This document is a clarification memorandum regarding a federal construction contract for joint sealant replacement and pressure washing at a Veterans Affairs medical center. The contract requires amendments to the scope of work due to the discovery of an existing adjacent electrical upgrade project. Specifically, joint sealant replacement and pressure washing must be omitted from areas on the north, east, and south sides of Building 20 where electrical cable trays have been temporarily attached to the exterior precast concrete panels. The contractor must also provide temporary protection of the cable trays during pressure washing using waterproof tarps. The contracting officer is requested to issue an amendment to Solicitation Number 36C24223B0047 to clarify the omitted work areas due to the existing electrical cable trays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA WESTERN NEW YORK HEALTHCARE SYSTEM
FACILITIES ENGINEERING
BUFFALO VA MEDICAL CENTER | 3495 BAILEY AVENUE, BUFFALO, NY 14215 | (716) 834-9200
CLARIFICATION Project Number: 528-21-144
Project Name: Building 20 Joint Sealant Replacement & Pressure Washing
RFI Topic: Existing Electrical Cable Tray
Contract Number: 36C24223B0047 Vendor: TBD
Contracting Specialist: Tanya Baldwin
Date: 02 Nov 2023
SOURCE
Discovery of existing adjacent Electrical Upgrade project installed work as part of the Pre-Bid Walk through 17 Oct 2023.
CLARIFICATION
Although not shown on the construction drawings issued for bid, and due to the construction progression of the adjacent electrical upgrade project the Contractor shall amend the replacement of the joint sealants and associated pressure washing on building 20 as follows:
1. North Side of Building 20 as follows:
a. Removal and replacement of the joint sealants on North side of building shall stop at a maximum of 6” above the installed electrical cable tray which has been temporarily attached to the existing precast concrete panels.
b. Removal and replacement of the horizontal joint sealant only below the electrical cable tray location shall be omitted at this time.
c. Pressure washing of façade on North side of building shall omit the area currently occupied by the cable tray and it’s supports.
d. Temporary protection of the cable tray using waterproof tarps during the remainder of the pressure washing shall be included by this contractor.
2. East Side of Building 20 as follows:
a. Removal and replacement of the joint sealants on East side of building shall stop at a maximum of 6” above the installed electrical cable tray which has been temporarily attached to or may be laying against and adjacent to the existing precast concrete panels.
b. Removal and replacement of the horizontal joint sealant only below the electrical cable tray location shall be omitted at this time.
c. Pressure washing of façade on East side of building shall omit the area currently occupied by the cable tray and it’s supports.
d. Temporary protection of the cable tray using waterproof tarps during the remainder of the pressure washing shall be included by this contractor.
e. Removal and replacement of newly installed joint sealants around new structural penetrations supporting the metal heating/cooling pipes shall remain and be become part of the final project.
Clarification VAMC Project A/E Firm Existing Electrical Cable Tray 528-21-144 N/A
02 Nov 2023 Building 20 Joint Sealant Replacement & Pressure Washing
TBD
3. South Side of Building 20 as follows:
a. Removal and replacement of the joint sealants on South side of building shall stop at a maximum of 6” above the installed electrical cable tray which has been temporarily attached to or may be laying against and adjacent to the existing precast concrete panels.
b. Removal and replacement of the horizontal joint sealant only below the electrical cable tray location shall be omitted at this time.
c. Pressure washing of façade on South side of building shall omit the area currently occupied by the cable tray and it’s supports.
d. Temporary protection of the cable tray using waterproof tarps during the remainder of the pressure washing shall be included by this contractor.
See Requested Actions below.
REQUESTED ACTIONS
VA Contracting Officer:
Request that an amendment to Solicitation 36C24223B0047 be issued to clarify the omission of work due to the presence of the existing electrical cable tray currently installed on the exterior face of building 20 under the adjacent electrical upgrade project.
SUBMITTED BY
Robert A. Dollman Contracting Officer Representative