CGC HUDSON Winch and Weight Handling Inspection SOW.pdf
PDF 329 KB Posted
- Solicitation number
- 52050PR260000308
About this file
This document is a Specification for Dockside Repairs for the USCGC HUDSON (WLIC 801) for Fiscal Year 2026, developed by Erik C Elasik and issued as Revision 0 on October 15, 2025. The specification addresses multiple work items related to vessel maintenance and repair.
Work Item 8 specifies inspection and service of the Utility Air Winch Model HU-40 Series, requiring six tasks performed on six winches including operate and inspect, NDE and preservation with black finish coat (color 17038), renewal of wire rope assemblies (5/8 inch, 6x37 XXIPS IWRC RRL, 150 feet per assembly with poured spelter or fiege end fittings), groom and lubricate, final operational test verifying free rotation with no unusual noise or binding, and fabrication and installation of label plates. Work Item 9 addresses the Jered LLC Air Driven Warping Capstan Model X-1503 located on the fantail, requiring nine recurring maintenance tasks with multiple Contractor Information Reports (CIRs) submitted for inspections including operate and inspect, disassemble and inspect, service and inspect, pneumatic brake inspection, control valve work, gear reducer service, preservation and NDE, gasket renewal, pneumatic hose assembly renewal (quantity two), groom and lubricate, operational and weight test per technical publication, and label plate fabrication. Work Item 10 specifies inspection and service of HU40 Series spud air winches (quantity four), requiring operate and inspect, preserve and NDE of foundations with black finish coat and weld joint inspection, wire rope renewal (5/8-inch 6x37 EIPS-IWRC RRL, 130 feet length with disposal of old rope), groom and lubricate, and final operational test including ten complete raise-lower cycles with verification of free rotation. Work Item 11 addresses boat davit inspection and service, requiring operate and inspect, disassemble and inspect, winch service and inspection, wire rope assembly renewal, pedestal NDE, davit preservation, grease fitting renewal, pin and sheeve bushing renewal, groom and lubricate, weight test per Coast Guard Drawing 160-WLIC 8201-7 with rated load test at 1,320 pounds, dynamic load test at 1,520 pounds, and static load test at 1,650 pounds, and label plate fabrication, with additional maintenance tasks including hoist hook and winch renewal as marked. All work must comply with Surface Forces Logistics Center Standard Specifications 0000 (General Requirements) and 5000 (Auxiliary Machine Systems) 2020, protective measures for vessel component protection, and interference handling procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HUDSON (WLIC 801)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: Erik C Elasik
(Rev-0, 15 October 2025)
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
38 (Rev-0)
57300_XdckWnchInspctSrvc_ACC_0121_IBCT REC_57300_XdckWnch_IBCT_160 WLIC (ALL) (1014)
WORK ITEM 8: Crossdeck Winch, Inspect & Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the Utility Air Winch Model HU-40 Series.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Fleet Drawing FL-1112-18, Rev -, HU40 Series Spud Winch Foundation
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4958, Section A, Amendment 1; Mar 2011, Utility Air
Winch Model HU-40 Series Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
39 (Rev-0)
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Renewal task particulars. The Contractor must perform the tasks designated in Table 1 below, in accordance with SFLC Std Spec 5000:
TABLE 1 – REQUIRED TASKS
ADDITION REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM SFLC
STD SPEC
OTHER
1 Operate and Inspect
6 3.2.1 (Operate and Inspect)
D2.1 (Fastener assemblies)
D2.1 (Fastener assemblies)
Submit CFR.
2 NDE and Preserve
6 Winch Foundation
3.2.4 (Preservation)
3.2.5 (NDE)
1. Finish coat color: black (17038).
2. Areas to NDE:
…- All weld joints connecting winch foundations to the deck …- Winch feet
3. Submit CFR.
3 Renew 6 Wire Rope Assembly
D2.2 (Wire Rope
Assemblies)
Wire rope particulars:
Each set is as follows:
- Nominal diameter: 5/8 inch.
- Nominal strength: 6x37 XXIPS IWRC
RRL
- Length of rope required: 150 ft per assembly
- End fitting type: Poured spelter or fiege
4 Groom and Lubricate
6 Winch 3.2.6 (Groom and lubricate)
5 Final Operational
Test
6 Winch B2.3 (Winches) Verify that winch and sheaves rotate freely and with no unusual noise or binding.
Submit CFR.
6 Fabricate and Install
6 Label Plate B2.9 (Label plates)
4. NOTES
This section is not applicable to this work item.
40 (Rev-0)
58210_ANK_0515_IBCT
REC_58210_Cpstn_IBCT_160 WLIC (ALL) (0323)
WORK ITEM 9: Capstan, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and repair the Jered LLC Air Driven Warping Capstan, Model X-1503, located on the Fantail.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4417, SWBS 582, Section A, Jan 2011, Warping
Capstan Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in Table 1:
• Task #1.
• Task #2.
• Task #3.
• Task #4.
41 (Rev-0)
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
• Tow bitt.
3.2 Recurring Maintenance Requirements. The Contractor shall perform the tasks designated in Table 1 below.
TABLE 1 – RECURRING MAINTENANCE REQUIREMENTS
ADDITIONAL REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA.
REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
OTHER
1 Operate and Inspect 1 Warping Capstan
Assembly
3.2.1 (Operate and Inspect)
Appendix A
Submit a CIR.
Disassemble, Inspect, and
Preserve 1 Warping Capstan head shaft assembly
3.2.3 (Disassemble and inspect)
3.2.4 (Preservation)
Submit a CIR.
Disassemble, Inspect, and
Preserve 1 Air Motor Assembly and
Associated Shaft Coupling
3.2.3 (Disassemble and inspect)
3.2.4 (Preservation)
Refer to «TP» Submit a CIR.
4 Disassemble and Inspect 1 Pnuematic brake
D2.3 (Brakes and clutches)
Submit a CIR.
5 Disassemble, Inspect, and
Preserve
1 Control Valve C2.4 (Valves and manifolds)
3.2.4 (Preservation)
Submit CFR.
6 Service and Inspect 1 Gear reducer D2.4 (Open gearing and gear reducers) Submit CFR.
7 Preserve and NDE 1 Warping Capstan assembly and foundation
3.2.4 (Preservation)
3.2.5 (NDE)
Submit CFR.
8 Renew All Foundation and soft patch gaskets
9 Renew 2 Pneumatic hose assembly See «TP».
42 (Rev-0)
ADDITIONAL REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA.
REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
OTHER
10 Groom and lubricate 1 Warping Capstan assembly 3.2.6 (Groom and
Lubricate)
11 Operational and Weight
Test
1 Warping Capstan B2.6 (Capstan) Refer to «TP» Submit CFR.
12 Fabricate and Install 1 Label plates B2.9 (Label Plates)
43 (Rev-0)
58210_ACC_0121_IBCT
REC_58210_160 WLIC 'A' Class (ALL) (0715)
WORK ITEM 10: Spud Winches, Inspect & Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the HU40 Series spud air winches.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
44 (Rev-0)
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection & service task particulars. The Contractor must perform the following tasks in accordance with SFLC Std Spec 5000 :
TABLE 1. INSPECTION & SERVICE TASKS
ADDITION REQUIREMENTS
# TASK
TYPE
(SFLC STD
SPEC 5000
PARA.
REF.)
QTY COMPONENT
OR
ASSEMBLY
APPENDIX /
PARA. FROM
SFLC STD SPEC
OTHER
1 Operate and Inspect 4 Spud Winch
Assembly
3.2.1 (Operate and
Inspect) Inspection also includes fasteners.
Submit CFR.
Preserve, NDE
4 Spud Winch Foundation
3.2.4 (Preservation)
3.2.5 (NDE)
1. Finish coat color: black (17038).
2. Areas to NDE: all weld joints connecting winch foundations to the deck.
3. Submit CFR.
3 Renew 4 Wire Rope Assembly
D2.2 (Wire rope assemblies)
Rope particulars:
1. Type: 5/8-inch 6 x 37 EIPS-IWRC RRL Wire Rope, Including Associated Fittings
2. Length: 130feet
Dispose of old wire rope.
4 Groom and Lubricate 4 Spud Winch
Assembly
3.2.6 (Groom and
Lubricate Submit CFR.
Final
Operational Test
4 Spud Winch Assembly B2.3 (Winches)
Operational Test:
1. Raise and lower the spud for 10 complete cycles (or as far as possible).
2. Verify that winch and sheaves rotate freely and with no unusual noise or binding.
3. Submit CFR.
45 (Rev-0)
58300_ACC_0121_160WLIC
WORK ITEM 11: Boat Davit, Inspect & Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the boat davit.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 160-WLIC 8201-7, Rev A, Boat Davit and Pedestal Assembly
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 2056, Manufacturer's Instruction Book-SWBS Group(s)
313-665 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in Table 1:
• Task #1
• Task #2
46 (Rev-0)
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection and service requirements. The Contractor must perform the tasks designated in Table 1 below, referring to the references list in Section 2 “References” for guidance.
TABLE 1 – INSPECTION & SERVICE REQUIREMENTS
TASK
TYPE
(SFLC STD
SPEC 5000
PARA.
REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
OTHER
1 Operate and Inspect 1 Davit assembly 3.2.1 (Operate and
Inspect) Submit a CIR.
2 Disassemble and inspect 1 Davit assembly 3.2.3 (Disassemble and inspect) Submit a CIR 3 Service and
Inspect 1 Winch 3.2.2 (Service and inspect) Submit CFR.
4 Renew 1 Wire rope assembly D2.2 (Wire rope assembly)
Contractor to furnish wire rope assembly
5 NDE 1 Pedestal 3.2.5 NDE 6 Preserve 1 Davit assembly 3.2.4 (Preservation) 7 Renew All Grease fittings 8 Renew All Pins and sheeve bushings
9 Groom and Lubricate 1 Davit assembly 3.2.6 (Groom and
Lubricate)
10 Weight Test 1 Davit B2.7.1 (SPD)
Weight test in accordance with CG Dwg 160-WLIC 8201-7, General Note 3.
Rated load test: 1,320 (+30 –
0) lbs Dynamic load test: 1,520 (+30 – 0) lbs Static load test: 1,650 (+32 –
0) lbs Submit a CFR.
11 Fabricate and Install} 1 Label Plate B2.9 (Label Plates)
3.3 Additional maintenance requirements. The Contractor must perform the Table 2 tasks below marked with an “X”. Submit CFR(s) to document all inspections, to recommend additional repairs, and to document completed maintenance and repair tasks. Combine or group CFRs, as required, to minimize administrative burden and maximize efficiency.
47 (Rev-0)
TABLE 2 – ADDITIONAL MAINTENANCE REQUIREMENTS
ADDITIONAL
TASK
TASK
TYPE QTY COMPONENT OR
ASSEMBLY
APPENDIX
AND PARA.
FROM SFLC
STD SPEC 5000
OTHER
Renew 1 Hoist Hook Renew 1 Winch
3.4 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 3 below, the Contractor must refer to the corresponding Appendix or paragraph of SFLC Std Spec 5000.
TABLE 3 – SPECIAL REQUIREMENTS
COMPONENT APPENDIX & PARAGRAPH
IN SFLC STD SPEC 5000
Fluids C2.1 Hose assemblies C2.2 Piping and tubing C2.3
Valves and manifolds C2.4 Gages C2.5
Gas charged accumulators C2.6 Heat exchangers and fluid coolers C2.7
Systems C2.8 Fastener assemblies D2.1
Wire rope assemblies D2.2 Brakes and clutches D2.3
Open gearing and gear reducers D2.4
Blank Page
File details come from the government source that posted it. Updated .