About this file

This pre-solicitation announcement describes an upcoming Invitation for Bid for construction services. The Department of Veterans Affairs VA Medical Center in Battle Creek, Michigan will be upgrading and expanding its security camera system through a firm fixed price contract with an anticipated value between $1 million and $5 million. The selected contractor will remove existing cameras, wiring, and DVR equipment and install new POIP cameras using CAT6A and fiber optic cabling. Additional requirements include installing new patch panels, network switches, and NVRs to support the cameras and minimize bandwidth usage. New software will also be provided for monitoring network recordings. The contractor must complete annual privacy training prior to beginning any work. The project completion period is 180 days. The solicitation containing specifications, forms and drawings will be posted on beta.SAM.gov on or around May 30th, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Upgrade and Expand Security Camera's 515-18-201, newest first.
File Type Posted
36C25021B0033 0005.docx DOCX document
RFI - combined.docx DOCX document
08-A.121 - RCP - FIRST FLOOR.pdf PDF
10-A.122 - RCP - SECOND FLOOR.pdf PDF
04-A.122 - RCP - SECOND FLOOR.pdf PDF
07-A.122 - RCP - SECOND FLOOR.pdf PDF
02-A.121 - RCP - FIRST FLOOR.pdf PDF
36C25021B0033 0003.docx DOCX document
06-A.121 - RCP - FIRST FLOOR.pdf PDF
05-A.121 - RCP - FIRST FLOOR.pdf PDF
07-A.120 - RCP - BASEMENT.pdf PDF
03-A.121 - RCP - FIRST FLOOR.pdf PDF
01-A.122 - RCP - SECOND FLOOR.pdf PDF
10-A.120 - RCP - BASEMENT.pdf PDF
50 10EY101 - BLDG 10 FIRST FLOOR NEW WORK PLAN.pdf PDF
13-A.120 - RCP - BASEMENT.pdf PDF
example project schedule.pdf PDF
36C25021B0033 0004.docx DOCX document
14-A.120 - RCP - BASEMENT.pdf PDF
13-A.121 - RCP - FIRST FLOOR.pdf PDF
14-A.121 - RCP - FIRST FLOOR.pdf PDF
14-A.122 - RCP - SECOND FLOOR.pdf PDF
20 02EY102A - BLDG 02 PARTIAL SECOND FLOOR NEW WORK PLAN - AREA A.pdf PDF
22-A.121 - RCP - FIRST FLOOR.pdf PDF
22-A.120 - RCP - BASEMENT.pdf PDF
13-A.122 - RCP - SECOND FLOOR.pdf PDF
13-A.123 - RCP - THIRD FLOOR.pdf PDF
05-A.122 - RCP -SECOND FLOOR.pdf PDF
02-A.122 - RCP - SECOND FLOOR.pdf PDF
04-A.121 - RCP - FIRST FLOOR.pdf PDF
08-A.120 - RCP - BASEMENT.pdf PDF
08-A.122 - RCP - SECOND FLOOR.pdf PDF
10-A.121 - RCP - FIRST FLOOR.pdf PDF
06-A.122 - RCP - SECOND FLOOR.pdf PDF
07-A.121 - RCP - FIRST FLOOR.pdf PDF
05-A.120 - RCP - BASEMENT.pdf PDF
01-A.120 - RCP - BASEMENT.pdf PDF
02-A.120 - RCP - BASEMENT.pdf PDF
01-A.121 - RCP - FIRST FLOOR.pdf PDF
36C25021B0033 0002.docx DOCX document
36C25021B0033 0001.docx DOCX document
18-201 Pre-bid attendance.pdf PDF
515-18-201 - UPGRADE AND EXPAND SECURITY CAMERA SYSTEM Specifications.pdf PDF
515-18-201 - WD-MI20210079 01-29-2021.docx DOCX document
36C25021B0033_1.docx DOCX document
515-18-201 - RFI Form.docx DOCX document
515-18-201 - Contractor EMR Certification Form 2021.docx DOCX document
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIBER OPTIC BACKBONE (EXISTING)

BLDG. 3 BLDG. 4 BLDG. 5

BLDG. 6

BLDG. 7 BLDG. 8 BLDG. 10 BLDG. 13 BLDG. 14 BLDG. 22 BLDG. 24 BLDG. 27 BLDG. 28 BLDG. 39A-

GROUND & 1ST FLR

BLDG. 39C-

SECOND FLR

BLDG. 82 BLDG. 83 BLDG. 84 BLDG. 134 BLDG. 145 BLDG. 300

CONTD. BELOW

BLDG. 39B-

GROUND & 1ST FLR

1--> 10

WALKWAY A

CAT6A

VIDEO NETWORK SWITCHES

VIDEO NETWORK RECORDER

EXISTING NETWORK SWITCHES

PATCH PANEL

CAMERAS

1--> 6

PATCH PANEL (24 PORT)

CAT6A

CAT6A

3-SW24

PATCH CABLES

EXISTING SWITCH

1--> 15

PATCH PANEL (24 PORT)

CAT6A

CAT6A

4-SW24

PATCH CABLES

EXISTING SWITCH

1--> 11

PATCH PANEL (48 PORT)

CAT6A

CAT6A

6-SW48

PATCH CABLES

EXISTING SWITCH

1--> 28

PATCH PANEL (24 PORT)

CAT6A

CAT6A

5-SW24

PATCH CABLES

EXISTING SWITCH

1--> 33

CAT6A

CAT6A

7A-SW48

PATCH CABLES

EXISTING SWITCH

1--> 4

PATCH PANEL (12 PORT)

CAT6A

CAT6A

8-SW24

PATCH CABLES

EXISTING SWITCH

1--> 28

PATCH PANEL (32 PORT)

CAT6A

CAT6A

4-SW48

PATCH CABLES

EXISTING SWITCH

1--> 28

PATCH PANEL (32 PORT)

CAT6A

CAT6A

22-SW48

PATCH CABLES

EXISTING SWITCH

1--> 3

PATCH PANEL (12 PORT)

CAT6A

CAT6A

24-SW24

PATCH CABLES

EXISTING SWITCH

1--> 7

PATCH PANEL (24 PORT)

CAT6A

CAT6A

1-SW24

PATCH CABLES

EXISTING SWITCH

FIBER OPTIC BACKBONE (EXISTING)

BLDG. 1 BLDG. 2A BLDG. 2B

CONTD. BELOW

VIDEO NETWORK SWITCHES

VIDEO NETWORK RECORDER

EXISTING NETWORK SWITCHES

PATCH PANEL

CAMERAS 1--> 38

PATCH PANEL

(48 PORT)

CAT6A

2A-SW48

PATCH CABLES

39--> 70

PATCH PANEL (48 PORT)

CAT6A

CAT6A

2B-SW48

PATCH CABLES

1--> 13

PATCH PANEL (48 PORT)

CAT6A

CAT6A

27-SW24

PATCH CABLES

EXISTING SWITCH

1--> 7

PATCH PANEL (12 PORT)

CAT6A

CAT6A

28-SW24

PATCH CABLES

EXISTING SWITCH

59--> 90

PATCH PANEL (48 PORT)

CAT6A

CAT6A

39B-SW48

PATCH CABLES

EXISTING SWITCH

1--> 58

PATCH PANEL (64 PORT)

CAT6A

CAT6A

(2) 39A-SW48

PATCH CABLES

91--> 119

PATCH PANEL (48 PORT)

CAT6A

CAT6a

39C-SW48

PATCH CABLES

1--> 33

PATCH PANEL (48 PORT)

CAT6A

CAT6A

82-SW48

PATCH CABLES

EXISTING SWITCH

82-NVR100-34TB

1--> 19

PATCH PANEL (48 PORT)

CAT6A

CAT6A

83-SW48

PATCH CABLES

EXISTING SWITCH

83-NVR100-34TB

1--> 26

PATCH PANEL (48 PORT)

CAT6A

CAT6A

84-SW48

PATCH CABLES

EXISTING SWITCH

84-NVR100-34TB

1--> 5

PATCH PANEL (24 PORT)

CAT6A

CAT6A

134-SW24

PATCH CABLES

EXISTING SWITCH

134-NVR70-20TB

1--> 23

PATCH PANEL (24 PORT)

CAT6A

CAT6A

145-SW24

PATCH CABLES

EXISTING SWITCH

145-NVR100-34TB

1--> 9

PATCH PANEL (24 PORT)

CAT6A

CAT6A

300-SW24

PATCH CABLES

EXISTING SWITCH

300-NVR70-20TB

FIBER OPTIC BACKBONE (EXISTING)

VIDEO NETWORK SWITCHES

VIDEO NETWORK RECORDER

EXISTING NETWORK SWITCHES

PATCH PANEL

CAMERAS

3-NVR70-20TB 4-NVR70-20TB 5-NVR100-34TB 6-NVR70-20TB

7A-NVR100-34TB 14-NVR100-34TB 22-NVR100-34TB 27-NVR70-20TB 39B-NVR100-53TB

1--> 5

PATCH PANEL

(12 PORT)

CAT6A

CAT6A

1-SW24

PATCH CABLES

EXISTING SWITCH

1--> 2

PATCH PANEL (12 PORT)

CAT6A

CAT6A

10-SW24

PATCH CABLES

EXISTING SWITCH

BLDG. 200

1--> 5

CAT6A

WALKWAY B

1--> 4

1--> 2

WALKWAY F

CAT6A

1--> 8

WALKWAY G

1--> 5

WALKWAY C

CAT6A

PATCH PANEL (48 PORT)

1--> 7

WALKWAY D

CAT6A

WALKWAY E

1--> 4 WALKWAY H WALKWAY I

FIBER OPTIC

FIBER OPTIC

FIBER OPTIC

CAT6A CAT6A CAT6A CAT6A

CAT6ACAT6A

CAT6A

CAT6ACAT6A

CAT6A CAT6A CAT6A CAT6A CAT6A CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

CAT6A

CAT6A

EXISTING SWITCH

2A-NVR100-53TB

CAT6A

1--> 4

DEDUCT

ALTERNATE-A

DEDUCT

ALTERNATE-B

DEDUCT

ALTERNATE-C

DEDUCT

ALTERNATE-D

DEDUCT

ALTERNATE-D

DEDUCT

ALTERNATE-D

DEDUCT

ALTERNATE-D DEDUCT

ALTERNATE-D

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

BLDG. 136

1--> 7

PATCH PANEL (24 PORT)

CAT6A

CAT6A

136-SW24

PATCH CABLES

EXISTING SWITCH

BLDG. 138

1--> 7

PATCH PANEL (12 PORT)

CAT6A

CAT6A

138-SW24

PATCH CABLES

EXISTING SWITCH

SQL

SERVER

EVENT

SERVER

SMART

CLIENT

SMART WALL

MANAGEMENT

SERVER

BLDG. 157

DATA CENTER

BLDG. 2

COMPUTERS

1 1 1

3 3

3 3 3

SMART

CLIENT

1--> 7

WALKWAY D

DEDUCT ALT. TYPICAL

WALKWAY WIRING

COAX

120V-24VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

TO HYBRID

RECORDER

EXISTING

ANALOG

CAMERAS

VIRTUALIZE SERVERS

ON GOVERNMENT SUPPLIED COMPUTERS

PROVIDE ALL NECESSARY HARDWARE

REQUIRED.

TO 2A-NVR

EXISTING SWITCH

39A-NVR100-53TB

CAT6A

TO 83-NVR TO 83-NVR

TO 83-NVR

TO 22-NVR TO 22-NVR

TO 84-NVR TO 84-NVR

MEDIA

CONVERTER

FIBER

OPTIC

120V-48VDC

POWER

SUPPLY

2C, 12AWG

POWER

CABLE

MEDIA

CONVERTER

CAT6A

BLDG. 138

BLDG. 136BLDG. 8

BLDG. 10

BLDG. 13

1--> 4

1--> 2

1--> 5

1--> 7

1--> 7

ALT. B CONNECT TO BLD 22-NVR

ALT. C CONNECT TO BLD 22-NVR

CHANGE TO 22-NVR100-54TB

DEDUCT

ALTERNATE-C

BLDG. 28

BLDG. 24 1--> 3

1--> 7

REMOTE CAMERAS REMOTE CAMERAS

REMOTE CAMERAS

DEDUCT

ALTERNATE-D

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN EY001

SINGLE-LINE DIAGRAM AND LEGEND

N.T.S

1 CAMERA NETWORK DIAGRAM

#1-SW#2 #1 DENOTES THE BUILDING NO. SWITCH IS IN.

#2 DENOTES NO. OF SWITCH PORTS.

SW DENOTES SWITCH

#1-NVR#2-#3TB #1 DENOTES THE BUILDING NO. RECORDER IS LOCATED IN.

#2 DENOTES MAXIMUM NO. OF CAMERA STREAMS RECORDER CAN HANDLE.

#3 DENOTES HARD DRIVE STORAGE CAPACITY (TB).

NVR DENOTES NETWORK VIDEO RECORDER.

#1 --> #2 SECURITY CAMERAS #1 THROUGH #2.

A. ALL CAMERAS AND RECORDERS REMOVED SHALL BE TURNED OVER TO THE GOVERNMENT

AND THE CONDUIT AND CABLE REMOVED SHALL BE DISPOSED OF BY THE CONTRACTOR.

B. DEMOLISH ALL ASSOCIATED CONDUIT AND COAX CABLE BACK TO THE DATA RACK

LOCATED IN THE IT CLOSET UNLESS NOTED OTHERWISE.

C. REMOVE ALL CAMERA LOW VOLTAGE AND LINE VOLTAGE WIRING.

D. CAREFULLY DOCUMENT THE CURRENT AIMING OF EACH CAMERA AND RECORD ON THE AS-

BUILT DRAWING SET. THIS SET SHALL BE USED TO AIM THE NEW IP BASED CAMERAS. TURN

OVER A COPY OF THE AS-BUILT DRAWINGS TO THE ARCHITECT AND COR.

E. FIELD VERIFY LOCATIONS OF EXISTING CAMERAS IN ALL BUILDINGS.

F. ELECTRICAL CONTRACTOR TO IDENTIFY NUMBER OF RECORDERS TO BE REMOVED IN

CLOSETS.

SECURITY CAMERA

TYPE 1, INTERIOR IP CAMERA

TYPE 2, INTERIOR IP CAMERA, FISHEYE LENS

TYPE 3, EXTERIOR IP CAMERA

TYPE 4, INTERIOR IP CAMERA / MEDIA CONVERTER

A. CABLES INSTALLED IN THE INTERIOR OF BUILDING TO BE RUN CONCEALED IN SLEEVE OR CONDUIT ABOVE THE CEILING OPEN ON BRIDLE RINGS. WHERE EXPOSED, CABLES SHALL BE INSTALLED IN EMT CONDUIT.

ELECTRICAL CONTRACTORS TO SIZE EMT CONDUIT FOR CAT6A CABLING. REUSE EXISTING CONDUIT

WHEREVER POSSIBLE.

B. REPLACE EXISTING VIDEO RECORDERS WITH NEW NETWORK VIDEO RECORDERS IN THE RACK SPACE

AVAILABLE UNLESS NOTED OTHERWISE.

C. ALL SECURITY CAMERAS TO BE CONNECTED FROM NETWORK SWITCH THROUGH PATCH PANELS.

CAT6A CABLES SHALL BE USED FOR PATCH CORDS. REFER TO 1/EY001 FOR CAMERA NETWORK DIAGRAM.

D. ALL EXTERIOR CAMERAS SHALL BE MOUNTED AT 14' HEIGHT UNLESS NOTED OTHERWISE. FIELD VERIFY

CAMERAS HAVE AN UNOBSTRUCTED VIEW. AVOID LOCATIONS LOOKING THRU

TREES ETC. RELOCATED CAMERA AS NECESSARY.

E. REPLACE ANY EXISTING CEILING TILES DAMAGED DURING NEW WORK WITH MATCHING TILE.

F WALLS AND CEILINGS WHICH REQUIRE CUTTING DURING CAMERA INSTALLATION TO BE PATCHED AND REPAIRED. PROVIDE ACCESS PANELS IN SOLID CEILINGS WHERE REQUIRED FOR ACCESS TO CABLING.

PAINT ACCESS PANELS SAME COLOR AS SURROUNDING SURFACES.

G. ANY DAMAGED AREAS TO BE REPAIRED BY ELECTRICAL CONTRACTOR TO MATCH INITIAL CONDITIONS.

H. CAT 6A CAMERA SYSTEM CABLES SHALL HAVE A PURPLE JACKET FOR IDENTIFICATION.

I. WHERE CABLES PASS THRU FIRE RATED WALLS & CEILINGS INSTALL CABLE IN PIPE SLEVES AND FIRE

CAULK AS REQUIRED WITH AN APPROVE SYSTEM TO SEAL PENETRATIONS.

J. PROVIDE A UPS SIZED FOR THE LOAD FOR EACH VIDEO RECORDER.

K. ALL EQUIPMENT INSTALLED IN NEW WORK TO BE PROVIDED BY CONTRACTOR.

L. ALL 120V-48V POWER SUPPLIES TO BE LOCATED IN THE IT CLOSETS ASSOCIATED WITH THE CAMERA MEDIA CONVERTERS. REUSE EXISTING CAMERA POWER SUPPLY CIRCUIT FOR MEDIA CONVERTERS.

GENERAL DEMOLITION NOTES:GENERAL NOTES:

LEGEND:

EXISTING DATA RACK AND VIDEO RECORDER

1-HOUR FIRE WALL

2-HOUR FIRE WALL

SMOKE BARRIER/ PARTITION

DIAGONAL REGION -

IT CLOSET LOCATION

PLAN NOTES:

1. IF ALTERNATE IS ACCEPTED: REMOVE THE EXISTING ANALOG VIDEO RECORDER. INSTALL A HYBRID

NETWORK VIDEO RECORDER WITH BOTH CAT 6A AND COAX CAMERA INPUTS. CONNECT THE EXISTING ANALOG CAMERAS TO THE COAX INPUTS. PROVIDE THIS HYBRID NETWORK VIDEO RECORDER WITH THE

NEW VIDEO SOFTWARE.

2. IF ALTERNATE IS ACCEPTED: EXTEND EXISTING ANALOG CAMERA COAX TO NEW HYBRID NETWORK VIDEO

RECORDER.

3. PROVIDE A COAX TO DIGITAL MEDIA CONVERTER FOR EACH EXISTING ANALOG CAMERA. EXTEND TO VIDEO

SWITCH THROUGH PATCH PANEL.

DEDUCT ALTERNATES

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

CD SUBMITTAL 08/10/2019

BD SUBMITTAL 11/20/2019

DEDUCT ALTERNATES

CONDUIT CLAMP.

SIZE AS REQUIRED

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

REFER TO PLANS FOR

QUANTITY & SIZE OF

CONDUITS

GENERAL NOTES:

1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING

CHANNEL LONGER THAN 915mm (36") SHALL BE

INSTALLED WITH A CENTER SUPPORT

ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED

METHOD PER SPECIFICATION 26 05 33, RACEWAY AND

BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY

EXACT

CONDITIONS.

LOCKING SQUARE

WASHER &

LOCKNUT

9.52mm (3/8") MIN

GALVANIZED THREADED

ROD, TYP.

WASHER

LOCKNUT

INTEGRAL

GALVANIZED

LIPPED

STEEL

MOUNTING

CHANNEL

CONDUIT,

TYP

MINERAL WOOL

(FIRMLY

PACKED)FIRESTOP SEALANT

PER SECTION 07 84 00,

FIRESTOPPING

9.52mm

JUNCTION BOX

(SIZE AS REQUIRED)

CONDUIT FITTING

SPRING

NUT,

TYP

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL,

TYP.FLOOR SLAB,

TYP. STEEL EXPANSION

ANCHOR, TYP

(3/8")

MAX

SEISMIC OR EXPANSION

JOINT. FIELD VERIFY

ACTUAL CONDITIONS &

LOCATIONS.FLOOR OR ROOF

STRUCTURE. FIELD VERIFY

ACTUAL CONDITIONS, TYP.

STRUCTURAL MEMBER

(BEAM, JOIST, ETC.),

TYP.

JUNCTION BOX,

TYP (SIZE AS

REQUIRED)

CONDUIT

TRAPEZE

BEAM

CLAMP,

TYP.

CONDUIT,

TYP.

PROVIDE 127mm (5") OF SLACK AT

MIDPOINT BETWEEN TWO END OF

FLEXIBLE GALVANIZED STEEL

CONDUIT. PROVIDE GREEN

INSULATED COPPER

EQUIPMENT GROUNDING CONDUCTOR

WITH FLEXIBLE CONDUIT.

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

STEEL EXPANSION

ANCHOR

JUNCTION BOX

(SIZE AS

REQUIRED)

CONDUIT FITTING

SPRING

NUT

PROVIDE EXTRA CABLE

TO MAKE COMPLETE

LOOP AROUND BOX

PERIMETER

GENERAL

NOTE:

1. DETAIL IS APPLICABLE ONLY FOR CONDUIT SMALLER THAN 76mm

(3").

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN EY002

DETAILS

N.T.S

1 CONDUIT TRAPEZE MOUNTING DETAIL

N.T.S

2 FLOOR SLAB PENETRATION DETAIL

N.T.S

3 CONDUIT EXPANSION JOINT CROSSING DETAIL - SMALL CONDUIT

N.T.S

4 TYPES 1 & 4 - INTERIOR IP AND INTERIOR IP/MEDIA CONVERTER CAMERA

N.T.S

6 TYPE 3 - EXTERIOR CAMERA

N.T.S

5 TYPE 2 - INDOOR IP CAMERA, FISHEYE LENS

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

CD SUBMITTAL 08/10/2019

CAMERAS AS SHOWN IN PLANS

3/4" CONDUIT TO BE ROUTED TO

ACCESSIBLE INTERIOR JUCTION BOX

PATCH CABLE

PROVIDE 1-DATA OUTLET UTILIZING SURFACE

MOUNT "BISCUIT" FOR TERMINATION OF DATA

DROP INTO RJ-45 OUTLET.

PROVIDE JUNCTION BOX ABOVE ACCESSIBLE CEILING

PROVIDE 10" COIL OF CABLE

MANAGED ABOVE CEILING

FIBER OPTIC PATCH PANEL(S)

COPPER CONDUCTOR PATCH PANEL(S)

DATA SWITCH(ES)

VIDEO NETWORK RECORDER PATCH PANEL(S)

VIDEO NETWORK NVR(S) 1

WIRE MANAGEMENT

VIDEO NETWORK SWITCH(ES) PoE

EXISTING

NEW INSTALLATION

EXISTING

NEW INSTALLATION

ANALOG RECORDER(S) 4

CAMERAS AS SHOWN IN PLANS

PATCH CABLE

PROVIDE 1-DATA OUTLET UTILIZING SURFACE

MOUNT "BISCUIT" FOR TERMINATION OF DATA

DROP INTO RJ-45 OUTLET.

PROVIDE JUNCTION BOX ABOVE ACCESSIBLE CEILING.

PROVIDE 10" COIL OF CABLE

MANAGED ABOVE CEILING

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN EY003

EQUIPMENT MOUNTING DETAILS

N.T.S

2 SECURITY CAMERA - HARD CEILING

N.T.S

1 TYPICAL RACK MOUNTING DETAIL

DRAWING NOTES:

1. REPLACE EXISTING ANALOG VIDEO RECORDER WITH NEW NETWORK VIDEO RECORDER.

2. PROVIDE A RACK MOUNTED SHELF FOR LARGE SERVERS WHICH DO NOT HAVE RACK

MOUNTING HARDWARE.

3. PROVIDE A UPS RATED FOR THE POWER REQUIREMENTS OF THE NVR RECORDER AND

VIDEO SWITCH. THE UPS SHALL BE RATED FOR 30 MIN. OF BACKUP POWER. UPS SHALL HAVE

A MINIMUM OF 4 RECEPTACLES FOR OUTPUT. REUSE EXISTING POWER RECEPTACLE AND

CIRCUIT THAT THE OLD RECORDER WAS CONNECTED.

4. REMOVE EXISTING ANALOG VIDEO RECORDER. TURN OVER TO THE GOVERMENT.

N.T.S

3 SECURITY CAMERA - LAY-IN CEILING

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

W Dickm an

Rd

N

C la rk

R d

M

A rm st ro n g

R d

1973030

139 155

13796

24 T 98

136136

138138

193 BLDG 200

PLAY GROUND

VAMC boundary

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN EY004

OVERALL SITE PLAN

N.T.S

1 OVERALL SITE PLAN

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

HZ

HZ HZ

HZ

UNEXCAVATED

OFFICE OFFICE OFFICE OFFICE OFFICE

VAULTCORRIDOR CORRIDOR

OFFICE

CLOSET

OFFICE

TOILET

HSK

ROOM

ELECT

OFFICE

STAIR

MECH/

STOR STOR

OFFICE OFFICE

CONFERENCE ROOM OFFICE

JC/COM

BREAK

002 001 015 014 013 013A

000CO2 C01

003E

007E

S1

011E

009 010

012 012A

UP

UP

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 01ED100

BLDG 01 BASEMENT DEMOLITION FLOOR

PLAN

1/8" = 1'-0"1 BASEMENT DEMOLITION FLOOR PLAN

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

CD SUBMITTAL 07/10/2019

STORAGE

LOBBY

TOILETASSOCIATE

DIRECTOR

OFFICE

ASSOCIATE TO

MEDICAL CENTER

DIRECTOR OFFICE

CORRIDOR CLOSET

DIRECTOR

OFFICE

CORRIDOR

KITCHENETTE

ADMINISTRATIVE

ASST. CHIEF OF

STAFF OFFICE

STAIR

MANAGEMENT

OFFICE

MEDICAL

CENTER

DIRECTOR

OFFICE

PUBLIC

AFFAIRS

OFFICE

HEALTH

SYSTEMS

OFFICE

CHIEF OF

STAFF

OFFICE

A.D. PATIENT

CARE

SERVICES

OFFICE

SEC. TO THE CHIEF

OF STAFF/PATIENT

CARE OFFICE

PORCH

VEST.

101A

L1

102B

S1

102C

105 106 107

C11C12

102A 102

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 01ED101

BLDG 01 FIRST FLOOR DEMOLITION PLAN

1/8" = 1'-0"1 FIRST FLOOR DEMOLITION PLAN

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

HZ HZ

HZ

UNEXCAVATED

OFFICE OFFICE OFFICE OFFICE OFFICE

VAULTCORRIDOR CORRIDOR

OFFICE

CLOSET

OFFICE

TOILET

HSK

ROOM

ELECT

OFFICE

STAIR

MECH/

STOR STOR

OFFICE OFFICE

CONFERENCE ROOM OFFICE

JC/COM

BREAK

002 001 015 014 013 013A

000CO2 C01

003E

007E

S1

011E

009 010

012 012A

UP

UP

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 01EY100

BLDG 01 BASEMENT NEW WORK FLOOR PLAN

1/8" = 1'-0"1 BASEMENT NEW WORK FLOOR PLAN

A. REFER TO SHEET EY001 FOR GENERAL NOTES.

B. CONNECT SECURITY CAMERAS SHOWN TO 1-SW24 SWITCH IN ROOM

MECH/JC/COM 011E. REFER TO SHEET EY001 FOR CAMERA

NETWORK DIAGRAM.

GENERAL NOTES:

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

STORAGE

LOBBY

TOILETASSOCIATE

DIRECTOR

OFFICE

ASSOCIATE TO

MEDICAL CENTER

DIRECTOR OFFICE

CORRIDOR CLOSET

DIRECTOR

OFFICE

CORRIDOR

KITCHENETTE

ADMINISTRATIVE

ASST. CHIEF OF

STAFF OFFICE

STAIR

MANAGEMENT

OFFICE

MEDICAL

CENTER

DIRECTOR

OFFICE

PUBLIC

AFFAIRS

OFFICE

HEALTH

SYSTEMS

OFFICE

CHIEF OF

STAFF

OFFICE

A.D. PATIENT

CARE

SERVICES

OFFICE

SEC. TO THE CHIEF

OF STAFF/PATIENT

CARE OFFICE

PORCH

VEST.

101A

L1

102B

S1

102C

105 106 107

C11C12

102A 102

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 01EY101

BLDG 01 FIRST FLOOR NEW WORK PLAN

1/8" = 1'-0"1 FIRST FLOOR NEW WORK PLAN

A. REFER TO SHEET EY001 FOR GENERAL NOTES.

B. CONNECT SECURITY CAMERAS SHOWN TO 1-SW24 SWITCH IN ROOM

MECH/JC/COM 011E. REFER TO SHEET EY001 FOR CAMERA

NETWORK DIAGRAM.

GENERAL NOTES:

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

IMMEDIATE CARE SUITE

MACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

FEMALE

OFFICE SERVICE

E SUB WAITING

HSK

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

CASHIER FUNDS

HOUSEKEEPING

ELEV.

ELEV.

HVAC

PROSTHETICS

OFFICE

TREATMENT

STOR. WAITING

SECRETARY

HVAC

SOUND BOOTH

EXAM

CHIEF

SOUND BOOTH

EXAM

HVAC

TREATMENT

OFFICETELE

HVAC

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

VENDING

OFFICE

OFFICE

CLOSET

TOILET

TOILET

SOUND BOOTH

EXAM

MEN'S

WOMEN'S

STAIR

TOILET

ELEC.

ELEV.

FEMALE

MALE

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

SHELLSHELL

MACH.

STAIRHSK

HVAC

ELEC

ELEC

VEST.

VEST.

STAIR

00640065

0076 0077

0111 0112 0113 0114

C012

E3

C013

0108 0116

0106 C011

0117 0118 0119

C01

0103A

0050E

E0004 0003

0016 0017

C05

0018E

0020E 0043

0042E

C010

C06

C08

C09

S2

0021E

0092A 0092 0093

0122A

S5

0078A

0048A

0017A

E1 E2

C07

S8

C015

C02

C014

IMMEDIATE CARE SUITE

PHARMACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE SUB WAITING

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

PIPE

WAITING

PHARMACY

CASHIER FUNDS

HVAC

HOUSEKEEPING

ELEV.

ELEV.

HVAC

PROSTHETICS

OFFICE

TREATMENT

STOR. WAITING

SECRETARY

HVAC

SOUND BOOTH

EXAM

CHIEF

SOUND BOOTH

EXAM

HVAC

TREATMENT

OFFICETELE

HVAC

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

CONTROLED

SUBSTANCE

VENDING

OFFICE

OFFICE

CLOSET

TOILET

TOILET

SOUND BOOTH

EXAM

MEN'S

WOMEN'S

STAIRSTAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

STAIR

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

SHELLSHELL

ELEC.

STAIR

STOR.

MACH.

STAIRHSK

HVAC

ELEC

HVAC

ELEC

VEST.

VEST.VEST.

STAIR STAIR

CLOSET

STOR.

00640067

S3

C04

0074 0074A

0007 0005

0076 0077

0111 0112 0113 0114

C012

E3

C013

0108 0116

0106 C011

0117 0118 0119

C01

0103A

0050E

E

0014E

C03

0006E

0004 0003

S1

0016A 0016 0017

0015E

S6

C05

0018E

0020E 0043

0042E

C010

C06

C08

C09

S2

0021E

0092A 0092 0093

0122A

S5

0078A

0015A

0048A

0017A

E1 E2

C07

S7 S8

C015

C02

C03A

C014

INSERTION

POINT

/1 02ED100B

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02ED100A

BLDG 02 PARTIAL GROUND FLOOR

DEMOLITION PLAN - AREA A

1/8" = 1'-0"1 PARTIAL GROUND FLOOR DEMOLITION PLAN - AREA A

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

PHARMACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE SUB WAITING

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

INF

REC

OFFICE

EQUIP

ELEV.

PIPE

WAITING

PHARMACY

CASHIER FUNDS

HVAC

HOUSEKEEPING

ELEV.

ELEV.

HVAC

HVAC

TRE

H

SOIL

CONTROLED

SUBSTANCE

V

O

O

CLOSE

TOILE

STAIRSTAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

STAIR

OFFICE

AGENT PATIENT

P

SECURITY

CUSTOMER

ADMISSIONS

SHELL

ELEC.

STAIR

STOR.

MACH.

HVAC

ELEC

VEST.VEST.

CLOSET

STOR.

00640067

S3

C04

0074 0074A

0007 0005

0076 0077 E3

C01

0014E

C03

0006E

0004 0003

S1

0016A 0016 0017

0015E

S6

C05

0018E

0020E

0092A

S5

0078A

0015A

0017A

E1 E2

S7

C015

C02

C03A

C014

INSERTION

POINT

IMMEDIATE CARE SUITE

PHARMACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE SUB WAITING

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

PIPE

WAITING

PHARMACY

CASHIER FUNDS

HVAC

HOUSEKEEPING

ELEV.

ELEV.

HVAC

PROSTHETICS

OFFICE

TREATMENT

STOR. WAITING

SECRETARY

HVAC

SOUND BOOTH

EXAM

CHIEF

SOUND BOOTH

EXAM

HVAC

TREATMENT

OFFICETELE

HVAC

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

CONTROLED

SUBSTANCE

VENDING

OFFICE

OFFICE

CLOSET

TOILET

TOILET

SOUND BOOTH

EXAM

MEN'S

WOMEN'S

STAIRSTAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

STAIR

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

SHELLSHELL

ELEC.

STAIR

STOR.

MACH.

STAIRHSK

HVAC

ELEC

HVAC

ELEC

VEST.

VEST.VEST.

STAIR STAIR

CLOSET

STOR.

00640067

S3

C04

0074 0074A

0007 0005

0076 0077

0111 0112 0113 0114

C012

E3

C013

0108 0116

0106 C011

0117 0118 0119

C01

0103A

0050E

E

0014E

C03

0006E

0004 0003

S1

0016A 0016 0017

0015E

S6

C05

0018E

0020E 0043

0042E

C010

C06

C08

C09

S2

0021E

0092A 0092 0093

0122A

S5

0078A

0015A

0048A

0017A

E1 E2

C07

S7 S8

C015

C02

C03A

C014

INSERTION

POINT

/1 02ED100A

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02ED100B

BLDG 02 PARTIAL GROUND FLOOR

DEMOLITION PLAN - AREA B

1/8" = 1'-0"1 PARTIAL GROUND FLOOR DEMOLITION PLAN - AREA B

1. TAG INDICATES LOCATION OF COMMAND CENTER OF CAMPUS

HOUSING EXISTING MONITORS DISPLAYING THE SECURITY CAMERA

FEED. REMOVE MONITORS AND TURN OVER TO THE GOVERNMENT.

2. REMOVE EXISTING DVR AND ASSOCIATED CONDUIT AND CABLING IN

PHARMACY 0015 AND TURN OVER TO THE GOVERNMENT.

DRAWING NOTES:

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

B. ELECTRICAL CONTRACTOR TO GIVE VA NOTICE TWO WEEKS PRIOR

TO WORK IN PHARMACY AREA FOR COORDINATION AND

PROVISION OF ESCORT.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZHZ

HZ

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1100C

1119 1119E

1118A

07 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

1318A

1316A

1300C

1416A

1414A

1415A

S8

1418A

1420 1417

C16

C18A

C18B

C19B C19A

E

E

1149E

TELEPH

T

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

TLT

AM EXAM EXAM

XAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

OM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

ICE

OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

STAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STORAGE

EXAM

TLT

TLT

TLT

STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZHZ

HZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

S1

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

1416A

1414A

1415A

S7 S8

1418A

1420 1417

C16C14

C18A

C18B

C19B C19A

C13

C13A

E

E

1149E

TELEPH

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

GROUP

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

EXAM

STAIRSTAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STAIR

TLT

TLT

HSK

STORAGE

EXAM

TLT

TLT

TLT

STAIR STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

/1 02ED101B

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02ED101A

BLDG 02 PARTIAL FIRST FLOOR DEMOLITION

PLAN - AREA A

1/8" = 1'-0"1 PARTIAL FIRST FLOOR DEMOLITION PLAN - AREA A

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

HZ

HZ

HZ

HZ

HZ

HZHZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

S1

C12

1117 1118

1120A

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E 1107E

1300C

S7

C14

C19B C19A

C13

C13A

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

REC

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. R

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

WA

WAITING

WWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

CHECK-IN CHEC

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

EXAM

GROUP

TLT

WEXAM

STAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

TLT

TLT

HSK

STORAGE

EXAM

STAIR

LOBBY

ELEV.

UTILITY

SOILED

SERVICES

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZHZ

HZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

S1

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

1416A

1414A

1415A

S7 S8

1418A

1420 1417

C16C14

C18A

C18B

C19B C19A

C13

C13A

E

E

1149E

TELEPH

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

GROUP

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

EXAM

STAIRSTAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STAIR

TLT

TLT

HSK

STORAGE

EXAM

TLT

TLT

TLT

STAIR STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

/1 02ED101A

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02ED101B

BLDG 02 PARTIAL FIRST FLOOR DEMOLITION

PLAN - AREA B

1/8" = 1'-0"1 PARTIAL FIRST FLOOR DEMOLITION PLAN - AREA B

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

F OF TWO STORY ADDITION ROOF OF TWO STORY ADDITION

RADIOLOGY SUITEATORY SUITE

N ROOF OF TWO STORY ADDITION

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HOT LAB

ELEV.

MEDICINE

LAB

STAIR

TESTING

STORAGE

CT EXAM

CT CONTROL

HSK

ELEV.

SECRETARY

RADIOLOGY

ROOM

CHIEF

X-RAY

FILM

PROCESSING

ROOM

LOUNGE

EXAMEXAMEXAM

MEN

HSK WOMEN

LABORATORY

PROSTHETIC

DENTAL

SUPPLY

MED.

OFFICE

OFFICE

OFFICE

WAITING AREA

PHYS. OFF

X-RAY

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

TREATMENT

ROOM

ROOM

TREATMENT

ROOM

STOR.

ROOM

ROOM

CORRIDOR

RECEPTION

WAITING

ROOM

RECEPTIONSTOR.

BREAK

WAITINGWAITING

STRESS

NUCLEAR

ELEV.

OFFICE

TLT TLT

ROOM RECEP.

WORK

OFFICE

OFFICE

OFFICE

HOT LAB

TLT

TLT

EXAM

TLT

STAIR

X-RAY

TLT

TLT

TREATMENT

ROOM

X-RAY

TREATMENT

ROOM

TREATMENT

ROOM

2271A

2203A

S5

2202B

2222A

2202 2200

C26 2267

2224A 2225A

C23

2233A

2237A

22632264 2264A 2263A

E

C25

2249A

22382237 S2

C24

C21

E3

E1 E2

2203A

2271B

22502236

E

3 '-8 1/8"

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZHZ

HZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

S1

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

1416A

1414A

1415A

S7 S8

1418A

1420 1417

C16C14

C18A

C18B

C19B C19A

C13

C13A

E

E

1149E

TELEPH

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

GROUP

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

EXAM

STAIRSTAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STAIR

TLT

TLT

HSK

STORAGE

EXAM

TLT

TLT

TLT

STAIR STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

/1 02ED102B

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02ED102A

BLDG 02 PARTIAL SECOND FLOOR

DEMOLITION PLAN - AREA A

1/8" = 1'-0"1 PARTIAL SECOND FLOOR DEMOLITION PLAN - AREA A

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

ROOF OF TWO STORY ADDITION

LABORATORY SUITE

ROOF OF TWO STORY ADDITION

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

H

ELEV.

MEDICINE

STORAGE

OFFICE

STOR.

CONF/BREAK

LOCKERS

OFFICE

OFFICE

LAB

CORR.

OFFICE

LABORATORY

MEN

LAB

WOMEN

STAIR

TES

STORAGE

CT

CT CO

HSK

ELEV.

MEDICAL

OFFICE

BIOSAFETY

LAB OFFICE

MICROBIOLOGY

SECRETARY

RADIOLOGY

ROOM

CHIEF

X

FILM

PROCE

STOR.

ROOM

ROOM

CORRIDOR

RECE

WAITING

RO

STOR.

BREAK

WAITINGWAITING

STR

NUCLEAR

ELEV.

TLT

BLOOD

DRAW

TLT

ROOM RECEP.

WORK

OFF

OF

OFF

H

TLT

HSK

STAIR

TLT

STAIR

X-RAY

WASTE

S3

C22

2203A

S5

2202B

2222A

2202 2200

C26 22

2205 2222

2224A 2225A

C23

C22A

C21

E3

E1 E2

2220B2220A

2219 2221

2203A

S1

3 '-8 1/8"

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZHZ

HZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

S1

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

1416A

1414A

1415A

S7 S8

1418A

1420 1417

C16C14

C18A

C18B

C19B C19A

C13

C13A

E

E

1149E

TELEPH

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

GROUP

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

EXAM

STAIRSTAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STAIR

TLT

TLT

HSK

STORAGE

EXAM

TLT

TLT

TLT

STAIR STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

/1 02ED102A

NEAR

ROOF

LINE

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02ED102B

BLDG 02 PARTIAL SECOND FLOOR

DEMOLITION PLAN - AREA B

1/8" = 1'-0"1 PARTIAL SECOND FLOOR DEMOLITION PLAN - AREA B

GENERAL DEMOLITION NOTES:

A. REFER TO SHEET EY001 FOR GENERAL DEMOLITION NOTES.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

IMMEDIATE CARE SUITE

MACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

FEMALE

OFFICE SERVICE

E SUB WAITING

HSK

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

CASHIER FUNDS

HOUSEKEEPING

ELEV.

ELEV.

HVAC

PROSTHETICS

OFFICE

TREATMENT

STOR. WAITING

SECRETARY

HVAC

SOUND BOOTH

EXAM

CHIEF

SOUND BOOTH

EXAM

HVAC

TREATMENT

OFFICETELE

HVAC

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

VENDING

OFFICE

OFFICE

CLOSET

TOILET

TOILET

SOUND BOOTH

EXAM

MEN'S

WOMEN'S

STAIR

TOILET

ELEC.

ELEV.

FEMALE

MALE

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

SHELLSHELL

MACH.

STAIRHSK

HVAC

ELEC

ELEC

VEST.

VEST.

STAIR

00640065

0076 0077

0111 0112 0113 0114

C012

E3

C013

0108 0116

0106 C011

0117 0118 0119

C01

0103A

0050E

E0004 0003

0016 0017

C05

0018E

0020E 0043

0042E

C010

C06

C08

C09

S2

0021E

0092A 0092 0093

0122A

S5

0078A

0048A

0017A

E1 E2

C07

S8

C015

C02

C014

IMMEDIATE CARE SUITE

PHARMACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE SUB WAITING

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

PIPE

WAITING

PHARMACY

CASHIER FUNDS

HVAC

HOUSEKEEPING

ELEV.

ELEV.

HVAC

PROSTHETICS

OFFICE

TREATMENT

STOR. WAITING

SECRETARY

HVAC

SOUND BOOTH

EXAM

CHIEF

SOUND BOOTH

EXAM

HVAC

TREATMENT

OFFICETELE

HVAC

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

CONTROLED

SUBSTANCE

VENDING

OFFICE

OFFICE

CLOSET

TOILET

TOILET

SOUND BOOTH

EXAM

MEN'S

WOMEN'S

STAIRSTAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

STAIR

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

SHELLSHELL

ELEC.

STAIR

STOR.

MACH.

STAIRHSK

HVAC

ELEC

HVAC

ELEC

VEST.

VEST.VEST.

STAIR STAIR

CLOSET

STOR.

00640067

S3

C04

0074 0074A

0007 0005

0076 0077

0111 0112 0113 0114

C012

E3

C013

0108 0116

0106 C011

0117 0118 0119

C01

0103A

0050E

E

0014E

C03

0006E

0004 0003

S1

0016A 0016 0017

0015E

S6

C05

0018E

0020E 0043

0042E

C010

C06

C08

C09

S2

0021E

0092A 0092 0093

0122A

S5

0078A

0015A

0048A

0017A

E1 E2

C07

S7 S8

C015

C02

C03A

C014

INSERTION

POINT

/1 02ED100B

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02EY100A

BLDG 02 PARTIAL GROUND FLOOR NEW

WORK PLAN - AREA A

1/8" = 1'-0"1 PARTIAL GROUND FLOOR NEW WORK PLAN - AREA A

A. REFER TO SHEET EY001 FOR GENERAL NOTES.

B. CONNECT ALL SECURITY CAMERAS SHOWN TO 2A-SW48 SWITCH IN

ROOM TELE0050E. REFER TO SHEET EY001 FOR CAMERA NETWORK

DIAGRAM.

GENERAL NOTES:

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

PHARMACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE SUB WAITING

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

INF

REC

OFFICE

EQUIP

ELEV.

PIPE

WAITING

PHARMACY

CASHIER FUNDS

HVAC

HOUSEKEEPING

ELEV.

ELEV.

HVAC

HVAC

TRE

H

SOIL

CONTROLED

SUBSTANCE

V

O

O

CLOSE

TOILE

STAIRSTAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

STAIR

OFFICE

AGENT PATIENT

P

SECURITY

CUSTOMER

ADMISSIONS

SHELL

ELEC.

STAIR

STOR.

MACH.

HVAC

ELEC

VEST.VEST.

CLOSET

STOR.

00640067

S3

C04

0074 0074A

0007 0005

0076 0077 E3

C01

0014E

C03

0006E

0004 0003

S1

0016A 0016 0017

0015E

S6

C05

0018E

0020E

0092A

S5

0078A

0015A

0017A

E1 E2

S7

C015

C02

C03A

C014

INSERTION

POINT

Z

K

OFFICE

TOILET

EC.

ELEV.

SECURITY

E3

0078A

IMMEDIATE CARE SUITE

PHARMACY SUITE

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE SUB WAITING

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

PIPE

WAITING

PHARMACY

CASHIER FUNDS

HVAC

HOUSEKEEPING

ELEV.

ELEV.

HVAC

PROSTHETICS

OFFICE

TREATMENT

STOR. WAITING

SECRETARY

HVAC

SOUND BOOTH

EXAM

CHIEF

SOUND BOOTH

EXAM

HVAC

TREATMENT

OFFICETELE

HVAC

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

CONTROLED

SUBSTANCE

VENDING

OFFICE

OFFICE

CLOSET

TOILET

TOILET

SOUND BOOTH

EXAM

MEN'S

WOMEN'S

STAIRSTAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

STAIR

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

SHELLSHELL

ELEC.

STAIR

STOR.

MACH.

STAIRHSK

HVAC

ELEC

HVAC

ELEC

VEST.

VEST.VEST.

STAIR STAIR

CLOSET

STOR.

00640067

S3

C04

0074 0074A

0007 0005

0076 0077

0111 0112 0113 0114

C012

E3

C013

0108 0116

0106 C011

0117 0118 0119

C01

0103A

0050E

E

0014E

C03

0006E

0004 0003

S1

0016A 0016 0017

0015E

S6

C05

0018E

0020E 0043

0042E

C010

C06

C08

C09

S2

0021E

0092A 0092 0093

0122A

S5

0078A

0015A

0048A

0017A

E1 E2

C07

S7 S8

C015

C02

C03A

C014

INSERTION

POINT

11111

1 1

1 1

/1 02EY100A

02EY100B

6' MOUNTING HEIGHT

TO CENTERLINE

4' MOUNTING HEIGHT

TO CENTERLINE

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02EY100B

BLDG 02 PARTIAL GROUND FLOOR NEW

WORK PLAN - AREA B

1/8" = 1'-0"1 PARTIAL GROUND FLOOR NEW WORK PLAN - AREA B

A. REFER TO SHEET EY001 FOR GENERAL NOTES.

B. CONNECT ALL SECURITY CAMERAS SHOWN TO 2B-SW48 SWITCH IN

ROOM I.T 0076. REFER TO SHEET EY001 FOR CAMERA NETWORK

DIAGRAM.

B. ELECTRICAL CONTRACTOR TO GIVE VA NOTICE TWO WEEKS PRIOR

TO WORK IN PHARMACY AREA FOR COORDINATION AND PROVISION

OF ESCORT.

GENERAL NOTES:

1/4" = 1'-0"2 ENLARGED PLAN - COMMAND CENTER 0078

DRAWING NOTES:

1. TAG INDICATES LOCATION OF COMMAND CENTER OF CAMPUS.

2. INSTALL (6) NEW 42" MONITORS IN LOCATION SHOWN TO DISPLAY SECURITY

CAMERA FEED. 3x2 VIDEO WALL.

3. INSTALL (2) NEW 19" MONITORS AND WORK STATIONS IN LOCATION SHOWN TO

DISPLAY SECURITY CAMERA FEED FOR CLOSE UP WORK AND

FORENSICS/VIDEO CALLUP.

4. VIDEO SMART CLIENT WORKSTATION. ONE REQUIRED FOR EVERY TWO

MONITORS.

5. KEYBOARD, JOY STICK, MOUSE AS REQUIRED.

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZHZ

HZ

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1100C

1119 1119E

1118A

07 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

1318A

1316A

1300C

1416A

1414A

1415A

S8

1418A

1420 1417

C16

C18A

C18B

C19B C19A

E

E

1149E

TELEPH

T

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

TLT

AM EXAM EXAM

XAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

OM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

ICE

OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

STAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STORAGE

EXAM

TLT

TLT

TLT

STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZHZ

HZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

S1

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

1416A

1414A

1415A

S7 S8

1418A

1420 1417

C16C14

C18A

C18B

C19B C19A

C13

C13A

E

E

1149E

TELEPH

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

GROUP

TLT

WORK

GROUP

MECH AO SPECIALITY

EXAMEXAMEXAMEXAM

EXAM

STAIRSTAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

STAIR

TLT

TLT

HSK

STORAGE

EXAM

TLT

TLT

TLT

STAIR STAIR

ELEC.

EXAM

STORAGE

HSK

WAITING

LOBBY

ELEV.

UTILITY

SOILED

UTILITY

SOILED

SERVICES

IT

/1 02ED101B

AREA OF WORK

IAJB

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

UPGRADE AND EXPAND

SECURITY CAMERA SYSTEM

BATTLE CREEK, MI

Project Director

11/20/19

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID DOCUMENTS

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ENGINEER:

321 4 5 6 7 8 9 10

FFE, INC.

110 BOGGS LANE, SUITE 170

CINCINNATI, OH 45246

(513) 552-0956

CLINT WEEKLEY

515-18-201

11/20/19

100% BID DOCUMENTS

FRED VOLLMERHAUSEN 02EY101A

BLDG 02 PARTIAL FIRST FLOOR NEW WORK

PLAN - AREA A

1/8" = 1'-0"1 PARTIAL FIRST FLOOR NEW WORK PLAN - AREA A

A. REFER TO SHEET EY001 FOR GENERAL NOTES.

B. CONNECT ALL SECURITY CAMERAS SHOWN TO 2A-SW48 SWITCH IN ROOM TELE0050E.

REFER TO SHEET EY001 FOR CAMERA NETWORK DIAGRAM.

GENERAL NOTES:

Revisions: Date:

SD SUBMITTAL 10/05/2018

SD - REV 1 SUBMITTAL 10/30/2018

DD SUBMITTAL 03/26/2019

HZ

HZ

HZ

HZ

HZ

HZHZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

S1

C12

1117 1118

1120A

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

S7

C14

C19B C19A

C13

C13A

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

REC

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. R

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

WA

WAITING

WWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

CHECK-IN CHEC

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

EXAM

GROUP

TLT

WEXAM

STAIR

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

EQUIP.

STAIR

TLT

TLT

HSK

STORAGE

EXAM

STAIR

LOBBY

ELEV.

UTILITY

SOILED

SERVICES

OFFICE SUITE

7,135 SQ. FT.

HZ

HZ

HZ

HZ

HZ

HZ

HZ

HZ HZ

HZ

HZ

HZ

HZHZ

HZ

1109B

1171 1170

1109C

1109D 1184 1185

1169 1168 1167 S5

1206 1207 1208 1209

1190 1191E

1192E

1186 1188

1102 1101 1100A C11

1203 1205

C18

1197 1198

1157A

S4

1149A1149C

1149B

1149D

1149F

S1

C12

1117 1118

1120A

1156E

C17

1133 1134

S2

1109A

1100C

1119 1119E

1118A

C19

1305 1306 1307 1308 1309

1300A 1300B

1300D

1148A

1148B

1406140714081409

1100B

E3

E1 E2

S3

1314A

1315A

1318A

1316A

E

1107E

1300C

1416A

1414A

1415A

S7 S8

1418A

1420 1417

C16C14

C18A

C18B

C19B C19A

C13

C13A

E

E

1149E

TELEPH

TREATMENT

OFFICE

EXAM

FEMALE

OFFICE

RECEPTION

WAITING

STAIR

ROOM

TLT

ELEC

ELEV. ROOM

STOR

ROOM

CLERK

OFFICE

EXAM EXAM

TLT

EXAM

EXAM

MALE

EXAM

EXAM

EXAM

BEDROOM

P.O.D.

ELEV. ELEV.

ELEV.

VOLUNTARY

EXAM

OFFICE

HSK

EXAM

EXAMEXAM

EXAM EXAM

TLT

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

EXAM EXAM EXAM EXAM EXAM

OFFICE

EXAM

EXAM

EXAM

TOILET

STOR.

TOILET WORK ROOM

CLASSROOM

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

PROCEDURE

ROOM

EXAM

OFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM

OFFICE

EXAMSTOR.

CLASSROOM

EXAM

WORK ROOM

EXAM

TLT

WAITING

WAITING

WAITINGWAITING

OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE HSK

HVAC

EXAM

OFFICE

OFFICE

EXAM

OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE TREATMENT

OFFICE

OFFICE OFFICE

CHECK-IN CHECK-IN

MEDICATION

ROOM

ELECTRICAL

ROOM

SUPPLY

ROOM

MEDICATION

ROOM

CLEAN

SUPPLY

EXAM

GROUP

TLT

WORK

GROUP

MECH AO SPECIALITY

EX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .