540-24-104 Clarksburg Mobile Pad - Bid Set Drawings - Copy.pdf
PDF 20 MB Posted
- Solicitation number
- 36C24526B0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract Bids.pdf | ||
| 36C24526B0002 0004.docx | DOCX document | |
| 36C24526B0002 0003.docx | DOCX document | |
| 36C24526B0002 0002.docx | DOCX document | |
| Copy of Copy of Construct Mobile Pad Combined Bid RFIs Final.xlsx | XLSX spreadsheet | |
| 010000-GENERAL REQUIREMENTS Mobile Pad.pdf | ||
| 540-24-104 Clarksburg Mobile Pad - Bid Set Drawings-R1.pdf | ||
| Record of Attendance - Site Visit - Mobile Imaging Pad - 12-2-2025.pdf | ||
| 36C24526B0002 0001.docx | DOCX document | |
| 36C24526B0002_1 Final Copy 2.docx | DOCX document | |
| 540-24-104 Clarksburg Mobile Pad - Bid Set Specs - Copy.pdf | ||
| SAM Mobile Pad WD - Copy.pdf | ||
| VHA PCRA- Mobile Equipment Pad - AD signed - Copy.pdf | ||
| ICRA Mobile Pad- Interior Work-Signed - Copy.pdf | ||
| 36C24526B0002_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL ELECTRICAL PLUMBING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s
/0
C la rk s b u rg
V A
M C
M o b ile P a d
/0
C la rk s b u rg
V A
M o b ile P a d
R
E
P T
.r v t
/2
/2
:3
:5
A
M
GI001
PROJECT COVER SHEET VAMC CLARKSBURG MOBILE
PAD
CLARKSBURG VA
0124029
05/28/2025 GCC CNB
BID SET
VAMC CLARKSBURG MOBILE PAD
VAMC - LOUIS A JOHNSON 1 Medical Center Dr, Clarksburg, WV 26301 PROJECT #: 540-24-104
540-24-104
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI001 PROJECT COVER SHEET
CIVIL
CI001 SITE CIVIL GEN. NOTES, SYMBOLS, AND ABBREVIATIONS
CI501 SITE CIVIL DETAILS
C-100 OVERALL CONSTRUCTION SEQUENCING PLAN
XP101 EXISTING CONDITIONS PLAN
GC001 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
GC101 EROSION AND SEDIMENT CONTROL PLAN PHASE I & II
CD101 SITE DEMOLITION PLAN
CS101 SITE LAYOUT AND UTILITY PLAN
CG101 SITE GRADING AND DRAINAGE PLAN
CS102 MOBILE TRAILER DECOMMISSIONING PLAN (NOT IN CONTRACT)
LP101 LANDSCAPE PLAN
STRUCTURAL
S-001 GENERAL NOTES AND ABBREVIATIONS
SS101 TEMPORARY TRAILER FOUNDATION PLAN
S-301 CONCRETE DETAILS AND SECTIONS
ARCHITECTURAL
AG001 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
AG002 ICRA ASSESSMENT NOTES
AD-101 BASEMENT REMOVAL PLAN - PARTIAL
AD-111 FIRST FLOOR REMOVAL PLAN-PARTIAL
AD-121 SECOND FLOOR REMOVAL PLAN-PARTIAL
AS-101 ARCH. SITE PLAN, ENCLOSURE PLAN & ELEVATIONS
A-101 BASEMENT FLOOR PLAN - PARTIAL
A-111 FIRST FLOOR PLAN - PARTIAL
A-121 SECOND FLOOR PLAN - PARTIAL
PLUMBING
P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS
P-101 SITE PLAN - PLUMBING - PROPOSED NEW WORK
P-102 ENLARGED PLAN - PLUMBING - NEW WORK
P-501 PLUMBING DETAILS
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
ED-100 SITE PLAN - POWER - DEMOLITION
E-100 SITE PLAN - POWER - NEW WORK
E-101 BASEMENT OVERALL PLAN - POWER - NEW WORK
E-102 FIRST FLOOR OVERALL PLAN - POWER - NEW WORK
E-103 SECOND FLOOR OVERALL PLAN - POWER - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
PROJECT LOCATION
© Google/Apple/Bing Maps
DELTA ENGINNERS,
ARCHITECTS, & SURVEYORS
ARCHITECT
8401 CONNETICUT AVE, SUITE 350
CHEVY CHASE, MD 20815
301.718.0080 P
INTEGRITY FEDERAL
SERVICES
CIVIL AND LANDSCAPE
148 S QUEEN STREET, SUITE 201
MARTINSBURG, WV 25401
304.725.8456 P
O'CONNOR CONSTRUCTION
MANAGEMENT INC, OCMI
COST ESTIMATING
2015 AYRSLEY TOWN BLVD., SUITE 202
CHARLOTTE, NC 28273
704.280.8356 P
NN
1. THE DEPARTMENT OF VETERANS AFFAIRS PROJECT SCOPE INCLUDES CONSTRUCTING A NEW PAD FOR A FUTURE MOBILE IMAGING
TRAILER AND NECESSARY UTILITY HOOKUPS.
2. REFERENCE DEMOLITION PLAN FOR HORIZONTAL AND VERTICAL CONTROL.
3. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY APPEARANCE IN ALL WORK AREAS. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH
DAY OR AS DIRECTED BY THE VA CONTRACTING OFFICERS REPRESENTATIVE “VA COR”.
4. THE GC'S SUPERINTENDENT, WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE SHALL BE PRESENT AT ALL TIMES WHEN WORK IS BEING DONE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
5. CONSTRUCTION OF THE PROJECT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE VA, FEDERAL AND STATE REQUIREMENTS.
6. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID
FOR BY THE CONTRACTOR.
7. LIMITS OF DISTURBANCE ARE APPROXIMATE. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED. DISTURBED TURF
AREAS SHALL BE RESTORED.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE VA COR PRIOR TO
ANY CONSTRUCTION.
9. PLANS SHOW FIXTURES “SIGNS, LIGHTS, ETC.” THAT ARE TO BE REMOVED AND REINSTALLED AFTER CONSTRUCTION OF UTILITIES.
CONTRACTOR SHALL:
A. DOCUMENT CONDITION OF FIXTURES PRIOR TO REMOVAL.
B. REMOVE ALL FIXTURES USING METHODS THAT DO NOT CAUSE DAMAGE.
C. STORE THE FIXTURES IN A VA COR APPROVED LOCATION UNTIL REINSTALLMENT
D. PROTECT ALL STORED FIXTURES FROM DAMAGE
PRICING NOTES:
GENERAL NOTES:
CONSTRUCTION NOTES:
1. REFERENCE DIVISION 1 SPECIFICATIONS FOR A COMPREHENSIVE LIST OF REQUIREMENTS. CONTRACTOR SHALL PROVIDE
ALTERNATE PRICING AS FOLLOWS:
A. ITEM I, BASE BID : WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, AND NECESSARY REMOVAL OF EXISTING
COMPONENTS.
2. CONTRACTOR IS TO ASSUME THAT ALL WORK WITHIN THE EXISTING HOSPITAL BUILDINGS FOR UTLITIY CONNECTIONS IS TO OCCUR
DURING OFF HOURS AND OR WEEKENDS.
A. THE VA RESERVES THE RIGHT TO REQUEST WORK OCCURS DURING NORMAL BUSINESS HOURS AT THEIR OWN DISCRESSION.
3. CONTRACTOR IS TO ASSUME THAT WORK REQUIRED TO ROUTE NEW CONDUITS WITHIN THE BUILDING SHALL OCCUR WITHIN MOBILE HEPA CARTS FOR INFECTION CONTROL, AND ROOMS AND SPACES WILL NOT BE SHUTDOWN TO ACCOMODATE THE WORK.
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON
THE DEPARTMENT OF VETERAN AFFAIRS, TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND ON THE
DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
TO BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ORDERING, FABRICATING OR
INSTALLING NEW MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED
OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT DOCUMENTS AND AS RECOMMENDED
BY PRODUCT MANUFACTURERS. ALL WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRE STOPPED AS
REQUIRED BY THE RATING OF THE WALL.
Revisions Date
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VAMC CLARKSBURG MOBILE
PAD
CLARKSBURG VA
VA PROJECT NO. 540-24-104
05/28/2025 PC BS
Revisions Date
BID SET
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRITY FEDERA
L
SERV I CES
AG PROJECT NO. 0124029
FULLY SPRINKLERED
Dwg. of 11
SITE CIVIL GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
CI001
REVERSE CURB
W W
OHE OHE
UGE UGE
TRANSCURB
X X X
OHC
UGC
FM FM FM
SSSS
G G
CIVIL LEGEND
EXISTING
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND UTILITY LINE
WATER MAIN
BUILDINGS
CONCRETE SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF GRADING
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
OHE
UGE
ORNAMENTAL FENCE
SOIL PROFILE BOUNDARY
WIRE FENCEXXXX
EDGE OF GRAVEL
GUARDRAIL
EDGE OF CONCRETE
LP
SANITARY SEWER CLEANOUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER YARD INLET
STORM SEWER CATCH BASIN
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
FLAG POLE
UTILITY POLE
FEATURE WALL
OHC
UGC
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
GROUND LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAINFM FM FM
W W W
LIMITS OF WORK
G UNDERGROUND GAS LINE
DRIP LINE OF BRUSH
WETLANDS
ELECTRIC BOX / METER / MANHOLE
BOLLARD
MOUNTABLE CURB
STORM DRAINAGE CLEANOUT
DETAIL LABEL
SOIL PROFILE SYMBOL
PARKING COUNT
TEST-PIT
JERSEY BARRIER
NORTH ARROW
DEMOLISHED
EXISTING
PROPOSEDEXISTING
TO REMAIN
GAS VALVE / METER / MANHOLE
ABBREVIATIONS:A AREA OR ARC
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
ATS ACTIVE TREATMENT SYSTEM
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK, BASELINE MARKER
BMP BEST MANAGEMENT PRACTICES
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS, CONTRACT DOCUMENTS OR CHECK DAM
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CE CONSTRUCTION ENTRANCE
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND OR COMPOST FILTER SOCK
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE OR CULVERT INLET PROTECTION
CJ CONTRACTION JOINT
CL CENTERLINE, CLASS
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CN CURVE NUMBER
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPv CHANNEL PROTECTION VOLUME
CPPE CONSERVATION PRACTICE PHYSICAL EFFECTS
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE OR CONCRETE WASHOUT
CWP COLD WATER PIPING
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
D DEPTH
DAT DATUM
DB DEED BOOK; DESIGN-BUILD; DRAIN BASIN
DBL DOUBLE
DD DIVERSION DIKE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
ECL EROSION CONTROL LOG
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOTG FIELD OFFICE TECHNICAL GUIDE
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FS FILTER SOCK
FT FEET
FWS FLOWER WATERING STATION
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
I RAINFALL INTENSITY
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE OR INLET PROTECTION
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
LS LIGHT STRUCTURE
M MARKER
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NCPS NATIONAL CONSERVATION PRACTICE STANDARDS
NCTCOG NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS
NE NOT EXCEEDING
NFA NET FLOOR AREA
NHCP NATIONAL HANDBOOK OF CONSERVATION PRACTICES
NIC NOT IN CONTRACT
NO NUMBER
NOI NOTICE OF INTENT
NOM NOMINAL
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
NRCP NON-REINFORCED CONCRETE PIPE
NRCS NATURAL RESOURCES CONSERVATION SERVICE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFB ORGANIC FILTER BERM
OFD OVERFLOW DRAIN
OFT ORGANIC FILTER TUBE
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OP OUTLET PROTECTION
OS OVER-SIZED
OZ OUNCE
P PERIMETER, RAINFALL DEPTH
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PLA PLASTIC PIPE
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
POTW PUBLICLY-OWNED TREATMENT WORKS
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PTS PASSIVE TREATMENT SYSTEM
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
Qf EXTREME FLOOD VOLUME Qp OVERBANK FLOOD PROTECTION VOLUME
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCN RUNOFF CURVE NUMBER
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
REv RECHARGE VOLUME
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK OR SEDIMENT BASIN
SBL SOUTH BOUND LANE
SCF SEDIMENT CONTROL FENCE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET OR SILT FENCE
SSF SUPER SILT FENCE
SJ SCORED JOINT
SLV SLEEVE
SM SECTION MARKER
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY
ST STREET OR SEDIMENT TRAP
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
SWM STORMWATER MANAGEMENT
S/W SIDEWALK
SWPPP STORM WATER POLLUTION PREVENTION PLAN (SWP3)
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
Tc TIME OF CONCENTRATION
TCEQ TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE, OR TREE PROTECTION
TPDES TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM
TW TOP OF WALL
TXDOT TEXAS DEPARTMENT OF TRANSPORTATION
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
USACE U.S. ARMY CORPS OF ENGINEERS
USDA U.S. DEPARTMENT OF AGRICULTURE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
VLT VAULT
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WQv WATER QUALITY VOLUME
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
GENERAL NOTES:
1. PROPOSED SITE IMPROVEMENTS FOR 'CLARKESBURG VETERANS AFFAIRS MEDICAL CENTER' INCLUDES, BUT IS NOT LIMITED TO, CONSTRUCTION OF A CONCRETE PAD AND
INTALLATION OF A MOBILE IMAGING TRAILER, WATERLINE IMPROVEMENTS, SANITARY IMPROVEMENTS, ASSOCIATED UTILITY APPURTENANCES, REPLACE EXISTING CONDITIONS IN KIND, AND EROSION AND SEDIMENT CONTROLS. THE PROJECT IS LOCATED IN CLARKSBURG, WEST VIRGINIA.
2. TOPOGRAPHIC INFORMATION SHOWN HEREON IS BASED ON A SURVEY PREPARED BY CIVIL & ENVIRONMENTAL CONSULTANTS, INC., CAD FILES ENTITLED, "347407XR-SV01-EXISTING_CADExport.DWG" AND "347407XR-SV01-LIDAR.DWG," RECEIVED VIA EMAIL ON 2/10/2025.
3. SEE THIS SHEET FOR LEGEND OF SYMBOLS AND ABBREVIATIONS USED HEREIN.
4. DUE TO THE SENSITIVE NATURE OF THE MEDICAL FACILITY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE
FREQUENTLY AS REQUIRED.
5. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE MEDICAL FACILITY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE MEDICAL FACILITY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE MEDICAL FACILITY COR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY MEDICAL FACILITY COR.
6. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE.
THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
CONSTRUCTION NOTES:
1. THE CONTRACTING OFFICER REPRESENTATIVE AND THE CONTRACTOR ARE RESPONSIBLE FOR REVIEWING THE CONSTRUCTION DOCUMENTS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS
CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. THE CONTRACTOR SHALL CONTACT MISS UTILITY 811 AND OBTAIN A DIG PERMIT FROM THE VA A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO ANY EXCAVATION, DEMOLITION OR OTHER EARTH DISTURBING ACTIVITIES WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE
PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
4. EXISTING UNDERGROUND UTILITIES SHOWN HEREIN HAVE BEEN LOCATED FROM VISIBLE EVIDENCE AND RECORD DRAWINGS. THE UTILITIES SHOWN MAY OR MAY NOT REFLECT ALL UNDERGROUND UTILITIES IN SERVICE OR ABANDONED. UTILITIES SHOULD BE VERIFIED BY APPROPRIATE UTILITY COMPANIES PRIOR TO ANY CONSTRUCTION. INTEGRITY FEDERAL SERVICES DOES NOT CERTIFY TO THE LOCATION OR THE EXISTENCE OF EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND COR IMMEDIATELY. ALSO, THE CONTRACTOR SHALL NOTIFY INTEGRITY FEDERAL SERVICES SO THAT APPROPRIATE REVISIONS, IF WARRANTED, CAN BE MADE TO THE PLANS AT THE GOVERNMENT'S EXPENSE.
5. CONTRACTOR MUST OBTAIN APPLICABLE PERMIT(S) BEFORE ANY EXCAVATION TAKES PLACE. ANY EXCAVATIONS OVER 3'-11" WILL REQUIRE A CONFIDED SPACE PERMIT.
6. INTEGRITY FEDERAL SERVICES DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION.
IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.
7. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
8. ALL PROPOSED GRADES AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED ON THE PLAN.
9. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLANS FOR PHASING AND
DETAILS.
10. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION
AND SEDIMENTATION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER AND COR OF ANY CHANGES OR CONDITIONS ATTACHED TO PERMITS REQUIRED FOR
CONSTRUCTION.
12. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE
KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
13. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CONTRACTING OFFICER OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER'S AND COR ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. THE VA SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE WORK AREA AT ALL TIMES. TEMPORARY BARRICADES, ROAD CLOSURE SIGNAGE, FENCES AND OTHER WARNING DEVICES SHALL BE USED TO PREVENT PUBLIC ACCESS TO CONSTRUCTION WORK AREAS. VA MAINTENANCE OPERATIONS SHALL NOT BE UNDULY IMPEDED BY THE
CONTRACTOR'S OPERATIONS.
17. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND COR 21 DAYS BEFORE ANY DEMOLITION WORK BEGINS. ANY PLANNED INTERRUPTIONS IN SERVICES SHALL
BE COORDINATED WITH THE CONTRACTING OFFICER AT LEAST 21 DAYS IN ADVANCE.
18. THE CONTRACTOR SHALL CONFINE HIS EQUIPMENT AND OPERATIONS TO THE LIMITS OF CONSTRUCTION SHOWN. THE CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR THE
SAFETY AND SECURITY OF ALL MATERIALS AND EQUIPMENT ON SITE.
19. THE CONTRACTOR SHALL USE ONLY APPROVED ROADWAYS FOR CONSTRUCTION AND DELIVERY ACCESS. DAMAGE TO ANY AREAS OUTSIDE OF LIMITS OF WORK SHALL BE
REPAIRED AT NO COST TO THE OWNER.
20. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR OF EXISTING GROUNDS DUE TO CONSTRUCTION ACTIVITY.THE CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO
CONSTRUCTION ACTIVITY.
21. THE CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN ACCESS TO ALL BUILDINGS DURING CONSTRUCTION.
22. CONTRACTOR SHALL PROVIDE PHASING PLAN FOR ALL ROAD CLOSURES FOR VAMC APPROVAL. CONTRACTOR SHALL MAINTAIN CAMPUS ACCESS THROUGHOUT
CONSTRUCTION. CONTRACTOR TO PROVIDE TRAFFIC CONTROL SIGNAGE WHEN REQUIRED.
23. ALL EXCAVATION IN THE IMMEDIATE AREA OF EXISTING UTILITIES SHALL BE PERFORMED BY HAND AND WITH THE UTMOST CARE TO PROTECT EXISTING UTILITIES.
24. WORK WITH EXTREME CARE NEAR EXISTING DUCTS, CONDUITS, AND OTHER UTILITIES TO AVOID DAMAGING THEM.
25. PROTECT EXISTING SITE ELEMENTS TO REMAIN (TREES, UTILITIES, SIGNS, CURB, ETC) REPLACE IN KIND, IF DAMAGED. CONTRACTOR SHALL SALVAGE AND REPLACED ANY SITE SIGNS , FIXTURES, ETC. AS NEEDED TO COMPLETE THE INSTALLATION OF UTILITIES SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES
OR OTHER ITEMS DESIGNATED TO REMAIN.
26. THERE ARE NO KNOWN EXISTING UTILITY CROSSINGS, BUT THAT IN NO WAY LIMITS THE AMOUNT AND LOCATION OF TEST PITS REQUIRED TO BE PERFORMED BY THE CONTRACTOR. ELEVATIONS OF ALL EXISTING UTILITIES AT CROSSINGS WITH THE PROPOSED UTILITY PATHWAYS SHALL BE VERIFIED BY THE CONTRACTOR WITH A TEST PIT
PRIOR TO ANY EXCAVATION AT NO EXPENSE TO THE GOVERNMENT.
27. COORDINATE ALL TEMPORARY UTILITY DISRUPTIONS WITH VAMC STAFF 14 DAYS PRIOR.
28. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED FOR CONSTRUCTION IN KIND WITHIN 14 DAY CALENDAR DAYS OF COMPLETING WORK IN THE SPECIFIC AREAS.
29. LIMITS OF DISTURBANCE ARE APPROXIMATE. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED. TURF SHALL BE RESTORED WITH A SOD ANYWHERE EXISTING
TURF IS DISTURBED.
30. WHERE OPEN CUTTING OF PAVEMENT IS REQUIRED FOR INSTALLATION OF UTILITIES, CONTRACTOR SHALL REPLACE PAVEMENT TO MATCH EXISTING MATERIALS & DEPTHS.
NEW PAVEMENT SHALL BE FLUSH WITH EXISTING PAVEMENT SURFACES. ANY PAVEMENT MARKINGS DISTURBED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED TO
ORIGINAL CONDITION BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT.
31. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY INCLUDING ALL SUBGRADE MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE REMOVED.
32. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATES AND REPORT ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE PRIOR TO ANY CONSTRUCTION
33. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING THRUST BLOCKS WHICH ARE RESTRAINING EXISTING UTILITIES. EXISTING THRUST BLOCKS SHALL NOT BE UNDERMINED. ANY DISTURBED THRUST BLOCKS SHALL BE REPLACED AT NO COST TO THE GOVERNMENT.
34. EXISTING MAINS TO WHICH CONNECTIONS SHALL BE MADE ARE SIZED AND LOCATED IN ACCORDANCE WITH THE BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL VERIFY SIZE/TYPE OF CONNECTION WITH TEST PIT S AT THE BEGINNING OF THE PROJECT, AND ORDER MATERIALS ACCORDINGLY.
35. ALL TRENCHES SHALL BE BACKFILLED AS SOON AS PRACTICABLE. OPEN TRENCHES SHALL BE KEPT TO A MINIMUM. OPEN TRENCHES SHALL BE STEEL PLATED WHEN THEY CANNOT BE IMMEDIATELY COVERED. UPON BACKFILLING THE CONTRACTOR SHALL BROOM SWEEP STREETS AND USE APPROPRIATE METHODS TO CONTROL DUST AND HOSE DOWN PAVEMENT TO KEEP SURFACES CLEAN. TRENCHES WITHIN THE ROADWAY SHALL BE BACKFILLED BY THE END OF EACH WORK DAY. WHERE FIRE ACCESS MUST BE MAINTAINED ON A STREET, CONTRACTOR SHALL ASSURE A MINIMUM 15' STABILIZED ROUTE AROUND THE EXCAVATION.
36. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO EXCEPTION ALLOWED**
37. STANDING WATER (PONDING) ON ANY FINISHED ASPHALT OR CONCRETE SURFACE IS UNACCEPTABLE AND SHALL BE REMOVED AND REPLACED AT NO COST TO THE
GOVERNMENT.
38. ALL NEW PAVEMENT MARKINGS, STRIPING, CURBING, SIGNAGE, ETC.. SHOWN ON THIS PLAN ARE PART OF THE CONTRACT AND ARE TO BE PROVIDED BY THE CONTRACTOR AT
THE CONTRACTOR'S EXPENSE.
www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VAMC CLARKSBURG MOBILE
PAD
CLARKSBURG VA
VA PROJECT NO. 540-24-104
05/28/2025 PC BS
Revisions Date
BID SET
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRITY FEDERA
L
SERV I CES
AG PROJECT NO. 0124029
FULLY SPRINKLERED
Dwg. of 11
SITE CIVIL DETAILS
CI501
NOT TO SCALE
CONCRETE SIDEWALK PAVEMENT SECTION1
2% MAX 4" PORTLAND CEMENT
CONCRETE (4,000 PSI)
WWF 6X6 W1.4XW1.4
4" COMPACTED AGGREGATE
BASE COURSE
AS SHOWN
x x
NOTES:
1. EXPANSION JIOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CURB OR OTHER ADJACENT STRUCTURES, AND AT CONNECTIONS TO EXISTING SIDEWALK OR A DIFFERENT PAVEMENT SECTION. CONTROL JOINTS SHALL BE SPACED AT 5 FOOT INTERVALS EXCEPT WHERE AN EXPANSION JOINT IS ALREADY PROVIDED.
R1
4" ADJACENT TO PAVEMENT
R1
2" ADJACENT TO GRAVEL
R1
4" ADJACENT TO PAVEMENT
R1
2" ADJACENT TO GRAVEL
NOT TO SCALE
ASPHALT PAVEMENT SECTION2
6" BASE COURSE
ONE LIFT
12" MIN. COMPACTED NATIVE SOIL
98% PER AASHTO-T99C
3" ASPHALTIC SURFACE COURSE
ONE LIFT
10" COMPACTED STRUCTURAL FILL OR RECOMPACTED
NATIVE SOILS IN CUT SITUATIONS
TWO LIFTS
BITUMINOUS PRIME COAT
NOT TO SCALE
TEMPORARY ASPHALT CURB DETAIL3
EXISTING PAVEMENT
SECTION
NOTES:
1. IN AREAS OF CUT, CONTRACTOR TO OVER-EXCAVATE 10" AND BACKFILL WITH STRUCTURAL FILL OR RECOMPACTED
NATIVE SOILS. CONTRACTOR SHALL OBTAIN COMPACTION RECOMMENDATIONS FROM A LICENSED GEOTECHNICAL
ENGINEER.
EXISTING FINISHED GRADE OF
PAVED PARKING AREATEMPORARY ASPHALT CURB
BITUMINOUS PRIME COAT
0.5
0.5'
0.33'
4" S
TR
IP
IN
G
(T
YP
CURB
RESERVED
PARKING
UP TO
$500 FINE
NOTES:
1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE AMERICANS WITH DISABILITIES ACT
(ADA-CURRENT VERSION) ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES AND APPLICABLE
LOCAL AND STATE CODES.
2. 8' (96") MINIMUM PARKING SPACE WIDTH TYPICAL FOR STANDARD "CAR" AND "VAN ACCESSIBLE" ADA
PARKING SPACES.
3. 5' (60") MINIMUM ACCESS AISLE WIDTH TYPICAL FOR STANDARD "CAR" ADA PARKING SPACES; 8' (96") MINIMUM ACCESS AISLE WIDTH TYPICAL FOR STANDARD "VAN ACCESSIBLE" ADA PARKING SPACES.
4. FOR MORE EXTENSIVE STANDARDS REFER TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD) FOR STREETS AND HIGHWAYS 2023 EDITION (WITH UPDATES).
VAN
ACCESSIBLE
RESERVED
PARKING
UP TO
$500 FINE
STD. ADA
PARKING SIGN
STD. U-CHANNEL POST
(OR APPROVED
ALTERNATE)
GROUND LEVEL
"VAN ACCESSIBLE"
PARKING SIGN
(WHERE APPLICABLE)
VAN
ACCESSIBLE
RESERVED
PARKING
UP TO
$500 FINE
SEE NOTE
2 BELOW
SEE NOTE
3 BELOW
30"
60" MIN.
18"
12"
18"
12"
6"
2'
ADA PARKING
SYMBOL (WHITE)
SOLID
BACKGROUND
(BLUE)
STD. ADA
PARKING SIGN
NOT TO SCALE
ADA PAVEMENT MARKING DETAILS12
NOT TO SCALE
ADA PARKING SIGNAGE DETAILS13NOTES:
1. 6" GRADED AGGREGATE BASE AND COMPACTED SUBGRADE SHALL BE INSTALLED UNDER CURB CONSISTENT WITH
PAVEMENT TYPICAL SECTIONS.
2. CONCRETE SHALL BE GRADE A 3,000 PSI.
3. CONSTRUCTION OF CONCRETE CURBING SHALL BE BY THE "SEPARATE METHOD" WHEN SAWED JOINTS ARE
CONSTRUCTED IN THE PAVEMENT.
4. ALL CURB JOINTS SHALL BE MADE BY ACCEPTABLE FORMING METHODS.
5. *WHEN ABUTTING CONCRETE PAVEMENT, THICKNESS SHALL MATCH THICKNESS OF CONCRETE PAVEMENT.
6. **WHEN ABUTTING CONCRETE PAVEMENT, A LONGITUDINAL JOINT WITH TIE BARS OR TIE BOLT ASSEMBLIES SHALL
BE CONSTRUCTED AT THIS LOCATION IN LIEU OF PAINTED BITUMINOUS MATERIAL.
PLAIN CONCRETE CURBING
(HEADER CURB)
6"
14"
6"
8"
PAVEMENT
SURFACE
2"R
2"R
8"
**EDGE TO BE PAINTED WITH
BITUMINOUS MATERIAL
NOT TO SCALE
CONCRETE HEADER CURB DETAIL4
1/2" R
PAVEMENT
SURFACE
CURB TAPER DOWN
FULL HEIGHT
CONCRETE CURB
6"
8"
TAPER
(WIDTH VARIES, SEE PLAN)
2"
NOT TO SCALE
CURB TRANSITION DETAIL5
NOT TO SCALE
DOMESTIC WATERLINE TRENCHING DETAIL6
NOT TO SCALE
SANITARY LATERAL TRENCHING DETAIL8
NOT TO SCALE
SANITARY CLEAN-OUT DETAIL7
NEW PAVEMENT
(SEE PLAN FOR
PAVEMENT TYPE)
2" MIN. MILL/DEEP KEY
INTO EXISTING
PAVEMENT WITH NEW
TACK
COAT
EXISTING
PAVEMENT
SAW CUT. KEYED PAVEMENT
SHALL BE FLUSH WITH
EXISTING PAVEMENT
EXISTING
SUBBASE
NOT TO SCALE
PAVEMENT KEY/SAW-CUT DETAIL9
NOTES:
1. DIMENSIONS MAY BE MODIFIED AS NEEDED BASED ON PRODUCT SUPPLIER.
6" 5'-8"
3"5" 2"
6' 4" x x x x x x x x x x x
(2) #4 REBAR (TYP.)
(18" MIN. LENGTH)
3,000 PSI CONCRETE
SECTION
1"Ø HOLE (TYP.)
(2) #4 REBARS
NOT TO SCALE
WHEEL STOP DETAIL11
NOT TO SCALE
NON-ADA ACCESSIBLE SIGNAGE DETAIL10
NON-ADA
COMPLIANT
ROUTE
SEE NON-ADA
ROUTE SIGNAGE
DETAIL
STD. U-CHANNEL POST
(OR APPROVED
ALTERNATE)
GROUND LEVEL
30"
60" MIN.
18"
12"
NON-ADA ROUTE SIGN DETAIL
(CONTRACTOR SHALL OBTAIN
APPROVAL OF FINAL SIGN TYPE,
GRAPHIC, AND TEXT FROM VA)
NON-ADA
COMPLIANT
ROUTE
NOT TO SCALE
CONCRETE S/W EXPANSION JOINT DETAIL15
NOT TO SCALE
CONCRETE LIGHT POLE FOUNDATION DETAIL14
www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, X
X
X
XX
SID
EW
AL
K
SIDEWALK
CLARKSBURG PARK WAY
FREEDOM WAY
MED CENTER DR
PRIMARY CONSTRUCTION
ACCESS/SITE ENTRANCE TO PROJECT AREA
ENTRANCE IS TO BE USED AS THE PRIMARY
ACCESS FOR CONSTRUCTION ACTIVITIES
WITHIN THE PROJECT AREA
PROJECT
CONSTRUCTION
AREA
GENERAL PUBLIC ENTRANCE
CONTRACTOR VEHICLES PROHIBITED FROM
ACCESSING THE PROPERTY AT THIS LOCATION
UNLESS GIVEN PERMISSION BY THE RE/COR
GRAPHIC
SITE GRAPHIC AND KEYNOTE LEGEND
DESCRIPTION
MOBILE IMAGING TRAILER
PROJECT LIMITS OF CONSTRUCTION
· TEMPORARY ASPHALT CURB FOR STAND-OFF SETBACK
· ELECTRICAL EQUIPMENT/ENCLOSURE
· PATIENT ENCLOSURE
· CONCRETE PAD FOR MOBILE IMAGING TRAILER
· PAVEMENT REMOVAL AND REPLACEMENT FOR GRADING ACTIVITIES
TO MEET THE TRAILER CONCRETE PAD SLOPE REQUIREMENTS
· WATER AND SANITARY SERVICE LATERAL INSTALLATION
· SITE FINISHES AND FURNISHINGS
CONTRACTOR PRIMARY CONSTRUCTION
ROUTE/ACCESS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VAMC CLARKSBURG MOBILE
PAD
CLARKSBURG VA
VA PROJECT NO. 540-24-104
05/28/2025 PC BS
Revisions Date
BID SET
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRITY FEDERA
L
SERV I CES
AG PROJECT NO. 0124029
FULLY SPRINKLERED
Dwg. of 11
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
NORTH
OVERALL CONSTRUCTION SEQUENCING PLAN
C-100
CONSTRUCTION SEQUENCING ACTIVITIES:
1. CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE MEDICAL CENTER DIRECTOR AND DESIGNATED
STAFF THROUGH THE RESIDENT ENGINEER/CONTRACTING OFFICER'S REPRESENTATIVE (RE/COR) TO MINIMIZE
IMPACT TO MEDICAL CENTER OPERATION.
2. ALL COSTS TO MEET THE CONSTRUCTION SEQUENCING REQUIREMENTS SHALL BE INCLUDED IN THE
CONTRACTOR'S BID AND SHALL NOT BE THE BASIS FOR ADDITIONAL COSTS TO THE OWNER.
3. THE CONTRACTOR SHALL DEVELOP A NETWORK ANALYSIS SYSTEM (NAS) SCHEDULE DEMONSTRATING FULFILLMENT OF THE CONTRACT REQUIREMENTS IN ACCORDANCE WITH SPECIFICATION SCHEDULE. THE SCHEDULE SHALL ACCOUNT FOR ALL OPERATIONAL CONSTRUCTION SEQUENCING ACTIVITIES, PHASING AND ANY SPECIFIC IDENTIFIED WORK SEQUENCING TASKS INCLUDED IN THE CONSTRUCTION DOCUMENTS. THE SCHEDULE SHALL BE SUBMITTED, REVIEWED AND MODIFIED AS REQUIRED UNTIL APPROVED BY THE RE/COR AND MEDICAL CENTER DIRECTOR. THE APPROVED CONSTRUCTION SCHEDULE SHALL, AS MUCH AS POSSIBLE, ALLOW THE CONTRACTOR FLEXIBILITY IN THEIR MEANS AND METHODS.
4. DEVIATIONS FROM THE APPROVED CONSTRUCTION SCHEDULE SHALL BE CONSIDERED ONLY IF THE MEDICAL CENTER OPERATIONS AND/OR INCONVENIENCE TO THE PUBLIC HAVE BEEN SATISFACTORILY ADDRESSED.
SUCH DEVIATION MUST BE APPROVED IN ADVANCE IN WRITING BY THE RE/COR.
THERE ARE SPECIFIC WORK ACTIVITIES AND ELEMENTS WITHIN THIS CONTRACT THAT ARE OF A TIME SENSITIVE NATURE TO THE OPERATION OF THE MEDICAL CENTER. THESE REQUIREMENTS ARE AS FOLLOWS:
5. WORK SEQUENCING REQUIREMENTS: ALL WORK FOR THIS PROJECT MUST BE COMPLETED ON OR BEFORE THE CONTRACT COMPLETION DATE IDENTIFIED IN THE DOCUMENTS. THE WORK SEQUENCING IDENTIFIED IN THE CONTRACT DOCUMENTS IS THE BEST INFORMATION AVAILABLE AT THE TIME OF THE ISSUANCE OF THE DOCUMENTS FOR BIDDING. THE CONTRACTOR SHALL FACTOR INTO THEIR BID THAT THERE MAY BE ADJUSTMENTS IN THE WORK SEQUENCING AFTER CONTRACT AWARD DUE TO UNFORESEEN MEDICAL CENTER OPERATIONAL ISSUES. BEFORE THE START OF ANY WORK, THE CONTRACTOR IS REQUIRED TO SUBMIT A
DETAILED WORK SEQUENCING PLAN. THE GENERAL REQUIREMENTS FOR THE CONTRACTOR WORK
SEQUENCING PLAN ARE AS INDICATED BELOW:
a. THE CONTRACTOR SHALL FURNISH THE RE/COR A SCHEDULE OF APPROXIMATE DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF SITE, BUILDING OR PORTION THEREOF. IN ADDITION, THE CONTRACTOR SHALL NOTIFY THE RE/COR TWO WEEKS IN ADVANCE OF THE PROPOSED DATE OF STARTING WORK IN EACH SPECIFIC AREA OF SITE, BUILDING OR PORTION THEREOF.
ARRANGE SUCH DATES TO INSURE ACCOMPLISHMENT OF THIS WORK IN SPECIFIED SEQUENCES
MUTUALLY AGREEABLE TO THE RE/COR AND THE MEDICAL CENTER DIRECTOR.
GENERAL CONSTRUCTION REQUIREMENTS:
BEFORE ANY GENERAL CONSTRUCTION ACTIVITIES MAY COMMENCE, THE CONTRACTOR SHALL:
6. PAVEMENT REPAIR SHALL NOT BEGIN UNTIL THE MAJORITY OF THE PROJECT IS COMPLETE INCLUDING COMPLETION OF THE SIDEWALK REPAIR AND NEW ASPHALT AREAS ARE COMPLETED. BRING ANY OVERLAYED
ASPHALT GRADE TO SIDEWALK/ASPHALT GRADE.
7. RETAIN A PRIVATE UNDERGROUND LOCATOR SERVICE AT THEIR POST AND HAVE THEM PERFORM THE TRACING AND MARKING OF ALL THE ONSITE BELOW GRADE IMPROVEMENTS WITHIN OR ADJOINING THE CONTRACTOR WORK AREAS FOR THE PROJECT, WALK THE CONSTRUCTION AREAS WITH THE RE/COR AND, IF REQUESTED BY THE RE/COR, THE A/E AND ADJUST THE LOCATIONS OF THE NEW WORK AS REQUIRED TO AVOID CONFLICTS, DAMAGE OR UNINTENDED INTERRUPTIONS OF THE SERVICES BEING PROVIDED BY THE UNDERGROUND
FACILITIES.
8. OBSERVE AND DOCUMENT THE FUNCTIONALITY OF THE IRRIGATION SYSTEM IN THE VICINITY OF THE CONSTRUCTION AREA. DAMAGED OR NONFUNCTIONAL IRRIGATION SYSTEM EQUIPMENT NOT IDENTIFIED AS BEING DAMAGED OR NON-FUNCTIONAL DURING THE PRE-CONSTRUCTION SURVEY SHALL BE FULLY REPAIRED AND MADE FUNCTIONAL IMMEDIATELY UPON DETECTION OF ANY DAMAGE, AT NO ADDED COST TO THE OWNER.
9. PREPARE A CONSTRUCTION TRAFFIC CONTROL PLAN IN ACCORDANCE WITH PART 1.16 USE OF ROADWAYS IN
SPECIFICATION SECTION 01 00 01 GENERAL REQUIREMENTS.
10. COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROL BMP'S FOR THE WORK AREAS WHERE WORK WILL BE PERFORMED. INSTALL IMMEDIATELY PRIOR TO THE START OF THE WORK IN ACCORDANCE WITH THE
APPROVED EROSION AND SEDIMENT CONTROL PLAN.
11. COMPLETE ANY AND ALL OTHER CONTRACTUAL REQUIREMENTS AS IDENTIFIED ELSEWHERE IN THE
CONSTRUCTION DOCUMENTS.
12. GENERAL CONTRACTOR SHALL NOT USE GENERAL PUBLIC ENTRANCE TO THE FACILITY AT ANY TIME FOR ANY REASON, UNLESS APPROVED BY THE RE/COR AND ALL SIGNAGE NEEDED TO KEEP CONSTRUCTION TRAFFIC
AWAY FROM MAIN ENTRANCE SHALL BE PROVIDED BY CONTRACTOR AT THEIR COST.
MAINTENANCE OF TRAFFIC
13. TEMPORARY SIGNAGE IS REQUIRED THROUGHOUT THE PROJECT TO FACILITATE PUBLIC ACCESS TO THE
MEDICAL CENTER AND ADVANCE NOTIFICATION OF CONSTRUCTION ACTIVITIES.
14. CONTRACTOR SHALL USE THE PRIMARY CONSTRUCTION ACCESS.
15. MAINTAIN ONE LANE OF TRAFFIC OPEN TO THE PUBLIC AT ALL TIMES, UNLESS OTHERWISE AUTHORIZED BY THE
RE/COR.
16. EXISTING ROADWAYS SHALL REMAIN CLEAN AND FREE OF DEBRIS. ALL DEBRIS SHALL BE REMOVED AS IT
OCCURS.
17. CONTRACTOR SHALL MAINTAIN MEDICAL CENTER ROADS USED DURING CONSTRUCTION ACTIVITIES THROUGH
REGULAR STREET SWEEPING.
18. CONTRACTOR SHALL ENSURE THE NOISE FROM TRUCK AND EQUIPMENT TRAFFIC DOES NOT INTERFERE WITH
MEDICAL CENTER OPERATIONS.
19. CONTRACTOR STAGING AND STORAGE SHALL BE WITHIN AN AREA ISOLATED FROM PUBLIC ACCESS AND WHERE
APPROVED BY THE RE/COR ALONG THE CONTRACTOR CONSTRUCTION ACCESS ROADWAY.
20. EXISTING PAVEMENT REPAIR AND REPLACEMENT OPERATIONS SHALL BE PERFORMED AT NIGHT TO MINIMIZE DAYTIME ROAD CLOSURES. CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT, INCLUDING
TEMPORARY LIGHTING, AS REQUIRED.
21. ROADWAY ACCESS TO THE MEDICAL CENTER FACILITIES REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION, INCLUDING PAVING OPERATIONS. ONE LANE CLOSURES AND THE USE OF FLAGMEN IS ACCEPTABLE.
TEMPORARY USE OF MILLED ROADWAY IS ACCEPTABLE AS LONG AS THE CONTRACTOR HAS PROVIDED TRANSITIONS AND PROTECTION AROUND EXPOSED MANHOLES AND OTHER ENCUMBRANCES THAT MIGHT
DAMAGE A CAR OR ITS TIRES.
www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VAMC CLARKSBURG MOBILE
PAD
CLARKSBURG VA
VA PROJECT NO. 540-24-104
05/28/2025 PC BS
Revisions Date
BID SET
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRITY FEDERA
L
SERV I CES
AG PROJECT NO. 0124029
FULLY SPRINKLERED
Dwg. of 11
EXISTING CONDITIONS PLAN
XP101
www.abovegroupinc.com
COA/CA Lic. No. 31120
305 East Dr., Suite H, Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VAMC CLARKSBURG MOBILE
PAD
CLARKSBURG VA
VA PROJECT NO. 540-24-104
05/28/2025 PC BS
Revisions Date
BID SET
INTEGRITY
FEDERAL SERVICES
CIVIL ENGINEERING ● LANDSCAPE ARCHITECTURE ● PLANNING
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.ifs-ae.com
IN
TE
GRITY FEDERA
L
SERV I CES
AG PROJECT NO. 0124029
FULLY SPRINKLERED
Dwg. of 11
EROSION AND SEDIMENT CONTROL NOTES AND
DETAILS
GC001
EROSION AND SEDIMENT CONTROL NARRATIVE:
I. PROJECT DESCRIPTION:
THIS PROJECT IS FOR THE CONSTRUCTION OF A CONCRETE PAD FOR A FUTURE MOBILE IMAGING TRAILER AND ASSOCIATED WATER AND SEWER SERVICE STUBS. THE TOTAL PROJECT AREA IS APPROXIMATELY ±0.25 ACRES. THERE IS NO INCREASE IN IMPERVIOUS AREA PROPOSED WITH THIS PROJECT. ASSOCIATED GRADING VOLUMES FOR THE PROPOSED SITE IMPROVEMENTS ARE APPROXIMATELY100 C.Y. OF CUT AND 100 C.Y. OF FILL (NOT
TO BE USED FOR BIDDING PURPOSES).
II. EXISTING SITE CONDITIONS:
THE SITE IS LOCATED AT THE CLARKESBURG VETERAN'S MEDICAL CENTER IN CLARKSBURG, WEST VIRGINIA. THE SUBJECT PROPERTY CONSISTS OF AN EXISTING, ACTIVE AND DEVELOPED MEDICAL CENTER FACILITY. THE SITE CONSISTS OF MODERATELY STEEP AND FLAT SLOPES RANGING FROM APPROXIMATELY 1%-15%. THE SURFACE RUNOFF WITHIN THE PROJECT LIMITS DRAINS TO THE EXISTING STORM DRAIN INFRASTRUCTURE LOCATED ON
THE SITE.
III. ADJACENT AREAS:
THE PROJECT AREA IS BOUNDED BY PARKING AREAS AND DRIVE AISLES TO THE NORTH AND WEST, AND AN EXISTING MEDICAL FACILITY AND ASSOCIATED PEDESTRIAN ACCESS ROUTES TO THE WEST AND SOUTH. THERE IS LITTLE POTENTIAL FOR OFFSITE EROSION AND SEDIMENT DAMAGE BY THIS PROJECT AS TEMPORARY EROSION AND SEDIMENT CONTROLS WILL BE USED DURING CONSTRUCTION.
IV. CRITICAL AREAS:
THERE ARE NO CRITICAL AREAS ON THIS SITE. DISTURBED AREAS WILL BE PROTECTED WITH SILT FENCE, DIVERSION DIKES AND/OR OTHER CONTROL
MEASURES.
V. SOILS:
THE PROJECT AREA CONSISTS ENTIRELY OF REDEVELOPMENT AND IS LOCATED WITHIN AREAS THAT WERE PREVIOUSLY DEVELOPED. AS A RESULT, THE "URBAN LAND" SOIL CLASSIFICATION HAS BEEN IDENTIFIED FOR THIS PROJECT WITH AN HSG CLASS D RATING.
VI. POTENTIAL EROSION PROBLEM AREAS:
PER THE SOILS DATA SHOWN ABOVE, THE EXISTING SOILS LOCATED ONSITE HAVE A MODERATE-SLIGHT ERODABILITY POTENTIAL.
VII. EROSION AND SEDIMENT CONTROL ELEMENTS:
UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE CONSTRUCTED AND MAINTAINED IN STRICT COMPLIANCE WITH THE LATEST EDITION OF THE WEST VIRGINIA EROSION AND SEDIMENT CONTROL BEST MANAGEMENT
PRACTICE MANUAL AND APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.
1. MARK CLEARING LIMITS:
PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES, CLEARLY MARK ALL CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND TREES THAT ARE TO BE PRESERVED WITHIN THE CONSTRUCTION AREA. PLASTIC, METAL, OR STAKE WIRE FENCE MAY BE USED TO MARK CLEARING LIMITS. SAFETY FENCE SHOULD BE INSTALLED TO PREVENT PUBLIC ACCESS TO POTENTIALLY HAZARDOUS AREAS OF THE SITE AND TO PREVENT ACCESS TO EROSION
AND SEDIMENT CONTROL MEASURES.
2. ESTABLISH CONSTRUCTION ACCESS:
REFER TO CONSTRUCTION SEQUENCING PLAN FOR CONSTRUCTION ACCESS.
3. INSTALL SEDIMENT CONTROLS:
THE DUFF LAYER, NATIVE TOPSOIL, AND NATURAL VEGETATION SHALL REMAIN IN AN UNDISTURBED STATE TO THE MAXIMUM EXTENT PRACTICABLE.
PRIOR TO LEAVING THE CONSTRUCTION SITE, SURFACE RUNOFF FROM DISTURBED AREAS SHALL PASS THROUGH AN APPROPRIATE SEDIMENT CONTROL MEASURE. BMP'S INTENDED TO TRAP SEDIMENT ON SITE SHALL BE CONSTRUCTED AS ONE OF THE FIRST STEPS IN GRADING. THESE BMP'S SHALL BE FUNCTIONAL PRIOR TO LAND DISTURBING ACTIVITIES TAKING PLACE. EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED AS PER TEMPORARY AND PERMANENT SOIL STABILIZATION MEASURES.
SILT FENCE:
SILT FENCE SHALL BE INSTALLED ALONG THE DOWN-SLOPE SIDES OF DISTURBED AREAS TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE.
INLET PROTECTION:
INLET PROTECTION SHALL BE BE PLACED ON ALL STORM DRAIN DROP INLETS OR CURB INLETS TO TRAP SEDIMENT BEFORE CONTAMINATED RUNOFF ENTERS A STORM DRAINAGE SYSTEM. STORM DRAIN INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY FOLLOWING INSTALLATION OF STORMWATER CONTROLS OR PRIOR TO CONSTRUCTION ACTIVITIES FOR EXISTING STORM DRAINS OR WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT STABILIZATION OF THE CORRESPONDING DISTURBED DRAINAGE AREA.
4. STABILIZE SOILS:
THE GENERAL PERMIT REQUIRES THAT:
· STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOUR (4) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF
THE SITE HAS PERMANENTLY CEASED.
· APPLICABLE PRACTICES INCLUDE, BUT ARE NOT LIMITED TO, TEMPORARY AND PERMANENT SEEDING, SODDING, MULCHING, EROSION CONTROL FABRICS AND MATTING, SURFACE ROUGHENING, SURFACE WATER CONTROL, AND DUST CONTROL.
· SELECTED SOIL STABILIZATION MEASURES SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS, AND ESTIMATED DURATION OF USE.
· ALL SOIL STOCKPILES MUST BE STABILIZED AND PROTECTED WITH SEDIMENT TRAPPING MEASURES.
· LINEAR CONSTRUCTION ACTIVITIES SUCH AS RIGHT-OF-WAY AND EASEMENT CLEARING, ROADWAY DEVELOPMENT, PIPELINES, AND TRENCHING FOR UTILITIES, SHALL BE CONDUCTED TO MEET THE SOIL STABILIZATION TIMEFRAME REQUIREMENTS. CONTRACTORS SHALL INSTALL THE BEDDING MATERIALS, ROADBEDS, STRUCTURES, PIPELINES, OR UTILITIES AND RE-STABILIZE THE DISTURBED SOILS SO THAT THE FOUR (4) DAY REQUIREMENTS
ARE MET.
TEMPORARY SEEDING:
TEMPORARY STABILIZATION SHALL BE INITIATED WITHIN FOUR (4) DAYS TO AREAS THAT WILL NOT BE RE-DISTURBED FOR MORE THAN FOURTEEN (14) DAYS. AREAS INCLUDE DENUDED AREAS, SOIL STOCKPILES, DIKES, DAMS, SIDES OF SEDIMENT BASINS, TEMPORARY ROAD BANKS, ETC.
PERMANENT SEEDING:
PERMANENT STABILIZATION SHALL BE INITIATED WITHIN FOUR (4) DAYS OF REACHING FINAL GRADE AND WITHIN FOUR (4) DAYS AFTER CONSTRUCTION HAS BEEN COMPLETED. AREAS INCLUDE DISTURBED AREAS WHERE PERMANENT, LONG-LIVED VEGETATIVE COVER IS NEEDED TO STABILIZE THE SOIL AND ROUGH-GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR SIX MONTHS OR MORE.
MULCHING:
THE APPLICATION OF STRAW, HAY OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION BY PROTECTING THE SOIL SURFACE FROM RAINDROP IMPACT AND REDUCING THE VELOCITY OF OVERLAND FLOW. AREAS THAT HAVE BEEN TEMPORARILY OR PERMANENTLY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING. AREAS THAT CANNOT BE SEEDED BECAUSE OF THE SEASON SHOULD BE MULCHED TO
PROVIDE SOME PROTECTION TO THE SOIL SURFACE.
TOPSOILING:
TOPSOILING IS THE SPREADING OF TOPSOIL OF A SUITABLE QUALITY OVER AN AREA TO BE STABILIZED BY ESTABLISHING VEGETATION. IF TOPSOIL IS TO BE STOCKPILED AT SITE, IT SHALL BE IN A LOCATION THAT WILL NOTE ERODE, BLOCK DRAINAGE, OR INTERFERE WITH WORK ON THE SITE. ALL SOIL STOCKPILES SHALL BE STABILIZED BY TEMPORARY SEEDING AND MULCHING AND PROTECTED WITH SEDIMENT TRAPPING MEASURES SUCH AS SILT FENCE. TOPSOIL SHALL BE SPREAD AT A LIGHTLY COMPACTED DEPTH OF 2 TO 4 INCHES. 4 INCHES OR GREATER IS RECOMMENDED FOR AREAS WHERE
FINE-TEXTURED (CLAYEY)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .