5-Special Provsions 02785 Chip Seal Coat 02152024 UDOT Spec.pdf

PDF 171 KB Posted

Attached to
UDOT Liquid Asphalt Oil Region 3
Solicitation number
UDOT260236CN
Issued by
Utah

About this file

This document is a Standard Specifications section for Chip Seal Coat applications issued by the Utah Department of Transportation (UDOT). Section 02785 of the 2026 Standard Specifications, effective February 15, 2024, provides comprehensive technical requirements for applying emulsified asphalt followed by chip seal cover material and bituminous flush coat on roadway surfaces. The specification details materials and procedures for both standard and lightweight chip seal applications, including cationic emulsions (CRS-2A, CRS-2P, LMCRS-2) and high float emulsions (HFRS-2P, HFMS-2, HFMS-2P) as defined in Section 02745. Cover material specifications mandate crusher-processed virgin aggregate for standard chips with minimum 95 percent one fractured face and 90 percent two fractured faces, while lightweight chips utilize rotary-kiln expanded shale with maximum flakiness indices of 25. All work must be completed between May 15 and August 31, with asphalt application occurring when pavement temperatures range from 70 to 136 degrees Fahrenheit and air temperatures remain between 50 and 110 degrees Fahrenheit. Traffic restrictions prohibit opening Interstate routes the same day of application, and a minimum 48-hour cure period is required before applying bituminous flush coat material.

Equipment requirements specify computerized distributor trucks with pressure gauges, calibrated volume measuring devices, insulated tanks, and spray bars capable of maintaining 0.03 gallon per square yard tolerance, along with self-propelled aggregate spreaders featuring computerized controls with plus or minus 1 pound per square yard accuracy and adjustable gates. Application rates vary based on chip type and unit weight, ranging from 9.6 to 25.8 pounds per square yard as specified in Table 3. Surface rolling operations require a minimum of three pneumatic-tire rollers weighing 8 to 12 tons with 6-foot minimum width, operated at speeds not exceeding 5 miles per hour for at least three passes. The bituminous flush coat applies at 0.11 plus or minus 0.01 gallon per square yard, with permanent pavement markings prohibited until 24 hours after flush coat completion. Submittals must include test reports for cover material and emulsion compliance, equipment calibration documentation, daily application rate records, and vendor bills of lading certifying whether emulsion was diluted per specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chip Seal Coat 02785 – Page 1 of 9

2026 Standard Specifications Latest Revision: February 15, 2024

SECTION 02785

CHIP SEAL COAT

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Materials and procedures for applying emulsified asphalt, followed with an application of, either a standard chip seal cover material or lightweight chip seal cover material and bituminous flush coat.

1.2 RELATED SECTIONS

A. Section 02742S: Project Specific Surfacing Requirements

B. Section 02745: Asphalt Material

C. Section 02748: Prime Coat/Tack Coat

1.3 REFERENCES

A. AASHTO T 11: Materials Finer Than 75 µm (No. 200) Sieve in Mineral

Aggregates by Washing

B. AASHTO T 19: Bulk Density (Unit Weight) and Voids in Aggregate

C. AASHTO T 27: Sieve Analysis of Fine and Coarse Aggregates

D. AASHTO T 96: Resistance to Degradation of Small Size Coarse

Aggregate by Abrasion and Impact in the Los Angeles Machine

E. AASHTO T 104: Soundness of Aggregates by Use of Sodium Sulfate or

Magnesium Sulfate

F. AASHTO T 278: Surface Frictional Properties Using the British Pendulum

Tester

G. AASHTO T 279: Accelerated Polishing of Aggregates Using the British

Wheel

H. AASHTO T 335: Determining the Percentage of Fracture in Coarse

Aggregate

02785 – Page 2 of 9

2026 Standard Specifications

I. UDOT Materials Manual of Instruction (MMOI)

1.4 DEFINITIONS Not Used

1.5 SUBMITTALS

A. Test reports for information that the cover material and emulsion meets requirements of this Section, Part 2.

B. Equipment Calibration information including verifying asphalt application rates and chip application for information.

C. Documentation verifying daily asphalt application rates and chip application for information.

D. Vendor’s bill of lading upon delivery for each emulsion used on the project for information.

1. This bill of lading should certify if the emulsion was diluted or not according to this Section, Part 2.

PART 2 PRODUCTS

2.1 CATIONIC EMULSIONS

A. CRS-2A according to Section 02745.

B. CRS-2P according to Section 02745.

C. LMCRS-2 according to Section 02745.

2.2 HIGH FLOAT EMULSIONS

A. HFRS-2P according to Section 02745.

B. HFMS-2 according to Section 02745.

C. HFMS-2P according to Section 02745.

2.3 FLUSH COAT

A. Use the emulsion as specified in Special Provision 02742S, diluted two parts concentrate to one part water by the manufacturer.

02785 – Page 3 of 9

2026 Standard Specifications

2.4 COVER MATERIAL

A. Meet the requirements of Table 1.

1. Use crusher processed virgin aggregate consisting of natural stone, gravel, or slag for standard chips.

2. Use crusher-processed rotary-kiln lightweight expanded shale chips for lightweight chips.

Table 1 Chip Seal Cover Material Properties

Test Test Method Standard Chip Seal Type I & II

Lightweight Chip Seal Type I &II

*Unit Weight AASHTO T 19 100 lb/ft3, max 60 lb/ft3, max One Fractured Face

AASHTO T 335 95% minimum N/A

Two Fractured Faces

AASHTO T 335 90% minimum N/A

*LA wear AASHTO T 96 30% maximum 30% maximum *Soundness AASHTO T 104 10% maximum 10% maximum Flakiness Index Materials MOI 933 17 maximum 25 maximum *Stripping Materials MOI 945 10% maximum 10% maximum *Polishing AASHTO T 278, T 279 31 minimum 31 minimum

* This requirement may be waived if the aggregates have proven acceptable through successful past performance as determined by the Engineer.

B. Meet gradation limits in Table 2. Refer to AASHTO T 27 and T 11.

Table 2

Gradation Limits

Sieve Size

Percent Passing Standard Aggregate Lightweight Aggregate Type I Type II Type I Type II

½ in 100 - 98 100 100 - 90 ⅜ in 100 69 - 91 80 - 100 55 - 80 No. 4 0 - 15 0 - 11 5 - 40 0 - 10 No. 8 0 - 6 0 - 20 0 - 3

No. 16 0 - 10 No. 200 0 - 1 0 - 1.5 0 - 2

2.5 BLOTTER MATERIAL

A. Refer to Section 02748.

02785 – Page 4 of 9

2026 Standard Specifications

2.6 EQUIPMENT

A. Use distributor trucks with the following:

1. Tachometer, pressure gauges, accurate volume measuring devices or a calibrated tank, and a thermometer for measuring temperatures of the tank contents.

2. Insulated tanks capable of storing the binder at temperatures that allow the binder to remain consistent with the appropriate viscosity for proper application rates.

a. Use tanks equipped with baffles to prevent pressure surges resulting from the asphalt sloshing in the tank when starting and stopping.

b. Use trucks equipped with devices to provide for accurate control of the amount of bituminous material being applied.

3. Constant volume circulation pumps and heaters to maintain a pressurized system so binder will be uniformly heated.

a. Circulation pump must spray a constant volume for the entire length of the spray bar for each application.

4. Spray bar and nozzles designed to provide an appropriate fan width to provide uniform transverse distribution without corrugation or streaking.

a. Adjust the spray bar height to provide uniform distribution of binder across the application width and triple lapping of the binder on the pavement surface.

b. Use a fully circulating spray bar with a positive shutoff valve.

5. Computerized rate control system allowing the operator to control all distributor operations from the cab to include:

a. Pressure regulation of the material application and automatic rate control adjustment to the unit ground speed.

1) Hydrostatic system capable of maintaining a tolerance of ± 0.03 gal/yd2.

b. Spray bar height and width adjustment and shut off of individual spray bar sections.

B. Use a self-propelled aggregate (chip) spreader specifically designed and manufactured for chip seal operations, equipped with the following:

1. Computerized controls that will apply a uniform, even layer of aggregate across the full width of the binder and adjust output to the unit ground speed.

a. Use gates adjustable to drop the correct amount of aggregate plus or minus 1 lb/yd2.

2. Variable width spreader with hydraulic control extension and adjustable discharge gates.

3. Spreading hopper with a minimum capacity to cover a full lane of travel plus 1 ft/pass.

4. Spinner broadcast type of aggregate spreader not allowed.

02785 – Page 5 of 9

C. Use at least three articulating type pneumatic rollers for rolling operations.

1. Use rollers weighing between 8 tons minimum and 12 tons maximum with a minimum width of 6 ft.

2. Use rollers with pneumatic tires of equal size diameter and having treads satisfactory to the Engineer.

3. Inflate tires so that the entire roller width area is compacted by the rear-axle tires and the front-axle tires.

a. Inflate tires to 90 lb/in2, or lower with permission from the

Engineer.

1) Maintain tire pressure within 5 lb/in2.

D. Sweeping Equipment

1. Use rotary brooms with nylon or steel bristles or pickup or vacuum brooms for pavement cleaning or brooming operations.

E. Blotter Material Equipment

1. Apply blotter material using a truck mounted spinner broadcast spreader.

PART 3 EXECUTION

3.1 PREPARATION

A. Clean the road surface of all dirt, sand, dust, and other objectionable material to the satisfaction of the Engineer.

B. Protect structures including but not limited to guardrail, guideposts, concrete barriers, drains, and parapets.

C. Protect manholes, valve boxes, drop inlets, and other service utility entrances before placing any chip seal coat.

D. Stockpile blotter material with a quantity of at least 0.25 lb/yd2 for the production day.

1. Blotter material must be ready to be spread within 20 minutes of a road section being chip sealed.

2. Use blotter material, as needed to cover up oil if it bleeds through the new chip seal.

3.2 LIMITATIONS

A. Complete all work between May 15, and August 31.

B. Do not place chip seal coat if surface moisture is present.

02785 – Page 6 of 9

C. Chip seal coat application:

1. Place when the pavement temperature is between 70 and 136 degrees F.

2. Place when the air temperature is between 50 and 110 degrees F.

3. Do not apply after 6:00 pm if the temperature is expected to be below 50 F during the night.

4. Place when the forecasted temperature is not expected to be below

40 degrees F within 3 days after placement.

E. Do not open to traffic the same day chip seal coat is placed on Interstate routes.

1. Sweep chip seal to remove unbound aggregates prior to opening to traffic.

F. Allow at least 48 hours after completing application of cover material before applying bituminous flush coat material.

1. Apply bituminous flush coat material when the air temperature in the shade is at least 50 degrees F and the pavement temperature is at least 70 degrees F.

2. Do not apply bituminous flush coat material during fog, rain, or other adverse conditions.

3.3 COVER MATERIAL STOCKPILE

A. Construct individual 500 ton stockpiles for aggregates.

1. Construct on a clean base to minimize contamination.

2. Construct to facilitate uniform dampening.

3. Avoid excess moisture.

4. Combining, altering, or moving accepted stockpiles may require retesting by the Engineer before use.

B. Notify the Engineer at least seven calendar days before placement in order for the initial stockpiles to be sampled and tested for acceptance.

C. Obtain the Engineer’s acceptance of a stockpile before use.

D. Rework or remove material not meeting specifications from the stockpile area. Identify stockpiles that will be reworked.

02785 – Page 7 of 9

3.4 ASPHALT MATERIAL/COVER MATERIAL APPLICATION

A. Apply asphalt material at a rate sufficient to obtain 50 percent chip embedment before the rolling operation and 70 percent chip embedment after rolling operation.

1. Adjust application rates throughout the project depending on existing conditions.

B. Apply the asphalt emulsion at a minimum temperature of 145 degrees F.

C. Do not apply asphalt material if material does not spray through the distributor in a uniform way and remain in place on the roadway.

D. Place building paper adjacent to the transverse construction joint before starting each spraying operation.

1. Maintain the control valve to act instantaneously both at start-up and cut- off.

E. Locate longitudinal joints within 6 inches of the traffic lane line location.

1. Construct meet lines with no skip or voids between adjacent passes.

2. Do not place a double thickness of cover material.

F. Calibrate the spreader at the beginning of each day and as often as necessary to comply with Table 3.

1. Maintain a distance of less than 150 ft between the distributor and the chip spreader.

2. Maintain the chip spreader speed so that chips do not bounce or roll during application.

02785 – Page 8 of 9

Table 3

Approximate Spread Rates Unit

Weight lbs/ft3

Application Rate lbs/yd2

Lightweight Type I Chip Seal 45 - 50 9.6 50 - 55 10.6 55 - 60 11.6

Lightweight Type II Chip Seal 45 - 50 11.8 50 - 55 13.1 55 - 60 14.3

Standard Chip Seal 60 - 65 17.0 65 - 70 18.4 70 - 75 19.8 75 - 80 20.7 80 - 85 22.1 85 - 90 23.5 90 - 95 24.9

95 - 100 25.8

3.5 SURFACE ROLLING

A. Use at least three pneumatic-tire rollers in a longitudinal direction to roll surface after the cover material has been spread.

B. Roll at least three passes to seat the cover material.

1. A pass is defined as traveling in one direction only.

C. Control bleeding with blotter material and as determined by the Engineer.

D. Set the roller speed to prevent bouncing or skidding.

1. Do not exceed 5 mph.

2. Reduce roller speeds during directional changes to prevent surface tearing.

E. Synchronize the speed of the distributor and chip spreader with that of the rolling operation.

1. Begin initial rolling, consisting of one complete coverage, immediately behind the chip spreader.

2. Begin secondary rolling, consisting of second and third coverage, immediately after completing initial rolling.

3. Synchronize all operations to keep rolling operations within 2,500 feet of the ongoing chip seal application.

02785 – Page 9 of 9

F. Sweep excess cover material off the roadway after the emulsion has set.

1. Remove excess cover material to the satisfaction of the Engineer before opening the roadway to traffic.

2. Keep downward pressure of broom to a minimum.

3. Use water as requested by the Engineer if excessive dust is generated during sweeping operations.

4. Use pickup or vacuum sweepers in urban areas where aggregate accumulates in gutters or where removal is required from the edge of the shoulder.

5. Do not dislodge embedded aggregate when brooming chip sealed roadway.

G. Repair all damage to the seal coat before opening the roadway to traffic.

3.6 BITUMINOUS FLUSH COAT APPLICATION

A. Clean the surface of all dirt, sand, dust, loose chips, and other objectionable material to the satisfaction of the Engineer before applying bituminous flush coat.

B. Apply the bituminous flush coat at a rate of 0.11, ± 0.01 gal/yd2.

1. Keep traffic off the flushed surface until the bituminous material has set sufficiently to prevent tracking or pick-up.

3.7 PAVEMENT MARKING PAINT

A. Allow at least 24 hours after completing flush coat before applying permanent pavement markings.

END OF SECTION

File details come from the government source that posted it. Updated .