This is Addendum No. 1 issued by the Maryland Department of Transportation Office of Maintenance, directed to all holders of contract documents for Contract No. 528CF71428, concerning maintenance and repair to highway street lighting at various locations in Carroll and Frederick counties. The bid opening remains scheduled for August 6, 2026. The addendum revises the Special Provisions section 800, establishing minimum crew requirements for lighting repair work. The addendum clarifies that prospective bidders must acknowledge receipt of all addenda through the electronic bid submission system (.ebsx file) prior to submitting their bids, with failure to do so potentially resulting in bid rejection as non-responsive.

The revised minimum crew specification requires one Electrical Foreman and two Electrical Helpers per scheduled workday, with zero Unskilled Laborers as the baseline crew composition. Any additional crew members or classifications beyond this minimum crew must be approved in advance by the project Engineer. Labor classifications deemed necessary by the Engineer but not included in the original bid items are subject to negotiation between the Contractor and Engineer and must be documented in writing prior to employment on the project. The addendum was issued July 13, 2026, and all questions concerning the contract should be directed to SHAOOMProc@mdot.maryland.gov.

View the file

Other files

File Type Posted
528CF71428 Ad Notice.pdf PDF
528CF71428 NTC #1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

TO: ALL HOLDERS OF CONTRACT DOCUMENTS

FROM: OOM DIRECTOR, DAN HOUCK

SUBJECT: CONTRACT NO.: 528CF71428

F.A.P. NO.: N/A

DESCRIPTION: MAINTENANCE AND REPAIR TO HIGHWAY STREET

LIGHTING AT VARIOUS LOCATIONS IN CARROLL AND

FREDERICK COUNTIES

DATE: July 13, 2026

Please be advised that the Bid Opening date for this project is still scheduled for August 06, 2026.

The attention of prospective bidders is directed to the following: revisions to the Invitation for Bids Booklet and Proposal Form Packet.

INVITATION FOR BIDS BOOKLET

Page Description

131 REVISED SPECIAL PROVISIONS 800 – LABOR - MINIMUM CREW FOR LIGHTING

REPAIRS

PROPOSAL FORM PACKET

Note: A revision to the proposal form packet file (528CF71428.001x) has been loaded and attached to BIDX for this proposal. Listed below are the changes to the individual sections of the proposal form packet.

General

REVISED the “Addenda Count” field from 0 to 1

Amendment/Addendum Receipt Verification Form

REVISED the number of Addenda/Amendment issued from 0 to 1

CONTRACT NO. 528CF71428

ADDENDUM NO. 1

Page Two

All questions concerning this contract should be submitted preferably in Word format to:

SHAOOMProc@mdot.maryland.gov.

Dan Houck Director - Office of Maintenance

This Addendum is issued to clarify, add to, delete from, correct and/or change the bid documents to the extent indicated and is hereby made part of the said bid documents on which the Contract will be based. COMAR 21.05.02.08 requires that all addenda issued be acknowledged prior to submitting your bid. Failure to submit a completed addenda acknowledgement/ verification through the ‘.ebsx’ file for all addenda may result in the bid being declared non-responsive.

FOR:

SPECIAL PROVISIONS CONTRACT NO. 528CF71428

800 – LABOR - MINIMUM CREW FOR LIGHTING REPAIRS 1 of 1

07/01/2022

CATEGORY 800

TRAFFIC

MINIMUM CREW FOR LIGHTING REPAIRS

1 "Minimum Crew(s)" will be required for each scheduled workday. Each minimum crew will consist of the following classes of labor:

1 Electrical Foreman per crew 2 Electrical Helper(s) per crew 0 Unskilled Laborer(s) per crew

When work is scheduled, the "minimum crew(s)” will be the normal work crew required each day, and any additional crew members to the standard crew and/or additional crews will consist of the classifications of labor required by the type of work being performed and they must have prior approval by the Engineer before they start work.

Any item of labor deemed necessary by the Engineer and not included in the Bid Items shall be subject to negotiations by the Contractor and the Engineer and agreed to in writing prior to the use of that craft.

File details come from the government source that posted it. Updated .