528-19-108 Nuc Med DWG Package.pdf
PDF 29 MB Posted
- Solicitation number
- 36C24222B0045
About this file
This document provides details on a federal contract solicitation for nuclear medicine equipment site preparation. The solicitation number is 36C24222B0045 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 for the project named "Z1DA--528-19-108B NUCLEAR MEDICINE EQUIPMENT SITE PREPARATION." The bid date and time is June 21, 2022 at 2:00 PM EST. The solicitation is seeking bids for site preparation services related to nuclear medicine equipment for a Veterans Affairs medical facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222B0045 0006.docx | DOCX document | |
| ICRA Amendment 6-23-2022.pdf | ||
| 36C24222B0045 0005.docx | DOCX document | |
| Scan_2022_05_27_10_45_02_376.pdf | ||
| 36C24222B0045 0004.docx | DOCX document | |
| 36C24222B0045 0003.docx | DOCX document | |
| 36C24222B0045 0002.docx | DOCX document | |
| 36C24222B0045 0001.docx | DOCX document | |
| 528-19-108 - Nuc Med Spec List BK-2.pdf | ||
| 528-19-108 - Nuc Med Spec List BK-1.pdf | ||
| 36C24222B0045_2.docx | DOCX document | |
| WAGE RATES.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
/1
/2
:3
:0
P
M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com
APPROVALS
PROJECT INFORMATION
CONTRACT OFFICER/SPECIALIST
GI001
COVER SHEET
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
NUCLEAR MEDICINE EQUIPMENT SITE
PREPARATIONS
BUFFALO VA MEDICAL CENTER
BID DOCUMENTS (100%)
3495 Bailey Avenue Buffalo, NY 14215
Zachary Reisdorf zachary.reisdorf@va.gov Office: (716) 834-9200 x2803 Cell: (716) 208-2320
VA Project Number: 528-19-108
Approved by Medical Center Director
Approved by Project COR
Approved by Infection Control
Approved by Project CO
Approved by Director of Facility Management Service
Approved by Medical Director
Approved by Safety Office
Shaun Maines shaun.maines@va.gov Office: (716) 862-7461 x22470
VA WESTERN NEW YORK
HEALTHCARE SYSTEM,
BUFFALO VA CAMPUS
ARCHITECTURAL ELEMENTS SHEET LIST
7 AE101 4TH FLOOR - NEW WORK PLANS
8 AE102 INTERIOR ELEVATONS, SECTIONS & DETAILS
9 AE401 DOOR SCHEDULE & DETAILS
GENERAL CONTRACT SHEET LIST
4 GC101 3RD FLOOR - ICRA CONTROL PLAN - SPS
5 GC102 4TH FLOOR - ICRA CONTROL PLAN
GENERAL INFORMATION SHEET LIST
1 GI001 COVER SHEET
2 GI002 GENERAL INFORMATION
3 GI201 4TH FLOOR - LIFE SAFETY PLAN
ARCHITECTURAL DEMOLITION SHEET LIST
6 AD101 4TH FLOOR - DEMOLITION PLANS
INTERIOR FINISH ELEMENTS SHEET LIST
10 AI101 4TH FLOOR SCHEDULED FINISH LEGEND, FINISH PLANS & DETAILS
ARCHITECTURAL EQUIPMENT SHEET LIST
11 Q101 4TH FLOOR - EQUIPMENT PLAN
STRUCTURAL SHEET LIST
20 SF100 STRUCTURAL NOTES
21 SF101 PARTIAL 4TH FLOOR STRUCTURAL FRAMING PLAN & SECTIONS
22 SF102 ENLARGED PARTIAL 5TH FLOOR FRAMING PLAN
FIRE PROTECTION SHEET LIST
23 F001 FIRE PROTECTION GENERAL NOTES AND DETAILS
24 F101 FOURTH FLOOR FIRE PROTECTION DEMO AND NEW WORK PLANS
PLUMBING SHEET LIST
25 P001 PLUMBING ABBREVIATIONS, NOTES AND LEGENDS
26 PD101 FOURTH FLOOR PLUMBING DEMOLITION PLANS
27 PN101 FOURTH FLOOR PLUMBING NEW WORK PLANS
MECHANICAL SHEET LIST
28 M001 MECHANICAL ABBREVIAITONS, NOTES, LEGENDS AND SCHEDULES
29 M101 FOURTH FLOOR DEMOLITION & NEW WORK PLANS
30 M201 MECHANICAL DETAILS
31 M202 MECHANICAL DETAILS
ELECTRICAL SHEET LIST
32 E001 ELECTRICAL ABBREVIATIONS, NOTES AND LEGENDS
33 E101 4TH FLOOR POWER DEMOLITION AND NEW WORK PLANS
34 E201 4TH FLOOR LIGHTING DEMOLITION AND NEW WORK PLANS
35 E601 SINGLE-LINE DIAGRAM, PANEL SCHEDULE AND DETAILS
EQUIPMENT SHEETS
12 QJ101 GE SHEETS - 417c
13 QJ102 GE SHEETS - 417c
14 QJ103 GE SHEETS - 417c
15 QJ104 GE SHEETS - 417c
16 QJ105 GE SHEETS - 419c
17 QJ106 GE SHEETS - 419c
18 QJ107 GE SHEETS - 419c
19 QJ108 GE SHEETS - 419c
Revisions: Date: Page 1 of 35
NY LIC. NO.:
043141
CENTER LINE
DETAIL INDICATIOR
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT INDENTIFIER
- SEE DOOR SCHEDULE, DETAILS AND ELEVATIONS SHEET
DRAWING BLOCK TITLE, TYPICAL
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
COLUMN NUMBER
GENERAL CONSTRUCTION KEYNOTE TAG
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
CG
FEC
DETAIL NUMBER
SHEET NUMBER
XX-XX
1"
XX-XX
CL
XX-XX
x'-x"
SPOT ELEVATION
1 REVISION
REVISION CLOUD
BREAK LINE
DD ROOM TAG - ROOM NAME AND NUMBER
X
EXISTING DOOR OPENING
View Name 1/8" = 1'-0"
Room name
N
PROJECT
NORTH
1/8" = 1'-0"
0' 8'4' 16'2'
GRAPHIC SCALE
X INTERIOR SIGNAGE TAG
DOOR TAG
E###
DOOR TAG
REFLECTED CEILING KEYNOTE TAGX
ELEVATION INDICATOR- 1
SHEET NUMBER
ELEVATION NUMBER
WOOD
WOOD FINISH
ALUMINUM
STEEL
EARTH
GYPSUM - PLASTER
MASONRY - CONCRETE BLOCK
RIGID INSULATION
BATT INSULATION
PLYWOOD
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTIC TILE
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BMPR BUMPER
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
C CONCRETE
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EPY EPOXY
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDPL HIGH DENSITY PLASTIC LAMINATE
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INCLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
LVT LUXORY VINYL TILE
MAT WALK-OFF CARPET
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
P PAINT
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PT PORCELAIN TILE
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RT RUBBER TILE
S SOUTH
S SOLID SURFACE
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TRAN TRANSITION
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WP WALL PROTECTION
WRS WINDOW ROLLER SHADE
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN MAY NOT BE
USED ON THIS PROJECT. CERTAIN COMMON
ABBREVIATIONS MAY NOT BE SHOWN. SEE
MATERIAL LEGEND FOR INTERIOR FINISH
ABBREVIATIONS.
1. ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO
FACE OF FINISH SURFACE.
2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.
3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE PROJECT
IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.
5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE
CONDITIONS AFFECTING THE WORK.
6. WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN
USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE WORK AREA
THOROUGHLY.
8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE
SPECIFICATIONS.
9. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES.
IBC - 2018
VA PLUMBING DESIGN GUIDE - 2021
10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD AND
VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.
11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION.
IBC - 2018
NFPA 70 - 2020
NFPA 90A - 2021
NFPA 99 - 2021
NFPA 101 - 2021
VA HVAC DESIGN GUIDE - 2020
13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.
IBC - 2018
NFPA 101 - 2021
VA ELECTRICAL DESIGN GUIDE - 2019
VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY
BUILDINGS - 2015
VA LIGHTING DESIGN MANUAL - 2008
VA RADIOLOGY DESIGN MANUAL - 2008
VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2015
14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.
IBC - 2018
NFPA 101 - 2021
NFPA 13 - 2019
NFPA 72 - 2021
VA FIRE PROTECTION DESIGN GUIDE - 2021
1. SPACES AROUND THE PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS UNLESS INDICATED. ALL TEMPORARY SYSTEM SHUTDOWNS WILL OCCUR DURING 2ND SHIFT OR WEEKENDS AND COORDINATED AND APPROVED BY THE PROJECT COR.
2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE AIR PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND PATIENTS.
3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.
4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.
5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION
RATIO.
6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO
RECEIVE NEW FINISHES DESIGNATED.
7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.
8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED
TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.
9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENING SHALL BE PATCHED
TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.
10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.
11. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR
ITEMS OR SURFACES.
12. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED BY THE ARCHITECT OF RECORD. THE RESULTS OF THE SAMPLES TAKEN ARE INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS AND A COPY OF REPORT IS INCLUDED WITH THE SPECIFICATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.
13. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND ARCHITECT FOR REVIEW OF EXISTING CONDITIONS.
14. PATCH AND FIRE STOP EXISTING ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS AND WALLS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts \2
-U
S D
V A
-0
A R
C H
T
H F
L O
O R a k a n u s k y V
B N
S Y
.r v t
/2 /2
:3
:5
A M
GI002
GENERAL INFORMATION
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
BID DOCUMENTS (100%)
ARCHITECTURAL SYMBOLS MATERIAL LEGENDARCHITECTURAL ABBREVIATIONS
GENERAL NOTES - NEW CONSTRUCTION
GENERAL NOTES - GENERAL CONDITIONS
Revisions: Date:
043141 Page 2 of 35
435-C
409-C
410-C
424-C
426-C
427-C
428-C
430-C
400C-3
431-C
432-C
#8
428C-1
429-C
433-C
434-C
425-C
"C" WING
GENERAL NOTES
A. PARTITIONS SHALL BE TYPE A1 UNLESS NOTED OTHERWISE.
B. REFER TO SPECIFICATIONS AND PARTITION TYPE SCHEDULE FOR ADDITIONAL NOTES.
C. NEW PARTITIONS ARE DIMENSIONED TO FACE OF METAL STUD OR MASONRY UNLESS NOTED
OTHERWISE.
D. EXISTING PARTITIONS ARE DIMENSIONED TO FINISH FACE UNLESS NOTED OTHERWISE.
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR
POSITIVE LATCH DOOR HARDWARE
(EXISTING SMOKE BARRIER)
EXISTING EXISTING
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS
COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE
PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER
ESM ESM
E90 E90
EXIT LIGHT SIGNAGE
INDICATES COMMON PATH OF TRAVEL TO POINT OF DECISION
INDICATES PATH OF TRAVEL TO POINT OF EXIT
(FROM COMMON PATH OF TRAVEL)
STARTING POINT
N
PLAN
NORTH
AREA OF WORK
STAIR #7
TO STAIR #7 = 6'
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
36"
42"
6"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
32"
44"
4"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
44"
96"
4"
PLAN NOTES:
1. SEE ELECTRICAL PLANS FOR EMERGENCY
LIGHTS, SMOKE DETECTORS, ETC...
EXISTING AREA
EXISTING AREA
E90
E
E
COMMON PATH = 56'
302 SF
NUCLEAR
MEDICINE
439 SF
NUCLEAR
MEDICINE
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
36"
42"
6"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
32"
44"
4"
STAIR #8
EXISTING AREA
E90
E
E90
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
44"
98"
4"
E90 E90
C O
M M
O N
P A
T H
5'
T O
S T
A
IR
EXIT CAPACITIES LEGEND
DOORS
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32"
WIDTH PER OCCUPANT (NFPA T 7.3.3.1)
OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)
MIN. WIDTH (0.2" X OCCUPANCY)
CODE MIN (18 IBC 1010.1.1)
CLEARANCE PROVIDED
CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE
CORRIDORS
WIDTH PER OCCUPANT (NFPA T 7.3.3.1)
OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)
MIN. WIDTH (0.2" X OCCUPANCY)
CODE MIN (2018 NFPA 39.2.3.2)
CLEARANCE PROVIDED
CLEARANCE SHOWN BETWEEN FACE OF WALLS
STAIRS
WIDTH PER OCCUPANT (NFPA T 7.3.3.1)
OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)
MIN. WIDTH (0.3" X OCCUPANCY)
CODE MIN (18 IBC 1010.1.1)
CLEARANCE PROVIDED
* 2018 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
44"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
36" *
(2021 NFPA 101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR)
OCCUPANT LOAD FACTORS
SPACE FUNCTION SF/OCCUPANT
AMBULATORY HEALTH CARE 150 GROSS
DESIGN CODE
2021 NFPA 101 LIFE SAFETY CODE
CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS
6.1.5 HEALTH CARE - EXISTING. CHAPTER 19.
FIRE SUPPRESSION: FULLY SPRINKLERED
CHAPTER 19: EXISTING HEALTH CARE OCCUPANCIES
CONSTRUCTION TYPE LIMITATIONS (TABLE 19.1.6.1)
CONSTRUCTION TYPE: II (222)
FIRE RESISTANCE REQUIREMENTS
PRIMARY STRUCTURE FRAME 2-HOURS (EXISTING)
BEARING WALLS EXTERIOR 2-HOURS (EXISTING)
BEARING WALLS INTERIOR 2-HOURS (EXISTING)
NONBEARING WALLS 0
NONBEARING WALLS INTERIOR 0
FLOOR CONSTRUCTION 2-HOURS (EXISTING)
STAIRWELL EGRESS 2-HOURS (EXISTING)
SECOND FLOOR:
NUCLEAR MEDICINE 741 SF (EXISTING)
19.2.5 ARRANGEMENT OF MEANS OF EGRESS.
19.2.5.3 DEAD-END CORRIDORS: NOT TO EXCEED 30'-0"
19.2.5.7 HEALTH CARE SUITES.
19.2.5.7.3.3 (A) TRAVEL DISTANCE WITHIN A PATIENT CARE NONSLEEPING SUITE TO AN EXIT ACCESS DOOR TO ANOTHER SUITE, AN EXIT ACCESS CORRIDOR DOOR, OR A HORIZONTAL EXIT DOOR FROM THE
SUITE SHALL NOT EXCEED 100'-0".
19.2.5.7.3.3 (B) TRAVEL DISTANCE BETWEEN ANY POINT IN A NONSLEEPING SUITE AND AN EXIT SHALL NOT EXCEED 200'-0" IN A BUILDING PROTECTED THROUGHOUT BY AN APPROVED ELECTRICALLY
SUPERVISED SPRINKLER SYSTEM.
19.3.6.2 CONSTRUCTION OF CORRIDOR WALLS.
19.3.6.2.3 CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE.
19.3.6.2.4 CORRIDOR WALLS SHALL BE PERMITTED TO TERMINATE AT OR ABOVE THE CEILING, BUT SHALL NOT BE REQUIRED TO EXTEND TO THE DECK ABOVE, WHERE THE CEILING IS CONSTRUCTED TO LIMIT
THE TRANSFER OF SMOKE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts \2
-U
S D
V A
-0
A R
C H
T
H F
L O
O R a k a n u s k y V
B N
S Y
.r v t
/2 /2
:3
:0
A M
GI201
4TH FLOOR - LIFE SAFETY PLAN
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
BID DOCUMENTS (100%)
4TH FLOOR KEY PLAN
1/8" = 1'-0"1
4TH FLOOR - LIFE SAFETY PLAN
LIFE SAFETY CODE INFORMATION
Revisions: Date:
043141 Page 3 of 35
104 108 112
101 105 109
309C-1
311C-1 STAIR #7
310-C
309-C
T2
TD1
T3
T1
T2
T1
OUTLINE OF GE UNIT ON FLOOR
ABOVE - FOR REFERENCE ONLY
OUTLINE OF GE UNIT ON FLOOR
ABOVE - FOR REFERENCE ONLY
T3
106 110 114
115111107
N
PLAN
NORTH
AREA OF WORK
/8
3 5/8" METAL STUDS @ 16" OC, TYP
5/8" GYPSUM BOARD, BOTH SIDES, SEE
ROOM FINISH SCHEDULE FOR FINISHES
CONTINUOUS METAL STUD TOP TRACK.
PROVIDE DEFLECTION TRACK AT ROOF
CONTINUOUS METAL STUD BOTTOM TRACK
LINE OF EXISTING FLOOR
CONTINUOUS 3 1/2" SOUND ATTENUATION
BATTS, TYP
CONTINUOUS METAL HORIZONTAL BRIDGING
CHANNEL @ MID HEIGHT, TYP
FIRE-RATED SEALANT, BOTH SIDES
3 5/8" METAL STUDS @ 16" OC, 25-GAGE, TYPICAL
5/8" TYPE "X" GYPSUM BOARD, BOTH SIDES
WITH STAGGERED UNFINISHED TAPED
JOINTS ON OPPOSITE SIDES OF ROOM.
PAINT WALL ON PUBLIC SIDE.
TEMPORARY CONSTRUCTION FIRE BARRIER
EXISTING UNDERSIDE OF DECK
T1 1 HOUR RATED
FIRE-RATED SEALANT, BOTH SIDES
SECTION
PLAN
ASSEMBLY UL-419
ACCESS ZIPPER
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOOR & BASE TYPE
CONTINUOUSLY SEAL FIRE RETARDANT POLYSTYRENE
TO EXISTING FINISHED FLOOR.
6-MIL FIRE RETARDANT POLYSTYRENE, SEE
SPECIFICATIONS. PROVIDE ZIPPER ACCESS WHERE
REQUIRED
EXISTING UNDERSIDE OF DECK
FIRE RETARDANT ICRA DUST PARTITION
CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE
RETARDANT POLYSTYRENE TO UNDERSIDE OF
DECK
EXISTING FINISHED CEILING SYSTEM. REMOVE AND
REINSTALL CEILING PANELS AS REQUIRED
CONTINUOUSLY SECURE FIRE RETARDANT
POLYSTYRENE SHEET TO UNDERSIDE OF METAL
CEILING TRACK AND ABOVE METAL CEILING TRACK
SECURE AND SEAL ALL SIDES OF
EXISTING DUCTS, CONDUIT, PIPES, ETC.
6-MIL FIRE RETARDANT
POLYSTYRENE
CONTINUOUSLY SECURE EDGE OF FIRE
RETARDANT POLYSTYRENE TO
EXISTING HOLLOW METAL FRAME
HOLLOW METAL FRAME
DOOR SYSTEM BEYOND
CONTINUOUSLY SECURE/SEAL FIRE RETARDANT
POLYSTYRENE TO EXISTING WALL. TYPICAL ALL WALLS AS
REQUIRED. PATCH/REPAIR EXISTING WALLS AS REQUIRED
TO MATCH EXISTING PRIOR TO CONSTRUCTION
T2FIRE RETARDANT ICRA DUST CONTROL DETAILT3
LINE OF EXISTING CEILING
PRECAUTIONS DURING CONSTRUCTION
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.
5. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.
6. PLACE TWO DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
8. REMOVE CONSTRUCTION WASTE DAILY.
9. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH RED CONSTRUCTION SEAM TAPE TO SEAL AREA FROM NON-
WORK AREA BEFORE CONSTRUCTION BEGINS.
10. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.
SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR
PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH
EXISTING.
11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND
BEFORE 7 AM.
12. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS
THROUGH THE FACILITY.
13. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
14. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK
SITE.
15. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM.
16. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST. A MOBILE ICRA CART (DUST COLLECTION CART) MAY ALSO BE USED. ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO SANITIZE WORK AREA PRIOR TO
REMOVING PLASTIC CONTAINMENT AREA.
EXISTING OR ICRA WALL
EXISTING OR
ICRA DOOR
PROVIDE STICKY WALK-OFF MAT
(TYP. EACH SIDE OF DOOR)
GLAZING PANEL REMOVAL
EXISTING WALL CONSTRUCTION TO REMAIN
EXISTING GLAZING PANEL TO BE REMOVED FROM
EXISTING WINDOW SYSTEM PRIOR TO START OF
ABATEMENT. CONTRACTOR TO STORE GLAZING
PANEL IN A SAFE LOCATION UNTIL WORK IS
COMPLETE AND REPLACE TO IT'S EXISTING
CONDITION. IF DAMAGED, CONTRACTOR WILL
REPLACE TO MATCH EXISTING
EXISTING WINDOW SYSTEM FRAME TO REMAIN-
VERIFY IN FIELD THE WINDOW SYSTEM TYPE
HEPA EXHAUST
EXISTING WALL CONSTRUCTION TO REMAIN
PROVIDE HEPA FILTRATION EXHAUST DUCTING
THROUGH NEW TEMPORARY PLYWOOD PANEL
PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL
WITHIN EXISTING ALUMINUM FRAME
NOTE:
1. GENERAL CONTRACTOR TO LOCATE PER
QUANTITIES REQUIRED.
PROVIDE DUCT SEALING TAPE AROUND
PENETRATION (TYPICAL)
EXTERIORINTERIOR EXTERIOR
INTERIOR
(NEGATIVE SPACE)
EXISTING WINDOW SYSTEM FRAME TO REMAIN-
VERIFY IN FIELD THE WINDOW SYSTEM TYPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts \2
-U
S D
V A
-0
A R
C H
T
H F
L O
O R a k a n u s k y V
B N
S Y
.r v t
/2 /2
:3
:5
A M
GC101
3RD FLOOR - ICRA CONTROL PLAN - SPS
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
BID DOCUMENTS (100%)
1/4" = 1'-0"1
3RD FLOOR - ICRA CONTROL PLAN - SPS
3RD FLOOR KEY PLAN
ICRA KEY NOTES - 3RD FLOOR
NUMBER DESCRIPTION
1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3
MICRONS INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES
2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST, DIRECTLY VENTED TO EXTERIOR. SEE DETAIL
B/GC101 FOR DETAIL
3 REMOVE EXISTING GLAZING, INSTALL PLYWOOD WITH SEALED EXHAUST PORT. SEE B/GC101 FOR DETAIL
4 WALK-OFF MAT. SEE SPECIFICATIONS & DETAIL A/GC101
5 EXISTING CEILING SYSTEM IS TO BE MODIFIED AS REQUIRED TO ALLOW FOR CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIER. WHEN CONSTRUCTION IS COMPLETE THE CEILING SYSTEM IS TO BE RETURNED TO
ITS PRE-CONSTRUCTION CONFIGURATION
ICRA CONTROL POLICY
1/2" = 1'-0"A
STICKY WALK-OFF MAT DETAIL
1 1/2" = 1'-0"B
TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL
Revisions: Date:
043141 Page 4 of 35
N
PLAN
NORTH
AREA OF WORK
CORRIDOR
400C-2
NUCLEAR MEDICINE
419C
NUCLEAR MEDICINE
416C
SPECIAL
PROCEDURES
415C
NUCLEAR MEDICINE
418C
NUCLEAR MEDICINE
417C
CONTROL
ROOM
STAIR
#7
104 108 112
101 105 109
106 110 114
115111107
TD2 T1
T1
ACCESS ZIPPER
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOOR & BASE TYPE
CONTINUOUSLY SEAL FIRE RETARDANT POLYSTYRENE
TO EXISTING FINISHED FLOOR.
6-MIL FIRE RETARDANT POLYSTYRENE, SEE
SPECIFICATIONS. PROVIDE ZIPPER ACCESS WHERE
REQUIRED
EXISTING UNDERSIDE OF DECK
T2
FIRE RETARDANT ICRA DUST PARTITION
CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE
RETARDANT POLYSTYRENE TO UNDERSIDE OF
DECK
EXISTING FINISHED CEILING SYSTEM. REMOVE AND
REINSTALL CEILING PANELS AS REQUIRED
CONTINUOUSLY SECURE FIRE RETARDANT
POLYSTYRENE SHEET TO UNDERSIDE OF METAL
CEILING TRACK AND ABOVE METAL CEILING TRACK
SECURE AND SEAL ALL SIDES OF
EXISTING DUCTS, CONDUIT, PIPES, ETC.
6-MIL FIRE RETARDANT
POLYSTYRENE
CONTINUOUSLY SECURE EDGE OF FIRE
RETARDANT POLYSTYRENE TO
EXISTING HOLLOW METAL FRAME
EXISTING HOLLOW METAL
FRAME
EXISTING DOOR SYSTEM
BEYOND
CONTINUOUSLY SECURE/SEAL FIRE RETARDANT
POLYSTYRENE TO EXISTING WALL. TYPICAL ALL WALLS AS
REQUIRED. PATCH/REPAIR EXISTING WALLS AS REQUIRED
TO MATCH EXISTING PRIOR TO CONSTRUCTION
T1
FIRE RETARDANT ICRA DUST
CONTROL DETAIL
PRECAUTIONS DURING CONSTRUCTION
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.
5. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.
6. PLACE TWO DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
8. REMOVE CONSTRUCTION WASTE DAILY.
9. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH RED CONSTRUCTION SEAM TAPE TO SEAL AREA FROM NON-
WORK AREA BEFORE CONSTRUCTION BEGINS.
10. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.
SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR
PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH
EXISTING.
11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND
BEFORE 7 AM.
12. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS
THROUGH THE FACILITY.
13. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
14. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK
SITE.
15. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM.
16. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST. A MOBILE ICRA CART (DUST COLLECTION CART) MAY ALSO BE USED. ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO SANITIZE WORK AREA PRIOR TO
REMOVING PLASTIC CONTAINMENT AREA.
EXISTING OR ICRA WALL
EXISTING OR
ICRA DOOR
PROVIDE STICKY WALK-OFF MAT
(TYP. EACH SIDE OF DOOR)
GLAZING PANEL REMOVAL
EXISTING WALL CONSTRUCTION TO REMAIN
EXISTING GLAZING PANEL TO BE REMOVED FROM
EXISTING WINDOW SYSTEM PRIOR TO START OF
ABATEMENT. CONTRACTOR TO STORE GLAZING
PANEL IN A SAFE LOCATION UNTIL WORK IS
COMPLETE AND REPLACE TO IT'S EXISTING
CONDITION. IF DAMAGED, CONTRACTOR WILL
REPLACE TO MATCH EXISTING
EXISTING WINDOW SYSTEM FRAME TO REMAIN-
VERIFY IN FIELD THE WINDOW SYSTEM TYPE
HEPA EXHAUST
EXISTING WALL CONSTRUCTION TO REMAIN
PROVIDE HEPA FILTRATION EXHAUST DUCTING
THROUGH NEW TEMPORARY PLYWOOD PANEL
PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL
WITHIN EXISTING ALUMINUM FRAME
NOTE:
1. GENERAL CONTRACTOR TO LOCATE PER
QUANTITIES REQUIRED.
PROVIDE DUCT SEALING TAPE AROUND
PENETRATION (TYPICAL)
EXTERIORINTERIOR EXTERIOR
INTERIOR
(NEGATIVE SPACE)
EXISTING WINDOW SYSTEM FRAME TO REMAIN-
VERIFY IN FIELD THE WINDOW SYSTEM TYPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts \2
-U
S D
V A
-0
A R
C H
T
H F
L O
O R a k a n u s k y V
B N
S Y
.r v t
/2 /2
:3
:5
A M
GC102
4TH FLOOR - ICRA CONTROL PLAN
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
BID DOCUMENTS (100%)
4TH FLOOR KEY PLAN
1/4" = 1'-0"1
4TH FLOOR - ICRA CONTROL PLAN
ICRA CONTROL POLICY
ICRA KEY NOTES - 4TH FLOOR
NUMBER DESCRIPTION
1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3
MICRONS INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES
2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST, DIRECTLY VENTED TO EXTERIOR. SEE B/GC102 FOR
DETAIL
3 REMOVE EXISTING GLAZING, INSTALL PLYWOOD WITH SEALED EXHAUST PORT. SEE B/GC102 FOR DETAIL
4 CONTINUOUSLY SEAL PERIMETER OF EXISTING DOOR WITH TAPE TO PREVENT PASSAGE OF DUST
5 WALK-OFF MAT. SEE SPECIFICATIONS & DETAIL A/GC102
1/2" = 1'-0"A
STICKY WALK-OFF MAT DETAIL
1 1/2" = 1'-0"B
TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL
Revisions: Date:
043141 Page 5 of 35
NORTH
AREA OF WORK
CORRIDOR
400C-2
NUCLEAR
MEDICINE
419C
NUCLEAR
MEDICINE
416C
SPECIAL
PROCEDURES
415C
NUCLEAR
MEDICINE
417C
CONTROL
ROOM
STAIR
#7
NUCLEAR
MEDICINE
418C
A
B
B
C
CD D
E
D
F
G
H
J
B
B
H
CORRIDOR
400C-2
NUCLEAR MEDICINE
419C
NUCLEAR MEDICINE
416C
SPECIAL
PROCEDURES
415C
NUCLEAR MEDICINE
417C
CONTROL
ROOM
STAIR
#7
NUCLEAR MEDICINE
418C
1 1
104 108 112
101 105 109
7 7
106 110
111107
EXISTING ACOUSTICAL CEILING TILE SYSTEM TO BE
REMOVED
EXISTING LIGHT FIXTURE(S) TO BE REMOVED. SEE
ELECTRICAL DRAWINGS
SPRINKLER HEAD TO BE REMOVED - REFER TO FIRE
PROTECTION DRAWINGS
EXISTING ACOUSTICAL CEILING TILE SYSTEM TO
REMAIN UNLESS NOTED OTHERWISE
GENERAL AREA OF WORK NOT
INCLUDED IN CONTRACT
EXISTING LIGHT FIXTURE(S) TO REMAIN. SEE
ELECTRICAL DRAWINGS
EXISTING MECHANICAL GRILLES TO REMAIN. SEE
MECHANICAL DRAWINGS
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED BY THE SPECIFICATIONS WITHIN THE
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN HATCHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY.
EXISTING DOOR TO BE REMOVED. EXISTING FRAME TO REMAIN.
REMOVE AND RE-INSTALL EXISTING HARDWARE UNLESS NOTED
OTHERWISE. PREP AND PAINT EXISTING FRAME FOR NEW PAINT.
EXISTING WALL MOUNTED SINK/ LAVATORY TO BE REMOVED. SEE
PLUMBING DRAWINGS.
AREA OF WORK NOT INCLUDED IN CONTRACT.
1. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION MAY BE REQUIRED OUTSIDE OF THIS LINE.
ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF DEMOLITION WORK REQUIRED FOR THE PROJECT.
3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO
FABRICATION, ERECTION AND/OR INSTALLATION.
4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM
SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.
6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF
BARRICADE TO CONFIRM PRESSURE.
7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE.
COVER FIRE SPRINKLER HEADS WITH A THIN PAPER BAG TO PROTECT HEADS DURING CONSTRUCTION.
8. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE LOCATION OF BARRIERS
WITH OWNER.
9. REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.
10. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND
DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED.
11. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT.
12. FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE
READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE BY THE INSTALLING CONTRACTOR.
13. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
14. DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND
RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.
15. PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO
CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE.
16. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH EXISTING FIRE
RATING UNLESS NOTED OTHERWISE.
17. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION.
PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR RELOCATION PRIOR TO COMMENCING DEMOLITION.
18. WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR. PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE SURFACES FOR SCHEDULED FINISHES.
19. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
20. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND MATCH EXISTING
FINISHES.
21. REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION. REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts \2
-U
S D
V A
-0
A R
C H
T
H F
L O
O R a k a n u s k y V
B N
S Y
.r v t
/2 /2
:3
:4
A M
AD101
4TH FLOOR - DEMOLITION PLANS
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
BID DOCUMENTS (100%)
4TH FLOOR KEY PLAN
1/4" = 1'-0"1
4TH FLOOR - REFLECTED CEILING PLAN - DEMOLITION
DEMOLITION KEY NOTES - RCP
NUMBER DESCRIPTION
A REMOVE/ MODIFY EXISTING CEILING GRID SHOWN DASHED IN THIS AREA FOR NEW WALL PARTITION. SEE FLOOR PLANS.
B EXISTING LIGHT FIXTURE TO BE RELOCATED. SEE ELECTRICAL PLAN E201
C EXISTING ACOUSTICAL CEILING PANELS TO BE REMOVED FOR RELOCATION OF EXISTING LIGHT FIXTURE. REMOVE CENTER CEILING GRID.
SUPPORT EXISTING GRID AS REQUIRED.
D REMOVE EXISTING CEILING TILES THROUGHOUT ROOM. GRID SUSPENSION SYSTEM TO REMAIN.
E REMOVE/ RELOCATE EXISTING HVAC RETURN GRILLE. SEE MECHANICAL DRAWING M101
F EXISTING PATIENT LIFT TO REMAIN
G EXISTING PATIENT LIFT IS TO BE REMOVED AND SALVAGED FOR RELOCATION. REFER TO NEW WORK PLAN
H EXISTING CURTAIN TRACK IS TO BE REMOVED IN ITS ENTIRETY
J EXISTING CURTAIN TRACK IS TO BE REMOVED AND CEILING GRID IS TO BE PREPPED TO RECEIVE NEW TRACK
1/4" = 1'-0"2
4TH FLOOR PLAN - DEMOLITION
DEMOLITION LEGEND - REFLECTED CEILING PLAN.
DEMOLITION LEGEND - FLOOR PLAN.
DEMO FINISH SCHEDULE - FOURTH FLOOR
RM
NUMBER FLOOR BASE
WALL -
NORTH
WALL -
SOUTH
WALL -
EAST
WALL -
WEST MILLWORK CEILING COMMENTS
417C EPOXY EPOXY PAINT PAINT PAINT PAINT EXISITNG WINDOW SILLS
TO REMAIN
ACOUSTICAL CEILING W/ PAINTED
DRYWALL FASCIA
418C EPOXY EPOXY PAINT PAINT PAINT PAINT EXISITNG WINDOW SILLS
TO REMAIN
ACOUSTICAL CEILING W/ PAINTED
DRYWALL FASCIA
419C EPOXY EPOXY PAINT PAINT PAINT PAINT EXISITNG WINDOW SILLS
TO REMAIN
ACOUSTICAL CEILING W/ PAINTED
DRYWALL FASCIA
DEMOLITION KEY NOTES - FLOOR PLAN
NUMBER DESCRIPTION
1 EXISTING GANTRY TO BE REPLACED. REMOVE ASSOCIATED EQUIPMENT, CEILING MOUNTED DEVICES, AND RAIL SYSTEM. PREPARE TO RECEIVE NEW
GANTRY.
2 REMOVE EXISTING FLOOR FINISH AND WALL BASE IN ITS ENTIRETY. PREP CONCRETE DECK AND EXISTING WALLS FOR NEW FINISHES.
3 EXISTING EQUIPMENT TO BE REMOVED BY VA.
4 REMOVE EXISTING SINK. COORDINATE WITH PLUMBING DRAWINGS. PREP EXISTING WALLS FOR NEW FINISHES.
5 EXISTING MECHANICAL EQUIPMENT TO REMAIN AND BE PROTECTED DURING DEMOLITION AND CONSTRUCTION
6 EXISTING GLAZING PANEL IS TO BE REMOVED AND TEMPORARILY FILLED WITH PLYWOOD PANEL AS REQUIRED IN ORDER TO ALLOW FOR NEW EQUIPMENT TO BE BROUGHT IN FOR SCOPE OF NEW WORK. REFER TO NEW WORK AND EQUIPMENT DRAWINGS FOR MORE INFORMATION
7 EXISTING WINDOW SILL FINISH IS TO REMAIN AND BE PREPPED TO RECEIVE NEW CLADDING
8 EXISTING EQUIPMENT TO REMAIN. REFER TO ELECTRICAL DRAWINGS
9 DEMOLISH UNUSED DISCONNECT CONDUIT AND WIRING BACK TO SOURCE AND TERMINATE - REFER TO ELECTRICAL DRAWINGS
10 EXISTING WINDOW SYSTEM IS TO BE REMOVED AND OPENING IS TO BE PREPPED TO RECEIVE NEW LOUVERED PANEL INSERT. REFER TO NEW WORK
PLANS, ELEVATIONS AND SECTIONS FOR MORE INFORMATION
11 APPROXIMATE LOCATION OF ICRA CONSTRUCTION BARRIER, REFER TO ICRA PLANS FOR MORE INFORMATION
X
GENERAL DEMOLITION NOTES
Revisions: Date:
043141 Page 6 of 35
NORTH
AREA OF WORK
CORRIDOR
400C-2
NUCLEAR MEDICINE
416C
SPECIAL
PROCEDURES
415C
CONTROL
ROOM
STAIR
#7
NUCLEAR MEDICINE
419C
NUCLEAR MEDICINE
417C
AE102
AE102
AE102
AE102
AE102
A1
31'-7 1/2"
HW-2
104 108 112
101 105 109
417CA
E419C
E417C
AE102
SIMILAR
AE1023
AE102
AE102 7
106 110 114
115111107
E416C
E419CB
CONT METAL BOTTOM TRACK
SET IN CONT BEAD OF SEALANT.
LINE OF FINISHED FLOOR, SEE ROOM
FINISH SCHEDULE FOR FLOOR & BASE
TYPE
UNDERSIDE OF ROOF OR FLOOR DECK
LINE OF CEILING SYSTEM, SEE ROOM
FINISH SCHEDULE FOR TYPE & HEIGHT
3 5/8" METAL STUDS @ 16" OC, TYP
(1) LAYER 5/8" THK. GWB BOTH SIDES
SECTION
CONTINUOUS 3 1/2" SOUND ATTENUATION
BATTS
CONTINUOUS METAL HORIZONTAL
BRIDGING CHANNEL @ MID HEIGHT, TYP.
PLAN
A1
/8
FULL HGT 5/8" GWB BOTH SIDES
METAL STUD PARTITION
CONTINUOUS METAL TOP TRACK. PROVIDE
DEFLECTION TRACK AT ROOF
CONTINUOUS METAL STUD TOP TRACK
CONTINUOUS METAL STUD BOTTOM TRACK
3 5/8" METAL STUDS @ 16" OC, TYPICAL
(1) LAYER 5/8" GYPSUM BOARD BOTH
SIDES
/8
SOLID SURFACE WALL CAP. REFER TO
MILLWORK DETAILS AND FINISH
SCHEDULE
U .N
.O
DASHED LINE: PROVIDE STEEL SUPPORT
POST @ UNSECURED END OF WALL
WHERE REQUIRED. ANCHOR POST TO
FLOOR SLAB.
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOORING TYPE
5 7/8"
/2
SECTION
PLAN
LOW WALL PARTITION
A2
3/8" ACOUSTICAL SEALANT BOTH SIDES
RUBBER BASE, BOTH SIDES. REFER TO FINISH
SCHEDULE
(TYPICAL)
1/2"
(TYPICAL)
1/2"
CORRIDOR
400C-2
NUCLEAR MEDICINE
416C SPECIAL
PROCEDURES
415C
CONTROL
ROOM
STAIR
#7
A
A A
B C
D
NUCLEAR MEDICINE
419C
NUCLEAR MEDICINE
417C
E
F
D
G
AE102
H
AT-1
9'-0"
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED FOR NEW FINISHES IF INDICATED ON
FINISH SCHEDULE.
NEW CONSTRUCTION
AREA GENERALLY NOT INCLUDED IN CONTRACT
NEW LAVATORY
NEW MILLWORK TO BE PROVIDED BY
GENERAL CONTRACTOR
INDICATES FOOTPRINT OF NUCLEAR MEDICINE IMAGING
EQUIPMENT
2x2 ACOUSTICAL CEILING TILE
SYSTEM (GRID ONLY)
EXISTING LIGHTING FIXTURES TO
REMAIN
EXHAUST GRILLE
SPRINKLER HEAD
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXISTING:
2x2 ACOUSTICAL CEILING TILE
SYSTEM
EXHAUST GRILLE
NEW:
2x4 RECESSED LED LIGHT FIXTURE
AREA GENERALLY NOT INCLUDED IN CONTRACT
WIRELESS ACCESS POINT
RECESSED DOWNLIGHT
A. ALL CEILINGS ARE 8'-0" AFF UNLESS NOTED OTHERWISE.
B. PROVIDE AND INSTALL NEW CEILING GRID AND LAY-IN TILES ACT-1: SEE SPECIFICATIONS: CEILING HEIGHT TO
BE AS INDICATED EXISTING LAYOUT.
C. CENTER AND/OR ALIGN ALL CEILING TILES, AS INDICATED GRAPHICALLY, UNLESS NOTED OTHERWISE.
D. PATCH AND REPAIR EXISTING ACT CEILING TO MATCH EXISTING.
E. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE DESCRIPTIONS, ALL CEILING MOUNTED MECHANICAL
DEVICES AND CEILING MOUNTED TECHNOLOGY EQUIPMENT
F. REFER TO MECHANICAL DRAWINGS FOR DIFFUSER DESCRIPTIONS AND CEILING MOUNTED MECHANICAL
DEVICES.
G. CT = CUT TILE.
H. PROVIDE AND INSTALL HVAC DIFFUSERS AND RETURN GRILLS AS INDICATED: SEE MECHANICAL DRAWINGS
FOR ADDITIONAL REQUIREMENTS.
I. PROVIDE AND INSTALL SPRINKLER HEAD LOCATIONS AS INDICATED: SEE FIRE PROTECTION DRAWINGS FOR
ADDITIONAL REQUIREMENTS.
J. CEILING HEIGHT DIMENSIONS SHOWN ON REFLECTED CEILING PLAN AND DETAILS ARE FROM FINISH FLOOR TO
FINISH CEILING.
K. UNLESS NOTED OTHERWISE, LIGHT FIXTURES SHALL BE LOCATED AS SHOWN ON REFLECTED CEILING PLANS.
L. PROVIDE AND INSTALL NEW LIGHT FIXTURES, SENSING AND OTHER DEVICES AS INDICATED: SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL REQUIREMENTS.
M. WHERE LIGHT FIXTURES, DEVICES AND ACCESSORIES ARE SHOWN TO BE RECESSED IN CEILING TILES, THEY SHALL BE CENTERED IN THE CEILING TILES UNLESS NOTED OTHERWISE. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING
EQUIPMENT.
N. PROVIDE ACCESS PANELS LOCATED IN FINISHED AREAS SHALL BE PAINTED TO MATCH ADJACENT SURFACES.
LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING WITH THE INSTALLATION.
O. ALL GYPSUM WALL BOARD CEILINGS AND SOFFITS ARE TO BE PAINTED.
P. NO MECHANICAL EQUIPMENT IN THE CEILING CAVITY REQUIRING NORMAL MAINTENANCE SHALL BE INSTALLED ABOVE A GYPSUM WALL BOARD CEILING. NOTIFY ARCHITECT IF ANY SUCH ITEMS ARE INDICATED ABOVE
GYPSUM WALL BOARD CEILINGS.
Q. EXIT SIGNS AND SMOKE DETECTORS LOCATED IN HARD CEILINGS SHALL BE CENTERED IN CORRIDORS AND LOCATED A DISTANCE OF 1'-0" FROM WALL TO CENTER OF THE FIXTURE UNLESS NOTED OTHERWISE. LOCATE
EXIT SIGNS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
R. SOFFITS AND BULKHEADS SHALL BE LATERALLY BRACED TO RESIST HORIZONTAL MOVEMENT.
S. GYPSUM WALL BOARD SOFFITS TO OCCUR ABOVE ALL WALL CABINETS 7'-2" TO CEILING, UNLESS NOTED
OTHERWISE.
T. DROPPED GWB LIGHT COVE WITH CONTINUOUS LED LIGHT STRIP: SEE CEILING DETAILS AND ELECTRICAL
DRAWINGS FOR ADDITIONAL REQUIREMENTS.
1. ALL PARTITIONS TO BE TYPE 'A1' UNLESS NOTED OTHERWISE.REFER TO THIS SHEET FOR
PARTITION INFORMATION.
2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO
COMMENCEMENT OF WORK. IF DRAWINGS CONFLICT WITH ACTUAL FIELD CONDITIONS,
CONTACT ARCHITECT PRIOR TO PROCEEDING WITH WORK.
3. REFER TO LIFE SAFETY PLANS FOR RATED WALL LOCATIONS.
4. REFER TO Q-SERIES DRAWINGS FOR FURNITURE AND EQUIPMENT LOCATION COORDINATION.
DASHED FURNITURE AND EQUIPMENT ITEMS SHOWN FOR REFERENCE ONLY AND IS NOT PART
OF THE GENERAL CONTRACT. THESE ITEMS WILL BE PROVIDED AND INSTALLED BY OWNER,
UNLESS NOTED OTHERWISE. CONTRACTOR MAY NEED TO COORDINATE SPECIFIC FIXTURE
AND EQUIPMENT REQUIREMENTS IF NOTED.
5. PROVIDE CONCEALED IN-WALL REINFORCING / BLOCKING FOR ATTACHMENT OF ALL
MILLWORK, CASEWORK, AND / OR ACCESSORIES AS REQUIRED.
6. ALL DIMENSIONS ARE TO THE FACE OF STUD AT NEW WALLS UNLESS NOTED OTHERWISE.
VERIFY IN FIELD WITH DESIGNER FINAL LOCATIONS OF ALL LIGHT SWITCHES, STROBES, FIRE
EXTINGUISHER CABINETS, FIRE ALARM PULLS AND OTHER DEVICES ON WALLS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts \2
-U
S D
V A
-0
A R
C H
T
H F
L O
O R a k a n u s k y V
B N
S Y
.r v t
/2 /2
:3
:4
A M
AE101
4TH FLOOR - NEW WORK PLANS
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-108NUCLEAR MEDICINE
EQUIPMENT SITE
PREPARATIONS
BID DOCUMENTS (100%)
4TH FLOOR KEY PLAN
1/4" = 1'-0"2
4TH FLOOR PLAN - NEW WORK
1/4" = 1'-0"1
4TH FLOOR REFLECTED CEILING PLAN - NEW WORK
KEY NOTES - FLOOR PLAN
NUMBER DESCRIPTION
1 NEW WALL MOUNTED SINK
2 NEW EPOXY FLOOR FINISH
3 OUTLINE OF EXISTING PATIENT LIFT ABOVE (PL-02)
4 OUTLINE OF RELOCATED PATIENT LIFT ABOVE (PL-01)
5 NEW EQUIPMENT IS TO BROUGHT IN THROUGH WINDOW OPENING PRIOR TO NEW WORK SILL BEING INSTALLED TO PREVENT DAMAGE.
ONCE EQUIPMENT HAS BEEN BROUGHT IN, EXISTING GLAZING PANEL IS TO BE RE-INSTALLED AND NEW WORK SILL IS TO BE COMPLETED
6 EXISTING MECHANICAL EQUIPMENT TO REMAIN & BE PROTECTED DURING CONSTRUCTION - REFER TO MECHANICAL DRAWINGS
7 EXISTING WINDOW SYSTEM IS TO BE REPLACED WITH NEW LOUVERED PANEL SYSTEM. REFER TO ELEVATION AND SECTION FOR MORE
INFORMATION
KEY NOTES - REFLECTED CEILING PLAN
NUMBER DESCRIPTION
A NEW CEILING TILES THROUGHOUT ROOM. GRID SUSPENSION SYSTEM TO REMAIN.
B EXISTING PATIENT LIFT (PL-02)
C INFILL AREA OF CEILING WORK WITH NEW CEILING GRID AND TILE AS REQUIRED. NEW TO MATCH EXISTING
D EXISTING LIGHTING IS TO BE RELOCATED AS INDICATED
E RELOCATED EXHAUST GRILL. REFER TO MECHANICAL DRAWINGS
F RELOCATED PATIENT LIFT (PL-01)
G NEW CURTAIN TRACK MOUNTED TO ACOUSTICAL CEILING GRID- REFER TO DETAIL
H PROVIDE NEW ACOUSTIC CEILING GRID & TILE
FLOOR PLAN LEGEND.
LEGEND - REFLECTED CEILING PLAN.
GENERAL NOTES - REFLECTED CEILING PLAN
GENERAL FLOOR PLAN NOTES
X
Revisions: Date:
043141 Page 7 of 35
POWDER COATED SUPPORT BRACKET,
BASIS OF DESIGN HAFELE 'SPEED
BRA…