
6" PC
12" HPS
10" HPS
5" PC
10" HPS
5" PC
DBB-PC-1CC-2
DBB-HP-1CC-1
DBB-HP-1CC-3
DBB-PC-1CC-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
C C
.E
R
.r v t
/2
/2
:4
:5
A
M
B1CC - M100
FIRST FLOOR PLAN - OVERALL -
MECHANICAL
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
1CC
04/29/2025 AJA PHD
23022.009
1" = 30'-0"
B1CC - FIRST FLOOR PLAN - OVERALL - MECHANICAL
GENERAL NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE
SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR
NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION
SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY VALVES INSTALLED NEARER
TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT THEY SERVE. REFER TO VALVE TAGS AND SCHEDULE ON
SHEET M600 FOR MORE INFORMATION.
6. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF EACH BUILDING DURING EACH PHASE.
N
30 30 60
1" = 30'-0"
FEETSCALE
1/4" = 1'-0"
B1CC - ENLARGED TRAMWAY - MECHANICAL
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
SHEET NOTES:
1. BOTH PAIRS OF DOUBLE BLOCK AND BLEED VALVES MUST BE CLOSED AT SAME TIME TO PROVIDE ISOLATION TO PORTION OF VA LOVELL CAMPUS. FAILURE TO CLOSE BOTH PAIRS OF VALVES WILL ALLOW STEAM TO FLOW FREELY THROUGH CAMPUS STEAM DISTRIBUTION LOOP AS SHOWN ON SITE PLAN LOCATED ON SHEET MS-100. THE FOLLOWING BUILDINGS WILL BE ISOLATED DUE TO CLOSURE OF VALVES DBB-1CC-1, 2, 3, & 4:
A. BUILDINGS 66, 131, 132, 133, 133CA, 133EF, 134, AND 135.
VESTIBULE
108A
UNUSED
PERPETUAL
RECORDS
CORRIDOR
CO-1-04
STORAGE
RECORDS
STORAGE
FREEZER
104F
EQUIP.
STORAGE
VESTIBULE
104B
STO
104D
STO
104C
PACKING
104E
STORAGE
104A
OFFICE
TEMPORARY
RECORDS
STORAGE
103A
STORAGE
STORAGE
STORAGE
SUPPLIES
114A
BREAK
ROOM
STORAGE
VESTIBULE
115A
OFFICE
103B
CORRIDOR
CO-1-03
STAIR
SW-1-01UNUSED
117B
STAIR
SW-1-02
CORRIDOR
CO-1-02
ELEV
P-18
STORAGE
STORAGE
STORAGE
STORAGE
INVENTORY
STORAGE
LABORATORY
STORAGE
JAN
F TLT
OFFICE
M TLT
OFFICE
IMAGING
CORRIDOR
CO-1-07
LABORATORY
VEST
152CCORRIDOR
CO-1-06
STORAGE
MECHANICAL
OFFICE
OFFICE
LABORATORY
LAB
LABORATORY
OFFICE
LABORATORY
Room
STAFF
TLT
103C
TOILET
101A
ELECTRICAL
Room
FIRE
CONTROL
PANELS
CORRIDOR
CO-1-05
LABORATORY
Room
OFFICE
OFFICE
OFFICE
CORRIDOR
CO-1-08
RECORDS
MANAGEMENT
117A
RECORDS
MANAGEMENT
B01 - M101
2" PC
5" HPS
M600
(TYP)
DBB-HP-01-1
DBB-PC-01-2
5" HPS
2" PC
B01 - M101
B01 - M101
2" PC
5" HPS
B01 - M101
EXISTING CONDENSATE
ISOLATION VALVE EXISTING STEAM
ISOLATION VALVE
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:4
:0
A
M
B01 - M101
FIRST LEVEL FLOOR PLAN - OVERALL
- MECHANICAL
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
N
30 30 60
1" = 30'-0"
FEETSCALE
1" = 30'-0"
B01_FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
1/4" = 1'-0"
B01 - ENLARGED TRAMWAY - MECHANICAL
GENERAL NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING
MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE
INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND
DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY VALVES INSTALLED NEARER TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT THEY SERVE. REFER TO VALVE TAGS AND SCHEDULE ON SHEET M600 FOR MORE INFORMATION.
6. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF BUILDINGS DURING
EACH PHASE.
7. ELEVATION MARKERS SHOW THE APPROXIMATE LOCATION AND DIRECTION OF PHOTOS TAKEN BY DESIGN ENGINEERS WHILE ON
SITE. THE NUMBER OF THE DETAIL REFERENCED IS NOTED WITHIN THE ARROW.
1/4" = 1'-0"
B01 - ENLARGED TRAMWAY - MECHANICAL - DEMOLITION
1" = 30'-0"
B01 - FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
N
30 30 60
1" = 30'-0"
FEETSCALE
1" = 20'-0"
B01 - EXISTING ISOLATION VALVES
SHEET NOTES:
1. EXISTING STEAM AND CONDENSATE PIPING IS LOCATED BELOW TRAMWAY.
2. EXISTING STEAM AND CONDENSATE ISOLATION VALVES SHALL BE REMOVED DURING DEMOLITION.
3. CONNECT STEAM AND CONDENSATE SYSTEMS TO NEW DOUBLE BLOCK AND BLEED VALVES AFTER REMOVAL OF EXISTING ISOLATION
VALVES.
VEST
TOILET
CORRIDOR
CO-B-01
STORAGE
07A
TOILET
STORAGE
05A
EQUIPMENT
UNEXCAVATED
SR4
SERVICE
SR1
SERVICE
SR2
UNEXCAVATED
B03/187 - M100
SERVICE
SR2
PRV
TO BUILDING 187
TO BUILDING 48
EXISTING
CONDENSATE
PUMP
2" HPS
3" HPS
1" PC
DBB-HP-03-1
DBB-PC-03-2
3" HPS
DBB-LP-187-13
B03/187 - M100
SERVICE
SR2
PRV
EXISTING
CONDENSATE PUMP
TO BUILDING 187
TO BUILDING 48
3" HPS
2" HPS
3" HPSB03/187 - M100
1" PC
B03/187
- M100
SHUTOFF VALVE FOR
BUILDINGS 03, 48, AND 187
SHUTOFF VALVE FOR BUILDING 48
STEAM SUPPLY FOR
BUILDINGS 03 AND 187
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:5
:0
A
M
B03/187 - M100
BASEMENT FLOOR PLAN - OVERALL -
MECHANICAL
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
1" = 30'-0"
B03/187 - BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
N
30 30 60
1" = 30'-0"
FEETSCALE
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
B03/187 - ENALRGED ROOM UNEXCAVATED - MECHANICAL
GENERAL NOTES:
SHEET NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE
SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER
OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION
SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY VALVES INSTALLED
NEARER TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT THEY SERVE. REFER TO VALVE TAGS AND
SCHEDULE ON SHEET M600 FOR MORE INFORMATION.
6. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF BUILDINGS DURING EACH PHASE.
7. ELEVATION MARKERS SHOW THE APPROXIMATE LOCATION AND DIRECTION OF PHOTOS TAKEN BY DESIGN ENGINEERS WHILE ON SITE. THE NUMBER OF THE DETAIL
REFERENCE IS NOTED WITHIN THE ARROW.
1. EXISTING ISOLATION VALVE FOR BUILDING 48 IS LOCATED WITHIN VERTICAL PIPING INDICATED ON PLANS.
2. DOUBLE BLOCK AND BLEED VALVE SERVING BUILDING 3 SHALL BE INSTALLED IN LOCATION SHOWN ON PLANS.
3. DOUBLE BLOCK AND BLEED VALVE SERVING BUILDING 187 SHALL BE INSTALLED IN LOCATION SHOWN ON PLANS.
4. CONDENSATE DOUBLE BLOCK AND BLEED VALVE SHALL BE INSTALLED IN VERTICAL PIPING DIRECTLY DOWNSTREAM OF CONDENSATE PUMP.
5. REMOVE VERTICAL SECTION OF PIPING REQUIRED TO INSTALL NEW DOUBLE BLOCK AND BLEED VALVE DBB-PC-03-2.
1" = 30'-0"
B03/187 - BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
N
30 30 60
1" = 30'-0"
FEETSCALE
1/4" = 1'-0"
B03/187 - ENALRGED ROOM UNEXCAVATED - MECHANICAL - DEMOLITION
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
NO SCALE
B03/187 - PIPING JUNCTION AND ISOLATION VALVES
B04 - MD100
B04 - MD100
TRANSFORMER
ROOM
SERVICE
ROOM
EXISTING
CONDENSATE
PUMP (TYP. x10)
2 PRV
2" HPS
4" PC
4" PC
B04 - MD100
B04 -
MD100
2" HPS
PRV1
B04 - MD100
B04 -
MD100
BUILDING 04 STEAM ISOLATION VALVE
EXISTING PRV'S
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:0
:3
A
M
B04 - MD100
BASEMENT FLOOR PLAN - OVERALL
- MECHANICAL - DEMOLITION
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
1" = 30'-0"
B04 - BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
N
30 30 60
1" = 30'-0"
FEETSCALE
1/4" = 1'-0"
B04 - ENLARGED ROOM 233 & 247 - TRANSFORMER & SERVICE ROOM - DEMOLITION
1/4" = 1'-0"
B04 - ENLARGED TRAMWAY - DEMOLITION
GENERAL NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING
MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE
INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND
DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. CONTRACTOR TO VERIFY SIZE OF STEAM AND PUMPED CONDENSATE PIPING PRIOR TO INSTALLING DOUBLE BLOCK AND BLEED
VALVES.
6. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY VALVES INSTALLED NEARER TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT THEY SERVE. REFER TO VALVE TAGS AND SCHEDULE ON SHEET M600 FOR MORE INFORMATION.
7. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF BUILDINGS DURING
EACH PHASE.
8. ELEVATION MARKERS SHOW THE APPROXIMATE LOCATION AND DIRECTION OF PHOTOS TAKEN BY DESIGN ENGINEERS WHILE ON
SITE. THE NUMBER OF THE DETAIL REFERENCED IS NOTED WITHIN THE ARROW.
SHEET NOTES:
1. EXISTING PRV SERVES DECOMMISIONED HVAC EQUIPMENT. PRV SHALL BE REMOVED AND PIPE SERVING PRV SHALL BE CAPPED IN
PLACE. SEE SHEET B04 - M100 FOR MORE INFORMATION.
2. REMOVE EXISTING STRAINERS IN PIPING PRIOR TO CONNECTION WITH PRV. SAVE FOR RELOCATION DURING NEW CONSTRUCTION.
3. EXISTING STEAM ISOLATION VALVE SHALL BE REMOVED DURING DEMOLITION.
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
NO SCALE
B04 - EXISTING STEAM ISOLATION VALVE
NO SCALE
B04 - EXISTING STEAM PRESSURE REDUCING VALVES
TRANSFORMER
ROOM
SERVICE
ROOM
247B04 - M100
B04 - M100
TRANSFORMER
ROOM
SERVICE
ROOM
DBB-HP-04-2
DBB-PC-04-5
2" HPS
4" PC
4" PC
DBB-PC-04-3
DBB-PC-04-4
PRV1
EXISTING
CONDENSATE
PUMP (TYP. x10)
2" HPS
DBB-HP-04-1
6" HPS
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:0
:3
A
M
B04 - M100
BASEMENT FLOOR PLAN - OVERALL
- MECHANICAL
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
N
30 30 60
1" = 30'-0"
FEETSCALE
1" = 30'-0"
B04 - BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
1/4" = 1'-0"
B04 - ENLARGED ROOM 233 & 247 - TRANSFORMER & SERVICE ROOM
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
B04 - ENLARGED TRAMWAY - MECHANICAL
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
SHEET NOTES:
1. REINSTALL STRAINERS IN REROUTED PIPING CONNECTING TO EXISTING PRV STATIONS DURING NEW CONSTRUCTION.
2. CONNECT STEAM SYSTEM TO NEW DOUBLE BLOCK AND BLEED VALVE AFTER REMOVING EXISTING VALVE.
3. CAP EXISTING STEAM TAP AFTER REMOVING PRV. PROVIDE END OF MAIN DRIP AT TERMINATION POINT.
GENERAL NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING MECHANICAL
SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE
WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK
INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. CONTRACTOR TO VERIFY SIZE OF STEAM AND PUMPED CONDENSATE PIPING PRIOR TO INSTALLING DOUBLE BLOCK AND BLEED VALVES.
6. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY
VALVES INSTALLED NEARER TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT THEY
SERVE. REFER TO VALVE TAGS AND SCHEDULE ON SHEET M600 FOR MORE INFORMATION.
7. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF BUILDINGS DURING EACH PHASE.
8. ELEVATION MARKERS SHOW THE APPROXIMATE LOCATION AND DIRECTION OF PHOTOS TAKEN BY DESIGN ENGINEERS WHILE ON SITE. THE
NUMBER OF THE DETAIL REFERENCED IS NOTED WITHIN THE ARROW.
ELECTRICAL
MECHANICAL
B05 - M100
MECHANICAL
12" HPS
6" PC
B05 - M100
B05 - M100
MECHANICAL
DBB-HP-1CC-5
12" HPS6" PC
DBB-PC-1CC-6
DBB-HP-05-1 3
3" HPS
B05 - M100
MECHANICAL
ELECTRICAL
EXISTING SHUTOFF VALVE
SERVING NORTH LOOP
CONDENSATE DISTRIBUTION
EXISTING SHUTOFF VALVE SERVING
NORTH LOOP STEAM DISTRIBUTION
EXISTING SHUTOFF VALVE SERVING
BUILDING 05 STEAM DISTRIBUTION
EXISTING STEAM TAP FOR FUTURE
CONNECTION TO BUILDING 05
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
100% Construction Documents 04-29-2025 www.specializedeng.com SES Project :
NE Certificate Of Authorization Number: CA-1620
04/29/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll D o u b le
B lo c k a n d
B le e d
V a lv e s /5
-2
-1
.B u ild in g
.E
R
.r v t
/2
/2
:1
:5
A
M
B05 - M100
BASEMENT FLOOR PLAN - OVERALL
- MECHANICAL
Double Block & Bleed Valves
3001 Green Bay Rd, N.Chicago, IL 60064
556-24-108
04/29/2025 AJA PHD
23022.009
1" = 30'-0"
B05 - BASEMENT FLOOR PLAN - OVERALL - MECHANICAL
N
30 30 60
1" = 30'-0"
FEETSCALE
1/4" = 1'-0"
B05 - ENLARGED ROOM 01 - MECHANICAL - DEMOLITION
1/4" = 1'-0"
B05 - ENLARGED ROOM 01 - MECHANICAL
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
GENERAL NOTES:
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING MECHANICAL
SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE
WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK
INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THIS WORK.
5. INDIVIDUAL SHEETS ARE TITLED TO REFLECT BUILDINGS IN WHICH NEW VALVING WORK IS REQUIRED OR BUILDINGS DIRECTLY AFFECTED BY VALVES INSTALLED NEARER TO OTHER BUILDINGS. DESIGN MAY CALL FOR VALVES TO BE INSTALLED OUTSIDE OF THE BUILDING FOOTPRINT
THEY SERVE. REFER TO VALVE TAGS AND SCHEDULE ON SHEET M600 FOR MORE INFORMATION.
6. REFER TO SHEETS MS101 AND M602 FOR PHASING OF CONSTRUCTION AND INSTRUCTIONS FOR ISOLATION OF BUILDINGS DURING EACH PHASE.
7. ELEVATION MARKERS SHOW THE APPROXIMATE LOCATION AND DIRECTION OF PHOTOS TAKEN BY DESIGN ENGINEERS WHILE ON SITE. THE
NUMBER OF THE DETAIL REFERENCED IS NOTED WITHIN THE ARROW.
1" = 30'-0"
B05 - BASEMENT FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
N
30 30 60
1" = 30'-0"
FEETSCALE
SHEET NOTES:
1. EXISTING STEAM TAP AND SHUTOFF VALVE SERVES AS CONNECTION POINT FOR STEAM SUPPLY TO BUILDING 05.
2. EXISTING STEAM SHUTOFF VALVE SERVES AS ISOLATION POINT FOR NORTH LOOP OF CAMPUS STEAM AND CONDENSATE DISTRIBUTION.
3. DOUBLE BLOCK AND BLEED VALVE DBB-05-01…