This document outlines the scope of work for a federal contract solicitation to replace joint sealants and pressure wash exterior precast concrete panels at a Department of Veterans Affairs medical center building. The solicitation provides drawings indicating the locations of joints to be sealed and notes specifying that existing mesh panels covering windows should be removed, stored, cleaned, and reinstalled after pressure washing. The scope of work also includes cleaning procedures for the precast concrete panels in accordance with National Concrete Masonry Association guidelines. The related federal contract opportunity is solicitation number 36C24223B0047 to provide joint sealant replacement and pressure washing services at VA Building 20 under Veterans Health Administration VISN 2.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAWNYDollmR Text Box THIS SHEET PROVIDED AS REFERENCE TO SCOPE OF WORK APPLICABLE TO PROJECT 528-21-144 FOR THE EXTERIOR JOINT SEALANT REPLACEMENT (CAULK & POWERWASH) PROJECT
VHAWNYDollmR Text Box ELEVATIONS AND DETAILS WHICH MAY PROVIDE REFERENCE AND INFORMATION TO JOINT SEALANT LOCATIONS ARE OUTLINED IN RED
VHAWNYDollmR Rectangle
VHAWNYDollmR Rectangle
VHAWNYDollmR Callout REMOVE, TEMPORARILY STORE, CLEAN AND REINSTALL EXISTING METAL AWNING OVER DOORWAY AFTER PRESSURE WASHING OF CONCRETE PANELS IS COMPLETE
VHAWNYDollmR Callout
REMOVE EXISTING VAMC BOX SIGN ON WEST FACADE.
PATCH EXISTING CONCRETE PANELS W/ MASONRY GROUT TO MATCH COLOR & TEXTURE OF EXISTING PANELS PRIOR TO PRESSURE WASHING EXISTING PANELS
VHAWNYDollmR Text Box
VA MEDICAL CENTER
VHAWNYDollmR Text Box 02/27/2023
VHAWNYDollmR Text Box 528-21-144
VHAWNYDollmR Text Box
VHAWNYDollmR Rectangle
VHAWNYDollmR Rectangle
VHAWNYDollmR Rectangle
VHAWNYDollmR Rectangle
VHAWNYDollmR Callout
NOTES FOR EXISTING MESH PANELS (NOT SHOWN ON DRAWING):
1. REMOVE, CATALOG, ORGANIZE AND STORE EXISTING MESH PANELS COVERING WINDOWS.
2. REMOVE AND REPLACE JOINT SEALANTS AROUND PERIMETER OF WINDOW FRAME.
3. PRESSURE WASH EXISTING BUILDING AND WASH EXISTING WINDOW EXTERIOR PRIOR TO REINSTALLING MESH PANELS.
4. REINSTALL MESH PANELS IN SAME LOCATIONS AS CATALOGED AND PROVIDE NEW FASTENERS AS REQUIRED IN MATERIAL AND COLOR AS REMOVED FASTENERS. UPSIZE FASTENER IF REQUIRED TO PROPERLY ANCHOR INTO EXISTING HOLE.
VHAWNYDollmR Line
VHAWNYDollmR Line
VHAWNYDollmR Rectangle
VHAWNYDollmR Rectangle
VHAWNYDollmR Rectangle
VHAWNYDollmR Line
VHAWNYDollmR Line
VHAWNYDollmR Line
VHAWNYDollmR Text Box
BUILDING 20, JOINT SEALANT REPLACEMENT &
POWERWASH PROJECT
VHAWNYDollmR Text Box
CLEANING & PRESSURE WASHING OF PRECAST CONCRETE PANELS:
| A. | Remove excess joint sealant from exposed surfaces immediately. |
| B. | Remove excess droppings and other foreign substances from wall surfaces. |
| C. | Wet surfaces with clean water. |
| D. | Clean exposed pre-cast panels surfaces on completion of all joint sealants per National Concrete Masonry Association Tek Bulletin 08-02A; WATER CLEANING METHOD |
| E. | If deemed necessary to removed dirt and stains, Brush pre-cast panel surfaces with stiff fiber brushes while washing. |
| F. | Immediately after washing, rinse with clean water. |
| G. | Remove any and all traces of foreign streaks or stains. |