PROJECT SUMMARY: REPLACE BOILER STACK

This document is a set of architectural and engineering construction drawings for the "Replace Boiler Stack" project at Syracuse VA Medical Center, located at 125 Brookley Road, Rome, NY 13441. The project number is 528A7-18-707, dated 1/13/2026. The 14-sheet drawing set (drawing numbers GI-001 through MG-502) provides comprehensive demolition and construction specifications for a multi-phase replacement of the existing boiler stack and generator exhaust system at the VA Rome Community-Based Outpatient Clinic (CBOC). The project is 100% sprinklered, with work occurring in the ground floor mechanical room, first floor, second floor, penthouse, and on the roof. The scope includes hazardous materials abatement (Phase I), mechanical and structural demolition (Phase II), and new construction installation (Phase III).

Phase I addresses asbestos-containing materials (ACM) removal from the existing generator exhaust pipe, masonry chimney, and associated piping, with work coordinated to maintain operational systems critical to facility operations. Phase II includes demolition of the existing 20-inch diameter masonry chimney, removal of 6-inch and 8-inch abandoned pipes, and mechanical system isolation. Phase III involves installation of new 12-inch diameter generator exhaust piping (insulated and aluminum jacketed) and a new 14-inch diameter double-walled boiler vent stack with condensate trap relocation. The structural design includes a new galvanized steel support assembly with stainless steel vertical ductwork, designed for 50 psf wind loading and 40 psf snow loading per New York State Building Code requirements. Work requires coordination with existing mechanical and electrical systems, includes infection control precautions, carbon monoxide detection and alarm systems, and temporary construction fencing per specified details. The contractor is responsible for all means, methods, sequencing, permits, shop drawings, testing and balancing, and restoration of damaged surfaces, with work potentially performed during off-hours and weekends to minimize facility disruption.

View the file

Other files

File Type Posted
36C24226R0084 0004.docx DOCX document
528A7-18-707_Perforated Screen Drawing.pdf PDF
36C24226R0084 0003.docx DOCX document
36C24226R0084 0002.docx DOCX document
boilerspec 1.pdf PDF
36C24226R0084 0001.docx DOCX document
Final_Specification of Repair Boiler Stack 528A7-18-707.pdf PDF
52.225-9 Buy American Certificate.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION.pdf PDF
WD Oneida 5-18-2026.docx DOCX document
36C24226R0084_2.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

125 BROOKLEY RD ROME, NY 13441

1/13/2026

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

528A7-18-707REPLACE BOILER STACK

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

\52

8A 7-

-7

R ep lac e B oil er S tac k R om e C

BO

C\

De sig n C on tra ct\

Dr aw ing s\V

A

RE

DE

SI

GN

\52

8A 7-

-7

_A ll.d wg

OF 1401

GI-001

DWNAM

COVER SHEET WITH INDEX

DRAWINGS INDEX

SHEET NO. DRAWING TITLE

GENERAL

1. GI-001 COVER SHEET

CIVIL

2. CI-100 UTILITY SITE PLAN

HAZARDOUS

3. HA-101 HAZARDOUS DEMOLITION PLAN (PHASE I)

STRUCTURAL

4. S-001 STRUCTURAL ABBREVIATION & NOTES

5. S-101 STRUCTURAL STEEL TOWER (PHASE I)

6. S-102 STRUCTURAL TOWER DETAIL CONT.(PHASE I)

ARCHITECTURAL

7. A-101 ARCHITECTURAL PLANS & DETAILS (PHASE III)

FIRE ALARM

8. FA-100 CARBON MONOXIDE ALARM PLAN (PHASE II) PLANS

MECHANICAL

9. MG-001 MECHANICAL ABBREVIATION, SYMBOLS & NOTES

10. MD-101 GROUND FLOOR MECHANICAL ROOM DEMOLITION PLAN (PHASE II)

11. MD-102 MECHANICAL DEMOLITION OF ROOF AND SHAFT DETAILS

PLAN (PHASE III)

12. M-101 BOILER AND GENERATOR EXHAUST PLAN (PHASE II)

13. MG-501 MECHANICAL DETAILS

14. MG-502 MECHANICAL DETAILS

DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A7-18-707

VA ROME CBOC

125 BROOKLEY ROAD

ROME, NY 13441

REPLACE BOILER STACK

KEY PLAN

SCALE: NONE2

PROJECT LOCATION

SCALE: NONE1

AREA OF WORK

GRND, 1ST, 2ND AND

OUTSIDE AND ROOF

AREA OF WORK

PENTHOUSE AND ROOF

ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

125 BROOKLEY RD ROME, NY 13441

1/13/2026

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

528A7-18-707REPLACE BOILER STACK

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

\52

8A 7-

-7

R ep lac e B oil er S tac k R om e C

BO

C\

De sig n C on tra ct\

Dr aw ing s\V

A

RE

DE

SI

GN

\52

8A 7-

-7

_A ll.d wg

OF 1403

CI-100

KORDDWW

UTILITY SITE PLAN

ROME SITE PLAN

SCALE: 1" = 20'-0"1

DRAWING LEGEND

CATCH BASIN (SQUARE AND ROUND)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CLEANOUT

COMBINATION SANITARY/STORM SEWER

ELECTRIC DUCTBANK OR BURIED CONDUIT

OVERHEAD ELECTRICAL LINES

BURIED ELECTRIC LIGHTING CIRCUIT

ELECTRIC MANHOLE OR JUNCTION BOX

FIRE ALARM LINE

FIRE HYDRANT

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL VENT

GAS VALVE

POLE LIGHT

NATURAL GAS

OXYGEN

SANITARY SEWER

STORM SEWER

STEAM CONDENSATE RETURN

STEAM MANHOLE

SANITARY SEWER MANHOLE

STORM SEWER MANHOLE

STEAM SUPPLY

TELEPHONE OR SIGNAL DUCTBANK

BURIED CATV LINE

TELEPHONE OR SIGNAL MANHOLE

UTILITY POLE

WATER MAIN

WATER CURB VALVE

PROPERTY LINE

MONITORING WELL

JET FUEL PIPING

FENCE

DRAWING ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AG ABOVE GRADE

APPROX APPROXIMATE

ASSY ASSEMBLY

BDRY BOUNDARY

BFP BACKFLOW PREVENTER

BLDG BUILDING

C CONDUIT

CB CATCH BASIN

CI CAST IRON OR CURB INLET

CMP CORRUGATED METAL PIPE

COMM COMMUNICATIONS

CONC CONCRETE

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CO CLEANOUT

CSS COMBINATION SANITARY/STORM SEWER

CR CONDENSATE RETURN

CU COPPER

DB DUCTBANK

DI DUCTILE IRON

DIA DIAMETER

EA EACH

EL or ELEV ELEVATION OR ELEVATOR EXIST or (E) EXISTING

EDB ELECTRIC DUCTBANK

EMH ELECTRIC MANHOLE OR JUNCTION BOX (JB)

ESMT EASEMENT

EXT EXTERIOR

FF FINISHED FLOOR ELEVATION

FHYD FIRE HYDRANT

FLG FLANGE

FLTR FILTER

FT FEET OR FOOT

FTG FOOTING

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

GAL GALLONS

GND GROUND

GI GALVANIZED IRON

GV GAS VALVE

HAZMAT HAZARDOUS MATERIALS

ID INSIDE DIAMETER

INV INVERT ELEVATION

JB JUNCTION BOX

JF JET FUEL

MH MANHOLE

NG NATURAL GAS

NTS NOT TO SCALE

O2 OXYGEN

OPNG OPENING

PIV POST INDICATING VALVE

PVC POLYVINYL CHLORIDE (PLASTIC)

RCP REINFORCED CONCRETE PIPE

ROW RIGHT OF WAY

RW RETAINING WALL

SAN SANITARY SEWER

SF SQUARE FOOT (FEET)

SS SANITARY SEWER

SSMH SANITARY SEWER MANHOLE

STMH STORM SEWER MANHOLE

STS STORM SEWER

SST STAINLESS STEEL

TEL TELEPHONE

TDB TELEPHONE / SIGNAL DUCTBANK

TMH TELEPHONE / SIGNAL MANHOLE

TYP TYPICAL

UTIL UTILITY

W/ WITH

W WATER

WV WATER CURB VALVE

FHYD

CBCB

SMH

WV

MH

SAN

MH

STS

CO

MH T

MH E

N

EROSION AND SEDIMENT CONTROL

MEASURES LEGEND

IP

CW

COMPOST FILTER SOCK

STAGING AREA

INLET PROTECTION

TREE PROTECTION

CONCRETE WASHOUT

SA

EROSION CONTROL MATTING

GENERAL SITE NOTES:

1. ANY EXCESS OR UNSUITABLE MATERIAL SHALL BE TAKEN

OFFSITE TO A LOCATION WITH AN APPROVED AND VALID NPDES

PERMIT AND EROSION & SEDIMENTATION CONTROL PLAN.

IMPORTED FILL SHALL ONLY BE RECEIVED FROM A LOCATION

WITH AN APPROVED AND VALID NPDES PERMIT AND EROSION &

SEDIMENTATION CONTROL PLAN.

2. CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THE SITE

OF ALL IMPORT/EXPORT HAS AN APPROVED AND VALID NPDES

PERMIT AND EROSION & SEDIMENTATION CONTROL PLAN.

3. STABILIZE ALL SLOPES 3:1 OR GREATER WITH NAG S75 MATTING

OR EQUIVALENT. SPILLWAYS TO BE STABILIZED WITH SOD.

4. TOPSOIL SHALL BE PLACED ACROSS THE SITE AT A MINIMUM

THICKNESS OF 4 INCHES.

5. EROISION CONTROL SHALL BE IN ACCORDANCE WITH

SPECIFICATION SECTION 015719 TEMPORARY ENVIROMENTAL

CONTROL.

MH E

MH

8"

GAS METER

MH

STS

MH

STS

RIM:487.43

W:480.43

MHE

MH

E

MH E

MHE

WV

MHT

WV

WV

10"

8"

MH

STS

WV

ABOVE GROUND

AutoCAD SHX Text

811 OR 1-800-962-7962

AutoCAD SHX Text

CFS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text C5

AutoCAD SHX Text C6

AutoCAD SHX Text C11

AutoCAD SHX Text C2

AutoCAD SHX Text C1

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

X-FORMERS

AutoCAD SHX Text

LP TANK

AutoCAD SHX Text

12' HIGH WOOD FENCE

AutoCAD SHX Text C15

AutoCAD SHX Text

30" ASPEN

AutoCAD SHX Text

24" ASPEN

AutoCAD SHX Text

24" ASPEN

AutoCAD SHX Text

CONC. LANDING

AutoCAD SHX Text

20' HEDGE

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text Z

AutoCAD SHX Text

FF:489.987

AutoCAD SHX Text

12" DBL MAPLE

AutoCAD SHX Text

18" BIRCH

AutoCAD SHX Text

4" CEDAR

AutoCAD SHX Text

LOADING ZONE

AutoCAD SHX Text

FF:489.891

AutoCAD SHX Text

NO PARKING

AutoCAD SHX Text

6" CEDAR

AutoCAD SHX Text

NO PARKING

AutoCAD SHX Text

INV:494.999

AutoCAD SHX Text 300mm CMP

AutoCAD SHX Text

1 STORY

AutoCAD SHX Text

CONC. GARAGE

AutoCAD SHX Text

FF:501.913

AutoCAD SHX Text

FF:501.799

AutoCAD SHX Text

FF:501.925

AutoCAD SHX Text

FF:501.940

AutoCAD SHX Text

FF:501.939

AutoCAD SHX Text

6' HIGH 24"

AutoCAD SHX Text

FF:501.998

AutoCAD SHX Text

FF:501.924

AutoCAD SHX Text

FLAGPOLE

AutoCAD SHX Text

18" MAPLE

AutoCAD SHX Text

24" ASPEN

AutoCAD SHX Text

VA CLINIC

AutoCAD SHX Text

CB

AutoCAD SHX Text

TG:500.065

AutoCAD SHX Text

SW:496.465

AutoCAD SHX Text W:497.115

AutoCAD SHX Text

1 STY

AutoCAD SHX Text

SHED

AutoCAD SHX Text

"RESERVED PARKING"

AutoCAD SHX Text

ANY TIME

AutoCAD SHX Text

NO PARKING

AutoCAD SHX Text

ANY TIME

AutoCAD SHX Text

VA CLINIC

AutoCAD SHX Text

VA

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

CLINIC

AutoCAD SHX Text

VA

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

CLINIC

AutoCAD SHX Text

RESERVED

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

RADIATOR

AutoCAD SHX Text

HOUSING

AutoCAD SHX Text

ASPHALT PATH

AutoCAD SHX Text

ASPH. SIDEWALK

AutoCAD SHX Text

HYD

AutoCAD SHX Text

HYD

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

PAD

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

PAD

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

O'HANG

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

RW

AutoCAD SHX Text

RW

AutoCAD SHX Text

RW

AutoCAD SHX Text

HYD

AutoCAD SHX Text 9 C.L.F.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

MARKED WITH FLAGS

AutoCAD SHX Text

12" CMP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text THIS PIPE WAS LOCATED FROM RECORD DRAWING INFORMATION PROVIDED BY OTHERS. DRAINAGE MANHOLE WAS NOT LOCATED IN THE FIELD.

AutoCAD SHX Text

COOLING TOWER

AutoCAD SHX Text

CONC. PAD

AutoCAD SHX Text

VA CBOC

AutoCAD SHX Text

(NEW) BOILER STACK, STRUCTURAL TOWER LOCATION

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.

C la ss

II

ICRA NOTES

1. CONTRACTOR SHALL PROVIDE REQUIRED INFECTION

CONTROL PRECAUTIONS AS SHOWN IN CHART FOR ALL

WORK TO BE DONE UNDER THIS PROJECT.

2. IF AREA OF WORK IS IN QUESTION, COORDINATE WITH VA

REPRESENTATIVE FOR CLASSIFICATION OF AREA.

3. ADDITIONAL REQUIRMENT APPLY FOR ASBESTOS

REMEDIATION (STATE & FEDERAL)

PATIENT RISK GROUP FOR "TYPE C" CONSTRUCTION

LOW RISK GROUP

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES.

· SANDING OF WALLS FOR PAINTING OR WALL COVERING

· REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

· NEW WALL CONSTRUCTION

· MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS

· MAJOR CABLING ACTIVITIES

· ANY ACTIVITIES THAT CANNOT BE COMPLETED WITHIN A SINGLE

WORK SHIFT.

CLASS II

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

125 BROOKLEY RD ROME, NY 13441

1/13/2026

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

528A7-18-707REPLACE BOILER STACK

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

\52

8A 7-

-7

R ep lac e B oil er S tac k R om e C

BO

C\

De sig n C on tra ct\

Dr aw ing s\V

A

RE

DE

SI

GN

\52

8A 7-

-7

_A ll.d wg

OF 1402

HA-101

KORDDWW

HAZARDOUS DEMOLITION PLAN

(PHASE I)

FIRST FLOOR DEMOLITION PLAN

1/4" = 1'-0"2

GROUND FLOOR ABATEMENT DEMOLITION

3/16"= 1'-0"1

GENERAL NOTES:

1. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATION AND APPLICABLE

REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY LICENSED BY THE NYSDOL. ALL CERTIFICATES AND LICENSES ARE TO BE READILY AVAILABLE FOR VERIFICATION BY THE VETERANS AFFAIRS MEDICAL CENTER (VAMC).

2. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND

ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

3. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

4. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY EXISTING ASBESTOS CONTAMINATION, DUST AND

DEBRIS WITHIN THE REMOVAL AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT ACTIVITIES OR HIS PERSONNEL.

6. CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE SCOPE OF WORK UNDER THIS CONTRACT.

7. SOME OF THE WORK MAY BE PHASED TO ACCOMMODATE THE VAMC FACILITY REQUIREMENTS. WORK MAY HAVE TO BE PERFORMED OFF-HOURS, WEEKENDS AND AT NIGHT AT NO ADDITIONAL COST TO THE VAMC.

8. THE PROJECT SHALL BE FILED AS A LARGE PROJECT WITH THE NYSDOL AND USEPA.

9. REPLACE INSULATION WHERE REMOVED FROM PIPING SLATED TO REMAIN. REFER TO INSULATION

SPECIFICATION FOR MORE INFORMATION.

10. EXISTING CONDITION OF FLOOR SLAB, ROOF DECK, AND ROOF SLAB INSIDE AND ABOVE SHAFT ARE UNKNOWN.

PROVIDE SHOP DRAWINGS OF EXISTING FLOOR/CEILING SLAB CONDITIONS ONCE SHAFT IS OPEN.

CONTRACTOR SHALL DEMOLISH SLABS AND/OR DECK AS NECESSARY FOR WORK. PROVIDE SHOP DRAWINGS

OF FLOOR & CEILING OPENINGS SIGNED BY NYS-PE FOR APPROVAL.

ASBESTOS ABATEMENT NOTES:

1. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) AND ASBESTOS CONTAMINATED

MATERIALS IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VAMC SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS AN OVERLAP THE MOST

STRINGENT REGULATION SHALL APPLY.

2. THE ASBESTOS ABATEMENT CONTRACTOR SHALL PERFORM GLOVEBAG REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES FOR MINOR QUANTITIES OF PIPE INSULATION. NONFRIABLE ACM REMOVAL SHALL BE PERFORMED WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE CONTAINMENTS. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECONTAMINATION UNIT AS SHOWN ON THE ACCOMPANYING DRAWING (1-HA-101).

THE ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. NEGATIVE AIR PRESSURE CONTAINMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS THE ENCLOSURES SHALL BE SHEATHED FOR SAFETY. SPECIFIC AREAS OF WALL PLASTER, ENCLOSING THE PIPE INSULATION, WILL NEED TO BE REMOVED AS ASBESTOS-CONTAMINATED MATERIAL TO ACCESS THE UNDERLYING PIPE INSULATION. REMOVAL OF THE WALL PLASTER SHALL BE PERFORMED WITHIN THE HEPA-FILTERED NEGATIVE AIR PRESSURE ENCLOSURES. ONLY REMOVE THE WALL PLASTER DIRECTLY ENCLOSING THE PIPE INSULATION. THE REMAINING WALL PLASTER CAN BE REMOVED AND DISPOSED OF AS CONSTRUCTION DEBRIS FOLLOWING ABATEMENT.

THE CONTRACTOR SHALL ALSO ABATE ANY DEBRIS AS ACM THAT IS PRESENT. FIRE DOORS CAN BE REMOVED INTACT, WRAPPED AND LABELLED AS ACM AFTER THE HEPA-FILTERED NEGATIVE AIR PRESSURE ENCLOSURE HAS BEEN ERECTED.

3. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HAZARDOUS WASTE DUMPSTER WITH THE COR AT THE

PRECONSTRUCTION MEETING.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT

ACTIVITIES.

5. THE GENERATOR SHALL BE SHUT DOWN, LOCKED OUT, AND TAGGED BEFORE THE CONTRACTOR IS TO BEGIN ABATEMENT ACTIVITIES. MECHANICAL AND ELECTRICAL SYSTEMS, WHICH CANNOT BE LOCKED OUT AND TAGGED, SHALL BE

PROTECTED AND SUPPORTED THROUGHOUT ASBESTOS ABATEMENT ACTIVITIES.

6. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE V.A. NUMEROUS MECHANICAL AND ELECTRICAL SYSTEMS MUST REMAIN OPERATIONAL THROUGHOUT THE PROJECT. THESE SYSTEMS ARE CRITICAL TO THE VAMC'S OPERATION AND MUST BE PRESERVED AND PROTECTED THROUGHOUT THE ASBESTOS ABATEMENT PROJECT. SOME OF THE WORK MAY BE PHASED TO ACCOMMODATE VAMC FACILITY REQUIREMENTS. WORK MAY HAVE TO BE PERFORMED DURING REGULAR (0800-1600) OFF-HOURS (1600-0000), WEEKENDS AND AT NIGHT (0000-0800). SOME WORK MAY HAVE TO BE PERFORMED 24-HOURS AROUND THE CLOCK FOR SPECIFIC MECHANICAL AND OPERATIONAL SHUTDOWNS. COORDINATE 24-HOUR OPERATIONS WITH VAMC SHUTDOWNS. SCHEDULING OF THIS WORK IS CRITICAL TO THE OPERATION OF THE

FACILITY.

7. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS. ALL UTILITIES AND PIPING SHALL BE LOCKED

OUT AND TAGGED BEFORE THE CONTRACTOR IS TO BEGIN ABATEMENT ACTIVITIES.

8. SELECTIVE DEMOLITION IS REQUIRED PRIOR TO ABATEMENT. COORDINATE WITH GENERAL CONTRACTOR AND

CONTRACTOR OFFICER'S REPRESENTATIVE.

SECOND FLOOR DEMOLITION PLAN

1/4" = 1'-0"2

KEYED NOTES:

REMOVE ACM ON GENERATOR EXHAUST PIPE BEFORE WORK TO

TEMPORARILY EXHAUST THE GENERATOR BEGINS. ACM SHALL BE

REMOVED A DISTANCE AWAY FROM TEMPORARY CONNECTION

POINT TO CREATE SAFE WORK SPACE FOR GENERATOR EXHAUST

RE-ROUTING. SEE ASBESTOS DRAWINGS FOR ABATEMENT

PROCEDURE. GENERATOR SHALL BE SHUTDOWN WHILE ACM

ABATEMENT IS HAPPENING. SHUTDOWN SHALL OCCUR DURING

NON-BUSINESSHOURS AND SHALL BE COORDINATED WITH THE VA

COR.

PROVIDE TEMPORARY FENCING 10' AWAY FROM EXHAUST PIPES

AND STRUCTURES, AND INCLUDING STRUCTURAL FOUNDATION IN

ALL THREE DIRECTIONS. PROVIDE GATE PLAN SOUTH OF EXHAUST

PIPES IN THE FENCE. SEE DETAIL 9/MG-502 AND SHEET MD-101.

PROVIDE SIGN ON ALL THREE SIDE OF FENCE STATING:"DANGER.

HOT EXHAUST PIPE. AUTHORIZED PERSONNEL ONLY. EXHAUST CAN

TURN ON AT ANY TIME."

ALL WINDOWS ON THE FLOORS ABOVE THESE PIPES, WITHIN 10

FEET HORIZONTALLY SHALL BE MADE INOPERABLE UNTIL THE

TEMPORARY EXHAUST PIPES ARE NO LONGER IN USE AND

REMOVED.

2 3

N

N

N

DEMOLISH EXISTING CMU.

SEE GENERAL NOTE 2 &

DEMOLISH EXISTING CMU.

SEE GENERAL NOTE 2 & 10

DRAWING LEGEND:

TEMPORARY ICRA 2 HOUR FIRE-RATED BARRIER WITH 36" 11

2 HOUR DOOR

CONSTRUCTION WORK BOUNDARY

WALK-OFF MAT

FENCE

WALL TO BE DEMOLISHED

PIPING AND DUCTWORK:

P1

AT ALL REMOVED CHASES AND WALLS: REMOVE ALL INSULATION ON

PIPES WITH ACM. REMOVE ALL PIPES IN SCOPE OF WORK EXCEPT

FOR RISERS TO BE FITTED WITH NEW INSULATION. CUT AND CAP

ALL PIPES DETERMINED TO BE DEAD OR ABANDONED.

NOTE

1. SEE SHEET A-101.

NOTE

1. SEE SHEET A-101.

G134

MECH

G134A

GENERATOR

GS2

STAIR 2

O

AI

APPROXIMATE

LIMITS OF ACM

EXHAUST PIPE

INSULATION

DCSP

1S2

STAIR 2

LINEN

ALCOVE

2S2

STAIR 2

MC3

CORRIDOR

MC-4

CORRIDOR

AutoCAD SHX Text

ASBESTOS

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

QTY

AutoCAD SHX Text

TOTAL AREA/ LENGTH

AutoCAD SHX Text

12" PIPE

AutoCAD SHX Text

AutoCAD SHX Text

65 LF

AutoCAD SHX Text

PIPES 8"

AutoCAD SHX Text

AutoCAD SHX Text

30 LF

AutoCAD SHX Text

PIPE 6"

AutoCAD SHX Text

30 LF

ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

125 BROOKLEY RD ROME, NY 13441

1/13/2026

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

528A7-18-707REPLACE BOILER STACK

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

\52

8A 7-

-7

R ep lac e B oil er S tac k R om e C

BO

C\

De sig n C on tra ct\

Dr aw ing s\V

A

RE

DE

SI

GN

\52

8A 7-

-7

_A ll.d wg

OF 1404

S-001

KORDDWW

STRUCTURAL ABBREVIATIONS &

NOTES

ABBREVIATIONS

GENERAL STRUCTURAL & CONSTRUCTION NOTES

WELDING SYMBOLS

FILET WELD AT ARROW SIDE

FLARE BEVEL LONG TOP/BOTTOM ALL AROUND

WELD ALL AROUND

FIELD WELD

V WELD AT ARROW SIDE

SQUARE WELD AT ARROW SIDE

AutoCAD SHX Text

CMU

AutoCAD SHX Text

COL

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONN

AutoCAD SHX Text

CONT

AutoCAD SHX Text Ø

AutoCAD SHX Text

DWG

AutoCAD SHX Text

EL

AutoCAD SHX Text

EMBED

AutoCAD SHX Text (E)

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

EXP

AutoCAD SHX Text

FDN

AutoCAD SHX Text

FT

AutoCAD SHX Text

GA

AutoCAD SHX Text

GALV

AutoCAD SHX Text

HS

AutoCAD SHX Text

INFO

AutoCAD SHX Text

MEP

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MIN

AutoCAD SHX Text

NTS

AutoCAD SHX Text

NW

AutoCAD SHX Text

OC

AutoCAD SHX Text

PSF

AutoCAD SHX Text

PSI

AutoCAD SHX Text

REINF

AutoCAD SHX Text

SOG

AutoCAD SHX Text

SPECS

AutoCAD SHX Text

STRUCT

AutoCAD SHX Text T/

AutoCAD SHX Text

TYP

AutoCAD SHX Text

UNO

AutoCAD SHX Text

VIF

AutoCAD SHX Text W/

AutoCAD SHX Text

WWF

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

COLUMN

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONNECTION

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

EMBEDMENT

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXPANSION

AutoCAD SHX Text

FOUNDATION

AutoCAD SHX Text

FEET

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

GALVANIZED

AutoCAD SHX Text

HIGH STRENGTH

AutoCAD SHX Text

INFORMATION

AutoCAD SHX Text

MECHANICAL ELECTRICAL PLUMBING

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NORMAL WEIGHT

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

POUNDS PER SQUARE FOOT

AutoCAD SHX Text

POUNDS PER SQUARE INCH

AutoCAD SHX Text

REINFORCEMENT

AutoCAD SHX Text

SLAB ON GRADE

AutoCAD SHX Text

SPECIFICATIONS

AutoCAD SHX Text

STRUCTURAL

AutoCAD SHX Text

TOP OF

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

VERIFY IN FIELD

AutoCAD SHX Text

WITH

AutoCAD SHX Text

WELDED WIRE FABRIC

AutoCAD SHX Text

ELECT

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

PLUMBING

AutoCAD SHX Text

PLUMB

SL

AutoCAD SHX Text

SLOPE

AutoCAD SHX Text

CFMF

AutoCAD SHX Text

COLD FORM METAL FRAMING

AutoCAD SHX Text

CJ

AutoCAD SHX Text

CONTROL JOINT

AutoCAD SHX Text

LB

AutoCAD SHX Text

LONG BARS

AutoCAD SHX Text

SB

AutoCAD SHX Text

SHORT BARS

AutoCAD SHX Text

PEN

AutoCAD SHX Text

PENETRATION

AutoCAD SHX Text (D)

AutoCAD SHX Text

DEMOLISH

AutoCAD SHX Text

IN

AutoCAD SHX Text

INCHES

AutoCAD SHX Text

EJ

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

SCH

AutoCAD SHX Text

SCHEDULE

AutoCAD SHX Text GENERAL 1. ALL WORK SHALL CONFORM TO THE: ALL WORK SHALL CONFORM TO THE: A. 2024 INTERNATIONAL BUILDING CODE 2024 INTERNATIONAL BUILDING CODE B. VA DESIGN CODES VA DESIGN CODES C. AND TO ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. AND TO ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. 2. IN CASE OF CONFLICT BETWEEN THE GENERAL NOTES, SPECIFICATIONS, AND DETAILS, THE MOST RIGID IN CASE OF CONFLICT BETWEEN THE GENERAL NOTES, SPECIFICATIONS, AND DETAILS, THE MOST RIGID REQUIREMENTS SHALL GOVERN. 3. WORK NOT INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT WORK NOT INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN IN CORRESPONDING PLACES SHALL BE REPEATED. 4. JOB SITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE JOB SITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 5. THE CONTRACTOR SHALL PROVIDE FOR DEWATERING AS REQUIRED DURING EXCAVATION AND THE CONTRACTOR SHALL PROVIDE FOR DEWATERING AS REQUIRED DURING EXCAVATION AND CONSTRUCTION. 6. THE CONTRACTOR SHALL COORDINATE OPENINGS, SLEEVES, CONCRETE HOUSEKEEPING PADS, INSERTS THE CONTRACTOR SHALL COORDINATE OPENINGS, SLEEVES, CONCRETE HOUSEKEEPING PADS, INSERTS AND DEPRESSIONS SHOWN ON THE ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS. 7. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF MASONRY AND DRYWALL NON-LOAD BEARING SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF MASONRY AND DRYWALL NON-LOAD BEARING PARTITIONS. PROVIDE SLIP CONNECTIONS THAT ALLOW VERTICAL MOVEMENT AT THE HEADS OF ALL SUCH PARTITIONS. CONNECTIONS SHALL BE DESIGNED TO SUPPORT THE TOP OF THE WALLS LATERALLY FOR THE CODE-REQUIRED LATERAL LOAD. 8. ALL COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR IMPROPER INSTALLATION OF ALL COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR IMPROPER INSTALLATION OF STRUCTURAL ELEMENTS OR OTHER ITEMS NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS SHALL BE AT THE CONTRACTOR'S EXPENSE. 9. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE SPECIFICATIONS, THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE SPECIFICATIONS, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS. IF THERE IS A DISCREPANCY BETWEEN DRAWINGS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER PRIOR TO PERFORMING THE WORK. 10. THE CONTRACTOR SHALL COORDINATE NEW EQUIPMENT STRUCTURES SHOWN ON THE CONTRACT THE CONTRACTOR SHALL COORDINATE NEW EQUIPMENT STRUCTURES SHOWN ON THE CONTRACT DRAWINGS WITH MANUFACTURER'S APPROVED SHOP DRAWINGS. ALL DIMENSIONS, DETAILS AND STRUCTURAL DESIGN REVISIONS REQUIRED TO ACCOMMODATE APPROVED EQUIPMENT SHALL BE MADE BY THE CONTRACTOR AT NO COST TO THE OWNER. 11. THE CONTRACTOR SHALL SUBMIT, FOR REVIEW, DRAWINGS AND CALCULATIONS FOR ALL PERFORMANCE THE CONTRACTOR SHALL SUBMIT, FOR REVIEW, DRAWINGS AND CALCULATIONS FOR ALL PERFORMANCE ASSEMBLIES IDENTIFIED IN THE SPECIFICATIONS, GENERAL NOTES AND LISTED BELOW. THE DESIGN OF THESE ASSEMBLIES IS THE RESPONSIBILITY OF THE CONTRACTOR'S ENGINEER REGISTERED IN THE PROJECT'S JURISDICTION. ALL SUBMITTALS SHALL BEAR THIS ENGINEER'S SEAL AND SIGNATURE. REVIEW SHALL BE FOR GENERAL CONFORMANCE WITH THE PROJECT REQUIREMENTS AS INDICATED ON THE DRAWINGS AND IN THE GENERAL NOTES: A. NON-LOAD BEARING STUD WALL AND CURTAIN WALL SYSTEMS AND RELATED CONNECTIONS - NON-LOAD BEARING STUD WALL AND CURTAIN WALL SYSTEMS AND RELATED CONNECTIONS - DESIGNS SHALL TAKE IN TO ACCOUNT ALL VERTICAL AND LATERAL LOADS REQUIRED BY APPLICABLE BUILDING CODES. BACK UP SYSTEM AND CURTAIN WALL SHALL BE DESIGNED FOR A MAXIMUM DEFLECTIONS OF 1/600 OF THE SPAN, OR 3/8", WHICHEVER IS LESS, AT THE APPLICABLE DESIGN WIND LOAD. 12. SHOP DRAWINGS FOR ALL STRUCTURAL MATERIALS TO BE SUBMITTED TO COR FOR REVIEW PRIOR TO SHOP DRAWINGS FOR ALL STRUCTURAL MATERIALS TO BE SUBMITTED TO COR FOR REVIEW PRIOR TO THE START OF FABRICATION OR COMMENCEMENT OF WORK. REVIEW PERIOD SHALL BE A MINIMUM OF TWO (2) WEEKS. A. REPRODUCTION OF ANY PORTION OF THE STRUCTURAL CONTRACT DRAWINGS FOR RESUBMITTAL AS REPRODUCTION OF ANY PORTION OF THE STRUCTURAL CONTRACT DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE REJECTED AND RETURNED. B. SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S STAMP OF APPROVAL, WHICH SHALL CONSTITUTE SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S STAMP OF APPROVAL, WHICH SHALL CONSTITUTE CERTIFICATION THAT THE CONTRACTOR HAS VERIFIED ALL CONSTRUCTION CRITERIA, MATERIALS AND SIMILAR DATA AND HAS CHECKED EACH DRAWING FOR COMPLETENESS, COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS. C. THE SHOP DRAWINGS SHALL INCLUDE ALL COORDINATED DIMENSIONS. THE SHOP DRAWINGS SHALL INCLUDE ALL COORDINATED DIMENSIONS. SPECIAL INSPECTIONS 1. INSPECTION IS REQUIRED OF ALL CONSTRUCTION DELINEATED ON THE STRUCTURAL DRAWINGS AND/OR INSPECTION IS REQUIRED OF ALL CONSTRUCTION DELINEATED ON THE STRUCTURAL DRAWINGS AND/OR SPECIFICATIONS. THE CONTRACTOR SHALL ENGAGE A TESTING AGENCY TO PROVIDE TESTING SERVICES AS INDICATED IN EACH SECTION OF THESE GENERAL NOTES. THE TESTING AGENCY SHALL PROVIDE PERSONNEL CERTIFIED BY INSTITUTE OF CERTIFIED ENGINEERING TECHNICIANS, OR OTHER RECOGNIZED COMPARABLE ORGANIZATION. THE WORK SPECIFICALLY REQUIRING SPECIAL INSPECTIONS AS FOLLOWS: A. STRUCTURAL CONCRETE INSPECTION STRUCTURAL CONCRETE INSPECTION B. STRUCTURAL MASONRY INSPECTION STRUCTURAL MASONRY INSPECTION C. STRUCTURAL STEEL INSPECTION STRUCTURAL STEEL INSPECTION D. SOILS/SUBGRADE INSPECTION SOILS/SUBGRADE INSPECTION E. SEISMIC RESTRAINT OF NON-STRUCTURAL COMPONENTS SEISMIC RESTRAINT OF NON-STRUCTURAL COMPONENTS SUBMIT PERIODIC REPORTS WITHIN ONE (1) BUSINESS DAY AFTER RECEIPT BY THE CONTRACTOR TO COR DURING CONSTRUCTION. SUBMIT FINAL INSPECTION REPORT SUMMARY FOR EACH DIVISION OF WORK, CERTIFIED BY A LICENSED PROFESSIONAL ENGINEER, THAT INSPECTIONS WERE PERFORMED AND THAT WORK WAS PERFORMED IN ACCORDANCE WITH CONTRACT DOCUMENTS. EXISTING CONDITIONS 1. ALL DIMENSIONS, ELEVATIONS, AND PHYSICAL CONDITIONS SHOWN ON THE DRAWINGS FOR EXISTING ALL DIMENSIONS, ELEVATIONS, AND PHYSICAL CONDITIONS SHOWN ON THE DRAWINGS FOR EXISTING STRUCTURES ARE BASED ON LIMITED FIELD OBSERVATIONS OR OTHER AVAILABLE SOURCES. SUCH DEPICTIONS OF EXISTING CONSTRUCTION ARE INTENDED TO BE GENERAL, APPROXIMATE, AND LIMITED TO THOSE AREAS FOR WHICH WORK IS REQUIRED. THESE DEPICTIONS ARE PROVIDED ONLY FOR THE CONVENIENCE OF THE CONTRACTOR. PRIOR TO BIDDING, CONDUCT A CAREFUL AND THOROUGH EXAMINATION OF EXISTING CONDITIONS AT THE SITE APPLICABLE TO THE WORK. 2. THE EXACT EXTENT OF THE CONSTRUCTION WORK CANNOT BE NECESSARILY OR ACCURATELY DETERMINED THE EXACT EXTENT OF THE CONSTRUCTION WORK CANNOT BE NECESSARILY OR ACCURATELY DETERMINED PRIOR TO THE COMMENCEMENT OF WORK. ACTUAL FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO THE CONSTRUCTION DETAILS, MATERIAL QUANTITIES, AND EXTENT OF THE MODIFICATION WORK SHOWN ON CONTRACT DRAWINGS. PERFORM THE WORK TO MEET FIELD CONDITIONS ENCOUNTERED. 3. THE CONTRACTOR SHALL VERIFY ALL EXISTING BUILDING INFORMATION SHOWN (DIMENSIONS, ELEVATIONS, THE CONTRACTOR SHALL VERIFY ALL EXISTING BUILDING INFORMATION SHOWN (DIMENSIONS, ELEVATIONS, ETC.) AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO FABRICATION OF ANY STRUCTURAL COMPONENT. 4. THE CONTRACTOR SHALL VERIFY AND/OR ESTABLISH ALL EXISTING CONDITIONS AND DIMENSIONS AT THE THE CONTRACTOR SHALL VERIFY AND/OR ESTABLISH ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE BEFORE STARTING CONSTRUCTION AND/OR SUBMITTING SHOP DRAWINGS. IF THE EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN ACCORDANCE WITH THE DETAILS SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AND PROVIDE A SKETCH OF THE CONDITION WITH HIS PROPOSED MODIFICATION OF THE DETAILS GIVEN ON THE CONTRACT DOCUMENTS. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND THE COR APPROVES MODIFICATION. FAILURE TO NOTIFY ENGINEER OF UNSATISFACTORY CONDITIONS CONSTITUTES ACCEPTANCE OF UNSATISFACTORY CONDITIONS. 5. INCORPORATE ACTUAL FIELD CONDITIONS AND DIMENSIONS IN THE WORK AND INDICATE CHANGES AND INCORPORATE ACTUAL FIELD CONDITIONS AND DIMENSIONS IN THE WORK AND INDICATE CHANGES AND ADJUSTMENTS ON SUBMITTED DRAWING 6. WHERE ALTERATIONS INVOLVE THE EXISTING SUPPORTING STRUCTURE, EXISTING STRUCTURAL WHERE ALTERATIONS INVOLVE THE EXISTING SUPPORTING STRUCTURE, EXISTING STRUCTURAL COMPONENTS (MASONRY WALLS, FACADE PANELS, ETC.), ADJACENT CONSTRUCTION, AND/OR ADJACENT UTILITY LINES, THE CONTRACTOR SHALL PROVIDE SHORING AND PROTECTION REQUIRED TO MAINTAIN STRUCTURAL INTEGRITY AND PREVENT ANY LATERAL OR VERTICAL MOVEMENTS OF ALL EXISTING AND ADJACENT SITE STRUCTURES AND UTILITIES. A. BRACING, SHEETING, SHORING, UNDERPINNING, ETC., REQUIRED TO ENSURE THE STRUCTURAL BRACING, SHEETING, SHORING, UNDERPINNING, ETC., REQUIRED TO ENSURE THE STRUCTURAL INTEGRITY OF THE EXISTING BUILDINGS OR NEW CONSTRUCTION, SIDEWALKS, UTILITIES, ETC., SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER ENGAGED BY THE CONTRACTOR. DETAILED SIGNED AND SEALED SHOP DRAWINGS SHALL BE PREPARED INDICATING ALL WORK TO BE PERFORMED, SUBMIT THE SHOP DRAWINGS IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. B. THE CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE ALLOWABLE CONSTRUCTION LOADS AND TO THE CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE ALLOWABLE CONSTRUCTION LOADS AND TO PROVIDE DESIGN AND CONSTRUCTION OF FALSEWORK, FORMWORK, STAGINGS, BRACING, SHEETING AND SHORING, ETC. 7. IN NO CASE SHALL HEAVY EQUIPMENT BE PERMITTED CLOSER THAN 8'-0" FROM ANY FOUNDATION WALL. IN NO CASE SHALL HEAVY EQUIPMENT BE PERMITTED CLOSER THAN 8'-0" FROM ANY FOUNDATION WALL. IF IT IS NECESSARY TO OPERATE SUCH EQUIPMENT CLOSER THAN 8'-0" TO THE WALL, THE CONTRACTOR SHALL BE THE SOLE RESPONSIBLE PARTY AND, AT HIS OWN EXPENSE, SHALL PROVIDE ADEQUATE SUPPORTS OR BRACE THE WALL TO WITHSTAND THE ADDITIONAL LOADS SUPERIMPOSED FROM SUCH EQUIPMENT. 8. NO BLASTING SHALL BE PERMITTED WITHOUT WRITTEN APPROVAL. NO BLASTING SHALL BE PERMITTED WITHOUT WRITTEN APPROVAL. CONSTRUCTION OPERATIONS 1. NOTIFY THE COR OF ANY CONFLICT ON CONTRACT DOCUMENTS DURING BID. IN CASE OF CONFLICT IN NOTIFY THE COR OF ANY CONFLICT ON CONTRACT DOCUMENTS DURING BID. IN CASE OF CONFLICT IN THE CONTRACT DRAWINGS OR THE PROJECT SPECIFICATIONS, THE MOST STRINGENT REQUIREMENT SHALL APPLY. 2. AFTER THE AWARD OF THE CONTRACT, THE CONTRACTOR MAY NOT SUBMIT ANY CLAIM ALLEGING AFTER THE AWARD OF THE CONTRACT, THE CONTRACTOR MAY NOT SUBMIT ANY CLAIM ALLEGING INSUFFICIENT DATA, INCORRECTLY ASSUMED CONDITIONS, OR MISUNDERSTANDING WITH REGARD TO MATTERS FOR WHICH NO SUCH CLARIFICATION WAS SOUGHT DURING THE BIDDING PHASE OF THE PROJECT, AS DESCRIBED FURTHER IN THE GENERAL CONDITION CONTRACT. 3. ASSUME AN ABSOLUTE OBLIGATION TO PROTECT EXISTING STRUCTURES AND EQUIPMENT, NEW WORK AND ASSUME AN ABSOLUTE OBLIGATION TO PROTECT EXISTING STRUCTURES AND EQUIPMENT, NEW WORK AND THE GENERAL PUBLIC FROM DAMAGE, LOSS OR INJURY RESULTING FROM THE CONTRACTOR'S OPERATIONS. IN THE EVENT OF SUCH DAMAGE OR LOSS, PROMPTLY REPLACE OR RESTORE THE WORK TO AN EQUIVALENT QUALITY TO THE SATISFACTION OF THE COR AND AT NO EXPENSE TO THE OWNER. 4. REMOVE TO THE EXTENT INDICATED AND PROPERLY DISPOSE OF EXISTING STRUCTURES AND MATERIALS REMOVE TO THE EXTENT INDICATED AND PROPERLY DISPOSE OF EXISTING STRUCTURES AND MATERIALS TO BE DEMOLISHED IN ACCORDANCE WITH THE SPECIFICATIONS. 5. ALL WORK SPECIFIED HEREIN SHALL BE INSPECTED IN ACCORDANCE WITH THE BUILDING CODE AND ALL ALL WORK SPECIFIED HEREIN SHALL BE INSPECTED IN ACCORDANCE WITH THE BUILDING CODE AND ALL LOCAL ORDINANCES. THE COR MAY VISIT THE SITE TO ASCERTAIN GENERAL CONFORMANCE WITH THE CONTRACT DOCUMENTS. SUCH SITE VISITS ARE NOT TO BE CONSTRUED AS MEETING ANY INSPECTION REQUIREMENTS UNLESS THE COR SPECIFICALLY SO STATES IN WRITING. 6. RFI & RFC ARE REQUIRED TO BE COMMUNICATED FORMALLY AND IN WRITING TO THE COR AS PROVIDED RFI & RFC ARE REQUIRED TO BE COMMUNICATED FORMALLY AND IN WRITING TO THE COR AS PROVIDED IN THIS GENERAL NOTES. THE PURPOSE OF THIS POLICY IS TO AVOID COMMUNICATION WITH UNAUTHORIZED PERSONS AND TO MINIMIZE MISINFORMATION AND SPECULATION. THE COR WILL NOT RECOGNIZE AND CANNOT BE OBLIGATED TO ANY REQUEST THAT HAS NOT BEEN COMMUNICATED IN THE MANNER SET FORTH ABOVE. THE COR CANNOT BE RESPONSIBLE FOR ANY MISCOMMUNICATION OR MISINFORMATION OBTAINED IN VIOLATION OF THIS POLICY AND RESERVES THE RIGHT TO REJECT ANY REQUEST IN THE EVENT THAT ANY PERSON FAILS TO ADHERE TO THIS POLICY. 7. ALL OFFICIAL DIRECTIONS TO THE CONTRACTO SHALL COME FROM THE CONTRACTING OFFICER. ALL OFFICIAL DIRECTIONS TO THE CONTRACTO SHALL COME FROM THE CONTRACTING OFFICER. 8. THE CONTRACTING OFFICER IS THE ONLY PERSON AUTHORIZED TO CONTRACTUALLY BOND THE THE CONTRACTING OFFICER IS THE ONLY PERSON AUTHORIZED TO CONTRACTUALLY BOND THE GOVERMENT 9. ALL MATERIALS SHALL BE STORED TO PROTECT THEM FROM EXPOSURE TO THE ELEMENTS. ALL MATERIALS SHALL BE STORED TO PROTECT THEM FROM EXPOSURE TO THE ELEMENTS. 10. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. 11. CONTRACTOR SHALL RETAIN THE SERVICES OF A PROFESSIONAL ENGINEER LICENSED BY THE STATE OF CONTRACTOR SHALL RETAIN THE SERVICES OF A PROFESSIONAL ENGINEER LICENSED BY THE STATE OF NEW YORK TO DESIGN, INSPECT AND APPROVE METHODS AND MEANS OF PERFORMING DEMOLITION, STRUCTURAL AND CIVIL WORK INCLUDING BUT NOT LIMITED TO DEMOLITION, TEMPORARY SHORING, EARTHWORK AND UNDERPINNING, CONCRETE WORK AND STRUCTURE TEMPORARY LOADING. SELECTIVE DEMOLITION 1. CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PERSONS AND DAMAGE TO ADJACENT CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PERSONS AND DAMAGE TO ADJACENT STRUCTURES, FACILITIES AND SITE IMPROVEMENTS TO REMAIN. ENSURE SAFE PASSAGE OF PERSONS AROUND SELECTIVE DEMOLITION AREA. LOCATE AND RE-ROUTE ANY EXISTING UTILITY PRIOR TO STARTING THE WORK. 2. DEMOLISH AND REMOVE EXISTING CONSTRUCTION TO THE EXTENT INDICATED ON THE DRAWINGS, OR AS DEMOLISH AND REMOVE EXISTING CONSTRUCTION TO THE EXTENT INDICATED ON THE DRAWINGS, OR AS OTHERWISE NECESSARY TO ACCOMMODATE NEW CONSTRUCTION. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS. 3. PROMPTLY PATCH AND REPAIR DAMAGED SURFACES IN ADJOINING CONSTRUCTION TO REMAIN, WHICH ARE PROMPTLY PATCH AND REPAIR DAMAGED SURFACES IN ADJOINING CONSTRUCTION TO REMAIN, WHICH ARE CAUSED BY SELECTIVE DEMOLITION OPERATIONS. 4. THE OWNER WILL USE AND OCCUPY PORTIONS OF THE FACILITY AND SITE IMMEDIATELY ADJACENT TO THE OWNER WILL USE AND OCCUPY PORTIONS OF THE FACILITY AND SITE IMMEDIATELY ADJACENT TO SELECTIVE DEMOLITION AREA. CONDUCT SELECTIVE DEMOLITION SO THAT OWNER'S OPERATIONS WILL NOT BE DISRUPTED. PROVIDE NOT LESS THAN SEVEN (7) CALENDAR DAYS NOTICE TO THE COR OF ACTIVITIES THAT WILL AFFECT OWNER'S OPERATIONS. 5. THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITIONS OF COMPONENTS AND SITE THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITIONS OF COMPONENTS AND SITE ELEMENTS TO BE SELECTIVELY DEMOLISHED. 6. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS OFF-SITE. DO NOT PERMIT DEMOLISHED MATERIALS TO PROMPTLY DISPOSE OF DEMOLISHED MATERIALS OFF-SITE. DO NOT PERMIT DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE. TRANSPORT DEMOLISHED MATERIALS OFF THE OWNER'S PROPERTY AND DISPOSE OF IN A SAFE AND LAWFUL MANNER. 7. THE CONTRACTOR SHALL USE EXTREME CAUTION IN THE DEMOLITION OF PORTIONS OF THE EXISTING THE CONTRACTOR SHALL USE EXTREME CAUTION IN THE DEMOLITION OF PORTIONS OF THE EXISTING BUILDING. SUCH DEMOLITION SHALL BE PERFORMED IN A MANNER AS TO MAINTAIN THE STRUCTURAL INTEGRITY OF ALL EXISTING TO REMAIN. PROVIDE TEMPORARY SHORING WHERE REQUIRED. EARTHWORK 1. THE CONTRACTOR SHALL RETAIN THE SERVICES OF A PROFESSIONAL GEOTECHNICAL ENGINEER, SUBJECT THE CONTRACTOR SHALL RETAIN THE SERVICES OF A PROFESSIONAL GEOTECHNICAL ENGINEER, SUBJECT TO THE APPROVAL OF THE ENGINEER, TO PERFORM SOIL TESTING AND INSPECTION. THE CONTRACTOR'S ENGINEER SHALL INSPECT THE SUBGRADE TO VERIFY GEOTECHNICAL ENGINEERING DESIGN RECOMMENDATIONS. INSPECTION REPORTS SHALL BE SUBMITTED TO THE COR OUTLINING THE WORK PERFORMED AND TEST RESULTS. 2. PROVIDE SHEETING, SHORING, AND UNDERPINNING AS REQUIRED. REFER TO GENERAL NOTES BELOW. PROVIDE SHEETING, SHORING, AND UNDERPINNING AS REQUIRED. REFER TO GENERAL NOTES BELOW. 3. EXCAVATION SHALL BE PERFORMED SO AS NOT TO DISTURB EXISTING ADJACENT BUILDINGS, STREETS EXCAVATION SHALL BE PERFORMED SO AS NOT TO DISTURB EXISTING ADJACENT BUILDINGS, STREETS AND UTILITY LINES. VERIFY LOCATION OF ALL UTILITIES PRIOR TO COMMENCEMENT OF WORK. INFORM AND OBTAIN REQUIRED PERMITS FROM OWNERS OF UTILITIES, AND COORDINATE WITH COR PRIOR TO WORK. HAND EXCAVATE AROUND UTILITIES AS REQUIRED. 4. THE CONTRACTOR SHALL OBSERVE STORM WATER CONDITIONS AT THE SITE AND TAKE THE NECESSARY THE CONTRACTOR SHALL OBSERVE STORM WATER CONDITIONS AT THE SITE AND TAKE THE NECESSARY PRECAUTIONS TO ENSURE THAT THE FOUNDATION EXCAVATIONS ARE PROTECTED AND REMAIN DRY DURING CONSTRUCTION. ANY SHEETING OR SHORING REQUIRED FOR DEWATERING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. PROVIDE SUFFICIENT DEWATERING MEASURES TO MAINTAIN GROUND WATER IF ENCOUNTERED AT LEAST 2 FEET BELOW WORKING SUBGRADE. 5. REMOVE EXISTING VEGETATION, TOPSOIL AND UNSATISFACTORY SOIL MATERIALS. PROOF ROLL SUBGRADE REMOVE EXISTING VEGETATION, TOPSOIL AND UNSATISFACTORY SOIL MATERIALS. PROOF ROLL SUBGRADE TO OBTAIN UNIFORMLY DENSIFIED SUBSTRATA PRIOR TO PLACING FILL. 6. SATISFACTORY FILL MATERIALS ARE THOSE COMPLYING WITH ASTM D2487, GROUPS GW, GP, GM, SM, SW SATISFACTORY FILL MATERIALS ARE THOSE COMPLYING WITH ASTM D2487, GROUPS GW, GP, GM, SM, SW AND SP. ON SITE BORROW MATERIAL SHALL BE TESTED TO DETERMINE SUITABILITY FOR USE AS FILL MATERIAL. 7. ENGINEERED (CONTROLLED COMPACTED) FILL WITHIN THE BUILDING AREA SHALL BE CONSTRUCTED PRIOR ENGINEERED (CONTROLLED COMPACTED) FILL WITHIN THE BUILDING AREA SHALL BE CONSTRUCTED PRIOR TO FOOTING EXCAVATION. SEE SPECIFICATIONS FOR REQUIREMENTS ENGINEERED FILL. 8. PLACE FILL MATERIAL EVENLY IN 8" THICK (MAXIMUM) LAYERS AND COMPACTING TO REQUIRED DENSITY. PLACE FILL MATERIAL EVENLY IN 8" THICK (MAXIMUM) LAYERS AND COMPACTING TO REQUIRED DENSITY. COMPACT SOIL TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DENSITY OF MODIFIED PROCTOR (ASTM D1557): A. UNDER BUILDING FOUNDATIONS: 98% UNDER BUILDING FOUNDATIONS: 98% B. UNDER BUILDING SLABS, STEPS PAVEMENTS: 95% UNDER BUILDING SLABS, STEPS PAVEMENTS: 95% 9. BACKFILL SHALL BE BROUGHT UP SIMULTANEOUSLY ON EACH SIDE OF WALLS AND GRADE BEAMS, WITH BACKFILL SHALL BE BROUGHT UP SIMULTANEOUSLY ON EACH SIDE OF WALLS AND GRADE BEAMS, WITH A GRADE DIFFERENCE NOT TO EXCEED 2'-0" AT ANY TIME. 10. DO NOT BACKFILL AGAINST BASEMENT WALLS UNTIL BASEMENT SLAB ON GRADE AND ALL FRAMED SLABS DO NOT BACKFILL AGAINST BASEMENT WALLS UNTIL BASEMENT SLAB ON GRADE AND ALL FRAMED SLABS ARE IN PLACE AND HAVE ATTAINED THE SPECIFIED DESIGN STRENGTH. PROVIDE TEMPORARY SHORING WHERE REQUIRED. FOUNDATIONS 1. ALLOWABLE BEARING CAPACITY: THE FOUNDATIONS ARE DESIGNED AND SHALL BEAR ON COMPACTED ALLOWABLE BEARING CAPACITY: THE FOUNDATIONS ARE DESIGNED AND SHALL BEAR ON COMPACTED SUBGRADE CAPABLE OF SAFELY SUPPORTING 1000 PSF BASED ON EXISTING DRAWINGS. 2. PRIOR TO FOOTING CONCRETE PLACEMENT, THE FOOTING SUBGRADE SHALL BE APPROVED BY THE PRIOR TO FOOTING CONCRETE PLACEMENT, THE FOOTING SUBGRADE SHALL BE APPROVED BY THE INSPECTING GEOTECHNICAL ENGINEER. IF CONDITIONS PROVE TO BE UNACCEPTABLE AT THE WORKING ELEVATIONS, INSPECTING GEOTECHNICAL ENGINEER SHALL PROVIDE RECOMMENDATIONS TO ACHIEVE THE SPECIFIED DESIGN BEARING CAPACITY, SUBJECT TO THE APPROVAL OF THE ENGINEER. 3. THE BOTTOM OF EXTERIOR FOOTINGS SHALL BE A MINIMUM OF 3'-6" FEET BELOW FINISHED GRADE, OR THE BOTTOM OF EXTERIOR FOOTINGS SHALL BE A MINIMUM OF 3'-6" FEET BELOW FINISHED GRADE, OR AS REQUIRED BY LOCAL BUILDING CODES. 4. THE BEARING ELEVATIONS OF NEW FOOTINGS ADJACENT TO EXISTING FOOTINGS ARE TO MATCH THE THE BEARING ELEVATIONS OF NEW FOOTINGS ADJACENT TO EXISTING FOOTINGS ARE TO MATCH THE ADJACENT EXISTING FOOTING BEARING ELEVATIONS UNLESS INDICATED OTHERWISE ON PLANS. 5. SLABS ON GRADE SHALL BEAR ON MECHANICALLY COMPACTED SOIL CAPABLE OF SUPPORTING 150 PSF. SLABS ON GRADE SHALL BEAR ON MECHANICALLY COMPACTED SOIL CAPABLE OF SUPPORTING 150 PSF. DRAINAGE FILL UNDER SLABS SHALL BE COMPACTED GRAVEL OF CRUSHED STONE. 6. CONCRETE FOR FOUNDATIONS SHALL BE POURED ON THE SAME DAY THE SUBGRADE IS APPROVED BY CONCRETE FOR FOUNDATIONS SHALL BE POURED ON THE SAME DAY THE SUBGRADE IS APPROVED BY THE GEOTECHNICAL ENGINEER. 7. UTILITY LINES SHALL NOT BE PLACED THROUGH OR BELOW FOUNDATIONS WITHOUT THE ENGINEER'S UTILITY LINES SHALL NOT BE PLACED THROUGH OR BELOW FOUNDATIONS WITHOUT THE ENGINEER'S APPROVAL. 8. PROVIDE A CONTINUOUS WATERSTOP AT ALL HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS IN ALL PROVIDE A CONTINUOUS WATERSTOP AT ALL HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS IN ALL SUBGRADE WALLS. 9. THE CONTRACTOR SHALL OBSERVE WATER CONDITIONS AT THE SITE AND TAKE THE NECESSARY THE CONTRACTOR SHALL OBSERVE WATER CONDITIONS AT THE SITE AND TAKE THE NECESSARY PRECAUTIONS TO ENSURE THAT THE FOUNDATION EXCAVATIONS REMAIN DRY DURING CONSTRUCTION. ANY SHEETING OR SHORING REQUIRED FOR DEWATERING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE NEED TO USE FOUNDATION REBAR THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE NEED TO USE FOUNDATION REBAR AS A GROUNDING ELECTRODE SYSTEM AND SHALL BE RESPONSIBLE FOR INSTALLING THE BONDING CLAP PRIOR TO PLACEMENT OF THE CONCRETE. 11. GEO TECH FABRIC SHALL BE AASHTO M288-17, S300 GEO TECH FABRIC SHALL BE AASHTO M288-17, S300 SHEETING AND SHORING 1. SHEETING, SHORING AND ASSOCIATED EXCAVATION SHALL BE PERFORMED IN ACCORDANCE WITH OSHA SHEETING, SHORING AND ASSOCIATED EXCAVATION SHALL BE PERFORMED IN ACCORDANCE WITH OSHA GUIDELINES. 2. STRUCTURAL STEEL SOLDIER PILES AND RELATED MISCELLANEOUS FRAMING SHALL HAVE A MINIMUM STRUCTURAL STEEL SOLDIER PILES AND RELATED MISCELLANEOUS FRAMING SHALL HAVE A MINIMUM YIELD STRESS OF 36,000 PSI. WELDING ELECTRODES SHALL BE E70. 3. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI AT 28 DAYS. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI AT 28 DAYS. CAST-IN-PLACE CONCRETE 1. CONCRETE SHALL BE DESIGNED AND DETAILED IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS CONCRETE SHALL BE DESIGNED AND DETAILED IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318), AND CONSTRUCTED IN ACCORDANCE WITH THE CRSI MANUAL OF STANDARD PRACTICE. 2. CONCRETE SHALL HAVE MINIMUM COMPRESSIVE 28 DAY STRENGTH AS FOLLOWS: CONCRETE SHALL HAVE MINIMUM COMPRESSIVE 28 DAY STRENGTH AS FOLLOWS: TYPE: F'C (PSI) F'C (PSI) FOOTINGS: 5,000 5,000 WALLS: 5,000 5,000 INTERIOR SLAB-ON-GRADE: 4,000 4,000 EXTERIOR SLAB-ON-GRADE: 5,000 5,000 SITE CONCRETE: 5,000 5,000 3. AIR ENTRAINMENT SHALL BE 5% TO 6% IN ALL EXPOSED CONCRETE WORK. AIR ENTRAINMENT SHALL BE 5% TO 6% IN ALL EXPOSED CONCRETE WORK. 4. MAXIMUM WATER/CEMENT RATIOS: MAXIMUM WATER/CEMENT RATIOS: A. FOUNDATIONS: 0.45 FOUNDATIONS: 0.45 0.45 B. INTERIOR SLABS: 0.45 INTERIOR SLABS: 0.45 0.45 C. EXTERIOR SLABS: 0.40 EXTERIOR SLABS: 0.40 0.40 5. ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE (144 PCF +) WITH ALL CEMENT CONFORMING TO ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE (144 PCF +) WITH ALL CEMENT CONFORMING TO ASTM C150, TYPE I. MAXIMUM AGGREGATE SIZE SHALL BE 3/4" FOR FOOTINGS, WALLS, AND SLABS, CONFORMING TO ASTM C33. 6. REINFORCING STEEL: ASTM A615, GRADE 60. REINFORCING STEEL: ASTM A615, GRADE 60. 7. WELDED WIRE REINFORCEMENT: (WWR) ASTM A-185. WELDED WIRE REINFORCEMENT: (WWR) ASTM A-185. 8. LEVELING GROUT SHALL BE NON-SHRINK, NON-METALLIC TYPE, FACTORY PRE-MIXED GROUT IN LEVELING GROUT SHALL BE NON-SHRINK, NON-METALLIC TYPE, FACTORY PRE-MIXED GROUT IN ACCORDANCE WITH CE-CRD-C621 OR ASTM C109, WITH A MINIMUM COMPRESSIVE 28 DAY STRENGTH OF 5,000 PSI. 9. REINFORCING STEEL CLEAR COVER SHALL BE AS FOLLOWS UNLESS NOTED OTHERWISE: REINFORCING STEEL CLEAR COVER SHALL BE AS FOLLOWS UNLESS NOTED OTHERWISE: A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3" CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3" B. CONCRETE EXPOSED TO EARTH OR WEATHER: CONCRETE EXPOSED TO EARTH OR WEATHER: #6 BARS AND LARGER: 2" #5 BARS AND SMALLER: 1-1/2" C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: SLABS, WALLS & JOISTS #11 BARS AND SMALLER: 3/4" BEAMS AND COLUMNS: 1-1/2" 1-1/2" 10. PRIOR TO PLACING BARS, THE CONTRACTOR SHALL SUBMIT TO COR REINFORCING STEEL SHOP DRAWINGS PRIOR TO PLACING BARS, THE CONTRACTOR SHALL SUBMIT TO COR REINFORCING STEEL SHOP DRAWINGS FOR APPROVAL. 11. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WHILE PLACING CONCRETE. PROVIDE PLASTIC ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WHILE PLACING CONCRETE. PROVIDE PLASTIC TIPPED BOLSTERS AND CHAIRS AT ALL LOCATIONS WHERE THE CONCRETE SURFACE IN CONTACT WITH THE BOLSTERS OF CHAIRS IS EXPOSED. IF REQUIRED, ADDITIONAL BARS, STIRRUPS OR CHAIRS SHALL BE PROVIDED BY THE CONTRACTOR TO FURNISH SUPPORT FOR ALL BARS. 12. SPLICES IN REINFORCING BARS SHALL BE SPLICED PER ACI 318 WITH CLASS B TENSION LAP SPLICE. SPLICES IN REINFORCING BARS SHALL BE SPLICED PER ACI 318 WITH CLASS B TENSION LAP SPLICE. UNLESS SHOWN OTHERWISE ON THE DRAWINGS AND CALCULATED IN ACCORDANCE WITH ACI 318 AND APPROVED BY THE ENGINEER. REINFORCING BARS SHALL BE DEVELOPED PER ACI 318. 13. LAP WELDED WIRE REINFORCEMENT TWO (2) FULL WIRE SPACES AT SPLICES AND WIRE TOGETHER. LAP WELDED WIRE REINFORCEMENT TWO (2) FULL WIRE SPACES AT SPLICES AND WIRE TOGETHER. 14. ADHESIVE SHALL BE USED WHERE DOWELS ARE TO BE INSTALLED INTO EXISTING CONCRETE. ADHESIVE ADHESIVE SHALL BE USED WHERE DOWELS ARE TO BE INSTALLED INTO EXISTING CONCRETE. ADHESIVE SHALL BE HILTI HIT-HY 200 OR APPROVED EQUAL. 15. PLACING OF CONCRETE SHALL NOT START UNTIL THE PLACEMENT OF REINFORCING HAS BEEN APPROVED PLACING OF CONCRETE SHALL NOT START UNTIL THE PLACEMENT OF REINFORCING HAS BEEN APPROVED BY THE INSPECTION AGENCY. 16. PRIOR TO PLACING CONCRETE, THE CONTRACTOR SHALL SUBMIT TO THE COR FOR REVIEW, A CONCRETE PRIOR TO PLACING CONCRETE, THE CONTRACTOR SHALL SUBMIT TO THE COR FOR REVIEW, A CONCRETE POUR SCHEDULE SHOWING LOCATION OF ALL PROPOSED CONSTRUCTION JOINTS AND WATERSTOPS. 17. PRIOR TO PLACING CONCRETE, THE CONTRACTOR SHALL SUBMIT TO THE COR FOR REVIEW, CONCRETE PRIOR TO PLACING CONCRETE, THE CONTRACTOR SHALL SUBMIT TO THE COR FOR REVIEW, CONCRETE MIX DESIGNS PREPARED IN ACCORDANCE WITH THE SPECIFICATION AND REQUIREMENTS INDICATED IN THE GENERAL NOTES. 18. BONDING AGENT SHALL BE USED WHERE NEW CONCRETE IS PLACED AGAINST EXISTING CONCRETE. CLEAN BONDING AGENT SHALL BE USED WHERE NEW CONCRETE IS PLACED AGAINST EXISTING CONCRETE. CLEAN AND ROUGHEN TO 1/4" AMPLITUDE ALL EXISTING CONCRETE SURFACES TO RECEIVE NEW CONCRETE PRIOR TO PLACEMENT. 19.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .