542-19-113 - Bid Form - Reno Building 58.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Z1DA--542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
Solicitation number
36C24423R0083
Issued by

About this file

This document contains a bid form template and details of a related federal contract opportunity to renovate the first and second floors of Building 58 at a Veterans Affairs medical center. The solicitation is set aside solely for service-disabled veteran-owned small businesses and seeks bids to complete renovations across various construction divisions. Contractors must submit pricing for materials, labor, equipment, overhead costs, profit, taxes, and insurance to receive the prime contract award from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The renovation scope involves work in general conditions, divisions 1 through 3 and 5 through 10, 12, and 21 through 28. Bidders can also provide deductive pricing for optional line items. The completed bid form and any submitted deducts will determine the total proposed contract cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form (auto calc)

Contractor Bid FormProject Name:Renovate Building 58 1st and 2nd Floors
Project Number:542-19-113
Contract Number:
Contractor Name:
Date:
To be filled out by the Contractor
DescriptionQtyUnitMatrl SubtotalLabor SubtotalEquipment SubtotalTotal
Divisions
NoGeneral Conditions
1Division 1
2Division 2
3Division 3
4Division 4
5Division 5
6Division 6
7Division 7
8Division 8
9Division 9
10Division 10
11Division 12
12Division 21
13Division 22
14Division 23
15Division 26
16Division 27
17Division 28
Base Bid Subtotal$ - 0
Bid Deducts
Deduct 1
Deduct 2
Deduct 3
Deduct 4
Deduct 5
Bid Deducts Subtotal$ - 0

$ - 0

Subtotal (Direct Costs) $ -

Direct Overhead (first $20,000)10.0%$ - 0Calculated value
Direct Overhead (next $30,000)7.5%$ - 0Calculated value
Direct Overhead (over $50,000)5.0%$ - 0Calculated value
Direct Overhead Total$ - 0

Subtotal (Direct + Overhead $ - 0

Profit (first $20,000)10.0%$ - 0Calculated value
Profit (next $30,000)7.5%$ - 0Calculated value
Profit (over $50,000)5.0%$ - 0Calculated value
Profit Total$ - 0

Insurance and Taxes %

Taxes on Material and Equipment %

Total Prime Contractor Cost $ - 0