This document contains questions and answers regarding a federal solicitation for nuclear medicine equipment site preparation work. The solicitation number is 36C24222B0045 issued by the Department of Veterans Affairs Network Contracting Office to prepare space at the Veterans Affairs Medical Center for new nuclear medicine equipment. The contractor's scope of work includes delivering medical equipment through windows using a crane, installing solid surface materials to cover existing window sills, and coordinating phased shutdowns of the nuclear medicine area with medical staff. Clarification was provided that structural anchors must be attached to the deck rather than the fireproofed concrete, and that 1-hour firewalls will need to be temporarily removed and replaced to complete the full project scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222B0045 0006.docx | DOCX document | |
| ICRA Amendment 6-23-2022.pdf | ||
| 36C24222B0045 0005.docx | DOCX document | |
| Scan_2022_05_27_10_45_02_376.pdf | ||
| 36C24222B0045 0004.docx | DOCX document | |
| 36C24222B0045 0002.docx | DOCX document | |
| 36C24222B0045 0001.docx | DOCX document | |
| 528-19-108 - Nuc Med Spec List BK-2.pdf | ||
| 528-19-108 - Nuc Med Spec List BK-1.pdf | ||
| 36C24222B0045_2.docx | DOCX document | |
| WAGE RATES.pdf | ||
| 528-19-108 Nuc Med DWG Package.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 528-19-108B Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 To all Offerors/Bidders
36C24222B0045
X x
RFI QUESTIONS AND ANSWERS
Nicholas Winne Contracting Officer
1. Drawing GC101 Typical HEPA Filtration through Window Detail Talks about abatement, will there be any abatement included in this contract? Have the caulks and sealants been tested for hazardous materials a. No abatement is anticipated in this project, the windowsills as suspected to have ACM adhesives. These sills are to be completely wrapped/covered in solid surface materials (e.g. Corian). I show instances in the hospital where our Carpenter shop has already done this for an example.
2. From site visit there was talk of changing Drawing SF102 3 sections. Will new details be issued? a. The detail provided shows fasteners anchored to the sides of structural member’s encasing concrete. This is prohibited as the concrete is considered fireproofing and anchors compromise its integrity. So, to clarify the detail is wrong and should be disregarded. All anchors/fasteners shall be directed to the deck. The method of fastening shall be as recommended by the manufacturer and approved by the COR. I did not intend to issue a new detail unless one is required.
3. From Drawing Q101 equipment schedule calls for NMIS “VA to Contract install”, What is the responsibility of the contractor? Are we to include removal and replacement of windows to bring scan unit through and install? Please clarify responsibility regarding removal of existing units and installation of new. a. The responsibility of the Contractor will include all aspects of delivering new medical equipment to the space by means of crane outside of the building, delivering the equipment through a window. Please include rigging/equip.-delivery as a separate line item. Also include as a separate line-item removal of equipment in the same manner through a window by means of crane to remove the old equipment. Removal of the old equipment with a crane may not be required and shall be de-scoped if other removal means by the manufacturer are provided (i.e. elevator). Please be mindful of aspects such as certified crew and operator, lift plan, proper rigging and equipment to deliver to space and safely lower to the floor from window height.
4. Based on ICRA plan and work plan, T1 ICRA barriers will have to come down to complete project space outside of nuclear medicine 416C. Is this work to be phased or can work such as installing solid surfacing and epoxy floor paint be done at one time with 416C shutdown? a. Assume phasing of ICRA barriers to accommodate the local medical staff for some duration.
5. From 3rd floor ICRA Plan 1 hour fire rated walls are shown, are these walls able to be left up during the duration of construction? Also, No ICRA notes are shown in room 309C-1, but work is anticipated in this room. a. The 1-hour walls will be left up while work is being preformed on the 3rd floor but cannot be left up indefinitely for the duration of the complete project. The ICRA plans for this space will include the highest levels attainable as t is the Sterile Processing Service area. I am working on an ICRA plan which I will send out as a scope amendment once complete.