528-21-144 - Dwg 20-8 - Exterior Elevation East and West.pdf

PDF 2 MB Posted

Attached to
Z1DA--NRM-CONST 528-21-144 BUILDING 20 JOINT SEALANT REPLACEMENT AND PRESSURE WASHING
Solicitation number
36C24223B0047
Issued by

About this file

This document outlines the scope of work for a federal contract solicitation to replace joint sealants and pressure wash exterior precast concrete panels at a Department of Veterans Affairs medical center building. The solicitation provides drawings indicating the locations of joints to be sealed and notes specifying that existing mesh panels covering windows should be removed, stored, cleaned, and reinstalled after pressure washing. The scope of work also includes cleaning procedures for the precast concrete panels in accordance with National Concrete Masonry Association guidelines. The related federal contract opportunity is solicitation number 36C24223B0047 to provide joint sealant replacement and pressure washing services at VA Building 20 under Veterans Health Administration VISN 2.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAWNYDollmR Text Box THIS SHEET PROVIDED AS REFERENCE TO SCOPE OF WORK APPLICABLE TO PROJECT 528-21-144 FOR THE EXTERIOR JOINT SEALANT REPLACEMENT (CAULK & POWERWASH) PROJECT

VHAWNYDollmR Text Box ELEVATIONS AND DETAILS WHICH MAY PROVIDE REFERENCE AND INFORMATION TO JOINT SEALANT LOCATIONS ARE OUTLINED IN RED

VHAWNYDollmR Rectangle

VHAWNYDollmR Rectangle

VHAWNYDollmR Callout REMOVE, TEMPORARILY STORE, CLEAN AND REINSTALL EXISTING METAL AWNING OVER DOORWAY AFTER PRESSURE WASHING OF CONCRETE PANELS IS COMPLETE

VHAWNYDollmR Callout

REMOVE EXISTING VAMC BOX SIGN ON WEST FACADE.

PATCH EXISTING CONCRETE PANELS W/ MASONRY GROUT TO MATCH COLOR & TEXTURE OF EXISTING PANELS PRIOR TO PRESSURE WASHING EXISTING PANELS

VHAWNYDollmR Text Box

VA MEDICAL CENTER

VHAWNYDollmR Text Box 02/27/2023

VHAWNYDollmR Text Box 528-21-144

VHAWNYDollmR Text Box

VHAWNYDollmR Rectangle

VHAWNYDollmR Rectangle

VHAWNYDollmR Rectangle

VHAWNYDollmR Rectangle

VHAWNYDollmR Callout

NOTES FOR EXISTING MESH PANELS (NOT SHOWN ON DRAWING):

1. REMOVE, CATALOG, ORGANIZE AND STORE EXISTING MESH PANELS COVERING WINDOWS.

2. REMOVE AND REPLACE JOINT SEALANTS AROUND PERIMETER OF WINDOW FRAME.

3. PRESSURE WASH EXISTING BUILDING AND WASH EXISTING WINDOW EXTERIOR PRIOR TO REINSTALLING MESH PANELS.

4. REINSTALL MESH PANELS IN SAME LOCATIONS AS CATALOGED AND PROVIDE NEW FASTENERS AS REQUIRED IN MATERIAL AND COLOR AS REMOVED FASTENERS. UPSIZE FASTENER IF REQUIRED TO PROPERLY ANCHOR INTO EXISTING HOLE.

VHAWNYDollmR Line

VHAWNYDollmR Line

VHAWNYDollmR Rectangle

VHAWNYDollmR Rectangle

VHAWNYDollmR Rectangle

VHAWNYDollmR Line

VHAWNYDollmR Line

VHAWNYDollmR Line

VHAWNYDollmR Text Box

BUILDING 20, JOINT SEALANT REPLACEMENT &

POWERWASH PROJECT

VHAWNYDollmR Text Box

CLEANING & PRESSURE WASHING OF PRECAST CONCRETE PANELS:

A.Remove excess joint sealant from exposed surfaces immediately.
B.Remove excess droppings and other foreign substances from wall surfaces.
C.Wet surfaces with clean water.
D.Clean exposed pre-cast panels surfaces on completion of all joint sealants per National Concrete Masonry Association Tek Bulletin 08-02A; WATER CLEANING METHOD
E.If deemed necessary to removed dirt and stains, Brush pre-cast panel surfaces with stiff fiber brushes while washing.
F.Immediately after washing, rinse with clean water.
G.Remove any and all traces of foreign streaks or stains.

File details come from the government source that posted it. Updated .