This document is a Bid Sheet for the Lehi City Cemetery Irrigation Request for Bid (RFB), involving Lehi City in Utah. The project entails installing a new irrigation system across a 3.8-acre cemetery section, which includes removing existing irrigation infrastructure and installing 2,215 linear feet of mainline and 5,451 linear feet of lateral line according to specific design plans. The work scope requires layout of irrigation lines aligned with burial plots, installation of specified hardware and equipment, and complete restoration of ground surfaces disturbed during construction, including topsoil, turf, asphalt, and concrete. An optional pre-bid meeting was scheduled for Monday, September 15th at 3:00 PM to provide additional project details and allow potential bidders to ask questions.

The bid sheet indicates a total project cost of $0, which suggests either an error in documentation or potential alternative funding mechanisms. The irrigation system design emphasizes consistent water coverage while maintaining flexibility for future cemetery plot excavations. By improving turf health and ensuring reliable irrigation, the project aims to enhance the cemetery's infrastructure and operational efficiency. No specific pricing breakdown, set-asides, or funding sources are explicitly detailed in the provided documentation, leaving some financial aspects of the project unclear.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet

Lehi City Cemetery Irrigation RFB
Bid Summary Sheet
ItemsCost
Remove existing Irrigation lines & equipment throughout the 3.8 acre area

Layout accordingly and install 2,215 linear feet mainline and 5,451 linear feet of lateral line as per design plans to spec with all specified hardware and equipment called out on design schedule

Replace/Repair all ground surfaces disturbed during project (e.g. topsoil, turf, asphalt and concrete)

Total Project Cost - 0