5 Weekly Progress Report.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Submarine Support Equipment Maintenance Federal contract opportunity
- Solicitation number
- N0060420Q4035
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6 Temporary Services Equipment Transfer.doc | DOC document | |
| 2 DD Form 1149.doc | DOC document | |
| 1 Receipt and Acknowledgement of Training Form.doc | DOC document | |
| Performance Work Statement (PWS).docx | DOCX document | |
| 4 Weekly Status Report.xlsx | XLSX spreadsheet | |
| 3 Delivery Checklists.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Weekly Report
| Submarine Support Equipment Services | ||
| for the USS FRANK CABLE (AS 40) and USS EMORY S. LAND (AS 39) | ||
| (WS- Work Stoppage, P-Parts, X-Cancelled, D-Deferred, C-Completed, CC- Closed, H- Hot List, MP - Material Problems, OK - No Problems) |
Item No. Job Title Contract Price Start Date End Date Revised Date Previous % of Completion Current % of Completion Value of Completed Performance Value of Completed Performance-CFR Remarks Quotation
3.1 Turn-over from Previous Contractor 0.00% 0.00% $ - 0
3.2 Storage 0.00% 0.00% $ - 0 Week 1 of 52
Warehouse Personnel 0.00% 0.00% $ - 0 Week 1 of 52
Power & Utilities 0.00% 0.00% $ - 0 Week 1 of 52
Dispatching / Coordination and Warehouse Management 0.00% 0.00% $ - 0 Week 1 of 52
3.3 Delivery
| 3.5 | Projected Deliveries | ||||
| 1 | HPAC - 30 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 30 Deliveries |
| 2 | Chlorinator/Dechlorinator - 34 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 34 Deliveries |
| 3 | Hydrolancer - 50 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 50 Deliveries |
| 4 | LPAC - 50 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 50 Deliveries |
| 5 | Light Trees - 40 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 40 Deliveries |
| 6 | Industrial Dehumidifiers - 5 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 5 Deliveries |
| 8 | Diesel driven fire pump - 2 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 2 Deliveries |
| 7 | Electric driven fire pump - 2 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 2 Deliveries |
| 8 | Oil filter rig and 2190 TEP - 40 Deliveries | 0.00% | 0.00% | $ - 0 | 0 of 40 Deliveries |
| 9 | Oil filtration man-hours - 500 Manhours | 0.00% | 0.00% | $ - 0 | 0.00 HRS |
| 10 | Man-hours deduction report - 500 Manhours | 0.00% | 0.00% | $ - 0 | 4 HRS |
3.6 Operations
3.6.1 Onsite Support 0.00% 0.00% $ - 0 Week 1 of 52
3.6.2 Check HPAC oil levels 0.00% $ - 0 Week 1 of 52
3.6.3 Check HPAC overflow bottles daily, HAZMAT Disposal (Estimate Only) 0.00% 0.00% $ - 0 Week 1 of 52
3.6.4 Daily checks of fuel level. Fuel, diesel (Estimate 150 gallons per month = 1800 gals) 0.00% 0.00% $ - 0 Week 1 of 52
3.7 Maintenance
3.9 Preventative Maintenance
a. Chlorinators $ - 0
b. Dechlorinators $ - 0
c. High Pressure Air Compressors (HPAC) $ - 0
d. Hydrolancers $ - 0
e. Low Pressure Air Compressors (LPAC) $ - 0
f. Diesel Powered Light Towers $ - 0
g. Diesel Powered Fire Pump $ - 0
h. Electrically Powered Fire Pump $ - 0
i. Industrial Humidifiers $ - 0
| 3.10 | Corrective Maintenance | ||||
| CFR 000 | 0.00% | 0.00% | $ - 0 | N/A |
3.11 Training
3.12 Deliverables
3.12.1 Weekly Status Report 0.00% 1.92% $ - 0 Week 1 of 52
3.12.2 Preventative Maintenance Plan
3.12.3 Report of missing components parts and subassemblies
3.12.4 Inspection
3.12.5 Technical Manuals
3.12.6 Copies of applicable technical manuals, parts manuals and diagnostic manuals for equipment via CD and paper copy
GRAND TOTAL $0.00
| JOB STATUS SUMMARY | |||
| Authorized:: | LPAC | # of Deliveries This Reporting Period | 0 |
| In Progress: | HPAC | # of Deliveries This Reporting Period | 0 |
| Not Started: | HYDROLANCER | # of Deliveries This Reporting Period | 0 |
| Cancelled: | LIGHT TOWER | # of Deliveries This Reporting Period | 0 |
| Complete: | FIRE PUMP | # of Deliveries This Reporting Period | 0 |
| CHLOR / DECHLOR | # of Deliveries This Reporting Period | 0 | |
| OIL FILTER RIG | # of Deliveries This Reporting Period | 0 | |
| Total # of Deliveries Period | 0 |