(5) Schedule A - Statement of Work.docx

DOCX document 89 KB Posted

Attached to
DNR FRD Mastication Red Pine Salvage FY26
Solicitation number
RFP 751 260000002323 2
Issued by
Crawford County, Michigan

About this file

This is a Schedule of Work (Statement of Work) document for RFP 260000002323 issued by the Michigan Department of Natural Resources (DNR) for mastication of red pine stands in the Lower Peninsula. The project involves mastication services across four sites—three located in the Atlanta Management Unit and one in the Grayling Management Unit—that were recently affected by salvage harvesting following the 2024 ice storm. The contractor must masticate all stems greater than 3 inches in diameter (alive or dead; standing or down), with residual material limited to a maximum length of 4 feet, and spread mulch and small pieces of residual slash evenly across each site. Stumps must be no taller than 6 inches, and the work must be completed sufficiently to allow for follow-up site preparation activities and seedling planting. Mastication activities may occur between July 15th and November 1st. The contractor is required to contact MISS DIG at least 4 business days prior to any planned mastication work and must strictly adhere to shapefile polygons provided by the state. A kick-off meeting between the contractor and the NELP Timber Management Specialist must occur within 10 days of contract acceptance, with the contractor required to notify the state of completion at each site before proceeding to the next location and submit a final report within one week of project completion.

Pricing is firm for the entire contract duration, with adjustments permitted only upon documented evidence of changes in actual contractor costs reviewed and negotiated by both parties within a 30-day period. The state will make payment via Electronic Funds Transfer (EFT) based on invoices that include date, delivery order, quantity, description of work, unit price, shipping costs, vendor invoice number, and total price. Liquidated damages of $5,000 plus an additional $100 per day apply for late or improper completion of contract activities. The contractor must appoint a dedicated Program Manager for State of Michigan accounts and maintain customer service availability from 8:00 a.m. to 5:00 p.m. EST. The contractor must comply with the Americans with Disabilities Act accessibility standards for all digital deliverables and must disclose any subcontractors, including their legal business names, addresses, telephone numbers, percentage of work to be performed, and prior working relationships. Environmental and chemical disclosure requirements include identification of energy-efficient or bio-based products, Material Safety Data Sheets for hazardous chemicals, confirmation that products are mercury-free and do not intentionally contain PFAS or brominated flame retardants, and Best Management Practices to prevent invasive species spread and protect the Eastern Massasauga Rattlesnake, with any observations reported to DNR staff within 48 hours.

View the file

Other files

File Type Posted
(4) Standard Contract Terms.docx DOCX document
(2) Confidential Treatment Form.docx DOCX document
(7) Maps.docx DOCX document
(1) Proposal Instructions.docx DOCX document
(3) Vendor Questions Worksheet.docx DOCX document
Bidder QA Template_Answers.pdf PDF
(6) Schedule B - Pricing.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A – Statement of Work

RFP 260000002323

DNR FRD Mastication Red Pine Salvage FY26 This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required. Yellow fields are also used to identify areas where a bidder response is required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and reference it appropriately within your response.

Background The purpose of this Request for Proposal (RFP) is to secure a contract for the mastication of red pine stands that were recently salvage harvested. Given timber sale specifications attached to many red pine salvage sales following the 2024 ice storm in the northeastern Lower Peninsula, some sites are in need of significant mastication prior to other site preparation activities and/or the planting of seedlings.

Scope This project involves mastication acres spread across four sites. Three of the sites are located in the Atlanta Management Unit, while the fourth site is located in the Grayling Management Unit. Maps for further details on location of treatments are included as exhibits.

General Requirements Mastication of all stems (alive or dead; standing or down) greater than 3” dbh is required. Further, residual material cannot be longer than 4 feet. The average size of the material to be masticated varies between sites; site visits are highly encouraged prior to bidding. The site must be masticated sufficiently to allow for follow-up site preparation activities (e.g., trenching/herbicide) and/or the planting of seedlings. Shapefiles will be available prior to mastication activities.

Mastication can occur any time between July 15th and November 1st.

Best Management Practice to Prevent Impacts on Eastern Massasauga Rattlesnake (EMR):

If encountered, report observations of EMR to DNR staff within 48 hours.

Use Best Management Practices to reduce the spread of invasive species.

To increase human safety and awareness of EMR, operators should first watch MDNR’s “60-Second Snakes: The Eastern Massasauga Rattlesnake” video (available at 60-Second Snakes: The Eastern Massasauga Rattlesnake - YouTube Mastication – Machinery/Tactics:

A mulcher running greater than 300 horsepower is recommended due to the density and size of trees on these sites. A detailed description of the equipment and personnel involved in the project must be provided.

Mulch and small pieces of residual slash must be spread evenly across each site.

Stumps can be no taller than 6 inches. Root balls can be taller than 6 inches when the action of pushing the tree over brings the stump out of the ground.

Recreation trails must be protected from mastication activities (i.e., must be free of any debris at all times); the NELP Timber Management Specialist will provide the location of these trails. Be aware that these trails are used frequently.

MISS DIG MUST BE CONTACTED BY THE CONTRACTOR AT LEAST 4 BUSINESS DAYS PRIOR TO ANY PLANNED MASTICATION.

IT IS CRITICAL THAT MASTICATION ONLY OCCURS IN THE POLYGONS PROVIDED BY THE STATE; SHAPEFILES WILL BE MADE AVAILABLE FOR THIS PURPOSE.

Bidder Response

☐ I have reviewed the above requirement(s) and agree with no exceptions.

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Bidder must describe how they comply with the above requirement(s):

Describe how you will comply with the requirement(s)

ADA Compliance The State is required to comply with the Americans with Disabilities Act of 1990 (ADA), including its accessibility standard for websites, applications, content and documents. All Contract Activities created, provided, or made available by Contractor under this Contract in a digital format, including but not limited to, websites, applications, software, mobile applications, text, images, sounds, videos, controls, animations, links, and documents (including files in the following formats: PDF, word processing, presentation, and spreadsheet) must comply with the accessibility standards provided in the Digital Accessibility Standards, located at SOM Digital Standards.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Timeframes All Contract Activities must be delivered within times outlined within Service Requirements Section. The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.

Mastication can occur any time between July 15th and November 1st.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Reporting Before leaving a mastication site, the Contractor must send a notice of completion (via phone or email) to the NELP Timber Management Specialist, who will check the acceptability of the work prior to the Contractor moving on to the next site. A final report (via email) that includes the number of acres masticated at each site must be submitted within one week of the completion of the project.

Bidder Response

Explain your reporting capabilities, any reporting that is included in your proposal, and any additional reporting capabilities.

Describe how you will comply with the requirement(s)

Meetings The Contractor must attend the following meetings:

One kick-off meeting between the Contractor and the NELP Timber Management Specialist will be required within 10 days of contract acceptance. At this meeting, arrangements can be made to meet the TMS on-site for the first mastication activity.

The State may request other meetings as it deems appropriate.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Contractor Program Manager The Contractor must appoint one Contractor Program Manager specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Program Manager”).

The Contractor must notify the Contract Administrator at least 15 calendar days before removing or assigning a new Contractor Program Manager.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Bidder must identify its Contractor Program Manager:

Customer Service Number Bidder Response

The Contractor must specify its customer service number for the State to contact the Contractor Program Manager who must be available for calls during the hours of 8:00 am to 5:00 pm EST, at a minimum. Identify customer service availability for this proposal by hours and days of the week.

Insert customer service number

Disclosure of Subcontractors If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.

The relationship of the subcontractor to the Contractor.

Of the total bid, the price of the subcontractor’s work.

Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.

A complete description of the Contract Activities that will be performed or provided by the subcontractor.

Required Subcontractor information. Bidders must complete the table below for each anticipated subcontractor. Copy the table as many times as needed for each subcontractor. Complete the second table with the percentage of work that will be completed by all subcontractors involved.

Requested Information
Bidder Response

The legal business name, address, telephone number of the subcontractor(s).

A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities.

The relationship of the subcontractor to the Bidder.

Is the subcontractor a GDBE?

Whether the Bidder has a previous working experience with the subcontractor.

A complete description of the Contract Activities that will be performed or provided by the subcontractor.

Of the total bid, the price of the subcontractor’s work.

Work performed by subcontractors

Total percentage of work that will be performed by subcontractors: Insert %

Total percentage of subcontracted work that will be performed by GDBE subcontractors: Insert %

Price Term Pricing is firm for the entire length of the Contract.

Price Changes Adjustments will be based on changes in actual Contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing; and any other data the State deems relevant.

Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties. If the review reveals that changes are needed, both parties will negotiate such changes, for no longer than 30 days, unless extended by mutual agreement.

The Contractor remains responsible for Contract Activities at the current price for all orders received before the mutual execution of a Change Notice indicating the start date of the new Pricing Period.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Authorizing Document The appropriate authorizing document for the Contract will be a Purchase Order.

Invoice Requirements All invoices submitted to the State must include: (a) date; (b) delivery order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Payment Methods The State will make payment for Contract Activities via EFT.

Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $5,000 and an additional $100 per day for each day Contractor fails to remedy the late or improper completion of the Work.

Bidder Response

☐ I confirm the above requirement(s) and agree with no exception(s)

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

Exceptions: List all exceptions here

Environmental and Energy Efficiency Product Standards The Contractor must identify any energy efficient, bio-based, or otherwise environmentally friendly products used in the products. Contractor must include any relevant third-party certification, including the verification of a United States Department of Agriculture certified bio-based product label. Contractor must describe how products that meet these requirements are identified or otherwise labelled and list any exceptions to this requirement.

Bidder Response

☐ I have reviewed the above requirement(s) and agree with no exceptions.

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

List all exceptions – either in the Exceptions List table below or identified here as an attachment to this RFP labelled as add details:

Exceptions List

Item #
Response

Hazardous Chemical Identification In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.

The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.

Bidder Response

☐ I confirm the above requirement and agree with no exception

Mercury Content Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.

Bidder Response

☐ I confirm the above requirement and agree with no exception

Brominated Flame Retardants The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs and describe how the products are identified or otherwise labelled.

Bidder Response

☐ I have reviewed the above requirement(s) and agree with no exceptions.

☐ I have reviewed the above requirement(s) and have noted any exceptions below.

List all exceptions – either in the Exceptions List table below or identified here as an attachment to this RFP labelled as add details:

Exceptions List

Item #
Response

Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) The Contractor must confirm that the provided products do not intentionally contain PFAS. This consists of all components of the provided products, including product packaging.

Bidder Response

☐ I confirm the above requirement and agree with no exception

(OR)

The Contractor must disclose whether a product or its components contain intentionally added PFAS. If the product or its components contain intentionally added PFAS the Contractor must:

provide an explanation with respect to the intentionally added PFAS contents, including the purpose for which PFAS are used in the product or its components, the types of PFAS used in the product or its components, and the amount of each PFAS used in the product or its components.

indicate whether the product will be labeled or packaged with information about the intentionally added PFAS contents.

identify any alternative products that do not contain intentionally added PFAS.

provide any additional information that would further the Department’s implementation of ED 2021-08.

Bidder Response

☐ I have reviewed the above requirement and have listed all PFAS containing products in the table below or as an attachment labelled as add details

Bidder must provide detailed information as required above – either in this response box or identified here as an attachment to this RFP.

Describe how you will comply with the requirements or indicate the filename of the attachment.