This is a Special Project Requirements document for Montgomery County, Pennsylvania's Weapons Training Facility Exterior Painting project. The scope of work encompasses a comprehensive restoration of the facility's exterior facade, including repainting of exterior concrete last painted in 2016 and metal siding that has not been painted since the facility's 2007 construction. The project addresses faded paint due to sun exposure, lead dust staining around the dust collector unit, and cracking and spalling of concrete panels. Prime contractors are required to perform all work during regular County business hours of 7:00 A.M. to 3:30 P.M., Monday through Friday, with advance notice and written approval required for any work outside these hours. The contractor must maintain the work site and surrounding area free from waste materials and debris, removing all debris in a timely manner.
The contractor bears responsibility for submitting all applicable permit applications and fees per Plymouth Township's commercial permit requirements and must utilize e-Builder/Unity Construct, the County's construction management software platform, for the duration of the project. Contractor responsibilities include developing and enforcing an OSHA-compliant job site safety plan, maintaining a master project schedule, managing subcontractors, conducting quality assurance, preparing all submittals and pay requests with certified payrolls, providing all means for safe access including personal protective equipment and equipment rentals, and coordinating final inspections and closeout procedures. An allowance for unforeseen conditions is included in the contract sum and controlled by the County, with costs for design, products, delivery, installation, labor, insurance, payroll, taxes, bonding, differing site conditions, and equipment rental eligible for authorization. All products and manufacturers listed are basis of design specifications; substitutions require County approval per established product substitution procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPEC 6588 Montgomery County Weapons Training Facility EXTERIOR PAINTING
SPECIAL PROJECT REQUIREMENTS
1. CONSTRUCTION MANAGEMENT SOFTWARE:
Prime Contractors will utilize e-Builder / Unity Construct, the County’s construction management software platform, for the duration of the project. Tools and processes to be utilized within e-Builder include, but are not limited to, RFI submissions, product submittals, invoicing / payment applications and schedule updates (via Microsoft Project or Primavera P6).
2. PERMITS:
Prime contractors are responsible for the submission of any applicable permit applications, fees and inspections pertaining to their work. Refer to Plymouth Township’s commercial permit requirements.
3. WORK SITE:
All work performed during regular 7:00 A.M. – 3:30 P.M. County business hours (Monday thru Friday). Work may not be performed at other times without 48 hours advanced notice and written approval of the County representative. The work site and surrounding area shall be kept free from accumulation of waste materials and debris during this project. All debris and garbage must be removed from the site by the Contractor in a timely manner.
4. ALLOWANCE:
An allowance for unforeseen conditions is included in the Contract Sum and is controlled by the County. The County shall determine at its sole discretion which, if any, costs it will authorize in writing to be paid from or deducted by this Allowance. The costs (if any) for design, products, delivery, installation, labor, insurance, payroll, taxes, bonding, differing site conditions and equipment rental will be included in any authorization of expenditure of funds from this Allowance.
Funds will be drawn from this Allowance only with the County’s approval. At Contract Closeout, funds remaining in Allowance will be credited to the County.
5. SUBSTITUTIONS:
All products and manufacturers listed are basis of design products. Provide the product as specified or an approved equal per County product substitution procedures.
6. CONTRACTOR RESPONSIBILITIES:
The Contractor will be responsible for daily construction management during work at the site and coordinating all construction activities in cooperation with the County. The Contractor is required to provide all means for safe access including personal protective equipment (PPE), lifts and operators. The Contractor is not permitted to use County equipment. Services include, but are not limited to:
a. Prepare and enforce an OSHA-compliant job site safety plan
b. Maintain a master project schedule
c. Subcontractor selection / management
d. Quality Assurance
e. Progress meetings
f. Daily reports
g. Prepare all pay requests / certified payrolls
h. Prepare all submittals
i. Prepare all shop drawings, stamped by licensed architect / engineer if required
j. Coordinate deliveries
k. Prepare and manage punch list
l. Assist architect / engineer with preparation of close-out manuals and as-built drawings
m. Conduct final inspections in conjunction with the County
n. Ensure timely completion of all work