503-19-112 -CD- Drawings_Part1.pdf

PDF 31 MB Posted

Attached to
Z1DA--NRM | 503-19-112 Replace Steam System Project Federal contract opportunity
Solicitation number
36C24424R0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The solicitation number is 36C24424R0001 for the Z1DA--NRM | 503-19-112 Replace Steam System Project, which is currently in the pre-solicitation phase. The related file is 503-19-112 -CD- Drawings_Part1.pdf, a 31MB set of drawings for the project to replace the steam system. This opportunity will require contractors to replace an existing steam system and appears to include design and construction services. No other salient details are provided in this document.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019 ADDITION

1962 ADDITION

ORIGINAL 1947 BUILDING

BUILDING 01

ADDITION

P la n N or th

True North

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:1

A

M

GI001

COVER REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

JAMES E. VAN ZANDT VA MEDICAL CENTER

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

VAMC PROJECT #: 503-19-112

REPLACE STEAM SYSTEMS

P la n N or th

True North

AREA OF WORK AERIAL IMAGE SHEET INDEX

GENERAL AREA OF WORK

BUILDING 01

SHEET NO. SHEET NAME

MP102 PLAN NORTH BASEMENT MECHANICAL NEW WORK PLAN

MP103 PLAN WEST BASEMENT MECHANICAL PIPING NEW WORK PLAN

MP104 PLAN EAST BASEMENT MECHANICAL NEW WORK PLAN

MP105 PLAN SOUTHWEST BASEMENT MECHANICAL NEW WORK PLAN

MP112 PLAN NORTH 1ST FLOOR MECHANICAL NEW WORK PLAN

MP113 PLAN WEST 1ST FLOOR MECHANICAL NEW WORK PLAN

MP114 PLAN EAST 1ST FLOOR MECHANICAL NEW WORK PLAN

MP115 PLAN SOUTHWEST 1ST FLOOR MECHANICAL NEW WORK PLAN

MP122 PLAN NORTH 2ND FLOOR MECHANICAL NEW WORK PLAN

MP123 PLAN WEST 2ND FLOOR MECHANICAL NEW WORK PLAN

MP124 PLAN EAST 2ND FLOOR MECHANICAL NEW WORK PLAN

MP125 PLAN SOUTHWEST 2ND FLOOR MECHANICAL NEW WORK PLAN

MP132 PLAN NORTH 3RD FLOOR MECHANICAL NEW WORK PLAN

MP133 PLAN WEST 3RD FLOOR MECHANICAL NEW WORK PLAN

MP134 PLAN EAST 3RD FLOOR MECHANICAL NEW WORK PLAN

MP142 PLAN NORTH 4TH FLOOR MECHANICAL NEW WORK PLAN

MP143 PLAN WEST 4TH FLOOR MECHANICAL NEW WORK PLAN

MP144 PLAN EAST 4TH FLOOR MECHANICAL NEW WORK PLAN

MP152 PLAN NORTH ROOF MECHANICAL NEW WORK PLAN

MP153 PLAN WEST 5TH FLOOR MECHANICAL NEW WORK PLAN

MP154 PLAN EAST 5TH FLOOR MECHANICAL NEW WORK PLAN

MP163 PLAN WEST 6TH FLOOR MECHANICAL NEW WORK PLAN

MP164 PLAN EAST 6TH FLOOR MECHANICAL NEW WORK PLAN

MP173 PLAN WEST 7TH FLOOR MECHANICAL NEW WORK PLAN

MP174 PLAN EAST 7TH FLOOR MECHANICAL NEW WORK PLAN

MP301 MECHANICAL ROOM ENLARGEMENTS

MP302 MECHANICAL ROOM ENLARGEMENT

MP303 MECHANICAL ROOM ENLARGEMENT

MP311 MECHANICAL ROOM SECTIONS

MP601 NEW STEAM SYSTEM RISER DIAGRAM

MP602 NEW STEAM SYSTEM RISER DIAGRAM

MP901 MECHANICAL AXONOMETRIC VIEWS - NEW WORK

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES

E-002 ELECTRICAL SYMBOLS

EP102 PLAN NORTH BASEMENT ELECTRICAL NEW WORK PLAN

EP103 PLAN WEST BASEMENT ELECTRICAL PLAN

EP104 BASEMENT ELECTRICAL POWER PLAN

EP105 PLAN SOUTHWEST BASEMENT ELECTRICAL PLAN

SHEET NO. SHEET NAME

GENERAL

GI001 COVER

GI101 BASEMENT LIFE SAFETY REFERENCE PLAN

GI111 1ST FLOOR LIFE SAFETY REFERENCE PLAN

GI121 2ND FLOOR LIFE SAFETY REFERENCE PLAN

GI131 3RD FLOOR LIFE SAFETY REFERENCE PLAN

GI141 4TH FLOOR LIFE SAFETY REFERENCE PLAN

GI151 5TH FLOOR LIFE SAFETY REFERENCE PLAN

GI161 6TH FLOOR LIFE SAFETY REFERENCE PLAN

GI171 7TH FLOOR LIFE SAFETY REFERENCE PLAN

GC001 PHASING SCHEDULE, NOTES, AND LEGEND

GC101 BASEMENT PHASING PLAN

GC111 1ST FLOOR PHASING PLAN

GC121 2ND FLOOR PHASING PLAN

GC131 3RD FLOOR PHASING PLAN

GC141 4TH FLOOR PHASING PLAN

GC151 5TH THROUGH 7TH FLOOR PHASING PLAN

ARCHITECTURAL

AE112 PLAN NORTH 1ST FLOOR ARCHITECTURAL PLAN

AE113 PLAN WEST 1ST FLOOR ARCHITECTURAL PLAN

AE114 PLAN EAST 1ST FLOOR ARCHITECTURAL PLAN

AE115 PLAN SOUTHWEST 1ST FLOOR ARCHITECTURAL PLAN

AE122 PLAN NORTH 2ND FLOOR ARCHITECTURAL PLAN

AE123 PLAN WEST 2ND FLOOR ARCHITECTURAL PLAN

AE124 PLAN EAST 2ND FLOOR ARCHITECTURAL PLAN

AE132 PLAN NORTH 3RD FLOOR ARCHITECTURAL PLAN

AE133 PLAN WEST 3RD FLOOR ARCHITECTURAL PLAN

AE134 PLAN EAST 3RD FLOOR ARCHITECTURAL PLAN

AE143 PLAN WEST 4TH FLOOR ARCHITECTURAL PLAN

AE153 PLAN WEST 5TH FLOOR ARCHITECTURAL PLAN

AE163 PLAN WEST 6TH FLOOR ARCHITECTURAL PLAN

AE411 ENLARGED PLANS

MECHANICAL

M-001 MECHANICAL ABBREVIATIONS AND GENERAL NOTES

M-002 MECHANICAL SYMBOLS AND LEGENDS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

MD101 SUB-BASEMENT - STEAM PIPING DEMOLITION PLAN

MD102 PLAN NORTH BASEMENT - STEAM PIPING DEMOLITION PLAN

MD103 PLAN WEST BASEMENT- STEAM PIPING DEMOLITION PLAN

MD104 PLAN EAST BASEMENT - STEAM PIPING DEMOLITION PLAN

MD105 PLAN SOUTHWEST BASEMENT - STEAM PIPING DEMOLITION PLAN

MD112 PLAN NORTH 1ST FLOOR - STEAM PIPING DEMOLITION PLAN

MD113 PLAN WEST 1ST FLOOR - STEAM PIPING DEMOLITION PLAN

MD114 PLAN EAST 1ST FLOOR - STEAM PIPING DEMOLITION PLAN

MD115 PLAN SOUTHWEST 1ST FLOOR - STEAM PIPING DEMOLITION PLAN

MD122 PLAN NORTH 2ND FLOOR - STEAM PIPING DEMOLITION PLAN

MD123 PLAN WEST 2ND FLOOR - STEAM PIPING DEMOLITION PLAN

MD124 PLAN EAST 2ND FLOOR - STEAM PIPING DEMOLITION PLAN

MD125 PLAN SOUTHWEST 2ND FLOOR - STEAM PIPING DEMOLITION PLAN

MD132 PLAN NORTH 3RD FLOOR - STEAM PIPING DEMOLITION PLAN

MD133 PLAN WEST 3RD FLOOR - STEAM PIPING DEMOLITION PLAN

MD134 PLAN EAST 3RD FLOOR - STEAM PIPING DEMOLITION PLAN

MD135 PLAN SOUTHWEST 3RD FLOOR - STEAM PIPING DEMOLITION PLAN

MD142 PLAN NORTH 4TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD143 PLAN WEST 4TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD144 PLAN EAST 4TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD152 PLAN NORTH ROOF - STEAM PIPING DEMOLITION PLAN

MD153 PLAN WEST 5TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD154 PLAN EAST 5TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD163 PLAN WEST 6TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD164 PLAN EAST 6TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD173 PLAN WEST 7TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD174 PLAN EAST 7TH FLOOR - STEAM PIPING DEMOLITION PLAN

MD601 DEMO RISER DIAGRAM STEAM LOW PRESSURE

MD602 DEMO RISER DIAGRAM STEAM LOW PRESSURE

MD603 DEMO RISER DIAGRAM STEAM LOW PRESSURE

MD604 DEMO RISER DIAGRAM STEAM MEDIUM PRESSURE

MD605 DEMO RISER DIAGRAM STEAM MEDIUM PRESSURE

MD801 EXISTING MECHANICAL ROOM REFERENCE PHOTOS

MD901 MECHANICAL AXONOMETRIC VIEWS - EXISTING & DEMO

CONTRACTOR

PARKING

COORDINATE WITH

COR

DUMPSTER LOCATION

COORDINATE WITH COR

(LIMIT 1)

TRAILER LOCATION

COORDINATE WITH

COR (LIMIT 1)

ACCESS TO MECHANICAL ROOM

COORDINATE MATERIAL

LAYDOWN / TRANSPORT THRU

FACILITY WITH COR

06/09/2022

BA10

BB12

BE01E

BE01G

BE01D

BE01F

BE01C

BB15M

STAIR

FB

BB15G BB15H BB15I BB15J

BB15D

BA15A

AB-2

BA13

S4-2

P3-2

P2-2

SB01

BA10A

BC09

BC07

STAIR-2

CB-2

STAIR-2

BB-2

BB05

F5-2

BA05B

BA05A

STAIR-2

DB-2

BC11

BB08

BB08A

BA06 BA06A BA04

BA01

BB03

BB07

BB09

BB13A

BE01I

BE01J

BE01H

BE01B

STAIR

EB

BE01A

BE01

BE01K

BE01M

BA20

BB06

BA05

BA03

BC05

BC02

BC06

--2

BC04

BC01

BB16BB13

BB15B

BB15K

BA15

BA16

BA17

BB11BA18

BA21 BA22

BB16A

BC10A

BC08

BC10

BA11

BA11A

BB15A

BB15

BE01O

BE01N

BE01L

BC12

BC01A1

BC01A

BA02

BB15F

PLAN SOUTHEAST WING NOT IN SCOPE.

BA1BA2

BB01

BC1

BC12A

ZONE 1AB-01

BUSINESS AND OTHER USES

11092 SQ FT

ZONE 1AB-02

BUSINESS AND OTHER USES

9789 SQ FT

ZONE 1AB-03

BUSINESS AND OTHER USES

3476 SQ FT

ZONE 1AB-04

BUSINESS AND OTHER USES

11692 SQ FT

ZONE 1AB-05

BUSINESS AND OTHER USES

14789 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:1

A

M

GI101

BASEMENT LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

80'40'20'10'5'0'

P la n N or th

True North 1" = 20'-0"

BASEMENT FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

PERFORMED.

131F

131G

131D

129B 129A 129

LAUNDRY/STORAGE-1

141D

144A

145 145A 145B 146A

118A

116B

116C

101B

100B

118D-1

126 198B 198 198D 195B 195A

179B

179C

179D

179E

141C

141Q 141L

141B

141N 141E

STAIR-1

A1-1

140 140B

140C

132 134A

140A

141M 131K

131E

131A

127 S4-1

130A

130B

126A

116D

115A

116A

117A

120A

118 119

113B

STAIR-1

D1-1

102A

F5-1

147H 148

148D

147F

154153151 152

151A 152A 153A 156C

STAIR-1

C1-1

A124 A126

A125

A131

A127

A136 A137

A140

A134

STAIR-1

F1-1

A140A

A114

A111

A110

A112

A132

A115A116

A141

197A 195C196197198A

193K A107

A108A113193J

A117

A120 A119

A118

193H 193G 193E193F

193M193N

A130

A129

A123

A146

A101B

A106BA106C

A106D

A106E

A147A148B

A101D

183 185

158159

178159A

167 166

173 174 175

E1-1

MECHANICAL

ROOM-1

157E

157K

171-1

171A

A145

168169

147G

147C 147D

EXAM/TREATMENT-1

147E

STAIR-1

B1-1

131H

A106F

A144

157C160

A138E A138D A138C A138B

187A

187B

187C2A

187C2

131 CONTROL

RM-1

131C

131I131J

148A

P2-1

P3-1

P6-1

P7-1

180A

ER

WAITING-1

A101E

A106

A138G138F

A122B

A122C A122A

A139

156A

179G

156E

161A

179F

179F

193D 193D

193C

A143B

A105

147A

147B

148B

193A

193B

118C

102B

120B

100A

128B 128A

141C

141A

HALLWAY-1

187D

187C1A

187C1

156B

187C

A133

118D-2

179A

113A

ZONE 1A01-01

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

7724 SQ FT

ZONE 1A01-02

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

17886 SQ FT

ZONE 1A01-03

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

6049 SQ FT

ZONE 1A01-04

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

25405 SQ FT

ZONE 1A01-05

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

13924 SQ FT

ZONE 1A01-06

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

9691 SQ FT

ZONE 1A01-07

NEW HEALTH CARE

COMPLETE SPRINKLER PROTECTION

8121 SQ FT

ZONE 1A01-08

NEW HEALTH CARE

COMPLETE SPRINKLER PROTECTION

8970 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:2

A

M

GI111

1ST FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

80'40'20'10'5'0'

P la n N or th

True North 1" = 20'-0"

1ST FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

2C08

2A21

2A21B 2A21A1

2A18 2A20

2A20C

2A06

2A17

2A16 2A15

2A12

2A13

2A11

2A08

2A10

2A07

2A09

STAIR

A2

2A05 2A04A

2A03B1

2A03B 2B01

2A03A

2A03C

2C03

2A04

2A11A

2A02

2B02 2B04

2B07

STAIR

C2

2C01

2C09

2C10

2C16A

2C12

2C16

2C17

2C18 2C21

2C08A 2C20

2B06C

2B06B 2B06A 2B06R 2B06P 2B06O

2B08 2B09

2B10

2B06N1

2B39

2B40

2B06N

STAIR

D2

STAIR

B2

2B41 2B42

2B53

2B55 2B56

2B56A

2B52

2B542B50

2B44 2B512B432B11 2B06S

2B06Q

2B06J 2B06G

2B06D 2B06L

2B06K2B06H2B06F2B06E

2B47

2B45 2B46

2B49

2B482B30D2 2B30D1

2B30D

2B30C

2B30B

2B29B2B29C

2B29D2B29E2B29F

2B29

2B30

2B30A

2B29A 2B29H

2B29G

2B29I

2B29K

2B29M

2B29Q

2B29R

2B29P

2B29S 2B29O 2B29U

2B38A

2B38

2B35 2B29T

2B29N

2B29L

2B29J

STAIR

E2

2B29W

2A14

2A3 2A03

2C05

2C06

2C04

2C11

2A17A

2A20A

2A21A

2A2

2A1

2B1

2B03

2B3

2B2

2B4

2B5

2C1

2C3

2C2

2A20B

ZONE 1A02-01

BUSINESS AND OTHER USES

9538 SQ FT

ZONE 1A02-02

BUSINESS AND OTHER USES

7038 SQ FT

ZONE 1A02-03

BUSINESS AND OTHER USES

3964 SQ FT

ZONE 1A02-04

BUSINESS AND OTHER USES

9398 SQ FT

ZONE 1A02-05

BUSINESS AND OTHER USES

10256 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:2

A

M

GI121

2ND FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

80'40'20'10'5'0'

P la n N or th

True North 1" = 20'-0"

2ND FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

STAIR

C3

3C11

3C15

3C18

3C20

3C24

3C28

3C27

3C25

3C21

3C17

3C16

3C10

3C08

3C07

3A053A07

3A10

3A113A153A163A20

3A22

3A21 3A19

3A17

3A14 3A13 3A12 3A09 3A06 3A04

3C05

3C04

3C03

3C02 3B01

3B02

3B03

3B06 3B05

3B08 3B07

3B09 3B10

3A03

3C09

3C13

3C14

3C18A

3C19

3C22A

3C23

3C26

STAIR

D3

3C22

3C28A

3C21A

3C16A

3A15A 3A11A 3A07A

STAIR

A3

3A22A 3A08 3A02 3A01

3B01A

3B01B

3B01B1 3B01C 3E03

3E013E01A

3E02

3E02A

3F15 3F16 3F18 3F20

3F21

3F19

3F17 3F14

3F24

3F13

3F12

3F11

3F10

3FO9

3F05

3E05

3E05D

3E04C 3E04B

3E04

3E04A

STAIR

B3

3E05C

3E05B

3E05A

3F08B 3F08A

3F08 3F01

3F02

3B09A 3B11

3B15

3B16

3B18

3B20

3B21 3B22E

3B22E1

3B19

3B17

3B14

3B13

3B12

3B22F

3B22 3B22A

3B22B 3B22C 3B22D 3B22G 3B22H

3F22

3F23

3F12A

3F25

3F11A 3F11A1

3F10A1

3F10A

3F26

3F06

3F06A 3F05A

3F07

STAIR

E3

3C12

3A18

3C01

3F04

3F04A

3F03

3C28B

3C1

3A13A2

3C2

3B1

3B2

3F1

3E01B

ZONE 1A03-01

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

4521 SQ FT

ZONE 1A03-02

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

3131 SQ FT

ZONE 1A03-03

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

6320 SQ FT

ZONE 1A03-04

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

7438 SQ FT

ZONE 1A03-05

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

12688 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:2

A

M

GI131

3RD FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

80'40'20'10'5'0'

P la n N or th

True North 1" = 20'-0"

3RD FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

4C01A4C01

4C03

4C02

4A064A074A084A10

4A12

4A13

4A15

4A16

4A18

4A16A

4A18A

4A22A

4A22

STAIR

A4

4A21

4A21A

4A17

4A17A 4A14 4A14A 4A11 4A11A 4A09A 4A09 4A05A

4A05

4A03A

4A03

4A03B 4B05

4B05A

4B10 4B14

4B14A

4B17 4B21A

4B21

4B24 4B26 4B24A

4B28

4B274B25A4B25

4B234B22

STAIR

B4

4B184B16A4B164B134B11

4B094B06

4B04

4B02

STAIR

C4

4A19

4B08

4A04

4A01

STAIR

E4

4A14A2 4B1

ZONE 1A04-01

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

4094 SQ FT

ZONE 1A04-02

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

4970 SQ FT

ZONE 1A04-03

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

4712 SQ FT

ZONE 1A04-04

EXISTING HEALTH CARE

COMPLETE SPRINKLER PROTECTION

9125 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:2

A

M

GI141

4TH FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

48'24'12'6'3'0'

P la n N or th

True North 3/32" = 1'-0"

4TH FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

5C01

5A055A065A08

5A095A10

5A13

5A14 5A165A175A20

5A19 5A15 5A11 5A07 5A07A 5A03 5B03 5B07 5B08 5B11

5B13 5B16 5B19

5B21

5B185B17

5B15

5B125B105B095B06

5B05

5B04

5A01A 5A02

STAIR

C5

STAIR

B5

STAIR

A5

5A19A 5A15A 5A11A 5B03A 5B07A 5B08A 5B11A 5B13A

5B16A 5B19A

5B18A5B17A

5B10A

5B09A5B06A

5B02

5A16A

5A12

5A04

5A01

5B20

5B01

5A1

5A2 5B1 5B2

ZONE 1A05-01

NEW HEALTH CARE

2600 SQ FT

ZONE 1A05-02

NEW HEALTH CARE

5287 SQ FT

ZONE 1A05-03

NEW HEALTH CARE

4712 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:3

A

M

GI151

5TH FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

48'24'12'6'3'0'

P la n N or th

True North 3/32" = 1'-0"

5TH FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

6A06

6A08

6A09

6A10

6A11

6A13

6A146A166A196A21

6A20 6A15 6A12

6A16A

STAIR

A6

6A20A 6A15A 6A12A

6A07A

6A07B

6C01

STAIR

C6

6A02

6A07 6A05 6A03 6B03 6B04 6B07 6B09

6B12

6B14 6B17

6B18

6B166B15

6B13

6B106B086B066B05

6B02 6A01B

6B03A 6B04A 6B07A 6B09A

6B06A6B05A

6B02A

6B14A 6B17A

6B15A 6B16ASTAIR

B6

6A01

6A14A

6A17

6B01

6B12B

6B12A

6A1

6A2 6B1

ZONE 1A06-01

NEW HEALTH CARE

2983 SQ FT

ZONE 1A06-02

NEW HEALTH CARE

5970 SQ FT

ZONE 1A06-03

NEW HEALTH CARE

4634 SQ FT

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:3

A

M

GI161

6TH FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

48'24'12'6'3'0'

P la n N or th

True North 3/32" = 1'-0"

6TH FLOOR - LIFE SAFETY REFERENCE PLAN1

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

OFFICE

7B27

CHIEF OF

STAFF

7B26

CHIEF OF

STAFF

SECRETARY

7B25

HEALTH

SYSTEMS

SPECIALIST

CHIEF OF

STAFF

7B24

CORRIDOR

7B2

COMPLIANCE

OFFICER

AND GROUP

PRACTICE

MANAGER

7B22

DIRECTOR

7B19

STAIR

B7-2

EXECUTIVE

ASSISTANT

TO THE

DIRECTOR

7B16

DIRECTOR

SECRETARY

7B17

ASSOCIATE

DIRECTOR

SECRETARY

7B15

ASSOCIATE

DIRECTOR

7B12

WAITING

AREA

7B13

DIRECTORS

OFFICE

PROGRAM

SUPPORT

ASSISTANT

7B11

ASSOCIATE

DIRECTOR

FOR PATIENT

/ NURSING

SERVICES

7B06

ADMINISTRATIVE

OFFICER

PATIENT /

NURSING

SERVICES

7B08

PRIVACY /

FOIA OFFICE

7B07

ASSOCIATE

DIRECTOR

FOR PATIENT

/ NURSING

SERVICES

7B05

PRIVACY

SPECIALIST

7B04

PUBLIC

AFFAIRS

PROGRAM

SUPPORT

ASSISTANT

7B01

DIRECTOR'S

CONFERENCE

ROOM

7A02

PUBLIC

AFFAIRS

OFFICER

7B02

STAIR

C7-2

PROGRAM

ANALYST

DIRECTORS

OFFICE

7C02

CONFERENCE

ROOM

7C01

VENDING

7A05

WOMENS

RESTROOM,

ADA

7A09

PROGRAM

SPECIALIST

7A14

ROOM

7A16

MENS

RESTROOM,

ADA

7A12

ACCREDITATION

SPECIALIST

7A15

INFECTION

CONTROL/

PREVENTION

NURSE/

MDRO

COORDINATOR

7A17

RISK

MANAGER/

UTILIZATION

REVIEW

NURSE

7A20

PATIENT

SAFETY

MANAGER

7A19

SYSTEM

REDESIGN

COORDINATOR

7A21

STAIR

A7-2

CHIEF,

QUALITY

MANAGEMENT

SERVICE

7A23

QUALITY

MANAGEMENT

PROGRAM

SUPPORT

ASSISTANT

7A18

KITCHEN

AREA

7A03

STORAGE

7A07STORAGE

7A11

STORAGE

7A13

TELECOM

7A01

STORAGE

7B10

STORAGE

ROOM

7B14

RESTROOM

7B16A

STORAGE

7B18

ELEC

7B21

RESTROOM

7B12A

MAIL /

COPIER

ROOM

7A22

HOUSEKEEPING

7A24

Space

1F128

LIFE SAFETY REFERENCE LEGEND

2-HOUR FIRE SEPARATION

1-HOUR FIRE SEPARATION

1-HOUR SMOKE BARRIER

0-HOUR SMOKE RESISTIVE

EXIT

CHUTES/ACCESS/DISCHARGE

HAZARDOUS AREA

NON-SLEEPING SUITE

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:3

A

M

GI171

7TH FLOOR LIFE SAFETY

REFERENCE PLAN

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

A. GI100-SERIES LIFE SAFETY PLANS HEREIN INDICATE EXISTING FIRE-

RESISTIVE WALLS AND AREA DATA AS PROVIDED BY THE VHA. REFER TO

MECHANICAL AND ELECTRICAL PLANS FOR SCOPE OF WORK. REFER TO

SPECIFICATIONS FOR REQUIREMENTS OF WORK THAT AFFECTS FIRE-

RESISTIVE CONSTRUCTION.

B. REFER TO 'GC' SERIES SHEETS FOR WORK PHASING REQUIREMENTS.

C. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT

ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING WITH WORK.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT IN ACCORDANCE WITH

HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS HAS BEEN

PERFORMED.

48'24'12'6'3'0'

P la n N or th

True North 3/32" = 1'-0"

7TH FLOOR LIFE SAFETY REFERENCE PLAN1

RM NAME

RM#

RM NAME

RM#

Y.Y.Y

X.X.X

PHASING ZONE TAG,

TYPICAL. REFER TO

PHASING SCHEDULE ON

SHEET GI101.

PHASING ZONE

APPLICABLE SHADED

AREA, TYPICAL.

PHASING ZONE

BOUNDARY,

TYPICAL.

PHASING PLANS LEGEND

TEMPORARY CONSTRUCTION

PARTITION AND/OR INFECTION

CONTROL BARRIER. REF PLAN

KEYNOTES.

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:3

A

M

GC001

PHASING SCHEDULE, NOTES, AND

LEGEND

REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

PHASING SCHEDULE

PHASING

ZONE ZONE DESCRIPTION

ICRA

CLASS

PHASING

SEQUENCE

ALLOWABLE

WORK

HOURS

FOOT

NOTES

B.A.1

MAIN STEAM ENTRANCE MECH RM

BA10 & SUBBASEMENT

III 1 N/A 1,2,3,4

B.A.2 BASEMENT MAIL ROOM & CORRIDOR III 2 6PM-6AM 4

B.A.3 BASEMENT SHOPS III 3 6PM-6AM 4

B.A.4 BASEMENT BIOMED III 4 6PM-6AM 4

B.C.1 BASEMENT CANTEEN III 5 6PM-6AM 4

B.C.2 BASEMENT MECH BC11 III 6 N/A 2,4,5

B.B.1 BASEMENT MISC. III 7 6PM-6AM 4

B.B.2 BASEMENT MECH BB12 III 8 N/A 2,3,4

B.B.3 BASEMENT MECH BB15F III 9 N/A 2,3,4,5

B.B.4 BASEMENT CRAWLSPACE III 10 N/A 4

B.E.3 BASEMENT 1984 III 11 6PM-6AM 4

B.E.1 BASEMENT MECH BE01F&01B III 11 N/A 2

1.E.2 LAUNDRY III 12 4PM-6AM 4

1.E.1 1ST FLOOR RADIOLOGY III 13 6PM-6AM 4,7

1.D.3 1ST FLOOR PLAN SOUTH WING IV 14 6PM-6AM 4,7

1.G.1

1ST FLOOR CENTRAL CORRIDOR &

OFFICES

IV 15 6PM-6AM 4,7

1.F.3 1ST FLOOR ER ENTRANCE IV 16 10PM-6AM 4,6

1.G.2 1ST FLOOR MECH 1G10 III 17 N/A 4,5

1.F.1 1ST FLOOR PLAN NORTH WING IV 18 6PM-6AM 4,7

1.F.2 1ST FLOOR MECH 1F69 III 19 N/A 1,3,4

2.A.1

2ND FLOOR KITCHEN & LOADING

DOCK

III 20 3PM-6AM 4,7

2.C.1 2ND FLOOR PLAN SOUTH WING III 21 6PM-6AM 4,7

2.B.1 2ND FLOOR PLAN NORTHEAST WING IV 22 6PM-6AM 4,7

3.A.1 3RD FLOOR PLAN WEST WING III 23 6PM-6AM 4,7

3.C.1 3RD FLOOR PLAN SOUTH WING IV 24 6PM-6AM 4

3.B.1

3RD FLOOR TELEHEALTH & SURGERY

PREP

IV 25 6PM-6AM 4,6

3.F.1 3RD FLOOR SURGERY IV 26 6PM-6AM 4,6

3.E.1 3RD FLOOR SPS IV 27 6PM-6AM 4,6,7,8

4.A.1 4TH FLOOR PLAN WEST INPATIENT III 28 8AM-8PM 4,7,9

4.C.1 4TH FLOOR INPATIENT SUPPORT III 29 8AM-8PM 4,7

4.B.1 4TH FLOOR PLAN EAST INPATIENT III 30 8AM-8PM 4,7,9

4.D.1 4TH FLOOR MECH 400 III 31 N/A 4,5

5.A.1 5TH FLOOR PLAN WEST INPATIENT III 32 8AM-8PM 4,7,9

5.A.2 5TH FLOOR INPATIENT SUPPORT III 33 8AM-8PM 4,7

5.B.1 5TH FLOOR PLAN EAST INPATIENT III 34 8AM-8PM 4,7,9

5.B.2 5TH FLOOR PLAN EAST INPATIENT III 35 8AM-8PM 4,7,9

5.B.3 5TH FLOOR PLAN EAST INPATIENT III 36 8AM-8PM 4,7,9

6.A.1 6TH FLOOR PLAN WEST INPATIENT III 37 8AM-8PM 4,7,9

6.A.2 6TH FLOOR INPATIENT SUPPORT III 38 8AM-8PM 4,7

6.B.1 6TH FLOOR PLAN EAST INPATIENT III 39 8AM-8PM 4,7,9

6.B.2 6TH FLOOR PLAN EAST INPATIENT III 40 8AM-8PM 4,7,9

7.A.1 7TH FLOOR PLAN WEST III 41 6PM-6AM 4,7

7.A.2 7TH FLOOR PLAN SOUTH III 42 6PM-6AM 4,7

7.B.1 7TH FLOOR PLAN EAST III 43 6PM-6AM 4,7

7.B.2 7TH FLOOR PLAN EAST III 44 6PM-6AM 4,7

A. PHASING PLANS HEREIN ARE INTENDED FOR GENERAL GUIDANCE AND

RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, FOR REVIEW AND APPROVAL

BY THE VHA PRIOR TO COMMENCING WORK.

B. ANY CONCERNS OR OBJECTIONS TO MEETING ALL PHASING

REQUIREMENTS HEREIN MUST BE PROVIDED IN WRITING PRIOR TO

BIDDING. OTHERWISE, THE AWARDED CONTRACTOR IS RESPONSIBLE

FOR MEETING ALL REQUIREMENTS, OR MAKING ALTERNATIVE

ARRANGEMENTS TO MEET THE INTENT OF THE REQUIREMENTS TO THE

SATISFACTION OF THE VHA COR, AT NO ADDITIONAL COST TO THE

GOVERNMENT.

C. A TOTAL SYSTEM OUTAGE OF UP TO 8 HOURS MAY BE SCHEDULED WITH

THE VHA COR ON A WEEKEND BETWEEN 6 PM AND 6 AM TO INITIALLY CUT

IN VALVES IN THE SYSTEM TO ENABLE CONTINUED OPERATION

THROUGHOUT ALL PHASES, WITH MINIMAL LOCALIZED OUTAGES AS

ALLOWED PER THE PHASING SCHEDULE.

D. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR.

E. PROVIDE ISOLATION VALVES AND PRESSURIZATION CONNECTIONS FOR

NEW PIPES ENTERING AND EXITING ALL PHASING ZONES SUCH THAT THE

NEW PIPING SPECIFIC TO A COMPLETED ZONE MAY BE TESTED ALONE IN

ACCORDANCE WITH THE SPECIFICATIONS PRIOR TO PLACING BACK IN

SERVICE. PIPE TESTING PER SPECIFICATIONS OF EACH ZONE SHALL BE

INCLUDED IN THE ALLOCATED PHASING TIME FRAME FOR EACH PHASING

ZONE.

F. ALL CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND

CLEANING OF THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS

SHALL OCCUR BETWEEN THE WORK HOURS NOTED FOR EACH PHASING

ZONE, UNLESS SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY

THE VHA COR. ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS

NOTED "N/A" MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE

FOOTNOTED RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING

DOWNSTREAM SYSTEMS IN SERVICE.

G. UNLESS OTHERWISE NOTED, NEIGHBORING PHASING ZONES WITH

SIMILAR ALLOWABLE WORK HOURS MAY BE COMPLETED

SIMULTANEOUSLY PROVIDED 2 WEEK PRIOR WRITTEN NOTICE IS GIVEN

TO THE VHA COR.

H. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE

PHASING ZONES OR AFFECTED WORK AREA(S) DURING WORK HOURS.

REFER TO SPECIFICATIONS 01 35 26 FOR BARRIER AND OTHER

REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS. COORDINATE

BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA COR AND THE

VHA INFECTION CONTROL OFFICER. ICRA CLASSIFICATIONS IN PHASING

SCHEDULE ARE FOR INITIAL REFERENCE ONLY. COMPLETE ICRA PERMIT

FOR EACH WORK AREA IN CONSULTATION WITH THE VHA FOR OFFICIAL

CLASSIFICATIONS PRIOR TO START OF WORK.

I. NO WORK SHALL OCCUR DURING THE TWO WEEKS PER YEAR DURING A

JCAHO INSPECTION.

J. PROVIDE SMOKE TIGHT SEPARATION BETWEEN ACTIVE PHASING ZONES

AND ADJACENT OCCUPIED AREAS. VERIFY INTEGRITY OF EXISTING

SMOKE PARTITIONS. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS

TO MAINTAIN SMOKE SEPARATION WHERE EXISTING SEPARATIONS IS

COMPROMISED OR NON-EXISTING, IN ACCORDANCE WITH

SPECIFICATIONS. ADDITIONALLY PROVIDE 1-HR FIRE PROTECTION IF

SPRINKLERS ARE TO BE IMPAIRED IN THE AREA OF WORK.

1. PROVIDE TEMPORARY BYPASS FOR DOMESTIC WATER HEATERS TAKEN

OUT OF SERVICE FOR MORE THAN 4 HOURS. ALLOCATE MANPOWER AS

REQUIRED TO PERFORM BYPASS SWITCHOVERS AND FINAL TIE-INS TO

STEAM SYSTEM WITHIN A 4-HOUR SHUTDOWN WINDOW.

2. PROVIDE TEMPORARY CONDENSATE PUMP FOR DURATION OF

CONDENSATE PUMP REPLACEMENT. INCLUDE TEMPORARY POWER

PROVISIONS AS NECESSARY ALONG WITH SUPERVISION.

3. PERFORM HW HX AND HW PUMP REPLACEMENTS, AND/OR STEAM PIPING

REPLACEMENTS TO HW HXs, SUCH THAT HW FROM AT LEAST ONE HX IS

AVAILABLE TO THE HW LOOP WITHOUT INTERRUPTION FOR MORE THAN 4

HOURS, UNLESS PERFORMED FROM JUNE THROUGH SEPTEMBER,

INCLUSIVE.

4. PROVIDE TEMPORARY BYPASS FOR STEAM MAINS PASSING THROUGH

THE PHASING ZONE TO DOWNSTREAM EQUIPMENT, SUCH THAT

DOWNSTREAM MAINS REMAIN IN SERVICE WITHOUT INTERRUPTION FOR

MORE THAN 4 HOURS.

5. PROVIDE TEMPORARY BYPASS TO AHU HEATING COIL AND HUMIDIFIER

SUCH THAT STEAM IS AVAILABLE TO THE UNIT WITHOUT INTERRUPTION

FOR MORE THAN 4 HOURS. HEATING COIL MAY BE TAKEN OFFLINE FOR

LONGER IF PERFORMED FROM JUNE THROUGH SEPTEMBER, INCLUSIVE.

6. OVERALL ZONE MUST STAY IN CONTINUED OPERATION. PROVIDE

TEMPORARY BARRIERS AROUND LOCAL AREAS OF WORK OR UTILIZE

HEPA CARTS. COORDINATE WITH SITE IN WRITING AT LEAST ONE WEEK

IN ADVANCE OF START IN A NEW LOCATION TO FACILITATE RELOCATION

OF PERSONNEL AND EQUIPMENT BY THE SITE AS NEEDED.

7. PERFORM TIE-INS OF NEW RADIANT CEILING PANELS INTO EXISTING HW

LOOP SUCH THAT HW SERVICE TO AREAS BEYOND THE ACTIVE PHASING

ZONE IS NOT INTERRUPTED FOR MORE THAN 4 HOURS, UNLESS

PERFORMED FROM JUNE THROUGH SEPTEMBER, INCLUSIVE.

8. MAXIMUM ALLOWABLE STERILIZER DOWNTIME IS 4 HOURS. OTHERWISE,

CONTRACTOR SHALL PROVIDE TEMPORARY CLEAN STEAM GENERATOR

TO MAINTAIN OPERATIONS, INCLUDING ALL REQUIRED CONNECTIONS,

POWER, ETC.

9. PERFORM WORK IN ONE INPATIENT ROOM AT A TIME AND ONLY DURING

DAY HOURS AS SCHEDULED TO MINIMIZE DISTURBANCE TO RESIDENTS.

COORDINATE WITH SITE IN WRITING AT LEAST ONE WEEK IN ADVANCE OF

START IN A NEW ROOM TO FACILITATE RELOCATION OF RESIDENTS,

PERSONNEL, AND EQUIPMENT BY THE SITE AS NEEDED.

PHASING GENERAL NOTES

PHASING SCHEDULE FOOTNOTES

MECHANICAL

ROOM

BA10

MECHANICAL

ROOM

BB12

STORAGE,

GENERAL /

CAGE

BE01E

DAV

STORAGE /

CAGE

BE01G

POLICE

TRAINING

BE01D

MECHANICAL

ROOM

BE01F

ELEVATOR

PIT

BE01C

ELEC

BB15M

STAIR

FB

OFFICE

BB15G

OFFICE

BB15H

OFFICE

BB15I

OFFICE

BB15J

UTILITY

SYSTEMS

SHOP

BB15D

RESTROOM

BA15A

STAIR-2

AB-2

ELECTRICAL

RM

BA13

ELEV.-2

S4-2

ELEV.-2

P3-2

ELEV.-2

P2-2

SUB-BASEMENT

SB01

STORAGE

BA10A

ELECTRICAL

CLOSET

BC07

STAIR-2

CB-2

STAIR-2

BB-2

SIGN SHOP

BB05

ELEV.-2

F5-2

MENS

SHOWER

BA05B

MENS

RESTROOM

BA05A

CLOSET

BC08A

STAIR-2

DB-2

HVAC

BC11

CANTEEN

SERVICE

STORAGE

BB08

CANTEEN

OFFICE

BB08A

MAIL ROOM

BA06

OFFICE

BA06A

STORAGE

BA04

FIRE CLOSET

BA01

EMERGENCY

WHEELCHAIR

BB03

ELECTRICAL

CLOSET

BB07

STORAGE

A&MM

BB09

STORAGE,

EQUIPMENT

BB13A

MECHANICAL

ROOM

BE01I

ELEVATOR

PIT

BE01J

STORAGE,

EQUIPMENT /

CAGE

BE01H

MECHANICAL

ROOM

BE01B

STAIR

EB

STORAGE,

FILE RM /

CAGE

BE01A

STORAGE,

EQUIPMENT

BE01

STORAGE,

EQUIPMENT /

CAGE

BE01K

STORAGE,

EQUIPMENT /

CAGE

BE01M

MACHINE

SHOP

BA20

PATRIOT

STORE

STORAGE

BB06

FIRE ALARM

ROOM

BB04

MENS

LOCKER

ROOM STAFF

ONLY

BA05

CANTEEN

STORAGE

BA03

CREDIT

UNION

OFFICE

BC05

STORAGE

CLOSET

BC03

PATRIOT

STORE

BC02

RESTROOM,

ADA

BC06

ELEVATOR

LOBBY

--2

DINING

ROOM VCS

BC04

CANTEEN

BC01

HAC

STORAGE

BB16

HAC

BB13

STORAGE

BB15B

STORAGE

BB15K

STORAGE

BA15

PAINT SHOP

BA16

ELECTRICAL

SHOP

BA17

COMPUTER

ROOM

BB11

FIRE CLOSET

BB14

PLUMBING

SHOP

BA18

CARPENTER

SHOP

BA21

LOCKSMITH

BA22

CRAWL

SPACE

BB16A

CREDIT

UNION

MANAGER

OFFICE

BC10A

CREDIT

UNION

OFFICE

BC08

CREDIT

UNION

BC10

MECHANICAL

ROOM

BA11

STORAGE/EQUIPMENT

BA11A

HOUSEKEEPING

SHOP

BB15A

STORAGE,

WARD

SUPPLIES

BB15

STORAGE,

EQUIPMENT /

CAGE

BE01O

STORAGE,

GENERAL /

CAGE

BE01N

STORAGE,

GENERAL /

CAGE

BE01L

STORAGE,

CREDIT

UNION /

RESTRICTED

AREA

BC12

FREEZER

BC01A1

COOLER

BC01A

BIO-MED &

TELECOM

TECHNICIAN

BA02

MECHANICAL

BB15F

PLAN SOUTHEAST WING NOT IN SCOPE.

B.A.1

B.A.4

CORRIDOR

BA1

CORRIDOR

BA2

ROOM

BB01

CORRIDOR

BC1

B.B.2

B.B.1

B.C.2

B.C.1

B.B.3

B.E.3

B.E.1

B.A.3

B.A.2

INCLUDE SUB-BASEMENT

PIPING IN THIS PHASE.

B.B.4

CRAWLSPACE

BC12A

EXISTING

STEP 1

STEP 2

STEP 3A

STEP 3B,

3C, etc.

STEP 4

6" MPS MAIN MPS BRANCH, SIZE VARIES

NEW PARALLEL 6" MPS MAIN

TERMINATE IN CAPPED LINE-SIZE VALVES

EXISTING MPS MAIN AND

BRANCHES REMAIN IN SERVICE

BRIEF COORDINATED SHUTDOWN OF

MPS SYSTEM NOT TO EXCEED 8 HOURS

AND ON WEEKENDS

CUT LINE-SIZE VALVES INTO EXISTING BRANCHES

ISOLATE BRANCH FROM EXISTING MAIN

EXISTING MPS MAIN AND REMAINING

BRANCHES REMAIN IN SERVICE

CONNECT BRANCH TO NEW LIVE PARALLEL MAIN DURING BRIEF

COORDINATED SHUTDOWN OF BRANCH NOT TO EXCEED 8 HOURS AND

ON WEEKENDS.

REPEAT STEP 3A FOR REMAINING BRANCHES

BRANCHES AND NEW PARALLEL MAIN REMAIN

IN SERVICE

INSTALL NEW 6" MAIN WHILE ISOLATED

MEDIUM PRESSURE STEAM BASEMENT MAIN PIPING PHASING PLAN

GENERAL: DIAGRAMS BELOW ARE FOR GENERAL PHASING CONCEPT ONLY. REFER TO MECHANICAL PLANS, DETAILS, AND SPECIFICATIONS FOR SPECIFIC PIPE ACCESSORIES, SIZES, QUANTITIES, AND ROUTING REQUIREMENTS.

B.E.1

PHOTOS OF POSSIBLE CONTRACTOR ENTRANCE FOR LARGE PIPE SECTIONS SHOWN FOR

REFERENCE ONLY.

TYP

00KEYNOTES

KEY PLAN

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:4

A

M

GC101

BASEMENT PHASING PLAN REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

64'32'16'8'4'0'

1/16" = 1'-0"

BASEMENT PHASING PLAN1

PHASING GENERAL NOTES

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REF SPECIFICATION 01 35 26.

2. TYPICAL FOR ALL WELDING WORK WITHIN PHASING ZONES: REF

SPECIFICATION 01 35 26 HOT WORK REQUIREMENTS.

3. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON PLANS FOR GENERAL GUIDANCE ONLY.

SUBMIT PROPOSED FINAL LOCATIONS, TYPES, CONSTRUCTIONS,

DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH PHASING PLAN FOR VHA

APPROVAL PRIOR TO START OF WORK. COMPLY WITH SPECIFICATION 01

35 26 AND APPLICABLE REQUIREMENTS OF INTERIM LIFE SAFETY

MEASURE (ILSM) EVALUATION (SPECIFICATION SECTION 01 00 02) AS

COMPLETED FOR EACH AREA AND PHASE OF WORK.

A. PHASING PLANS HEREIN ARE INTENDED FOR GENERAL GUIDANCE AND

RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, FOR REVIEW AND APPROVAL

BY THE VHA PRIOR TO COMMENCING WORK.

B. ANY CONCERNS OR OBJECTIONS TO MEETING ALL PHASING

REQUIREMENTS HEREIN MUST BE PROVIDED IN WRITING PRIOR TO

BIDDING. OTHERWISE, THE AWARDED CONTRACTOR IS RESPONSIBLE

FOR MEETING ALL REQUIREMENTS, OR MAKING ALTERNATIVE

ARRANGEMENTS TO MEET THE INTENT OF THE REQUIREMENTS TO THE

SATISFACTION OF THE VHA COR, AT NO ADDITIONAL COST TO THE

GOVERNMENT.

C. A TOTAL SYSTEM OUTAGE OF UP TO 8 HOURS MAY BE SCHEDULED WITH

THE VHA COR ON A WEEKEND BETWEEN 6 PM AND 6 AM TO INITIALLY CUT

IN VALVES IN THE SYSTEM TO ENABLE CONTINUED OPERATION

THROUGHOUT ALL PHASES, WITH MINIMAL LOCALIZED OUTAGES AS

ALLOWED PER THE PHASING SCHEDULE.

D. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR.

E. PROVIDE ISOLATION VALVES AND PRESSURIZATION CONNECTIONS FOR

NEW PIPES ENTERING AND EXITING ALL PHASING ZONES SUCH THAT THE

NEW PIPING SPECIFIC TO A COMPLETED ZONE MAY BE TESTED ALONE IN

ACCORDANCE WITH THE SPECIFICATIONS PRIOR TO PLACING BACK IN

SERVICE. PIPE TESTING PER SPECIFICATIONS OF EACH ZONE SHALL BE

INCLUDED IN THE ALLOCATED PHASING TIME FRAME FOR EACH PHASING

ZONE.

F. ALL CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND

CLEANING OF THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS

SHALL OCCUR BETWEEN THE WORK HOURS NOTED FOR EACH PHASING

ZONE, UNLESS SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY

THE VHA COR. ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS

NOTED "N/A" MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE

FOOTNOTED RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING

DOWNSTREAM SYSTEMS IN SERVICE.

G. UNLESS OTHERWISE NOTED, NEIGHBORING PHASING ZONES WITH

SIMILAR ALLOWABLE WORK HOURS MAY BE COMPLETED

SIMULTANEOUSLY PROVIDED 2 WEEK PRIOR WRITTEN NOTICE IS GIVEN

TO THE VHA COR.

H. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE

PHASING ZONES OR AFFECTED WORK AREA(S) DURING WORK HOURS.

REFER TO SPECIFICATIONS 01 35 26 FOR BARRIER AND OTHER

REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS. COORDINATE

BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA COR AND THE

VHA INFECTION CONTROL OFFICER. ICRA CLASSIFICATIONS IN PHASING

SCHEDULE ARE FOR INITIAL REFERENCE ONLY. COMPLETE ICRA PERMIT

FOR EACH WORK AREA IN CONSULTATION WITH THE VHA FOR OFFICIAL

CLASSIFICATIONS PRIOR TO START OF WORK.

I. NO WORK SHALL OCCUR DURING THE TWO WEEKS PER YEAR DURING A

JCAHO INSPECTION.

J. PROVIDE SMOKE TIGHT SEPARATION BETWEEN ACTIVE PHASING ZONES

AND ADJACENT OCCUPIED AREAS. VERIFY INTEGRITY OF EXISTING

SMOKE PARTITIONS. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS

TO MAINTAIN SMOKE SEPARATION WHERE EXISTING SEPARATIONS IS

COMPROMISED OR NON-EXISTING, IN ACCORDANCE WITH

SPECIFICATIONS. ADDITIONALLY PROVIDE 1-HR FIRE PROTECTION IF

SPRINKLERS ARE TO BE IMPAIRED IN THE AREA OF WORK.

TYP

PLAN SOUTHEAST WING NOT IN SCOPE.

MRI ROOM

1E21

MRI

CONTROL

ROOM

1E23

CT OFFICE

1E17A

ULTRASOUND

ROOM

1E09

OFFICE

1E08

TECHNICIAN

WORKSTATION

1E06

LAUNDRY/STORAGE

1E35

WOMENS

LOCKER

ROOM

1E30

CHIEF OF

RADIOLOGY

1E28

OFFICE

1E26

BONE

DENSITOMETRY

1E25

RADIOLOGY

RECEPTION

1E24A

WOMENS

VETERANS

HEALTHCARE

OFFICE

1D07

HBOC

OFFICE

1D06

RESPIRATORY

THERAPY

1D12

SOCIAL

WORKER

OFFICE

1D17

OFFICE

1D18

CRNP RM

1D24

EXAM/OFFICE

1D30

EXAM

1D32

EXAM/OFFICE

1D33

OFFICE

1D35

AUDIOLOGY

CLINIC

1D37

AUDIOLOGY

1D39

EXAM

1D36

EXAM

1D34

EXAM

1D31

EXAM

1D28

PACT CARE

MANAGER

OFFICE/CRASH

CART

1D27

STAFF

BREAK

ROOM

1D20

EQUIPMENT

RM

1D14A

CLERK

WORKSTATION

1D14

WAITING

1D08

CHEST RM

1E05

ACUTE LONG

TERM CARE

CHIEF

OFFICE

1G19B

ACUTE &

LONG TERM

CARE

SERVICE &

OUTPATIENT

SERVICE

1G19

OFFICE

1G19A

HOMELESS

COORDINATOR

OFFICE

1G14B

HOMELESS

COORDINATOR

OFFICE

1G14A

EXAM RM

1F57

EXAM RM

1F56

EXAM RM

1F55

EXAM RM

1F46

OFFICE

1E35C

VETERANS

BENEFITS

OFFICE

1E34A

DAV

VETERANS

BENEFITS

1E34 PATIENT

CLOTHING

1E35A

OXYGEN

STORAGE

1E38SOAP ROOM

1E36A

STAIR

A1-2

MORGUE

1E37

MECHANICAL

ROOM

1E37A1

STAFF

RESTROOM

1E37A2

RADIOLOGY

SUPERVISOR

1E29

RESTROOM,

ADA

1E11B

STORAGE

1E11A

AUTOPSY

1E37A

FILM

STORAGE

1E39

MEDS

1E16

MRI

EQUIPMENT

ROOM

1E20

RESTROOM,

ADA

1E14

R&F RM #2

1E11

LINEN CHUTE

COLLECTION

AREA

1E27

R&F RM #1

1E07

ELEV.

2B61

STORAGE

1E13ELECTRICAL

CLOSET

1E15

EXAM/OFF

1D16

RESTROOM

1D23

STAFF

RESTROOM,

ADA

1D21

EXAM/OFFICE

1D15

STAFF

RESTROOM

1D10A

PULMONARY

FUNCTION

LAB

1D10

VFW

SERVICE

OFFICE

1D04

OFFICE

1D11

VETERANS

BENEFITS

COUNSELING

1D09

PSYCHOLOGIST/

NEUROPSYCHOLOGIST

OFFICE

1D05

FAMILY

RESTROOM,

ADA

1D02

FAMILY

RESTOOM,

ADA

1D01

ELEC

1D38

AUDIOLOGY

TECHNICIAN

OFFICE

1D25

HAC

1D22

STAIR

D1-2

DIRTY

UTILITY

1D26

ELEV.

2B58

ELECTRICAL

CLOSET

1E32

VLER OFFICE

1E31

CBOC RM

1E33

RESTROOM,

ADA

1E03B

CPAC

CUSTOMER

SERVICE

1E01

FIRE CLOSET

1E02

EXAM

1E03C

CASHIER

1F02

OFFICE

1F06

PHARMACY

SERVICE

ADMIN.

1F05

OFFICE

1F03

OFFICE

1F04

OFFICE

1F03A1

OFFICE

1F03A

PHARMACY

CHIEF

1F05A

CONFERENCE/

BREAK RM

1F07A

STAIR

C1-2

CLEAN

UTILITY

1A35

SOILED

UTILITY

1A33

MED RM

1A34

EXAM/OFF.

1A29

EXAM

1A32

EXAM

1A24

EXAM

1A21 OXYGEN

STOR.

1A12

EXAM/OFFICE

1A26

STAIR

F1-2

ELEC CL

1A12A

CLOSET

1A19A

EXAM

1A14

EXAM

1A15

EXAM

1A13

EXAM

1A28

EXAM

1A22

EXAM/OFFICE

1A23

EMPTY O2

CYLINDERS

1A07

MENS

RESTROOM,

ADA

1G18

HOMELESS

CASE

MANAGER

OFFICE

1G14C

COPY

1G16

WOMENS

RESTROOM,

ADA

1G17

ELEC

CLOSET

1G19C ROOM

1G12A

ON-CALL

1A19

PATIENT

ADVOCATE

OFFICE

1A17

OFFICE

1A17A

UNION

OFFICE

1G15

WAITING

1A38

RESTROOM,

ADA

1A39

STAFF

RESTROOM,

ADA

1A40 CONFERENCE

ROOM

1A41

EXAM

1G12B

SECRETARY

1G12C

EXAM

1G12G

EXAM

1G12E

OXYG.

1G12F

SU

1G12H

EXAM

1A30

EXAM

1A31

STAFF RM

1A36

MED RM

1A10A

NOD

1A03D

OPERATOR

1A03C

STAFF

RESTROOM,

ADA

1A03B

OFFICE

1A03A

ROI OFF.

1A18

CLEAN HOLD

1A10B

OFFICE

1A16

AOD/

STORAGE

1A03E

HAC

1G05

ELEC

1G03

MENS

RESTROOM,

ADA

1G08

OFFICE

1F54

PATIENT

TOILET

1F43

OFFICE

1F47

EXAM

1F48

OFFICE

1F44

RESTROOM,

ADA

1F48A

EXAM

1F58

ELEC

1F62

ELEC

1F60

EXAM

1F49

PSYCHOLOGIST

OFFICE

1F66

EXAM

1F64

EXAM

1F61

HAC

1F73

EXAM

1F71

STAIR

E1-3

MECHANICAL

ROOM

1G10

VAULT

1F10D

PHARMACY

OFFICE

1F68

CONSULT

COORDINATOR

OFFICE

1F67

STORAGE

1F10E

MECHANICAL

RM

1F69

MECH

1F69A

STAFF

CORRIDOR

1D3

TRIAGE

1A04

MEDS

1F70

CLEAN STOR.

1F72

EXAM

1F63

EXAM

1F65

SOIL. LINEN

1F51

HOMELESS

COORDINATOR

SUITE

1G14

CARDIOLOGY

STORAGE

1E03E

EXAM

1E03D

EXAM

1E03F EXAM/TREATMENT

1E03G

STAIR

B1-2

RADIOLOGY

WAITING

1E2

PREP ROOM

1E22

RADIOLOGY

CHECK-IN

1E24

ROI

1A20

UCC

1A05

HAC

1F10C

EXAM

1F50

RX PICK-UP

1F08

BED

1A09D

BED

1A09C

BED

1A09B

BED

1A09A

MULTI-PURPOSE

RM

1G02A

DETECTIVE

INTERVIEW

ROOM

1G02G

OPERATIONS

1G02E

POLICE

RECEPT.

1G02

CARDIOLOGY

LAB

1E03

CAT SCAN

1E12

CONTROL

RM

1E17

LOCKER

ROOM

1E18

LOCKER

ROOM

1E19

MAIL

1F01

ELEV.

2B60

ELEV.

2B59

ELEV.

P6-2

ELEV.

P7-2

COFFEE

SHOP

1G01

WAITING

1F09

ER WAITING

1A01

CENTRAL

REGISTRATION

1A03

NOURISHMENT

1A08

NURSE

STATION

1A10

DISCHARGE

1A37A

CHECK-OUT

1A37

DISCHARGE

1A37B

RESTROOM,

ADA

1A11

CONSULT

1F08A

CHECK-IN

1F42

ANTE/IV

ROOM

1F10A

PHARMACY

1F10

STAFF/

CONFERENCE

1F53

CONFERENCE

ROOM

1F53B

CHECK-OUT/BLUE

TEAM CLERK

1F45

CHECK-OUT/

BLUE TEAM

CLERK

1F43

OFFICE

1G07EXAM

1G12I

OFFICE

1G06

CORRIDOR

1A1

REGISTRATION

1A02

CARDIOLOGY

WORKSTATIONS

1E03A

CARDIOLOGY

WORKSTATIONS

1E03A1

CORRIDOR

148B

COMPENSATION

& PENSION

1G12

RECEPTION

1G12D

CORRIDOR

118C

CORRIDOR

COPIER

ALCOVE

1D27A

CORRIDOR

120B

CLERK/OFFICE

1D14

ULTRASOUND

ROOM

1E10

ULTRASOUND

ROOM

128A

WASH ROOM

1E36

WASH ROOM

141A

HALLWAY

187D

ARMORY

1G02F1

LOCKERS

1G02F

RX

DROP-OFF

1F08B

WOMENS

RESTROOM,

ADA

1G09

OPERATIONS

1G02D

EXAM/OFFICE

1A27

CORRIDOR

1E1

ROOM

1F59

Space

198E

UNKNOWN

1D29

1.E.1

1.E.2

1.D.3

1.G.1

1.G.2

1.F.1

1.F.2

1.F.3

TYP

00KEYNOTES

KEY PLAN

P la n N or th

True North

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C U s e rs

\V M

E

\D o c u m e n ts

\2 .1

A lt o o n a S te a m

V

E G

M E

P R m b ib le H

X D

.r v t

/9

/2

:2

:5

A

M

GC111

1ST FLOOR PHASING PLAN REPLACE STEAM SYSTEMS

2907 PLEASANT VALLEY BLVD ALTOONA, PA 16602

503-19-112

06/09/2022 MB RL

100% CONSTRUCTION

DOCUMENT

VEG 20.14

64'32'16'8'4'0'

1/16" = 1'-0"

1ST FLOOR PHASING PLAN1

PHASING GENERAL NOTES

1. PROVIDE INFECTION CONTROL BARRIER AT APPROXIMATE LOCATION

SHOWN. REF SPECIFICATION 01 35 26.

2. PROVIDE TEMPORARY CONSTRUCTION PARTITION AT APPROXIMATE

LOCATION SHOWN FOR SMOKE SEPARATION OF PHASING ZONES IF

COMPLETED SEPARATELY. PROVIDE DOORS TO MATCH EXISTING DOOR

LOCATIONS BETWEEN PHASE AREAS. PARTITIONS SHALL ALSO COMPLY

WITH ICRA REQUIREMENTS. REF SPECIFICATION 01 35 26.

3. INFECTION CONTROL BARRIERS AND TEMPORARY CONSTRUCTION

PARTITIONS ARE INDICATED ON PLANS FOR GENERAL GUIDANCE ONLY.

SUBMIT PROPOSED FINAL LOCATIONS, TYPES, CONSTRUCTIONS,

DOORWAYS, EXIT ROUTES, SIGNAGE, ETC WITH PHASING PLAN FOR VHA

APPROVAL PRIOR TO START OF WORK. COMPLY WITH SPECIFICATION 01

35 26 AND APPLICABLE REQUIREMENTS OF INTERIM LIFE SAFETY

MEASURE (ILSM) EVALUATION (SPECIFICATION SECTION 01 00 02) AS

COMPLETED FOR EACH AREA AND PHASE OF WORK. REFER TO GI SHEET

SERIES FOR EXISTING LIFE SAFETY PLANS INCLUDING EXISTING WALL

RATINGS AND EXITS ROUTES.

A. PHASING PLANS HEREIN ARE INTENDED FOR GENERAL GUIDANCE AND

RESOURCE ALLOCATION. FINAL ZONE PHASING ORDER WILL BE

DISCUSSED IN THE PRECONSTRUCTION MEETING FOLLOWING CONTRACT

AWARD. CONTRACTOR SHALL SUBMIT A PHASING PLAN WITH DETAILED

METHOD OF PROCEDURE FOR EACH PHASE, FOR REVIEW AND APPROVAL

BY THE VHA PRIOR TO COMMENCING WORK.

B. ANY CONCERNS OR OBJECTIONS TO MEETING ALL PHASING

REQUIREMENTS HEREIN MUST BE PROVIDED IN WRITING PRIOR TO

BIDDING. OTHERWISE, THE AWARDED CONTRACTOR IS RESPONSIBLE

FOR MEETING ALL REQUIREMENTS, OR MAKING ALTERNATIVE

ARRANGEMENTS TO MEET THE INTENT OF THE REQUIREMENTS TO THE

SATISFACTION OF THE VHA COR, AT NO ADDITIONAL COST TO THE

GOVERNMENT.

C. A TOTAL SYSTEM OUTAGE OF UP TO 8 HOURS MAY BE SCHEDULED WITH

THE VHA COR ON A WEEKEND BETWEEN 6 PM AND 6 AM TO INITIALLY CUT

IN VALVES IN THE SYSTEM TO ENABLE CONTINUED OPERATION

THROUGHOUT ALL PHASES, WITH MINIMAL LOCALIZED OUTAGES AS

ALLOWED PER THE PHASING SCHEDULE.

D. DO NOT PROCEED WITH WORK IN THE NEXT PHASE UNTIL WORK IN THE

PRECEDING PHASE HAS BEEN COMPLETED AND ACCEPTED IN WRITING

BY THE VHA COR.

E. PROVIDE ISOLATION VALVES AND PRESSURIZATION CONNECTIONS FOR

NEW PIPES ENTERING AND EXITING ALL PHASING ZONES SUCH THAT THE

NEW PIPING SPECIFIC TO A COMPLETED ZONE MAY BE TESTED ALONE IN

ACCORDANCE WITH THE SPECIFICATIONS PRIOR TO PLACING BACK IN

SERVICE. PIPE TESTING PER SPECIFICATIONS OF EACH ZONE SHALL BE

INCLUDED IN THE ALLOCATED PHASING TIME FRAME FOR EACH PHASING

ZONE.

F. ALL CONTRACTOR WORK, INCLUDING SET-UP, TAKE-DOWN, AND

CLEANING OF THE AREA TO THE PREVIOUS OCCUPIED CONDITIONS

SHALL OCCUR BETWEEN THE WORK HOURS NOTED FOR EACH PHASING

ZONE, UNLESS SPECIFICALLY AUTHORIZED OTHERWISE IN WRITING BY

THE VHA COR. ZONES SUCH AS MECHANICAL ROOMS WITH WORK HOURS

NOTED "N/A" MAY BE WORKED IN AT ANY TIME, SUBJECT TO APPLICABLE

FOOTNOTED RESTRICTIONS FOR MINIMIZING DOWNTIME AND KEEPING

DOWNSTREAM SYSTEMS IN SERVICE.

G. UNLESS OTHERWISE NOTED, NEIGHBORING PHASING ZONES WITH

SIMILAR ALLOWABLE WORK HOURS MAY BE COMPLETED

SIMULTANEOUSLY PROVIDED 2 WEEK PRIOR WRITTEN NOTICE IS GIVEN

TO THE VHA COR.

H. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND/OR INFECTION

CONTROL BARRIERS AS APPLICABLE AT BOUNDARIES OF ACTIVE

PHASING ZONES OR AFFECTED WORK AREA(S) DURING WORK HOURS.

REFER TO SPECIFICATIONS 01 35 26 FOR BARRIER AND OTHER

REQUIREMENTS OF APPLICABLE ICRA CLASSIFICATIONS. COORDINATE

BARRIER LOCATIONS AND CONSTRUCTION WITH THE VHA COR AND THE

VHA INFECTION CONTROL OFFICER. ICRA CLASSIFICATIONS IN PHASING

SCHEDULE ARE FOR INITIAL REFERENCE ONLY. COMPLETE ICRA PERMIT

FOR EACH WORK AREA IN CONSULTATION WITH THE VHA FOR OFFICIAL

CLASSIFICATIONS PRIOR TO START OF WORK.

I. NO WORK SHALL OCCUR DURING THE TWO WEEKS PER YEAR DURING A

JCAHO INSPECTION.

J. PROVIDE SMOKE TIGHT SEPARATION BETWEEN ACTIVE PHASING ZONES

AND ADJACENT OCCUPIED AREAS. VERIFY INTEGRITY OF EXISTING

SMOKE PARTITIONS. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS

TO MAINTAIN SMOKE SEPARATION WHERE EXISTING SEPARATIONS IS

COMPROMISED OR NON-EXISTING, IN ACCORDANCE WITH

SPECIFICATIONS. ADDITIONALLY PROVIDE 1-HR FIRE PROTECTION IF

SPRINKLERS ARE TO BE IMPAIRED IN THE AREA OF WORK.

LOADING

DOCK /

CORRIDOR

2A3

FOOD

SERVICE

KITCHEN

2A04

BREAK RM

2A07

INGREDIENT

STORAGE

2A09

OFFICE

2A10

VOLUNTEER

LOUNGE &

VOLUN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .