542-19-113 - Bid Form - Reno Building 58.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Z1DA--542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
- Solicitation number
- 36C24423R0083
About this file
This document contains a bid form template and details of a related federal contract opportunity to renovate the first and second floors of Building 58 at a Veterans Affairs medical center. The solicitation is set aside solely for service-disabled veteran-owned small businesses and seeks bids to complete renovations across various construction divisions. Contractors must submit pricing for materials, labor, equipment, overhead costs, profit, taxes, and insurance to receive the prime contract award from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The renovation scope involves work in general conditions, divisions 1 through 3 and 5 through 10, 12, and 21 through 28. Bidders can also provide deductive pricing for optional line items. The completed bid form and any submitted deducts will determine the total proposed contract cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24423R0083.docx | DOCX document | |
| Design Drawings.pdf | ||
| PCRA Form Bldg 58 A and B Renovation 8-2023 signed (002).pdf | ||
| Updated Combined Specs.pdf | ||
| Attachment 5 - Construction Safety Standards 8_17_22.pdf | ||
| Updated Design Drawing M-601.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form (auto calc)
| Contractor Bid Form | Project Name: | Renovate Building 58 1st and 2nd Floors | |||||
| Project Number: | 542-19-113 | ||||||
| Contract Number: | |||||||
| Contractor Name: | |||||||
| Date: | |||||||
| To be filled out by the Contractor | |||||||
| Description | Qty | Unit | Matrl Subtotal | Labor Subtotal | Equipment Subtotal | Total | |
| Divisions | |||||||
| No | General Conditions | ||||||
| 1 | Division 1 | ||||||
| 2 | Division 2 | ||||||
| 3 | Division 3 | ||||||
| 4 | Division 4 | ||||||
| 5 | Division 5 | ||||||
| 6 | Division 6 | ||||||
| 7 | Division 7 | ||||||
| 8 | Division 8 | ||||||
| 9 | Division 9 | ||||||
| 10 | Division 10 | ||||||
| 11 | Division 12 | ||||||
| 12 | Division 21 | ||||||
| 13 | Division 22 | ||||||
| 14 | Division 23 | ||||||
| 15 | Division 26 | ||||||
| 16 | Division 27 | ||||||
| 17 | Division 28 |
| Base Bid Subtotal | $ - 0 |
| Bid Deducts | |
| Deduct 1 | |
| Deduct 2 | |
| Deduct 3 | |
| Deduct 4 | |
| Deduct 5 | |
| Bid Deducts Subtotal | $ - 0 |
$ - 0
Subtotal (Direct Costs) $ -
| Direct Overhead (first $20,000) | 10.0% | $ - 0 | Calculated value |
| Direct Overhead (next $30,000) | 7.5% | $ - 0 | Calculated value |
| Direct Overhead (over $50,000) | 5.0% | $ - 0 | Calculated value |
| Direct Overhead Total | $ - 0 |
Subtotal (Direct + Overhead $ - 0
| Profit (first $20,000) | 10.0% | $ - 0 | Calculated value |
| Profit (next $30,000) | 7.5% | $ - 0 | Calculated value |
| Profit (over $50,000) | 5.0% | $ - 0 | Calculated value |
| Profit Total | $ - 0 |
Insurance and Taxes %
Taxes on Material and Equipment %
Total Prime Contractor Cost $ - 0