Questions and Answers - Amendment 0005
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| AMENDMENT 2 Q&A CHANNEL 3 | ||||||
| Question# | Section | Paragraph | Page/Referenced Content | Question | Answer | |
| 1 | Channel 3 SOW | n/a | n/a/ No Reference | What is the size of current SEC data warehouse? | Currently the SEC data warehouse contains hunderds of Terabytes of data. | |
| 2 | Channel 3 SOW | C.7 Task 4 | 6 of 9/C.7.4 Extract Transform and Load (ETL) process: The ETL and development process will be based off SEC available programming languages, tools and/or processes. (For Deliverables, see D.11) | Please provide a list of the SEC available programming languages referred to in Section C.7.4 of the SOW. | There are several programming languages available in the SEC. They include, and not limited to python, perl, Java, Scripting languages and SAS. | |
| 3 | Channel 3 SOW | C.6.2 | 4 of 9/Assist DBA’s during deployment into stage and production environments; Provide a process for loading relevant data sets in accordance with current DERA architecture and framework requirements and standards. | Please clarify to whom the DBA listed in the 2nd to last bullet of C.6.2 belongs. Is the DBA an asset of the SEC or an employee of the Offeror? | The DBA listed in the 2nd to last bullet refers to the SEC Database Adminstrator (DBA). | |
| 4 | Channel 3 SOW | C.6.1 | 4 of 9/Upon review the contractor shall provide technical recommendations (initial/interim/final) on ways to develop or enhance ETL or work products. These recommendations shall include but are not limited to design, development, and implementation of programs, database objects and ETL processes | Will the successful offeror receive current logical and physical data models and ETL routines and update, maintain, and improve them? | The successful offeror will receive all artifacts as needed to create, update and maintain database objects. | |
| 5 | Or will the successful offeror create the logical and physical data models and ETL routines new from scratch and then update, maintain, and improve the new ones? | The successful offeror will receive all artifacts as needed to create, update and maintain database objects. | ||||
| 6 | Attch L-3 | If an Offeror has already sent out the previous version of the PPQs (for Channel 3), can the Government confirm that the form is acceptable and our customers do not have to fill out the latest revision of the PPQ? | Confirmed. Customers do not need to fill out the latest version of the PPQ if any of the previous versions were already submitted on behalf of an offeror as the content of the PPQs did not change, just the due dates when the proposal due dates changed. | |||
| 7 | Cover Letter - Amendment 2 | In the last ***UPDATED paragraph in the Amendment 2 cover letter, it states that the Channel 3 proposals are due 12:00pm EST on February 9, 2018 but this is in conflict with the February 23, 2018 due date stated elsewhere. | ||||
| Question: Can the Government confirm that Channel 3 proposals are due 12:00pm EST on February 23, 2018? | The February 23, 2018 date and time refers to the due date and time for Channel 3 proposals only. The February 9, 2018 due date and time is for Channels 1, 2, 4, and 5 only. | |||||
| 8 | L | L.9 | 81/81 | • Page 81. L.9 Tab D that says, “(d) The Offeror shall identify the indirect rates, for both the Offeror and the Subcontractor(s), used in the proposal. The Offeror shall identify whether the indirect rates proposed are FPRAs or ACO/DCAA recommended rates, or Offeror proposed rates. The Offeror must provide an explanation of what costs are included in each overhead pool. |
• Page 81, Tab D in BOLD, “Note: If a subcontractor chooses not to reveal its rates to the prime, please refer to Section L.4.3 for delivery instructions.”
| Question: It is our interpretation that indirect rate information will not have to submitted by the subcontractor if the Prime is proposing only one set of rates for both the Prime and the Subcontractor. Is this accurate? | Yes, you are correct that indirect rate information will not have to submitted by the subcontractor if the Prime is proposing only one set of rates for both the Prime and the Subcontractor. | |||||
| 9 | L | L.9.2, Tab D | 84 | Tab D section 5 states calls for "...A work breakdown structure and schedule that describes how the Offeror will successfully complete the requirements of the sample task order. The work breakdown structure shall identify the proposed personnel, their labor categories and the hours proposed to accomplish the requirements of the sample task order. Key personnel shall be identified." | ||
| Question: Is it allowable to combine the WBS with the schedule into one document that will remain outside of the 30 page count for Volume II? | Yes, you may combine the WBS and schedule referred to in Tab D paragraph 5) and it will not be counted as part of the page count. | |||||
| 10 | L | L.9.2, Tab C | 79/88 | Question: Please confirm that Sample Task Channel 3 task 1 (Project Management) and task 2 (administrative) can be covered under 'Management Procedures that will be Implemented to control all aspects of Sample Task performance' and not under 'Identify specific techniques and methods to complete the requirement of each sample task order'? | The Sample Task Channel 3, Task 1 and Task 2 can be covered under the Management Procedures; however, it is the vendor's responsibility to make sure all required information requested in the RFP is included in the appropriate tabs. | |
| 11 | L, M | L.9 Tab D, M3.6 | 80, 90 | L.9 Tab D and M 3.6 directs that March 30, 2018 award date should be assumed for the IDIQ and the sample task orders." Question: Given the two-week extension of the proposal due date, what is the new award date for Channel 3? | Offerors shall still propose assuming the March 30, 2018 award date as stated in the soicitation. | |
| 12 | L | L.9 Tab D | 81 | L.9 Tab D requires that, "Each Offeror shall submit hourly labor rates for work performed on Government Site and Contractor Site. In accordance with FAR 52.216-29 (modified), Offerors proposing a Subcontractor to provide some labor categories shall establish fixed hourly rates using separate rates for each category of labor to be performed by each Subcontractor and for each category of labor to be performed by the Offeror, and for each category of labor to be transferred between divisions, subsidiaries, or affiliates of the Offeror under a common control." Question: Can the Government clarify if the separate rates for each labor category are only applicable at the Task Order level, or also at the IDIQ level? | Separate labor category rates are required at the IDIQ level and at the task order level in accordance with the pricing template provided by the government that offerors must complete. Keep in mind that the rates should be the same at the task order level as they are at the IDIQ level unless the offeror is providing the government with a discount off of their rates at the task order level. Additionally, if the prime and subcontractor/s choose to use the same labor categories and rates as each other, that is also acceptable and should just be noted in the price proposal or pricing template that the prime and subcontractor will abide by the same rates and labor categories. | |
| 13 | H | |||||
| J | H.19.1 | |||||
| Section J | Page 51 | |||||
| Page 68 | We noted that SEC did not provide a new Attachment L-2, Description of Key Personnel Labor Categories by Channel. Please confirm that no changes have been made to the attachment and that we should use Attachment L-2 that was provided under Amendment 1. | No changes have been made to Attachment L-2, Description of Personnel Labor Categories by Channel. Please use the Attachment L-2 that was provided via Amendment 0001. | ||||
| 14 | H.12 | What VPAT information is required from the contractors/vendors to be completed in the template? | The VPAT is not applicable to Channel 3. However, please see section H.12 in the updated QRADS amendment 0003 solicitation body and the note following that section and paragraph L.9.1 Tab B and the questions and answers provided via that amendment as well posted FBO on February 7, 2018. | |||
| 15 | H.12 | Why is the government requesting VPAT information for this services contract, since all the tools are selected by the government? It is our understanding that for these tools - the vendors provide the VPAT to SEC. | The VPAT is not applicable to Channel 3. However, please see section H.12 in the updated QRADS amendment 0003 solicitation body and the note following that section and paragraph L.9.1 Tab B and the questions and answers provided via that amendment as well posted FBO on February 7, 2018. | |||
| 16 | H.12 | Additionally, the RFP provides a link to the VPAT template, however this link does not display any template: (https://www.itic.org/policy/accessibility/vpat). Is the referenced template required as part of the proposal submission? If so, can the template be provided? | The template for the VPAT was provided via Amendment 0002 to the solicitation. It is Atttachment H-6 to the solicitation. Please refer to that amendment in FBO that was posted on February 1, 2018. Additionally, see the amended QRADS solicitation body and questions and answers posted to FBO via amendment 0003 on February 7, 2018 for additional information regarding Section 508 conformance and the VPAT. | |||
| 17 | L | L4.3 L.9 Tab D | 75 | |||
| 82 | Reference: The Governments answer to question #98 was as follows "The Vendor is to provide relevant experiences and years of experience in scope for the Channel to which they are proposing (so for example Channel 4 if that is the Channel being proposed)." |
But the last sentence in Tab B - Corporate Experience states "demonstrated commitment to the data analytics, database management, and data development work described in the IDIQ scope." The reference to Data Analytics, Database Management and Data Development implies that the Contractor should provide Corporate Experiences related to all IDIQ Channels scope (e.g. Channel 4 is focused on Data Analytics and not Database Management and Data Development).
Question:
• Should the contractor still focus the Corporate Experience only on the respective Channel being proposed? Or, focus on both the Channel being proposed and all Channels scope including Data Analytics, Database Management and Data Development?
| Offerors should be focusing on the Channel being proposed as it would not be useful to the government to have an offeror address areas that are not covered by the Channel to which they are proposing. | ||||
| 18 | L | L4.3 L.9 Tab D | 75 | |
| 82 | Reference: Section L.4.3 states, “The separate subcontractor cost proposal must be as detailed as the Offeror’s cost proposal and must be received in the designated mailbox identified above no later than the closing date and time specified in Section L.4.” And, L.9 Tab D states, “(d) The Offeror shall identify the indirect rates, for both the Offeror and the Subcontractor(s), used in the proposal. Note: If a subcontractor chooses not to reveal its rates to the prime, please refer to Section L.4.3 for delivery instructions.” |
Questions:
a. “The separate subcontractor cost proposal must be as detailed as the Offeror’s cost proposal..” Does this mean if a subcontractor does not want to share its proprietary indirect rates with the Prime Offeror, the subcontractor must submit a separate proposal in accordance with all of the requirements in Section L.9.1 for Tabs A, B, C and D?
b. Will the Government please clarify exactly what must be submitted by the subcontractor from the requirements presented in the RFP, Tabs A, B, C and D if a subcontractor wants to simply submit proprietary indirect rates directly to the Government?
c. Must a subcontractor submit indirect rate information regardless if only one set of blended pricing rates will be proposed by the Prime Offeror? a. and b. The government expects the subcontractors at a minimum to identify that they are a sub, the prime contractor, the Channel to which the price proposal is in response to, and Attachment L-1 which will include their proposed rates. c. No the subcontractor should not submit indirect rate information if only one set of blended pricing rates will be proposed by the Prime Offeror.