This is a Statement of Work for RFP 260000001958 issued by the Michigan Department of Natural Resources for vault pumping and portable toilet rental services at Porcupine Mountains Wilderness State Park in Ontonagon, Michigan and Lake Gogebic State Park in Marenisco, Michigan. The Contractor must provide all personnel, equipment, materials, and supervision necessary to perform vault toilet pumping and waste disposal services at various locations throughout both parks. Services are required on an "on call" basis with completion of each request within 24 hours of the call. The Contractor must coordinate with park staff to minimize inconvenience to visitors, remove solid matter from vaults, disinfect vault interiors with bleach or equally effective solution, and leave surrounding areas clean. The Contract Administrator will make every effort to schedule multiple vault pumps per request, though pumping frequency is not guaranteed. The Contractor must appoint a designated Program Manager available during business hours (minimum 8 a.m. to 5 p.m. EST Monday through Friday) to respond to State inquiries.
Pricing is firm for a 365-day Pricing Period beginning on the Effective Date, with all costs for equipment, labor, pumping, and waste disposal included in the bid; no additional charges are permitted. Price adjustments may be requested in writing by either party and will take effect no earlier than the next Pricing Period, supported by documented evidence of cost changes. The Contractor must be licensed by the Michigan Department of Environmental Quality to remove and transport septage waste in accordance with Part 117 of the Natural Resources and Environmental Protection Act and must dispose of effluent through a DEQ-approved receiving facility or via land application. Late or improper completion of Contract Activities subjects the Contractor to liquidated damages of $1,000 plus $100 per day for each day of non-compliance. Invoices must include date, delivery order number, quantity, description, unit price, shipping cost, invoice number, and total price, with payment made via Electronic Funds Transfer. The Contractor is responsible for reporting accidents and injuries to the Contract Administrator within one hour verbally and 24 hours in writing, and must repair any damage to State property caused by pumping equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (1) Proposal Instructions.docx | DOCX document | |
| (6) Schedule B - Pricing.docx | DOCX document | |
| (8) Map of Park.jpg | JPG image | |
| (2) Confidential Treatment Form.docx | DOCX document | |
| (3) Standard Contract Terms.docx | DOCX document | |
| (7) Vault pumping and toilet locations.xlsx | XLSX spreadsheet | |
| (8) ParkMapWithLocationsMarked.PNG | PNG image | |
| (4) Vendor Questions Worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A – Statement of Work
RFP 260000001958
Vault Pumping and Portable Toilet Rental Services at Porcupine Mountains Wildness State Park and Lake Gogebic State Park This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required. Yellow fields are also used to identify areas where a bidder response is required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and reference it appropriately within your response.
IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click the appropriate checkbox and complete the entries as appropriate.
Background The purpose for this Invitation to Bid (ITB) is to secure a contract for vault toilet pumping and waste disposal services along with portable toilet rental at Porcupine Mountains State Park located in Ontonagon, MI and Lake Gogebic State Park located in Marenisco, Michigan at various locations throughout the area. This is a formal request to prospective Bidders to solicit bids or price quotations to establish a contract to provide such services.
Scope The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform the vault pumping services as described in the requirements detailed herein. The required objectives are to perform vault pumping services in an approved and workmanlike manner without hindrance or delay and to maintain the facility(s) in such a manner that provides a clean, healthy, and safe environment for occupants and visitors of state-owned facilities.
Requirements General Requirements The Contractor shall provide septic system and vault toilet pumping and waste disposal services at various sites within Porcupine Mountains Wilderness State Park and Lake Gogebic State Park. Services will be required at the following locations:
Porcupine Mountains Wilderness State Park (and various sites as described) 33303 Headquarters Road Ontonagon, MI 49953
Lake Gogebic State Park (and various sites as described) N 9995 State Hwy M-64 Marenisco, MI 49947
Any service no longer required may be canceled from this Contract.
The Contractor must contact the Contract Administrator to arrange schedules and to receive necessary orientation prior to the start of any contracted service.
The Department of Natural Resources operates Porcupine Mountains Wilderness State Park and Lake Gogebic State Park. Vault toilet facilities are located at these sites for use by campers and visitors. Vaults must be pumped as part of regular maintenance and to prevent overflow. Effluent pumped from vaults must be disposed of in a manner that complies with federal and state laws.
Specific information regarding septic tanks and vault toilets is listed on the pricing page.
Frequency of pumping is not guaranteed. Vault pumping service shall be performed on an “on call” basis with completion of each request within 24 hours of call. The Contract Administrator or designee shall make every effort to schedule multiple vault pumps per request.
Pumping of vaults at Porcupine Mountains Wilderness State Park and Lake Gogebic State Park may conflict with public use of these facilities. The Contractor shall coordinate service with park staff to minimize inconvenience to visitors.
Removing a concrete lid is often required. If there is no lid, the vault toilet shall be pumped through the opening inside the vault toilet.
Any solid matter such as rocks, bottles, cans, etc., shall be removed as much as possible and secured in plastic bags (supplied by the Contractor) and left behind vault toilet for retrieval by a state employee.
After pumping is completed, the interior of the vault toilet shall be left in a clean condition and disinfected with a bleach or equally effective solution. The area surrounding the vault toilets shall be left at least as clean as when the Contractor arrived at the site.
Safety lights shall be in operation whenever the Contractor’s vehicle is on State trails.
Disposal of all effluent shall be through a Michigan Department of Environmental Quality (DEQ) approved septage waste receiving facility or be land applied in accordance with state and federal laws.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Contractor Responsibilities Removal, transport, and disposal of septage wastes shall be done in accordance with the requirements of Part 117, Septage Waste Servicers, Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA).
Contractor must be licensed through DEQ to remove and transport septage waste.
DEQ land permit is required for property used for land application of septage waste.
If not land applied, Contractor must dispose of septage waste at a DEQ authorized septage waste receiving facility.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Minimum Equipment Required The Contractor must have equipment and staff to adequately perform the specified services. In the event of mechanical breakdown, the Contractor shall be expected to provide backup service so that vault pumping services are performed as required. Equipment failure shall not constitute an acceptable reason for not performing the contracted service.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
ADA Compliance The State is required to comply with the Americans with Disabilities Act of 1990 (ADA), including its accessibility standard for websites, applications, content and documents. All Contract Activities created, provided, or made available by Contractor under this Contract in a digital format, including but not limited to, websites, applications, software, mobile applications, text, images, sounds, videos, controls, animations, links, and documents (including files in the following formats: PDF, word processing, presentation, and spreadsheet) must comply with the accessibility standards provided in the Digital Accessibility Standards, located at SOM Digital Standards.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Timeframes Frequency of pumping is not guaranteed. The Contract Administrator or designee shall make every effort to schedule multiple vault pumps per request.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Delivery Vault pumping service shall be performed on an “on call” basis with completion of each request within 24 hours of call.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Meetings The State may request other meetings as it deems appropriate.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Contractor Program Manager The Contractor must appoint a Contractor Program Manager specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Program Manager”).
The Contractor must notify the Contract Administrator at least 14 calendar days before removing or assigning a new Contractor Program Manager.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Bidder must identify its Contractor Program Manager:
Customer Service Number Bidder Response
The Contractor must specify its customer service number for the State to contact the Contractor Program Manager who must be available for calls during the hours of 8 am to 5 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.
Insert customer service number
Disclosure of Subcontractors If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:
The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Contractor.
Of the total bid, the price of the subcontractor’s work.
Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Required Subcontractor information. Bidders must complete the table below for each anticipated subcontractor. Copy the table as many times as needed for each subcontractor. Complete the second table with the percentage of work that will be completed by all subcontractors involved.
| Requested Information |
| Bidder Response |
The legal business name, address, telephone number of the subcontractor(s).
A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Bidder.
Is the subcontractor a GDBE?
Whether the Bidder has a previous working experience with the subcontractor.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Of the total bid, the price of the subcontractor’s work.
Work performed by subcontractors
Total percentage of work that will be performed by subcontractors: Insert %
Total percentage of subcontracted work that will be performed by GDBE subcontractors: Insert %
Security The Contractor will be subject the following security procedures:
The Contractor must explain any additional security measures in place to ensure the security of State facilities. The State may require the Contractor’s personnel to wear State issued identification badges.
Bidder Response
The Contractor must: (a) explain how it intends to ensure the security of State facilities, (b) whether it uses uniforms and ID badges, etc., (c) identify the company that will perform background checks, and (d) the scope of the background checks.
Explain your security measures.
Price Term Pricing is firm for a 365-day period (“Pricing Period”). The first pricing period begins on the Effective Date. Adjustments may be requested in writing by either party and will take effect no earlier than the next Pricing Period.
Price must include all costs for equipment, labor, pumping charge, and disposal of waste; no additional or miscellaneous charges (disposal fees, administrative fees, fuel surcharges, etc.) are allowed.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Price Changes Adjustments will be based on changes in actual Contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing; and any other data the State deems relevant.
Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties. If the review reveals that changes are needed, both parties will negotiate such changes, for no longer than 30 days, unless extended by mutual agreement.
The Contractor remains responsible for Contract Activities at the current price for all orders received before the mutual execution of a Change Notice indicating the start date of the new Pricing Period.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Authorizing Document The appropriate authorizing document for the Contract will be a Delivery Order (DO).
Invoice Requirements All invoices submitted to the State must include: (a) date; (b) delivery order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price. Overtime, holiday pay, and travel expenses will not be paid.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Payment Methods The State will make payment for Contract Activities via EFT (Electronic Funds Transfer) payment.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $1,000 and an additional $100 per day for each day Contractor fails to remedy the late or improper completion of the Work.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Damages The Contractor performing work on State property shall report all accidents and/or injuries to the Contract Administrator. The Contractor shall provide a verbal report to the Contract Administrator within one hour of occurrence followed by a written report within 24 hours of occurrence. Any damage to parking lot, office building, curbs, pavements, shrubs, etc. caused by vault pumping equipment shall be repaired and/or replaced by the Contractor.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Hazardous Chemical Identification In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.
The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.
Bidder Response
☐ I confirm the above requirement and agree with no exception
Mercury Content Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.
Bidder Response
☐ I confirm the above requirement and agree with no exception
Brominated Flame Retardants The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs and describe how the products are identified or otherwise labelled.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) The Contractor must confirm that the provided products do not intentionally contain PFAS. This consists of all components of the provided products, including product packaging.
Bidder Response
☐ I confirm the above requirement and agree with no exception
License Requirements The Contractor must be licensed by the Michigan Department of Environmental Quality to remove and transport Septic Tank Waste.
Removal, transportation, and disposal of septic waste shall be done in accordance with the requirements of Part 117, Septage Waste Servicers, Natural Resources and Environmental Protection Act (NREPA), 1994 PA 451, as amended.
Bidder Response
The Contractor must provide the name and address of the septic treatment facility which will be used for this service:
Insert name of septic treatment facility