5 Weekly Progress Report.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Submarine Support Equipment Maintenance Federal contract opportunity
Solicitation number
N0060420Q4035
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Submarine Support Equipment Maintenance, newest first.
File Type Posted
6 Temporary Services Equipment Transfer.doc DOC document
2 DD Form 1149.doc DOC document
1 Receipt and Acknowledgement of Training Form.doc DOC document
Performance Work Statement (PWS).docx DOCX document
4 Weekly Status Report.xlsx XLSX spreadsheet
3 Delivery Checklists.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Weekly Report

Submarine Support Equipment Services
for the USS FRANK CABLE (AS 40) and USS EMORY S. LAND (AS 39)
(WS- Work Stoppage, P-Parts, X-Cancelled, D-Deferred, C-Completed, CC- Closed, H- Hot List, MP - Material Problems, OK - No Problems)

Item No. Job Title Contract Price Start Date End Date Revised Date Previous % of Completion Current % of Completion Value of Completed Performance Value of Completed Performance-CFR Remarks Quotation

3.1 Turn-over from Previous Contractor 0.00% 0.00% $ - 0

3.2 Storage 0.00% 0.00% $ - 0 Week 1 of 52

Warehouse Personnel 0.00% 0.00% $ - 0 Week 1 of 52

Power & Utilities 0.00% 0.00% $ - 0 Week 1 of 52

Dispatching / Coordination and Warehouse Management 0.00% 0.00% $ - 0 Week 1 of 52

3.3 Delivery

3.5Projected Deliveries
1HPAC - 30 Deliveries0.00%0.00%$ - 00 of 30 Deliveries
2Chlorinator/Dechlorinator - 34 Deliveries0.00%0.00%$ - 00 of 34 Deliveries
3Hydrolancer - 50 Deliveries0.00%0.00%$ - 00 of 50 Deliveries
4LPAC - 50 Deliveries0.00%0.00%$ - 00 of 50 Deliveries
5Light Trees - 40 Deliveries0.00%0.00%$ - 00 of 40 Deliveries
6Industrial Dehumidifiers - 5 Deliveries0.00%0.00%$ - 00 of 5 Deliveries
8Diesel driven fire pump - 2 Deliveries0.00%0.00%$ - 00 of 2 Deliveries
7Electric driven fire pump - 2 Deliveries0.00%0.00%$ - 00 of 2 Deliveries
8Oil filter rig and 2190 TEP - 40 Deliveries0.00%0.00%$ - 00 of 40 Deliveries
9Oil filtration man-hours - 500 Manhours0.00%0.00%$ - 00.00 HRS
10Man-hours deduction report - 500 Manhours0.00%0.00%$ - 04 HRS

3.6 Operations

3.6.1 Onsite Support 0.00% 0.00% $ - 0 Week 1 of 52

3.6.2 Check HPAC oil levels 0.00% $ - 0 Week 1 of 52

3.6.3 Check HPAC overflow bottles daily, HAZMAT Disposal (Estimate Only) 0.00% 0.00% $ - 0 Week 1 of 52

3.6.4 Daily checks of fuel level. Fuel, diesel (Estimate 150 gallons per month = 1800 gals) 0.00% 0.00% $ - 0 Week 1 of 52

3.7 Maintenance

3.9 Preventative Maintenance

a. Chlorinators $ - 0

b. Dechlorinators $ - 0

c. High Pressure Air Compressors (HPAC) $ - 0

d. Hydrolancers $ - 0

e. Low Pressure Air Compressors (LPAC) $ - 0

f. Diesel Powered Light Towers $ - 0

g. Diesel Powered Fire Pump $ - 0

h. Electrically Powered Fire Pump $ - 0

i. Industrial Humidifiers $ - 0

3.10Corrective Maintenance
CFR 0000.00%0.00%$ - 0N/A

3.11 Training

3.12 Deliverables

3.12.1 Weekly Status Report 0.00% 1.92% $ - 0 Week 1 of 52

3.12.2 Preventative Maintenance Plan

3.12.3 Report of missing components parts and subassemblies

3.12.4 Inspection

3.12.5 Technical Manuals

3.12.6 Copies of applicable technical manuals, parts manuals and diagnostic manuals for equipment via CD and paper copy

GRAND TOTAL $0.00

JOB STATUS SUMMARY
Authorized::LPAC# of Deliveries This Reporting Period0
In Progress:HPAC# of Deliveries This Reporting Period0
Not Started:HYDROLANCER# of Deliveries This Reporting Period0
Cancelled:LIGHT TOWER# of Deliveries This Reporting Period0
Complete:FIRE PUMP# of Deliveries This Reporting Period0
CHLOR / DECHLOR# of Deliveries This Reporting Period0
OIL FILTER RIG# of Deliveries This Reporting Period0
Total # of Deliveries Period0