This document provides details on a federal contract solicitation for nuclear medicine equipment site preparation. The solicitation number is 36C24222B0045 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 for the project named "Z1DA--528-19-108B NUCLEAR MEDICINE EQUIPMENT SITE PREPARATION." The bid date and time is June 21, 2022 at 2:00 PM EST. The solicitation is seeking bids for site preparation services related to nuclear medicine equipment for a Veterans Affairs medical facility.

View the file

Other files

File Type Posted
36C24222B0045 0006.docx DOCX document
ICRA Amendment 6-23-2022.pdf PDF
36C24222B0045 0005.docx DOCX document
Scan_2022_05_27_10_45_02_376.pdf PDF
36C24222B0045 0004.docx DOCX document
36C24222B0045 0003.docx DOCX document
36C24222B0045 0002.docx DOCX document
36C24222B0045 0001.docx DOCX document
528-19-108 - Nuc Med Spec List BK-2.pdf PDF
528-19-108 - Nuc Med Spec List BK-1.pdf PDF
36C24222B0045_2.docx DOCX document
WAGE RATES.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

/1

/2

:3

:0

P

M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

U.S. Department of Veterans Affairs

LIST OF DRAWINGS

PROJECT CONTACT DIRECTORY

LOCATION MAP

CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103

Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com

APPROVALS

PROJECT INFORMATION

CONTRACT OFFICER/SPECIALIST

GI001

COVER SHEET

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

NUCLEAR MEDICINE EQUIPMENT SITE

PREPARATIONS

BUFFALO VA MEDICAL CENTER

BID DOCUMENTS (100%)

3495 Bailey Avenue Buffalo, NY 14215

Zachary Reisdorf zachary.reisdorf@va.gov Office: (716) 834-9200 x2803 Cell: (716) 208-2320

VA Project Number: 528-19-108

Approved by Medical Center Director

Approved by Project COR

Approved by Infection Control

Approved by Project CO

Approved by Director of Facility Management Service

Approved by Medical Director

Approved by Safety Office

Shaun Maines shaun.maines@va.gov Office: (716) 862-7461 x22470

VA WESTERN NEW YORK

HEALTHCARE SYSTEM,

BUFFALO VA CAMPUS

ARCHITECTURAL ELEMENTS SHEET LIST

7 AE101 4TH FLOOR - NEW WORK PLANS

8 AE102 INTERIOR ELEVATONS, SECTIONS & DETAILS

9 AE401 DOOR SCHEDULE & DETAILS

GENERAL CONTRACT SHEET LIST

4 GC101 3RD FLOOR - ICRA CONTROL PLAN - SPS

5 GC102 4TH FLOOR - ICRA CONTROL PLAN

GENERAL INFORMATION SHEET LIST

1 GI001 COVER SHEET

2 GI002 GENERAL INFORMATION

3 GI201 4TH FLOOR - LIFE SAFETY PLAN

ARCHITECTURAL DEMOLITION SHEET LIST

6 AD101 4TH FLOOR - DEMOLITION PLANS

INTERIOR FINISH ELEMENTS SHEET LIST

10 AI101 4TH FLOOR SCHEDULED FINISH LEGEND, FINISH PLANS & DETAILS

ARCHITECTURAL EQUIPMENT SHEET LIST

11 Q101 4TH FLOOR - EQUIPMENT PLAN

STRUCTURAL SHEET LIST

20 SF100 STRUCTURAL NOTES

21 SF101 PARTIAL 4TH FLOOR STRUCTURAL FRAMING PLAN & SECTIONS

22 SF102 ENLARGED PARTIAL 5TH FLOOR FRAMING PLAN

FIRE PROTECTION SHEET LIST

23 F001 FIRE PROTECTION GENERAL NOTES AND DETAILS

24 F101 FOURTH FLOOR FIRE PROTECTION DEMO AND NEW WORK PLANS

PLUMBING SHEET LIST

25 P001 PLUMBING ABBREVIATIONS, NOTES AND LEGENDS

26 PD101 FOURTH FLOOR PLUMBING DEMOLITION PLANS

27 PN101 FOURTH FLOOR PLUMBING NEW WORK PLANS

MECHANICAL SHEET LIST

28 M001 MECHANICAL ABBREVIAITONS, NOTES, LEGENDS AND SCHEDULES

29 M101 FOURTH FLOOR DEMOLITION & NEW WORK PLANS

30 M201 MECHANICAL DETAILS

31 M202 MECHANICAL DETAILS

ELECTRICAL SHEET LIST

32 E001 ELECTRICAL ABBREVIATIONS, NOTES AND LEGENDS

33 E101 4TH FLOOR POWER DEMOLITION AND NEW WORK PLANS

34 E201 4TH FLOOR LIGHTING DEMOLITION AND NEW WORK PLANS

35 E601 SINGLE-LINE DIAGRAM, PANEL SCHEDULE AND DETAILS

EQUIPMENT SHEETS

12 QJ101 GE SHEETS - 417c

13 QJ102 GE SHEETS - 417c

14 QJ103 GE SHEETS - 417c

15 QJ104 GE SHEETS - 417c

16 QJ105 GE SHEETS - 419c

17 QJ106 GE SHEETS - 419c

18 QJ107 GE SHEETS - 419c

19 QJ108 GE SHEETS - 419c

Revisions: Date: Page 1 of 35

NY LIC. NO.:

043141

CENTER LINE

DETAIL INDICATIOR

DIMENSION LINE

NEW DOOR OPENING / BORROWED LIGHT INDENTIFIER

- SEE DOOR SCHEDULE, DETAILS AND ELEVATIONS SHEET

DRAWING BLOCK TITLE, TYPICAL

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

COLUMN NUMBER

GENERAL CONSTRUCTION KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

DETAIL NUMBER

SHEET NUMBER

XX-XX

1"

XX-XX

CL

XX-XX

x'-x"

SPOT ELEVATION

1 REVISION

REVISION CLOUD

BREAK LINE

DD ROOM TAG - ROOM NAME AND NUMBER

X

EXISTING DOOR OPENING

View Name 1/8" = 1'-0"

Room name

N

PROJECT

NORTH

1/8" = 1'-0"

0' 8'4' 16'2'

GRAPHIC SCALE

X INTERIOR SIGNAGE TAG

DOOR TAG

E###

DOOR TAG

REFLECTED CEILING KEYNOTE TAGX

ELEVATION INDICATOR- 1

SHEET NUMBER

ELEVATION NUMBER

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

MASONRY - CONCRETE BLOCK

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AT ACOUSTIC TILE

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BMPR BUMPER

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

C CONCRETE

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EPY EPOXY

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDPL HIGH DENSITY PLASTIC LAMINATE

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INCLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

LVT LUXORY VINYL TILE

MAT WALK-OFF CARPET

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

P PAINT

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PT PORCELAIN TILE

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

RT RUBBER TILE

S SOUTH

S SOLID SURFACE

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TRAN TRANSITION

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB BAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WP WALL PROTECTION

WRS WINDOW ROLLER SHADE

WT WEIGHT

WWF WELDED WIRE FRAME

NOTE: ALL ABBREVIATIONS SHOWN MAY NOT BE

USED ON THIS PROJECT. CERTAIN COMMON

ABBREVIATIONS MAY NOT BE SHOWN. SEE

MATERIAL LEGEND FOR INTERIOR FINISH

ABBREVIATIONS.

1. ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO

FACE OF FINISH SURFACE.

2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.

3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE PROJECT

IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.

4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.

5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE

CONDITIONS AFFECTING THE WORK.

6. WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN

USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE WORK AREA

THOROUGHLY.

8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE

SPECIFICATIONS.

9. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES.

IBC - 2018

VA PLUMBING DESIGN GUIDE - 2021

10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD AND

VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.

11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION.

IBC - 2018

NFPA 70 - 2020

NFPA 90A - 2021

NFPA 99 - 2021

NFPA 101 - 2021

VA HVAC DESIGN GUIDE - 2020

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.

IBC - 2018

NFPA 101 - 2021

VA ELECTRICAL DESIGN GUIDE - 2019

VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY

BUILDINGS - 2015

VA LIGHTING DESIGN MANUAL - 2008

VA RADIOLOGY DESIGN MANUAL - 2008

VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2015

14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.

IBC - 2018

NFPA 101 - 2021

NFPA 13 - 2019

NFPA 72 - 2021

VA FIRE PROTECTION DESIGN GUIDE - 2021

1. SPACES AROUND THE PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS UNLESS INDICATED. ALL TEMPORARY SYSTEM SHUTDOWNS WILL OCCUR DURING 2ND SHIFT OR WEEKENDS AND COORDINATED AND APPROVED BY THE PROJECT COR.

2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE AIR PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND PATIENTS.

3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.

4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.

5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO.

6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO

RECEIVE NEW FINISHES DESIGNATED.

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.

8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENING SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.

11. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR

ITEMS OR SURFACES.

12. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED BY THE ARCHITECT OF RECORD. THE RESULTS OF THE SAMPLES TAKEN ARE INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS AND A COPY OF REPORT IS INCLUDED WITH THE SPECIFICATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.

13. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND ARCHITECT FOR REVIEW OF EXISTING CONDITIONS.

14. PATCH AND FIRE STOP EXISTING ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS AND WALLS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts \2

-U

S D

V A

-0

A R

C H

T

H F

L O

O R a k a n u s k y V

B N

S Y

.r v t

/2 /2

:3

:5

A M

GI002

GENERAL INFORMATION

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

BID DOCUMENTS (100%)

ARCHITECTURAL SYMBOLS MATERIAL LEGENDARCHITECTURAL ABBREVIATIONS

GENERAL NOTES - NEW CONSTRUCTION

GENERAL NOTES - GENERAL CONDITIONS

Revisions: Date:

043141 Page 2 of 35

435-C

409-C

410-C

424-C

426-C

427-C

428-C

430-C

400C-3

431-C

432-C

#8

428C-1

429-C

433-C

434-C

425-C

"C" WING

GENERAL NOTES

A. PARTITIONS SHALL BE TYPE A1 UNLESS NOTED OTHERWISE.

B. REFER TO SPECIFICATIONS AND PARTITION TYPE SCHEDULE FOR ADDITIONAL NOTES.

C. NEW PARTITIONS ARE DIMENSIONED TO FACE OF METAL STUD OR MASONRY UNLESS NOTED

OTHERWISE.

D. EXISTING PARTITIONS ARE DIMENSIONED TO FINISH FACE UNLESS NOTED OTHERWISE.

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR

POSITIVE LATCH DOOR HARDWARE

(EXISTING SMOKE BARRIER)

EXISTING EXISTING

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS

COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE

PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER

ESM ESM

E90 E90

EXIT LIGHT SIGNAGE

INDICATES COMMON PATH OF TRAVEL TO POINT OF DECISION

INDICATES PATH OF TRAVEL TO POINT OF EXIT

(FROM COMMON PATH OF TRAVEL)

STARTING POINT

N

PLAN

NORTH

AREA OF WORK

STAIR #7

TO STAIR #7 = 6'

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

36"

42"

6"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

32"

44"

4"

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

44"

96"

4"

PLAN NOTES:

1. SEE ELECTRICAL PLANS FOR EMERGENCY

LIGHTS, SMOKE DETECTORS, ETC...

EXISTING AREA

EXISTING AREA

E90

E

E

COMMON PATH = 56'

302 SF

NUCLEAR

MEDICINE

439 SF

NUCLEAR

MEDICINE

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

36"

42"

6"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

32"

44"

4"

STAIR #8

EXISTING AREA

E90

E

E90

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

44"

98"

4"

E90 E90

C O

M M

O N

P A

T H

5'

T O

S T

A

IR

EXIT CAPACITIES LEGEND

DOORS

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)

MIN. WIDTH (0.2" X OCCUPANCY)

CODE MIN (18 IBC 1010.1.1)

CLEARANCE PROVIDED

CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE

CORRIDORS

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)

MIN. WIDTH (0.2" X OCCUPANCY)

CODE MIN (2018 NFPA 39.2.3.2)

CLEARANCE PROVIDED

CLEARANCE SHOWN BETWEEN FACE OF WALLS

STAIRS

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)

MIN. WIDTH (0.3" X OCCUPANCY)

CODE MIN (18 IBC 1010.1.1)

CLEARANCE PROVIDED

* 2018 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

(2021 NFPA 101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR)

OCCUPANT LOAD FACTORS

SPACE FUNCTION SF/OCCUPANT

AMBULATORY HEALTH CARE 150 GROSS

DESIGN CODE

2021 NFPA 101 LIFE SAFETY CODE

CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS

6.1.5 HEALTH CARE - EXISTING. CHAPTER 19.

FIRE SUPPRESSION: FULLY SPRINKLERED

CHAPTER 19: EXISTING HEALTH CARE OCCUPANCIES

CONSTRUCTION TYPE LIMITATIONS (TABLE 19.1.6.1)

CONSTRUCTION TYPE: II (222)

FIRE RESISTANCE REQUIREMENTS

PRIMARY STRUCTURE FRAME 2-HOURS (EXISTING)

BEARING WALLS EXTERIOR 2-HOURS (EXISTING)

BEARING WALLS INTERIOR 2-HOURS (EXISTING)

NONBEARING WALLS 0

NONBEARING WALLS INTERIOR 0

FLOOR CONSTRUCTION 2-HOURS (EXISTING)

STAIRWELL EGRESS 2-HOURS (EXISTING)

SECOND FLOOR:

NUCLEAR MEDICINE 741 SF (EXISTING)

19.2.5 ARRANGEMENT OF MEANS OF EGRESS.

19.2.5.3 DEAD-END CORRIDORS: NOT TO EXCEED 30'-0"

19.2.5.7 HEALTH CARE SUITES.

19.2.5.7.3.3 (A) TRAVEL DISTANCE WITHIN A PATIENT CARE NONSLEEPING SUITE TO AN EXIT ACCESS DOOR TO ANOTHER SUITE, AN EXIT ACCESS CORRIDOR DOOR, OR A HORIZONTAL EXIT DOOR FROM THE

SUITE SHALL NOT EXCEED 100'-0".

19.2.5.7.3.3 (B) TRAVEL DISTANCE BETWEEN ANY POINT IN A NONSLEEPING SUITE AND AN EXIT SHALL NOT EXCEED 200'-0" IN A BUILDING PROTECTED THROUGHOUT BY AN APPROVED ELECTRICALLY

SUPERVISED SPRINKLER SYSTEM.

19.3.6.2 CONSTRUCTION OF CORRIDOR WALLS.

19.3.6.2.3 CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE.

19.3.6.2.4 CORRIDOR WALLS SHALL BE PERMITTED TO TERMINATE AT OR ABOVE THE CEILING, BUT SHALL NOT BE REQUIRED TO EXTEND TO THE DECK ABOVE, WHERE THE CEILING IS CONSTRUCTED TO LIMIT

THE TRANSFER OF SMOKE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts \2

-U

S D

V A

-0

A R

C H

T

H F

L O

O R a k a n u s k y V

B N

S Y

.r v t

/2 /2

:3

:0

A M

GI201

4TH FLOOR - LIFE SAFETY PLAN

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

BID DOCUMENTS (100%)

4TH FLOOR KEY PLAN

1/8" = 1'-0"1

4TH FLOOR - LIFE SAFETY PLAN

LIFE SAFETY CODE INFORMATION

Revisions: Date:

043141 Page 3 of 35

104 108 112

101 105 109

309C-1

311C-1 STAIR #7

310-C

309-C

T2

TD1

T3

T1

T2

T1

OUTLINE OF GE UNIT ON FLOOR

ABOVE - FOR REFERENCE ONLY

OUTLINE OF GE UNIT ON FLOOR

ABOVE - FOR REFERENCE ONLY

T3

106 110 114

115111107

N

PLAN

NORTH

AREA OF WORK

/8

3 5/8" METAL STUDS @ 16" OC, TYP

5/8" GYPSUM BOARD, BOTH SIDES, SEE

ROOM FINISH SCHEDULE FOR FINISHES

CONTINUOUS METAL STUD TOP TRACK.

PROVIDE DEFLECTION TRACK AT ROOF

CONTINUOUS METAL STUD BOTTOM TRACK

LINE OF EXISTING FLOOR

CONTINUOUS 3 1/2" SOUND ATTENUATION

BATTS, TYP

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYP

FIRE-RATED SEALANT, BOTH SIDES

3 5/8" METAL STUDS @ 16" OC, 25-GAGE, TYPICAL

5/8" TYPE "X" GYPSUM BOARD, BOTH SIDES

WITH STAGGERED UNFINISHED TAPED

JOINTS ON OPPOSITE SIDES OF ROOM.

PAINT WALL ON PUBLIC SIDE.

TEMPORARY CONSTRUCTION FIRE BARRIER

EXISTING UNDERSIDE OF DECK

T1 1 HOUR RATED

FIRE-RATED SEALANT, BOTH SIDES

SECTION

PLAN

ASSEMBLY UL-419

ACCESS ZIPPER

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

CONTINUOUSLY SEAL FIRE RETARDANT POLYSTYRENE

TO EXISTING FINISHED FLOOR.

6-MIL FIRE RETARDANT POLYSTYRENE, SEE

SPECIFICATIONS. PROVIDE ZIPPER ACCESS WHERE

REQUIRED

EXISTING UNDERSIDE OF DECK

FIRE RETARDANT ICRA DUST PARTITION

CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE

RETARDANT POLYSTYRENE TO UNDERSIDE OF

DECK

EXISTING FINISHED CEILING SYSTEM. REMOVE AND

REINSTALL CEILING PANELS AS REQUIRED

CONTINUOUSLY SECURE FIRE RETARDANT

POLYSTYRENE SHEET TO UNDERSIDE OF METAL

CEILING TRACK AND ABOVE METAL CEILING TRACK

SECURE AND SEAL ALL SIDES OF

EXISTING DUCTS, CONDUIT, PIPES, ETC.

6-MIL FIRE RETARDANT

POLYSTYRENE

CONTINUOUSLY SECURE EDGE OF FIRE

RETARDANT POLYSTYRENE TO

EXISTING HOLLOW METAL FRAME

HOLLOW METAL FRAME

DOOR SYSTEM BEYOND

CONTINUOUSLY SECURE/SEAL FIRE RETARDANT

POLYSTYRENE TO EXISTING WALL. TYPICAL ALL WALLS AS

REQUIRED. PATCH/REPAIR EXISTING WALLS AS REQUIRED

TO MATCH EXISTING PRIOR TO CONSTRUCTION

T2FIRE RETARDANT ICRA DUST CONTROL DETAILT3

LINE OF EXISTING CEILING

PRECAUTIONS DURING CONSTRUCTION

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.

5. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.

6. PLACE TWO DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

8. REMOVE CONSTRUCTION WASTE DAILY.

9. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH RED CONSTRUCTION SEAM TAPE TO SEAL AREA FROM NON-

WORK AREA BEFORE CONSTRUCTION BEGINS.

10. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.

SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR

PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH

EXISTING.

11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND

BEFORE 7 AM.

12. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS

THROUGH THE FACILITY.

13. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

14. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK

SITE.

15. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM.

16. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST. A MOBILE ICRA CART (DUST COLLECTION CART) MAY ALSO BE USED. ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO SANITIZE WORK AREA PRIOR TO

REMOVING PLASTIC CONTAINMENT AREA.

EXISTING OR ICRA WALL

EXISTING OR

ICRA DOOR

PROVIDE STICKY WALK-OFF MAT

(TYP. EACH SIDE OF DOOR)

GLAZING PANEL REMOVAL

EXISTING WALL CONSTRUCTION TO REMAIN

EXISTING GLAZING PANEL TO BE REMOVED FROM

EXISTING WINDOW SYSTEM PRIOR TO START OF

ABATEMENT. CONTRACTOR TO STORE GLAZING

PANEL IN A SAFE LOCATION UNTIL WORK IS

COMPLETE AND REPLACE TO IT'S EXISTING

CONDITION. IF DAMAGED, CONTRACTOR WILL

REPLACE TO MATCH EXISTING

EXISTING WINDOW SYSTEM FRAME TO REMAIN-

VERIFY IN FIELD THE WINDOW SYSTEM TYPE

HEPA EXHAUST

EXISTING WALL CONSTRUCTION TO REMAIN

PROVIDE HEPA FILTRATION EXHAUST DUCTING

THROUGH NEW TEMPORARY PLYWOOD PANEL

PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL

WITHIN EXISTING ALUMINUM FRAME

NOTE:

1. GENERAL CONTRACTOR TO LOCATE PER

QUANTITIES REQUIRED.

PROVIDE DUCT SEALING TAPE AROUND

PENETRATION (TYPICAL)

EXTERIORINTERIOR EXTERIOR

INTERIOR

(NEGATIVE SPACE)

EXISTING WINDOW SYSTEM FRAME TO REMAIN-

VERIFY IN FIELD THE WINDOW SYSTEM TYPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts \2

-U

S D

V A

-0

A R

C H

T

H F

L O

O R a k a n u s k y V

B N

S Y

.r v t

/2 /2

:3

:5

A M

GC101

3RD FLOOR - ICRA CONTROL PLAN - SPS

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

BID DOCUMENTS (100%)

1/4" = 1'-0"1

3RD FLOOR - ICRA CONTROL PLAN - SPS

3RD FLOOR KEY PLAN

ICRA KEY NOTES - 3RD FLOOR

NUMBER DESCRIPTION

1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3

MICRONS INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES

2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST, DIRECTLY VENTED TO EXTERIOR. SEE DETAIL

B/GC101 FOR DETAIL

3 REMOVE EXISTING GLAZING, INSTALL PLYWOOD WITH SEALED EXHAUST PORT. SEE B/GC101 FOR DETAIL

4 WALK-OFF MAT. SEE SPECIFICATIONS & DETAIL A/GC101

5 EXISTING CEILING SYSTEM IS TO BE MODIFIED AS REQUIRED TO ALLOW FOR CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIER. WHEN CONSTRUCTION IS COMPLETE THE CEILING SYSTEM IS TO BE RETURNED TO

ITS PRE-CONSTRUCTION CONFIGURATION

ICRA CONTROL POLICY

1/2" = 1'-0"A

STICKY WALK-OFF MAT DETAIL

1 1/2" = 1'-0"B

TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL

Revisions: Date:

043141 Page 4 of 35

N

PLAN

NORTH

AREA OF WORK

CORRIDOR

400C-2

NUCLEAR MEDICINE

419C

NUCLEAR MEDICINE

416C

SPECIAL

PROCEDURES

415C

NUCLEAR MEDICINE

418C

NUCLEAR MEDICINE

417C

CONTROL

ROOM

STAIR

#7

104 108 112

101 105 109

106 110 114

115111107

TD2 T1

T1

ACCESS ZIPPER

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

CONTINUOUSLY SEAL FIRE RETARDANT POLYSTYRENE

TO EXISTING FINISHED FLOOR.

6-MIL FIRE RETARDANT POLYSTYRENE, SEE

SPECIFICATIONS. PROVIDE ZIPPER ACCESS WHERE

REQUIRED

EXISTING UNDERSIDE OF DECK

T2

FIRE RETARDANT ICRA DUST PARTITION

CONTINUOUSLY SECURE AND SEAL EDGE OF FIRE

RETARDANT POLYSTYRENE TO UNDERSIDE OF

DECK

EXISTING FINISHED CEILING SYSTEM. REMOVE AND

REINSTALL CEILING PANELS AS REQUIRED

CONTINUOUSLY SECURE FIRE RETARDANT

POLYSTYRENE SHEET TO UNDERSIDE OF METAL

CEILING TRACK AND ABOVE METAL CEILING TRACK

SECURE AND SEAL ALL SIDES OF

EXISTING DUCTS, CONDUIT, PIPES, ETC.

6-MIL FIRE RETARDANT

POLYSTYRENE

CONTINUOUSLY SECURE EDGE OF FIRE

RETARDANT POLYSTYRENE TO

EXISTING HOLLOW METAL FRAME

EXISTING HOLLOW METAL

FRAME

EXISTING DOOR SYSTEM

BEYOND

CONTINUOUSLY SECURE/SEAL FIRE RETARDANT

POLYSTYRENE TO EXISTING WALL. TYPICAL ALL WALLS AS

REQUIRED. PATCH/REPAIR EXISTING WALLS AS REQUIRED

TO MATCH EXISTING PRIOR TO CONSTRUCTION

T1

FIRE RETARDANT ICRA DUST

CONTROL DETAIL

PRECAUTIONS DURING CONSTRUCTION

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.

5. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.

6. PLACE TWO DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

8. REMOVE CONSTRUCTION WASTE DAILY.

9. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH RED CONSTRUCTION SEAM TAPE TO SEAL AREA FROM NON-

WORK AREA BEFORE CONSTRUCTION BEGINS.

10. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.

SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR

PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH

EXISTING.

11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND

BEFORE 7 AM.

12. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS

THROUGH THE FACILITY.

13. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

14. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK

SITE.

15. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM.

16. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST. A MOBILE ICRA CART (DUST COLLECTION CART) MAY ALSO BE USED. ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO SANITIZE WORK AREA PRIOR TO

REMOVING PLASTIC CONTAINMENT AREA.

EXISTING OR ICRA WALL

EXISTING OR

ICRA DOOR

PROVIDE STICKY WALK-OFF MAT

(TYP. EACH SIDE OF DOOR)

GLAZING PANEL REMOVAL

EXISTING WALL CONSTRUCTION TO REMAIN

EXISTING GLAZING PANEL TO BE REMOVED FROM

EXISTING WINDOW SYSTEM PRIOR TO START OF

ABATEMENT. CONTRACTOR TO STORE GLAZING

PANEL IN A SAFE LOCATION UNTIL WORK IS

COMPLETE AND REPLACE TO IT'S EXISTING

CONDITION. IF DAMAGED, CONTRACTOR WILL

REPLACE TO MATCH EXISTING

EXISTING WINDOW SYSTEM FRAME TO REMAIN-

VERIFY IN FIELD THE WINDOW SYSTEM TYPE

HEPA EXHAUST

EXISTING WALL CONSTRUCTION TO REMAIN

PROVIDE HEPA FILTRATION EXHAUST DUCTING

THROUGH NEW TEMPORARY PLYWOOD PANEL

PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL

WITHIN EXISTING ALUMINUM FRAME

NOTE:

1. GENERAL CONTRACTOR TO LOCATE PER

QUANTITIES REQUIRED.

PROVIDE DUCT SEALING TAPE AROUND

PENETRATION (TYPICAL)

EXTERIORINTERIOR EXTERIOR

INTERIOR

(NEGATIVE SPACE)

EXISTING WINDOW SYSTEM FRAME TO REMAIN-

VERIFY IN FIELD THE WINDOW SYSTEM TYPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts \2

-U

S D

V A

-0

A R

C H

T

H F

L O

O R a k a n u s k y V

B N

S Y

.r v t

/2 /2

:3

:5

A M

GC102

4TH FLOOR - ICRA CONTROL PLAN

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

BID DOCUMENTS (100%)

4TH FLOOR KEY PLAN

1/4" = 1'-0"1

4TH FLOOR - ICRA CONTROL PLAN

ICRA CONTROL POLICY

ICRA KEY NOTES - 4TH FLOOR

NUMBER DESCRIPTION

1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3

MICRONS INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES

2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST, DIRECTLY VENTED TO EXTERIOR. SEE B/GC102 FOR

DETAIL

3 REMOVE EXISTING GLAZING, INSTALL PLYWOOD WITH SEALED EXHAUST PORT. SEE B/GC102 FOR DETAIL

4 CONTINUOUSLY SEAL PERIMETER OF EXISTING DOOR WITH TAPE TO PREVENT PASSAGE OF DUST

5 WALK-OFF MAT. SEE SPECIFICATIONS & DETAIL A/GC102

1/2" = 1'-0"A

STICKY WALK-OFF MAT DETAIL

1 1/2" = 1'-0"B

TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL

Revisions: Date:

043141 Page 5 of 35

NORTH

AREA OF WORK

CORRIDOR

400C-2

NUCLEAR

MEDICINE

419C

NUCLEAR

MEDICINE

416C

SPECIAL

PROCEDURES

415C

NUCLEAR

MEDICINE

417C

CONTROL

ROOM

STAIR

#7

NUCLEAR

MEDICINE

418C

A

B

B

C

CD D

E

D

F

G

H

J

B

B

H

CORRIDOR

400C-2

NUCLEAR MEDICINE

419C

NUCLEAR MEDICINE

416C

SPECIAL

PROCEDURES

415C

NUCLEAR MEDICINE

417C

CONTROL

ROOM

STAIR

#7

NUCLEAR MEDICINE

418C

1 1

104 108 112

101 105 109

7 7

106 110

111107

EXISTING ACOUSTICAL CEILING TILE SYSTEM TO BE

REMOVED

EXISTING LIGHT FIXTURE(S) TO BE REMOVED. SEE

ELECTRICAL DRAWINGS

SPRINKLER HEAD TO BE REMOVED - REFER TO FIRE

PROTECTION DRAWINGS

EXISTING ACOUSTICAL CEILING TILE SYSTEM TO

REMAIN UNLESS NOTED OTHERWISE

GENERAL AREA OF WORK NOT

INCLUDED IN CONTRACT

EXISTING LIGHT FIXTURE(S) TO REMAIN. SEE

ELECTRICAL DRAWINGS

EXISTING MECHANICAL GRILLES TO REMAIN. SEE

MECHANICAL DRAWINGS

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED BY THE SPECIFICATIONS WITHIN THE

CONTRACT AREA.

EXISTING WALL CONSTRUCTION SHOWN HATCHED TO BE

DEMOLISHED AND REMOVED IN ITS ENTIRETY.

EXISTING DOOR TO BE REMOVED. EXISTING FRAME TO REMAIN.

REMOVE AND RE-INSTALL EXISTING HARDWARE UNLESS NOTED

OTHERWISE. PREP AND PAINT EXISTING FRAME FOR NEW PAINT.

EXISTING WALL MOUNTED SINK/ LAVATORY TO BE REMOVED. SEE

PLUMBING DRAWINGS.

AREA OF WORK NOT INCLUDED IN CONTRACT.

1. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION MAY BE REQUIRED OUTSIDE OF THIS LINE.

ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF DEMOLITION WORK REQUIRED FOR THE PROJECT.

3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO

FABRICATION, ERECTION AND/OR INSTALLATION.

4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.

5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM

SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.

6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE.

7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE.

COVER FIRE SPRINKLER HEADS WITH A THIN PAPER BAG TO PROTECT HEADS DURING CONSTRUCTION.

8. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE LOCATION OF BARRIERS

WITH OWNER.

9. REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.

10. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND

DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED.

11. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT.

12. FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE

READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE BY THE INSTALLING CONTRACTOR.

13. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

14. DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND

RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.

15. PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO

CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE.

16. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH EXISTING FIRE

RATING UNLESS NOTED OTHERWISE.

17. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION.

PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR RELOCATION PRIOR TO COMMENCING DEMOLITION.

18. WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR. PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE SURFACES FOR SCHEDULED FINISHES.

19. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.

20. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND MATCH EXISTING

FINISHES.

21. REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION. REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts \2

-U

S D

V A

-0

A R

C H

T

H F

L O

O R a k a n u s k y V

B N

S Y

.r v t

/2 /2

:3

:4

A M

AD101

4TH FLOOR - DEMOLITION PLANS

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

BID DOCUMENTS (100%)

4TH FLOOR KEY PLAN

1/4" = 1'-0"1

4TH FLOOR - REFLECTED CEILING PLAN - DEMOLITION

DEMOLITION KEY NOTES - RCP

NUMBER DESCRIPTION

A REMOVE/ MODIFY EXISTING CEILING GRID SHOWN DASHED IN THIS AREA FOR NEW WALL PARTITION. SEE FLOOR PLANS.

B EXISTING LIGHT FIXTURE TO BE RELOCATED. SEE ELECTRICAL PLAN E201

C EXISTING ACOUSTICAL CEILING PANELS TO BE REMOVED FOR RELOCATION OF EXISTING LIGHT FIXTURE. REMOVE CENTER CEILING GRID.

SUPPORT EXISTING GRID AS REQUIRED.

D REMOVE EXISTING CEILING TILES THROUGHOUT ROOM. GRID SUSPENSION SYSTEM TO REMAIN.

E REMOVE/ RELOCATE EXISTING HVAC RETURN GRILLE. SEE MECHANICAL DRAWING M101

F EXISTING PATIENT LIFT TO REMAIN

G EXISTING PATIENT LIFT IS TO BE REMOVED AND SALVAGED FOR RELOCATION. REFER TO NEW WORK PLAN

H EXISTING CURTAIN TRACK IS TO BE REMOVED IN ITS ENTIRETY

J EXISTING CURTAIN TRACK IS TO BE REMOVED AND CEILING GRID IS TO BE PREPPED TO RECEIVE NEW TRACK

1/4" = 1'-0"2

4TH FLOOR PLAN - DEMOLITION

DEMOLITION LEGEND - REFLECTED CEILING PLAN.

DEMOLITION LEGEND - FLOOR PLAN.

DEMO FINISH SCHEDULE - FOURTH FLOOR

RM

NUMBER FLOOR BASE

WALL -

NORTH

WALL -

SOUTH

WALL -

EAST

WALL -

WEST MILLWORK CEILING COMMENTS

417C EPOXY EPOXY PAINT PAINT PAINT PAINT EXISITNG WINDOW SILLS

TO REMAIN

ACOUSTICAL CEILING W/ PAINTED

DRYWALL FASCIA

418C EPOXY EPOXY PAINT PAINT PAINT PAINT EXISITNG WINDOW SILLS

TO REMAIN

ACOUSTICAL CEILING W/ PAINTED

DRYWALL FASCIA

419C EPOXY EPOXY PAINT PAINT PAINT PAINT EXISITNG WINDOW SILLS

TO REMAIN

ACOUSTICAL CEILING W/ PAINTED

DRYWALL FASCIA

DEMOLITION KEY NOTES - FLOOR PLAN

NUMBER DESCRIPTION

1 EXISTING GANTRY TO BE REPLACED. REMOVE ASSOCIATED EQUIPMENT, CEILING MOUNTED DEVICES, AND RAIL SYSTEM. PREPARE TO RECEIVE NEW

GANTRY.

2 REMOVE EXISTING FLOOR FINISH AND WALL BASE IN ITS ENTIRETY. PREP CONCRETE DECK AND EXISTING WALLS FOR NEW FINISHES.

3 EXISTING EQUIPMENT TO BE REMOVED BY VA.

4 REMOVE EXISTING SINK. COORDINATE WITH PLUMBING DRAWINGS. PREP EXISTING WALLS FOR NEW FINISHES.

5 EXISTING MECHANICAL EQUIPMENT TO REMAIN AND BE PROTECTED DURING DEMOLITION AND CONSTRUCTION

6 EXISTING GLAZING PANEL IS TO BE REMOVED AND TEMPORARILY FILLED WITH PLYWOOD PANEL AS REQUIRED IN ORDER TO ALLOW FOR NEW EQUIPMENT TO BE BROUGHT IN FOR SCOPE OF NEW WORK. REFER TO NEW WORK AND EQUIPMENT DRAWINGS FOR MORE INFORMATION

7 EXISTING WINDOW SILL FINISH IS TO REMAIN AND BE PREPPED TO RECEIVE NEW CLADDING

8 EXISTING EQUIPMENT TO REMAIN. REFER TO ELECTRICAL DRAWINGS

9 DEMOLISH UNUSED DISCONNECT CONDUIT AND WIRING BACK TO SOURCE AND TERMINATE - REFER TO ELECTRICAL DRAWINGS

10 EXISTING WINDOW SYSTEM IS TO BE REMOVED AND OPENING IS TO BE PREPPED TO RECEIVE NEW LOUVERED PANEL INSERT. REFER TO NEW WORK

PLANS, ELEVATIONS AND SECTIONS FOR MORE INFORMATION

11 APPROXIMATE LOCATION OF ICRA CONSTRUCTION BARRIER, REFER TO ICRA PLANS FOR MORE INFORMATION

X

GENERAL DEMOLITION NOTES

Revisions: Date:

043141 Page 6 of 35

NORTH

AREA OF WORK

CORRIDOR

400C-2

NUCLEAR MEDICINE

416C

SPECIAL

PROCEDURES

415C

CONTROL

ROOM

STAIR

#7

NUCLEAR MEDICINE

419C

NUCLEAR MEDICINE

417C

AE102

AE102

AE102

AE102

AE102

A1

31'-7 1/2"

HW-2

104 108 112

101 105 109

417CA

E419C

E417C

AE102

SIMILAR

AE1023

AE102

AE102 7

106 110 114

115111107

E416C

E419CB

CONT METAL BOTTOM TRACK

SET IN CONT BEAD OF SEALANT.

LINE OF FINISHED FLOOR, SEE ROOM

FINISH SCHEDULE FOR FLOOR & BASE

TYPE

UNDERSIDE OF ROOF OR FLOOR DECK

LINE OF CEILING SYSTEM, SEE ROOM

FINISH SCHEDULE FOR TYPE & HEIGHT

3 5/8" METAL STUDS @ 16" OC, TYP

(1) LAYER 5/8" THK. GWB BOTH SIDES

SECTION

CONTINUOUS 3 1/2" SOUND ATTENUATION

BATTS

CONTINUOUS METAL HORIZONTAL

BRIDGING CHANNEL @ MID HEIGHT, TYP.

PLAN

A1

/8

FULL HGT 5/8" GWB BOTH SIDES

METAL STUD PARTITION

CONTINUOUS METAL TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOF

CONTINUOUS METAL STUD TOP TRACK

CONTINUOUS METAL STUD BOTTOM TRACK

3 5/8" METAL STUDS @ 16" OC, TYPICAL

(1) LAYER 5/8" GYPSUM BOARD BOTH

SIDES

/8

SOLID SURFACE WALL CAP. REFER TO

MILLWORK DETAILS AND FINISH

SCHEDULE

U .N

.O

DASHED LINE: PROVIDE STEEL SUPPORT

POST @ UNSECURED END OF WALL

WHERE REQUIRED. ANCHOR POST TO

FLOOR SLAB.

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOORING TYPE

5 7/8"

/2

SECTION

PLAN

LOW WALL PARTITION

A2

3/8" ACOUSTICAL SEALANT BOTH SIDES

RUBBER BASE, BOTH SIDES. REFER TO FINISH

SCHEDULE

(TYPICAL)

1/2"

(TYPICAL)

1/2"

CORRIDOR

400C-2

NUCLEAR MEDICINE

416C SPECIAL

PROCEDURES

415C

CONTROL

ROOM

STAIR

#7

A

A A

B C

D

NUCLEAR MEDICINE

419C

NUCLEAR MEDICINE

417C

E

F

D

G

AE102

H

AT-1

9'-0"

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED FOR NEW FINISHES IF INDICATED ON

FINISH SCHEDULE.

NEW CONSTRUCTION

AREA GENERALLY NOT INCLUDED IN CONTRACT

NEW LAVATORY

NEW MILLWORK TO BE PROVIDED BY

GENERAL CONTRACTOR

INDICATES FOOTPRINT OF NUCLEAR MEDICINE IMAGING

EQUIPMENT

2x2 ACOUSTICAL CEILING TILE

SYSTEM (GRID ONLY)

EXISTING LIGHTING FIXTURES TO

REMAIN

EXHAUST GRILLE

SPRINKLER HEAD

RETURN AIR GRILLE

SUPPLY AIR GRILLE

EXISTING:

2x2 ACOUSTICAL CEILING TILE

SYSTEM

EXHAUST GRILLE

NEW:

2x4 RECESSED LED LIGHT FIXTURE

AREA GENERALLY NOT INCLUDED IN CONTRACT

WIRELESS ACCESS POINT

RECESSED DOWNLIGHT

A. ALL CEILINGS ARE 8'-0" AFF UNLESS NOTED OTHERWISE.

B. PROVIDE AND INSTALL NEW CEILING GRID AND LAY-IN TILES ACT-1: SEE SPECIFICATIONS: CEILING HEIGHT TO

BE AS INDICATED EXISTING LAYOUT.

C. CENTER AND/OR ALIGN ALL CEILING TILES, AS INDICATED GRAPHICALLY, UNLESS NOTED OTHERWISE.

D. PATCH AND REPAIR EXISTING ACT CEILING TO MATCH EXISTING.

E. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE DESCRIPTIONS, ALL CEILING MOUNTED MECHANICAL

DEVICES AND CEILING MOUNTED TECHNOLOGY EQUIPMENT

F. REFER TO MECHANICAL DRAWINGS FOR DIFFUSER DESCRIPTIONS AND CEILING MOUNTED MECHANICAL

DEVICES.

G. CT = CUT TILE.

H. PROVIDE AND INSTALL HVAC DIFFUSERS AND RETURN GRILLS AS INDICATED: SEE MECHANICAL DRAWINGS

FOR ADDITIONAL REQUIREMENTS.

I. PROVIDE AND INSTALL SPRINKLER HEAD LOCATIONS AS INDICATED: SEE FIRE PROTECTION DRAWINGS FOR

ADDITIONAL REQUIREMENTS.

J. CEILING HEIGHT DIMENSIONS SHOWN ON REFLECTED CEILING PLAN AND DETAILS ARE FROM FINISH FLOOR TO

FINISH CEILING.

K. UNLESS NOTED OTHERWISE, LIGHT FIXTURES SHALL BE LOCATED AS SHOWN ON REFLECTED CEILING PLANS.

L. PROVIDE AND INSTALL NEW LIGHT FIXTURES, SENSING AND OTHER DEVICES AS INDICATED: SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL REQUIREMENTS.

M. WHERE LIGHT FIXTURES, DEVICES AND ACCESSORIES ARE SHOWN TO BE RECESSED IN CEILING TILES, THEY SHALL BE CENTERED IN THE CEILING TILES UNLESS NOTED OTHERWISE. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING

EQUIPMENT.

N. PROVIDE ACCESS PANELS LOCATED IN FINISHED AREAS SHALL BE PAINTED TO MATCH ADJACENT SURFACES.

LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING WITH THE INSTALLATION.

O. ALL GYPSUM WALL BOARD CEILINGS AND SOFFITS ARE TO BE PAINTED.

P. NO MECHANICAL EQUIPMENT IN THE CEILING CAVITY REQUIRING NORMAL MAINTENANCE SHALL BE INSTALLED ABOVE A GYPSUM WALL BOARD CEILING. NOTIFY ARCHITECT IF ANY SUCH ITEMS ARE INDICATED ABOVE

GYPSUM WALL BOARD CEILINGS.

Q. EXIT SIGNS AND SMOKE DETECTORS LOCATED IN HARD CEILINGS SHALL BE CENTERED IN CORRIDORS AND LOCATED A DISTANCE OF 1'-0" FROM WALL TO CENTER OF THE FIXTURE UNLESS NOTED OTHERWISE. LOCATE

EXIT SIGNS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.

R. SOFFITS AND BULKHEADS SHALL BE LATERALLY BRACED TO RESIST HORIZONTAL MOVEMENT.

S. GYPSUM WALL BOARD SOFFITS TO OCCUR ABOVE ALL WALL CABINETS 7'-2" TO CEILING, UNLESS NOTED

OTHERWISE.

T. DROPPED GWB LIGHT COVE WITH CONTINUOUS LED LIGHT STRIP: SEE CEILING DETAILS AND ELECTRICAL

DRAWINGS FOR ADDITIONAL REQUIREMENTS.

1. ALL PARTITIONS TO BE TYPE 'A1' UNLESS NOTED OTHERWISE.REFER TO THIS SHEET FOR

PARTITION INFORMATION.

2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

COMMENCEMENT OF WORK. IF DRAWINGS CONFLICT WITH ACTUAL FIELD CONDITIONS,

CONTACT ARCHITECT PRIOR TO PROCEEDING WITH WORK.

3. REFER TO LIFE SAFETY PLANS FOR RATED WALL LOCATIONS.

4. REFER TO Q-SERIES DRAWINGS FOR FURNITURE AND EQUIPMENT LOCATION COORDINATION.

DASHED FURNITURE AND EQUIPMENT ITEMS SHOWN FOR REFERENCE ONLY AND IS NOT PART

OF THE GENERAL CONTRACT. THESE ITEMS WILL BE PROVIDED AND INSTALLED BY OWNER,

UNLESS NOTED OTHERWISE. CONTRACTOR MAY NEED TO COORDINATE SPECIFIC FIXTURE

AND EQUIPMENT REQUIREMENTS IF NOTED.

5. PROVIDE CONCEALED IN-WALL REINFORCING / BLOCKING FOR ATTACHMENT OF ALL

MILLWORK, CASEWORK, AND / OR ACCESSORIES AS REQUIRED.

6. ALL DIMENSIONS ARE TO THE FACE OF STUD AT NEW WALLS UNLESS NOTED OTHERWISE.

VERIFY IN FIELD WITH DESIGNER FINAL LOCATIONS OF ALL LIGHT SWITCHES, STROBES, FIRE

EXTINGUISHER CABINETS, FIRE ALARM PULLS AND OTHER DEVICES ON WALLS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts \2

-U

S D

V A

-0

A R

C H

T

H F

L O

O R a k a n u s k y V

B N

S Y

.r v t

/2 /2

:3

:4

A M

AE101

4TH FLOOR - NEW WORK PLANS

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-108NUCLEAR MEDICINE

EQUIPMENT SITE

PREPARATIONS

BID DOCUMENTS (100%)

4TH FLOOR KEY PLAN

1/4" = 1'-0"2

4TH FLOOR PLAN - NEW WORK

1/4" = 1'-0"1

4TH FLOOR REFLECTED CEILING PLAN - NEW WORK

KEY NOTES - FLOOR PLAN

NUMBER DESCRIPTION

1 NEW WALL MOUNTED SINK

2 NEW EPOXY FLOOR FINISH

3 OUTLINE OF EXISTING PATIENT LIFT ABOVE (PL-02)

4 OUTLINE OF RELOCATED PATIENT LIFT ABOVE (PL-01)

5 NEW EQUIPMENT IS TO BROUGHT IN THROUGH WINDOW OPENING PRIOR TO NEW WORK SILL BEING INSTALLED TO PREVENT DAMAGE.

ONCE EQUIPMENT HAS BEEN BROUGHT IN, EXISTING GLAZING PANEL IS TO BE RE-INSTALLED AND NEW WORK SILL IS TO BE COMPLETED

6 EXISTING MECHANICAL EQUIPMENT TO REMAIN & BE PROTECTED DURING CONSTRUCTION - REFER TO MECHANICAL DRAWINGS

7 EXISTING WINDOW SYSTEM IS TO BE REPLACED WITH NEW LOUVERED PANEL SYSTEM. REFER TO ELEVATION AND SECTION FOR MORE

INFORMATION

KEY NOTES - REFLECTED CEILING PLAN

NUMBER DESCRIPTION

A NEW CEILING TILES THROUGHOUT ROOM. GRID SUSPENSION SYSTEM TO REMAIN.

B EXISTING PATIENT LIFT (PL-02)

C INFILL AREA OF CEILING WORK WITH NEW CEILING GRID AND TILE AS REQUIRED. NEW TO MATCH EXISTING

D EXISTING LIGHTING IS TO BE RELOCATED AS INDICATED

E RELOCATED EXHAUST GRILL. REFER TO MECHANICAL DRAWINGS

F RELOCATED PATIENT LIFT (PL-01)

G NEW CURTAIN TRACK MOUNTED TO ACOUSTICAL CEILING GRID- REFER TO DETAIL

H PROVIDE NEW ACOUSTIC CEILING GRID & TILE

FLOOR PLAN LEGEND.

LEGEND - REFLECTED CEILING PLAN.

GENERAL NOTES - REFLECTED CEILING PLAN

GENERAL FLOOR PLAN NOTES

X

Revisions: Date:

043141 Page 7 of 35

POWDER COATED SUPPORT BRACKET,

BASIS OF DESIGN HAFELE 'SPEED

BRA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .