About this file

This is a Certification of Current Capacity form issued by the Florida Department of Transportation (FDOT) for the City of Fort Myers' Sanitary Sewer Evaluation Survey Program on-call manhole lining contractor procurement. The form requires bidders to certify that their proposal amount does not exceed their firm's current capacity, calculated as maximum capacity rating less total uncompleted work. Contractors must complete the "Status of Contracts on Hand" report detailing all prime and subcontracts, whether in progress or awarded but not yet begun, with the report reflecting uncompleted work as of either the 15th day of the preceding month (if letting is before the 25th of the month) or the 15th day of the current month (if letting is after the 25th). The certification must be sworn and subscribed by an authorized representative, with all contract amounts shown to the nearest $100. The solicitation was released August 11, 2025, with questions due by August 28, 2025, and bid submissions required by September 11, 2025, for a five-year on-call contract term.

The form template presented shows zero dollars in total contracts on hand and total uncompleted work, indicating this is a blank certification form for prospective bidders. Evaluation of proposals will be based on project approach (45 points) and firm experience and personnel qualifications (55 points), with additional consideration given for Minority Business Enterprise compliance (13 points) and local vendor preference (5 points). Selected contractors must be licensed in Florida and have been in business for at least three consecutive years. The procurement emphasizes opportunities for Disadvantaged Business Enterprises and Minority Business Enterprises, with the FDOT maintaining a 10.54% overall DBE goal. Contractors must comply with Build America, Buy America requirements mandating use of U.S.-produced iron, steel, manufactured products, and construction materials, and must submit a Bidders Opportunity List within three business days of bid submission and maintain an approved DBE Affirmative Action Plan with the FDOT Equal Opportunity Office.

View the file

Other files

File Type Posted
Sanitary_Sewer_Evaluation_Survey_Program_On-Call_Contractors_-_Manhole_Lining_(Addendum_#2_Revision).pdf PDF
Sanitary_Sewer_Evaluation_Survey_Program_On-Call_Contractors_-_Manhole_Lining_(Addendum_#2_Revision).pdf PDF
SPECIFICATIONS_CFM_03-5-25_(4).pdf PDF
SPECIFICATIONS_CFM_03-5-25_(4).pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
BABA_Form.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
FHWA-1273_(10_23)_.pdf PDF
COMBINED_SPECIFICATIONS_04-18-25_(2).pdf PDF
w37503083_(3).docx DOCX document
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
COMBINED_SPECIFICATIONS_04-18-25_(2).pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
w37503083_(3).docx DOCX document
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
BABA_Form.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
FHWA-1273_(10_23)_.pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
Notice_of_Award.docx DOCX document
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
Notice_of_Award.docx DOCX document
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

525-010-46

09/20

STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION

PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY

CONFIDENTIAL per Ch 337.14(1) F.S.

Fill in your FDOT Vendor Number For bids to be received on

(Letting Date) VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this of , 20 day By:

Title

525-010-46

PROGRAM MANAGEMENT

STATUS OF CONTRACTS ON HAND 09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00