3 Delivery Checklists.doc

DOC document 101 KB Posted

Attached to
Submarine Support Equipment Maintenance Federal contract opportunity
Solicitation number
N0060420Q4035
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Submarine Support Equipment Maintenance, newest first.
File Type Posted
6 Temporary Services Equipment Transfer.doc DOC document
4 Weekly Status Report.xlsx XLSX spreadsheet
2 DD Form 1149.doc DOC document
5 Weekly Progress Report.xlsx XLSX spreadsheet
1 Receipt and Acknowledgement of Training Form.doc DOC document
Performance Work Statement (PWS).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Delivery Checklists

Low Pressure Air Compressor (LPAC)

Item
Initials

E-Procedures/Training product verified received by Ship’s force

LPAC installed in berm

Fuel tank is full

Hoses (100 FT) provided – QTY: 3

Check oil and fuel for presence of water

Temp. Services Equipment Transfer Form filled out & retained

High Pressure Air Compressor (HPAC)

Item
Initials

E-Procedures/Training product verified received by Ship’s force

Log book provided to ship’s force

HPAC installed in berm

HPAC overflow bottle installed in berm

Hoses provided: QTY:

Dogbone provided

Temp. Services Equipment Transfer Form filled out & retained

Chlorinator/DeChlorinator

Item
Initials

Topside chlorination unit

Interlock cable assemblies QTY: 2

Black power cable assemblies (chlorinator unit use) QTY: 2

All cables inspected and tested for shipboard use IAW NSTM Chapter 300

Dechlorinator carry case assembly unit

Jerry Can (5 GAL)

Cap assembly for Jerry Can

Wire braided hose assemblies QTY: 3

Yellow power cord assembly (Dechlorinator unit use)

Hose assemblies – QTY:3 (chlorinator unit: intake, discharge, bypass)

Chemical test kit

Magnet

Temp. Services Equipment Transfer Form filled out & retained

Diesel Fire Pump

Item
Initials

E-Procedures/Training product verified received by Ship’s force

Check oil and fuel for presence of water

Fuel tank is full

Discharge hose

Suction hose

Valve manifold

Suction strainer

Temp. Services Equipment Transfer Form filled out & retained

Diesel Fire Pump

Item
Initials

E-Procedures/Training product verified received by Ship’s force

Discharge hose

Suction hose

Valve manifold

Suction strainer

Temp. Services Equipment Transfer Form filled out & retained

Hydrolance

Item
Initials

E-Procedures/Training product verified received by Ship’s force

Hydrolancing Gun (QTY 1)

Hydrolance Tip (3/8)

Hydrolance Tip (1/16)

Water Hose (100 FT)

Wire Braided Hoses Assy, 100 FT (QTY 2)

Lance (Attached to gun and tip)

Check oil and fuel for presence of water (N/A if electrically powered)

Fuel tank is full (N/A if electrically powered)

Temp. Services Equipment Transfer Form filled out & retained

Item
Initials
Item
Initials
Item
Initials

Attachment (3) – PWS 1814