50-49500-24-01989_50-49500-24-01989 Items List (1).xlsx.XLSX

XLSX spreadsheet 19 KB Posted

Attached to
24-C12 FABRIC HANGAR/PAYLOAD FACILITY – 25-C05 HORIZONTAL LAUNCH AREA SOUTH HANGAR TAXIWAY
Solicitation number
50-49500-24-01989
Issued by
San Juan County, New Mexico

About this file

This is a detailed items list or bid schedule for what appears to be an airport construction project involving apron, hangar pad, and taxiway improvements. The project scope encompasses 78 line items divided into several major sections including Apron & Hangar Pad construction, Drainage & Sanitary Sewer Systems, Taxiway improvements, and Temporary Structures. Key elements include the construction of a 156' x 156' fabric hangar, modular office and restroom units, extensive pavement work including cement concrete and asphalt surfaces, installation of water lines, drainage systems, and various site improvements such as fencing, gates, and markings.

The document includes three pre-set allowances: $10,000 for underground utilities relocation, $60,000 for owner's allowance during construction, and $75,000 for testing. Mobilization, insurance, and bonds are set at $162,500, while demobilization and closeout documentation is fixed at $51,500. The bid requires quantities for various materials including approximately 12,820 cubic yards of unclassified excavation, 32,730 square yards of subgrade preparation, and significant amounts of concrete and asphalt paving materials. The total bid amount field is included but not populated in the document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Item No.DescriptionUnitEst. Qty.Bid Unit PriceBid Price
APRON & HANGAR PAD
1Airport Safety and Security, CompleteLS1
2Clearing and GrubbingAC4
3Unclassified Excavation, CompleteCY9700
4Temporary Pollution / Erosion ControlLS1
5Subgrade Preparation, 24" Complete in placeSY12850
6Subgrade Preparation, 12", Parking Lot, Complete in placeSY4360
7Cement Treated Subgrade 6", Complete in placeSY12850
8Crushed Aggregate Base Course, 8", Parking Lot, Complete in placeCY970
9Asphalt Mix, 4", Parking Lot, Complete in placeTON1940
10Asphalt Base Course, 5", Complete in placeTON2910
11Asphalt Base Course, 6", Complete in placeTON1000
12Cement Concrete Pavement, 13", Complete in placeCY3620
13Cement Concrete Pavement, 10", Complete in placeCY800
14Bituminous Prime CoatGAL7750
15Concrete for Miscellaneous Structures, Hangar Foundation, include reinforcing, Complete in placeCY55
16Markings, Complete in placeSF900
17Gravel, 3" Deep, Complete in placeSY15040
18Concrete Sidewalk, Complete in placeSF804
19Tie Downs, Complete in placeLS1
20High Game Fence, including man-gates, complete in placeLF500
21Automatic Rolling Gate, card reader and closure loops, complete in placeLS1
2212" Water line, include all fitting, T&B and Compaction, Complete in placeLF800
2312" Gate Valve with Valve Box, Complete in PlaceEA1
246" Water line, include all fitting, T&B and Compaction, Complete in placeLF480
256" Gate Valve with Valve Box, Complete in PlaceEA1
262" Water line (HDPE), include all fittings, complete in placeLF160
272" Water service, including tapping service saddle, corp stop and angle valve (2), complete in placeEA1
28Fire Hydrant Assembly, include valve, valve box, complete in placeEA1
292" Air-Vacuum Station, include manhole & cover, Complete in placeEA1
30Connection to existing System, Complete in placeLS1
31Base Course, Road Patch, complete in placeSY15
32Adjust Manhole ring and cover to grade, complete in placeEA1
DRAINAGE & SANITARY SEWER SYSTEMS
334" Diameter PVC SDR35 Sewer Pipe, complete in placeLF280
34Double Clean-out, both directions, complete in placeEA1
35Service connections (stub-outs) for modular units, hangar, complete in placeEA5
36Single Clean-out, hangar facility, complete in placeEA1
371500 Gallon HDPE Septic Tank, Compete in placeEA1
38Connection to existing sewer system, 8" PVC, saddle and fittings, complete in placeEA1
39Duraslot trench drain and pipe system, with concrete encasement, including grate, cleanout, connections, complete in place.LF152
406" HDPE Storm Drain Pipe (n=0.012), complete in placeLF252
418" HDPE Storm Drain Pipe (n=0.012), complete in placeLF510
421000 Gallon 2 Baffle Sand/Oil Separator, complete in placeEA1
43In-Line drop inlets, complete in placeEA2
444' Diameter Manhole, complete in placeEA3
45Connection to existing system, build manhole over existing line, complete in place.LS1
TAXIWAY
46Clearing and GrubbingAC3
47Unclassified Excavation, CompleteCY3120
48Temporary Pollution / Erosion ControlLS1
49Subgrade Preparation, 24" Complete in placeSY12080
50Cement Treated Subgrade 6", Complete in placeSY7800
51Asphalt Mix Pavement Base Course, 5", Complete in placeTON2270
52Cement Concrete Pavement, 13", Complete in placeCY2820
53Bituminous Prime CoatGAL5440
54Crushed Aggregate Base CourseCY720
55Asphalt Mix Pavement 9", Complete in PlaceTON2240
5648" Diameter Culverts Drainage Culverts, include headwalls for a double barrel configuration, Complete in placeLF480
57Markings, Complete in placeSF450
58Relocate existing windsock, including segmented circle, complete in placeEA1
Temporary Structures
59156' x 156' Fabric Hangar (Min R-8-10 Insulation), complete in placeEA1
60Hangar Door, completed in placeEA1
61Personnel Doors, complete in placeEA4
62Termination Bar and Angle Flashing with Sealants, complete in placeLF624
6360' x 24' Office Modular Unit, complete in placeEA1
6424' x 8' Restroom/Shower Modular Unit, complete in placeEA2
65Standard Metal Skirting (Per Modular), complete in placeEA3
66Pressure-Treated Elevated Decking (Includes Steps & Ramps), complete in placeSF960
67Utility Connections for Modular Buildings (Electrical, Plumbing, Sewer), complete in placeLS1
68Interior 6" Metal Stud Framing, complete in placeLF80
69Drywall, Mud, and Tape, complete in placeSF320
70Interior Hollow Metal Doors, complete in placeEA2
71Primer/Paint and Floor Base, complete in placeLS1
Other Project Construction Requirements
72Mobilization, Insurance, and Bonds.LOT1$ 162,500.00$ 162,500.00
73Demobilization and Submittal of All Closeout Documents.LOT1$ 51,500.00$ 51,500.00
74Prepare and Execute Storm Water Pollution Prevention Plan (SWPPP) Compliance per Requirements in
Section C-102, Including All Materials and Labor, Complete in Place, for Duration of Construction Period.LS1
Item No.DescriptionUnitEst. Qty.Bid Unit PriceBid Price
75Construction Staking Services by New Mexico Registered Surveyor.LS1
76Relocation of Underground Utilities Allowance.ALLOW1$ 10,000.00$ 10,000.00
77Owner's Allowance During Construction.ALLOW1$ 60,000.00$ 60,000.00
78Testing Allowance.ALLOW1$ 75,000.00$ 75,000.00
TOTAL BID AMOUNT (Exclusive of New Mexico Gross Receipts Tax) $

File details come from the government source that posted it. Updated .