This is a Statement of Work for Request for Proposal No. 260000002141 issued by the State of Michigan's Forest Resources Division for the procurement and installation of aviation radio equipment. The project involves the procurement of one Technisonics TDFM 9100 aircraft radio system with installation on a Cessna 182T aircraft (tail number N6275S, serial number 18282100). The radio must be P-25 compliant and feature two modules supporting VHF-FM (136-174 MHz) and 700/800 MHz bands with simultaneous receive and scan capabilities. The radio must support APCO Project 25 Phase I and II modes, various encryption formats (DES-OFB, AES, DES, DES-XL), cross-band repeat, simulcast functionality, and simultaneous monitoring of main and guard VHF frequencies. The installation must be completed within 90 calendar days from the date of order and must comply with Federal Aviation Regulations, manufacturer specifications, and acceptable aviation practices. The aircraft will be flown to the vendor's location for installation and retrieved upon completion.
Pricing is firm for the entire contract term with adjustments permitted only based on documented changes in actual contractor costs, subject to a 30-day review and negotiation period by both parties. Contractors must comply with Michigan prevailing wage requirements for all mechanics and laborers, maintain proper licensing (avionics technician, airframe mechanic, or repair station certification), and provide comprehensive warranties with third-party manufacturer warranties passing through to the State. The contractor must designate a Program Manager available Monday through Friday, 8 a.m. to 5 p.m. EST, and establish documented delivery programs and transportation methods. Liquidated damages of $5,000 plus $100 per day apply for late or improper completion. All contract activities are subject to State inspection and testing within 30 calendar days of receipt, with deficiencies to be corrected at no additional cost within 10 business days. The contract requires compliance with ADA accessibility standards, environmental product standards including mercury-free and PFAS-free certifications, and proper hazardous chemical identification per federal Emergency Planning and Community Right-to-Know Act requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (1) Proposal Instructions.docx | DOCX document | |
| (4) Standard Contract Terms.docx | DOCX document | |
| (3) Vendor Questions Worksheet.docx | DOCX document | |
| (7) Specifications.pdf | ||
| (2) Confidential Treatment Form.docx | DOCX document | |
| (6) Schedule B - Pricing.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A – Statement of Work Request for Proposal No. 260000002141 Forest Resources Division (1) Aviation Radio with Installation This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required. Yellow fields are also used to identify areas where a bidder response is required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and reference it appropriately within your response.
IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.
Background N6275S currently has (1) Motorola 800MHz and (1) Motorola VHF FM radio that would require removal before installing Technisonics TDFM 9100.
If possible, Motorola siren capabilities should remain intact.
Install Auxiliary VHF FM connection for use with portable radio per USFS drawings and parts list. NIICD Documents https://www.nifc.gov/sites/default/files/NIICD/docs/avionics/FSOAS_A15C.pdf N6275S has (1) 7/800 MHz antenna and (1) VHF FM antenna already installed (both belly mounted).
Replace the current 7/800 antenna with RAMI AV924 to support both bands of module #2.
TDFM9100 will be controlled from com #3 on Garmin Audio Panel.
Install a switch to select between TDFM and Auxiliary radio.
Install pilot yoke mounted channel select switch.
Scope Quantity of (1) aviation radio installed per specifications.
General Requirements Ability to procure (1) aviation radio per product specification and installing a Technisonics TDFM 9100 aircraft radio in N6275S Cessna 182T, S/N 18282100.
Product Specifications
P-25 COMPLIANT AIRCRAFT RADIO
The radio supplied for purchase must meet the following specifications:
Technisonics TDFM 9100 with two modules (VHF& VHF/7-800MHz) per Technisonics Project #91981. Project #91981 features include:
a. Either FAA STC or field approval qualified.
b. Support for two modules and three bands – (2) VHF-FM (136-174 MHz) and (1) 700/800 MHZ with ability to receive and scan simultaneously.
c. Support for multimode reception on any frequency and the optional multimode automatic response in the correct matching mode without user rechanneling.
d. APCO (TIA 102) Project 25 compliant.
e. Supports both Phase I and II P25 modes.
f. Supports Project 25 CAI trunking.
g. Supports Project 25 DES-OFB, AES, DES, DES-XL and multi-key or OTAR keying formats of encryption.
h. APCO P-25 Digital communications with backward compatibility to both narrow and wide band.
i. Ability to cross band repeat and/or simulcast.
j. Capability to simultaneously monitor MAIN and GUARD VHF frequencies.
k. Front panel programming.
l. Ability to install as single unit in Cessna aircraft panel.
In addition to the TDFM radio, the installer shall supply:
(1) PC-9000, P/N 127499 PC Cable.
(1) KVL-9000, P/N 127500 Keyloader Cable.
Installation using manufactures instructions and acceptable practices in accordance with Federal Aviation Regulations (FAR’s) and Advisory Circulars (AC’s).
Proper logbook entries.
337 forms as needed.
Updated weight and balance data.
Pertinent information for Items for Continued Airworthiness (ICA’s).
Bids on alternate brand or manufacturer lines will not be considered.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Bidder must describe how you will comply with the requirement(s)
Describe how you will comply with the requirement(s)
Warranties Bidder Response
Bidder must describe any warranties included in the bid and provide the length of the warranty. Explain the process for reporting warranty issues and how the Contractor how any repairs or replacements are made, including timing. If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State. Provide the name, address, contact name, phone number and email address of the party responsible for the warranty.
Describe how you will comply with the requirement(s)
The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.
Recall Requirements and Procedures Bidder Response
Bidder must describe any recall procedures. If none, enter NA.
Describe how you will comply with the requirement(s)
Quality Assurance Program Bidder Response
Explain your Quality Assurance Program(s).
Describe how you will comply with the requirement(s)
Incentives Bidder Response
Explain any special incentives or services including, but not limited to, return policies, trade-in programs, quantity discounts, etc. If none, enter NA.
Describe how you will comply with the requirement(s)
ADA Compliance The State is required to comply with the Americans with Disabilities Act of 1990 (ADA), including its accessibility standard for websites, applications, content and documents. All Contract Activities created, provided, or made available by Contractor under this Contract in a digital format, including but not limited to, websites, applications, software, mobile applications, text, images, sounds, videos, controls, animations, links, and documents (including files in the following formats: PDF, word processing, presentation, and spreadsheet) must comply with the accessibility standards provided in the Digital Accessibility Standards, located at SOM Digital Standards.
Timeframes All Contract Activities must be delivered within timeframes listed below. The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.
Project to be completed within 90 days.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Installation Installation will be expected within 90 calendar days upon date of order. Installation will be considered complete when the aircraft is returned to service in accordance with manufacturer and FAA standards in addition to the specifications supplied in the bid package. Aircraft will be flown to successful vendors’ location for installation and retrieved after installation is complete. Vendor location will be a factor of assessment.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Project Prevailing Wage Requirements The Contractor (and its Subcontractors) must pay all mechanics and laborers employed directly on the site of the work, unconditionally and at least once a week, and without subsequent deduction or rebate on any account, the full amounts accrued at time of payment, computed at wage rates not less than those stated in the advertised specifications as prevailing wages based on locality, regardless of any contractual relationship which may be alleged to exist between the Contractor or subcontractor and the laborers and mechanics.
Contractor must post the scale of wages to be paid in a prominent and easily accessible place at the site of the work.
Prevailing Wage Schedules as required by 2023 PA 10, as amended, MCL 408.1101 et seq. are incorporated into this Contract and can be accessed at LEO - Prevailing Wages By County Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Bidder must describe how you will comply with the requirement(s)
Describe how you will comply with the requirement(s)
Meetings The State may request other meetings as it deems appropriate.
Contractor Program Manager The Contractor must appoint individuals specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Program Manager”).
The Contractor must notify the Contract Administrator at least 14 calendar days before removing or assigning a new Contractor Program Manager.
Bidder Response
Bidder must specify Contract Program Manager
Describe how you will comply with the requirement(s)
Customer Service Number Bidder Response
The Contractor must specify its customer service number for the State to contact the Contractor Program Manager who must be available for calls during the hours of 8 am to 5 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.
Insert customer service number
Disclosure of Subcontractors If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:
The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Contractor.
Of the total bid, the price of the subcontractor’s work.
Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Required Subcontractor information. Bidders must complete the table below for each anticipated subcontractor. Copy the table as many times as needed for each subcontractor. Complete the second table with the percentage of work that will be completed by all subcontractors involved.
| Requested Information |
| Bidder Response |
The legal business name, address, telephone number of the subcontractor(s).
A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Bidder.
Is the subcontractor a GDBE?
Whether the Bidder has a previous working experience with the subcontractor.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Of the total bid, the price of the subcontractor’s work.
Work performed by subcontractors
Total percentage of work that will be performed by subcontractors: Insert %
Total percentage of subcontracted work that will be performed by GDBE subcontractors: Insert %
Security The Contractor will be subject the following security procedures: The Contractor’s staff may be required to make deliveries to or enter State facilities. The State may require the Contractor’s personnel to wear State issued identification badges.
Bidder Response
The Contractor must explain any security measures in place to ensure the security of State facilities.
Explain your security measures.
Price Term Pricing is firm for the entire length of the Contract.
Price Changes Adjustments will be based on changes in actual Contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing; and any other data the State deems relevant.
Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties. If the review reveals that changes are needed, both parties will negotiate such changes, for no longer than 30 days, unless extended by mutual agreement.
The Contractor remains responsible for Contract Activities at the current price for all orders received before the mutual execution of a Change Notice indicating the start date of the new Pricing Period.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Authorizing Document The appropriate authorizing document for the Contract will be a Purchase Order (PO).
Delivery Programs Bidder Response
The Contractor must explain in detail its delivery program(s) (e.g., standard delivery and quick-ship), including any limitations such as quantity.
Explain delivery program(s)
The Contractor must explain the transportation method(s) (e.g., UPS, FedEx, Contractor fleet, or other third-party carrier) it intends on utilizing in delivery of the Contract Activities.
Explain transportation method(s)
Packaging and Palletizing Packaging must be optimized to permit the lowest freight rate. Shipments must be palletized whenever possible using manufacturer's standard 4-way shipping pallets.
Acceptance, Inspection and Testing Contract Activities are subject to inspection and testing by the State within 30 calendar days of the State’s receipt of them (“State Review Period”), unless otherwise provided in a Statement of Work. If the Contract Activities are not fully accepted by the State, the State will notify Contractor by the end of the State Review Period that either: (a) the Contract Activities are accepted but noted deficiencies must be corrected; or (b) the Contract Activities are rejected. If the State finds material deficiencies, it may: (i) reject the Contract Activities without performing any further inspections; (ii) demand performance at no additional cost; or (iii) terminate this Contract in accordance with Section 24, Termination for Cause.
Within 10 business days from the date of Contractor’s receipt of notification of acceptance with deficiencies or rejection of any Contract Activities, Contractor must cure, at no additional cost, the deficiency and deliver unequivocally acceptable Contract Activities to the State. If acceptance with deficiencies or rejection of the Contract Activities impacts the content or delivery of other non-completed Contract Activities, the parties’ respective Program Managers must determine an agreed to number of days for re-submission that minimizes the overall impact to the Contract. However, nothing herein affects, alters, or relieves Contractor of its obligations to correct deficiencies in accordance with the time response standards set forth in this Contract.
If Contractor is unable or refuses to correct the deficiency within the time response standards set forth in this Contract, the State may cancel the order in whole or in part. The State, or a third party identified by the State, may perform the Contract Activities and recover the difference between the cost to cure and the Contract price plus an additional 10% administrative fee.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Invoice Requirements All invoices submitted to the State must include: (a) date; (b) delivery order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Payment Methods The State will make payment for Contract Activities via EFT.
Procedure Invoices will be sent to the Program Manager or Designee for final review and approval. If there are discrepancies between the invoice and work done, the contractor will work with the Program Manager or Designee to rectify the issue.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Licensing Agreement The Contractor must provide a copy of any applicable licensing agreement. Any of the following would be acceptable: avionics technician, airframe mechanic, repair station.
Bidder must provide a copy of any applicable licensing agreement either in this response box or identified here as an attachment to this RFP.
Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $5,000 and an additional $100 per day for each day Contractor fails to remedy the late or improper completion of the Work.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Environmental and Energy Efficiency Product Standards The Contractor must identify any energy efficient, bio-based, or otherwise environmentally friendly products used in the products. Contractor must include any relevant third-party certification, including the verification of a United States Department of Agriculture certified bio-based product label. Contractor must describe how products that meet these requirements are identified or otherwise labelled and list any exceptions to this requirement.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
List all exceptions – either in the Exceptions List table below or identified here as an attachment to this RFP labelled as add details:
Bidder must provide detailed information as required above – either in this response box or identified here as an attachment to this RFP.
Describe how you will comply with the requirements or indicate the filename of the attachment.
Exceptions List
| Item # |
| Response |
Hazardous Chemical Identification In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.
The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.
Bidder Response
☐ I confirm the above requirement and agree with no exception
Mercury Content Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.
Bidder Response
☐ I confirm the above requirement and agree with no exception
Brominated Flame Retardants The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs and describe how the products are identified or otherwise labelled.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
List all exceptions – either in the Exceptions List table below or identified here as an attachment to this RFP labelled as add details:
Exceptions List
| Item # |
| Response |
Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) The Contractor must confirm that the provided products do not intentionally contain PFAS. This consists of all components of the provided products, including product packaging.
Bidder Response
☐ I confirm the above requirement and agree with no exception
OR
The Contractor must disclose whether a product or its components contain intentionally added PFAS. If the product or its components contain intentionally added PFAS the Contractor must:
provide an explanation with respect to the intentionally added PFAS contents, including the purpose for which PFAS are used in the product or its components, the types of PFAS used in the product or its components, and the amount of each PFAS used in the product or its components.
indicate whether the product will be labeled or packaged with information about the intentionally added PFAS contents.
identify any alternative products that do not contain intentionally added PFAS.
provide any additional information that would further the Department’s implementation of ED 2021-08.
Bidder Response
☐ I have reviewed the above requirement and have listed all PFAS containing products in the table below or as an attachment labelled as PFAS.
Bidder must provide detailed information as required above – either in this response box or identified here as an attachment to this RFP.
Describe how you will comply with the requirements or indicate the filename of the attachment.
PFAS List
| Item # |
| Response |
Enter your company name
RFP 260000002141 1
Enter your solicitation type and number 1 image1.png
File details come from the government source that posted it. Updated .