This document is a Measurement and Payment schedule detailing the pricing and scope of work for nine line items related to septic system installation and upgrades.

The contract covers the following services: (1) Mobilization and Demobilization—transportation of equipment, materials, and personnel to/from the job site at a lump sum price; (2) Solid Sewer Pipe (4" PVC D3034)—paid per linear foot installed, including excavation, backfill, compaction, fittings, and connection to existing sewer service; (3) Underground Two-Way Cleanout—paid per unit installed at a unit price; (4) 1,050-Gallon 2-Compartment Septic Tank with Effluent Filter—paid at lump sum price for complete installation including excavation, backfill, gravel base, risers, lids, baffle, plumbing, and filter; (5) Gravity Transport Pipe (4" PVC D3034)—paid per linear foot from septic tank to distribution box; (6) Distribution Box with Riser and Speed Levelers—paid at lump sum price for complete system; (7) Feeder Lines to Laterals (4" PVC D3034)—paid per linear foot from distribution box to drainfield; (8) Gravity Trench Chamber Drainfield with 4" PVC D2729 Perforated Laterals—paid per linear foot of trench, including excavation, filter fabric, observation ports, backfill, topsoil, seeding, and mulch; and (9) Abandon Existing Septic Tank—paid at lump sum price for complete abandonment including tank breaking, pumping, disposal, and site restoration. All line items require complete and operational installations with all associated materials and labor included in the quoted prices.

View the file

Other files

File Type Posted
B01 75H70126Q00034.pdf PDF
A11 Pre-Solicitation SAM Notice.pdf PDF
6-US DOL WD WA20260089 Dated 5-18-2026.pdf PDF
3-OSS Design County Approved.pdf PDF
2-Technical Specifications.pdf PDF
1-Statement of Work.docx DOCX document
4-Location_Aerial.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEASUREMENT AND PAYMENT FOR BID SCHEDULE LINE ITEMS

1. MOBILIZATION AND DEMOBILIZATION

Payment shall be made at the contract lump sum price for transportation of equipment, material, and personnel to and from the job site location (regardless of trips required), all required permits and fees, taxes, and all other necessary items to complete the work.

2. SOLID SEWER PIPE, 4" PVC D3034

Payment for solid sewer pipe as specified on the Design shall be made for the size of pipe listed based on the number of linear feet installed. Payment shall include excavation, backfill and compaction; all pipe and fittings; connection of the solid sewer pipe to an existing sewer service line; resurfacing trenched areas to equal or better condition than existing; and all other necessary items for a complete and operational installation.

3. UNDERGROUND TWO-WAY CLEANOUT

Payment for the underground two-way (or doublesweep) cleanout as specified on the Design shall be made at the contract unit price for the number of underground cleanouts installed.

Payment shall include excavation, backfilling and compaction, all pipe and fittings, and all other necessary items for a complete and operational installation. No payment shall be made for cleanouts installed above grade as part of the connection to existing house, or as part of drop manholes.

4. 1,050-GALLON, 2-COMPARTMENT SEPTIC TANK WITH EFFLUENT FILTER

Payment for septic tank as specified in the Design shall be made at the contract lump sum price based on a complete system for the size of tank listed. Payment shall include excavation, backfill, compaction, gravel base (when required), dual compartment septic tank, risers and lids, baffle, plumbing, effluent filter, and all other necessary items needed for a complete and operational installation.

5. GRAVITY TRANSPORT PIPE, 4" PVC D3034

Payment for solid sewer pipe connections from the septic tank to the distribution box shall be made at the contract unit price for the sizes of pipe listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling, pipe and fittings, connections and other necessary items for a complete and operational installation.

6. DISTRIBUTION BOX WITH RISER AND SPEED LEVELERS

Payment for distribution box as specified in the Design shall be made at the contract lump sum price based on a complete system to accommodate the number of drainlines listed. Payment shall include excavation, backfill, compaction, gravel base (when required), distribution box with orifice levelers for each drainline, riser to grade with lid, plumbing and all other necessary items needed for a complete and operational installation.

7. FEEDER LINES TO LATERALS, 4" PVC D3034

Payment for solid sewer pipe connections as specified in the design from the distribution box with speed levelers to the gravity drainfield shall be made at the contract unit price for the sizes of the pipe listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling, pipe and fittings, connections, and other necessary items for a complete and operational installation

8. GRAVITY TRENCH CHAMBER DRAINFIELD WITH 4" PVC D2729

PERFORATED LATERALS

Payment for a gravity trench chamber drainfield as specified in the Design shall be made at the contract unit price based on the number of linear feet of trench installed. Payment shall include excavation, abandonment in place of existing drain lines, removal and proper disposal of any existing drainfield material encountered, filter fabric, observation ports, connections, backfill, imported topsoil (as needed), final grading, hydro seeding or grass seeding, mulch, and all other necessary items needed for a complete and operational installation.

9. ABANDON EXISTING SEPTIC TANK

Payment for abandonment of existing septic tank as specified on the Design shall be made at the contract lump sum price based on a complete abandonment. Payment shall include excavation, breaking into the tank, pumping the tank, disposal of the liquid and solids, filling the tank with borrow material, compaction, restoring the ground surface to pre-existing condition, and all other necessary items for a complete abandonment.