525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf

PDF 30 KB Posted

Attached to
Service Line Field Investigation and Meter Box Maintenance
Solicitation number
ITB 25-076
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This document is a Local Agency Program (LAP) Certification of Current Capacity form from the Florida Department of Transportation (FDOT), designed for pre-qualified contractors bidding on transportation projects. The form requires contractors to certify their current available contract capacity by detailing their total uncompleted work. The certification must be completed based on specific timing rules: if the letting is before the 25th of the month, the report reflects uncompleted work as of the 15th of the preceding month; if after the 25th, it reflects work in progress as of the 15th of the letting month. All new contracts awarded within five days of the letting date must be included and charged against the contractor's total rating.

The form includes a detailed "Status of Contracts on Hand" table where contractors must comprehensively list all current projects, including both prime and subcontracts, with columns for total contract amount, amount sublet to others, balance of contract amount, and uncompleted work to be done by the contractor as either a prime or subcontractor. The document is marked as confidential per Florida Statute 337.14(1) and requires the contractor to swear and subscribe to the accuracy of the information provided. In this specific document, all totals are listed as $0.00, indicating an empty or template form ready to be filled out by a specific contractor.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

525-010-46

09/20

STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION

PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY

CONFIDENTIAL per Ch 337.14(1) F.S.

Fill in your FDOT Vendor Number For bids to be received on

(Letting Date) VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this of , 20 day By:

Title

525-010-46

PROGRAM MANAGEMENT

STATUS OF CONTRACTS ON HAND 09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00

File details come from the government source that posted it. Updated .