5-JH26-23 ScoreSheet for Informational Purposes Only.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
JH26-23 Orphan Well Subsurface Plugging
Solicitation number
JH26-23
Issued by
Utah

About this file

This document is a Request for Statements of Qualifications (RFSQ) scoresheet issued by the State of Utah Division of Purchasing and Division of Oil, Gas and Mining for an Orphan Well Subsurface Plugging project. The contract is federally funded and estimated to span 5 years, with the primary objective of selecting a design professional service provider for subsurface abandonment, site surface restoration, and equipment decommissioning. The solicitation (JH26-23) seeks comprehensive qualifications from companies in areas including crew competency, equipment capabilities, maintenance processes, safety protocols, and relevant experience. The evaluation methodology uses a 0-5 scoring scale across multiple categories, with a total possible score of 1000 points, and will select the highest-ranking vendor to negotiate contract terms.

The project will be funded through a federal grant specifically targeting orphan well remediation, with separate contracts for subsurface plugging and site surface restoration. Importantly, vendors are instructed not to include pricing in their qualifications, and the state will determine compensation through negotiations with the highest-ranked vendor. If initial negotiations fail, the state may proceed with the next highest-ranked vendor. The solicitation emphasizes comprehensive evaluation of technical capabilities, safety metrics, crew experience, equipment maintenance, and previous work history, particularly focusing on subsurface abandonment work and compliance with regulations like the Davis Bacon Act.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subsurface RFSQ Questionnaire

Evaluator Scoring
0 = Fail, the proposal fails to address the requirements or criteria described in the RFSQ or cannot be assessed due to missing information
1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFSQ or cannot be assessed due to incomplete information
2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFSQ in an unsatisfactory manner
3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFSQ in a minimum satisfactory manner
4 = Good, the proposal addresses all requirements or criteria described in the RFSQ and in some respects exceeds them
5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFSQ
CategoryQuestionGroup WeightingQ WeightingEvaluator Score (0-5)Element Score
CompetencyWhat is the typical avg experience level of your rig crews?25%10%0%
CompetencyDescribe your company culture and how it relates to continuity of crews and employee retention. Provide the average length of employment of your field hands.30%0%
CompetencyWhat is the level of supervision provided for each crew and level of plugging experience required to reach this level of supervision? Please provide resume's for your current PA rig supervisors and pushers.60%0%
EquipmentAre BOPs owned or rented? If owned, provide mechanic certification service logs, and test logs for BOPs and accumulators. Provide details on your company's BOP training program and function testing protocols.15%25%0%
EquipmentDescribe your company's equipment maintenance processes. Provide equipment maintenance logs and age of major equipment that will be used on this project: rigs, pumps, cement equipment, etc.50%0%
EquipmentFor plug and abandonment work, what tanks do you provide on each location and how do you manage them? Provide three location photographs with typical PA equipment layout.25%0%
MaintenanceDescribe your company's process for managing a major equipment failure on a remote location. What is the expected response and repair time?10%30%0%
MaintenanceIn the event of an equipment breakdown that cannot be repaired in the field, what is your company's process for maintaining project progress?40%0%
MaintenanceHow frequently are hoses and iron tested? Provide maintenance logs for last 5 years.30%0%
SafetyDescribe your company's safety training program and culture.25%40%0%
SafetyWhat are your primary safety metrics and 5 year trends? What is your TRIR 5 year trend.30%0%
SafetyWhat is your company's process when there is a significant safety event on location?30%0%
ExperienceWhat is your company's process for complying with the requirements of the Davis Bacon Act? Provide examples of previous documentation or proposed documentation.25%10%0%
ExperienceHow will you accomplish this scope of work? Provide a commentary of how the scope of work would be implemented. How will your company manage logistics considering the remote nature of most of the well locations on this project?40%0%
ExperienceHas your company performed subsurface abandonment work for the state of Utah previously? If so, how many wells and what year/s was the work performed?25%0%
ExperienceWhat plug and abandonment work has your company performed in the last two years onshore US? Please provide well counts, basins, and operators performed for. Note any well control or safety events.25%0%
Total Score0%

JH26-23 ScoreSheet

Orphan Well Subsurface Plugging
Solicitation #JH26=23
RFSQ Evaluation Scoresheet
Firm Name:______________________________Evaluator Scoring
0 = Fail, the proposal fails to address the requirements or criteria described in the RFSQ or cannot be assessed due to missing information
Evaluator:________________________________1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFSQ or cannot be assessed due to incomplete information
2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFSQ in an unsatisfactory manner
Date: ___________________________________3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFSQ in a minimum satisfactory manner
4 = Good, the proposal addresses all requirements or criteria described in the RFSQ and in some respects exceeds them
5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFSQ
QuestionCategoryQuestionGroup WeightingQ WeightingEvaluator Score (0-5)Points EarnedPoints Possible
1CompetencyWhat is the typical avg experience level of your rig crews?25%10%0.025
2CompetencyDescribe your company culture and how it relates to continuity of crews and employee retention. Provide the average length of employment of your field hands.30%0.075
3CompetencyWhat is the level of supervision provided for each crew and level of plugging experience required to reach this level of supervision? Please provide resume's for your current PA rig supervisors and pushers.60%0.0150
4EquipmentAre BOPs owned or rented? If owned, provide mechanic certification service logs, and test logs for BOPs and accumulators. Provide details on your company's BOP training program and function testing protocols.15%25%0.037.5
5EquipmentDescribe your company's equipment maintenance processes. Provide equipment maintenance logs and age of major equipment that will be used on this project: rigs, pumps, cement equipment, etc.50%0.075
6EquipmentFor plug and abandonment work, what tanks do you provide on each location and how do you manage them? Provide three location photographs with typical PA equipment layout.25%0.037.5
7MaintenanceDescribe your company's process for managing a major equipment failure on a remote location. What is the expected response and repair time?10%30%0.030
8MaintenanceIn the event of an equipment breakdown that cannot be repaired in the field, what is your company's process for maintaining project progress?40%0.040
9MaintenanceHow frequently are hoses and iron tested? Provide maintenance logs for last 5 years.30%0.030
10SafetyDescribe your company's safety training program and culture.25%40%0.0100
11SafetyWhat are your primary safety metrics and 5 year trends? What is your TRIR 5 year trend.30%0.075
12SafetyWhat is your company's process when there is a significant safety event on location?30%0.075
13ExperienceWhat is your company's process for complying with the requirements of the Davis Bacon Act? Provide examples of previous documentation or proposed documentation.25%10%0.025
14ExperienceHow will you accomplish this scope of work? Provide a commentary of how the scope of work would be implemented. How will your company manage logistics considering the remote nature of most of the well locations on this project?40%0.0100
15ExperienceHas your company performed subsurface abandonment work for the state of Utah previously? If so, how many wells and what year/s was the work performed?25%0.062.5
16ExperienceWhat plug and abandonment work has your company performed in the last two years onshore US? Please provide well counts, basins, and operators performed for. Note any well control or safety events.25%0.062.5
Total Score01000

File details come from the government source that posted it. Updated .