5-F. AIA 133 Exhibit B - 2019 - CMAR McEachern HS Grandstand Replacement, P26040 - S6K486MCEH - Attachment B1.pdf
PDF 671 KB Posted
- Attached to
- CMAR McEachern HS Grandstand Replacement
- Solicitation number
- P26040
- Issued by
- Cobb County, Georgia
About this file
This is an AIA Document A133 - 2019 Exhibit B Insurance and Bonds document for the McEachern High School Grandstand Replacement project for Cobb County School District, located at 2400 New Macland Road in Power Springs, Georgia. The document outlines comprehensive insurance and bonding requirements for the construction project, with the Construction Manager (currently marked as TBD) responsible for obtaining various insurance coverages and performance bonds. The insurance requirements include commercial general liability, automobile liability, workers' compensation, employers' liability, professional liability, pollution liability, maritime liability, and aircraft liability insurance, with specific policy limits ranging from $500,000 to $2,000,000 depending on the type of coverage.
The Construction Manager is required to provide both a Payment Bond and a Performance Bond, each for 100% of the Contract Sum, from a surety company with an A.M. Best rating of "A-" and specific financial size requirements. Additional requirements include obtaining insurance for physical damage to property in storage and transit, an umbrella liability policy, and a fidelity bond with $5,000,000 in coverage. Subcontractors performing roofing, HVAC, plumbing, sprinkler system, and electrical work with subcontract values of $50,000 or more must also provide performance and payment bonds. The Construction Manager must file a "Notice of Commencement" with the Clerk of the Superior Court of Cobb County prior to beginning work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document A133® – 2019 Exhibit B Insurance and Bonds
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
This document is intended to be used in conjunction with AIA Document A201™–2017, General Conditions of the Contract for Construction. Article 11 of A201™–2017 contains additional insurance provisions.
This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Construction Manager, dated the Eighth day of September in the year Two Thousand Twenty-Five (In words, indicate day, month and year.)
for the following PROJECT:
(Name and location or address)
McEachern High School Grandstand Replacement S6K486MCEH 2400 New Macland Road Power Springs, GA 30127
THE OWNER:
(Name, legal status, and address)
Cobb County School District
514 Glover Street Marietta, Ga. 30060
THE CONSTRUCTION MANAGER:
(Name, legal status, and address)
TBD
TABLE OF ARTICLES
B.1 GENERAL
B.2 OWNER’S INSURANCE
B.3 CONSTRUCTION MANAGER’S INSURANCE AND BONDS
B.4 SPECIAL TERMS AND CONDITIONS
ARTICLE B.1 GENERAL
The Owner and Construction Manager shall purchase and maintain insurance, and provide bonds, as set forth in this Exhibit. As used in this Exhibit, the term General Conditions refers to AIA Document A201™–2017, General Conditions of the Contract for Construction.
ARTICLE B.2 OWNER’S INSURANCE
§ B.2.1 General The Owner does not intend to purchase any general liability, property, or other type of insurance in connection with Project.
§ B.2.2 Liability Insurance The Owner does not intend to purchase general liability insurance.
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
§ B.2.3 Required Property Insurance § B.2.3.1 The obligation to purchase property insurance is placed on the Construction Manager pursuant to Section A.3.3.2.1. The Construction Manager shall purchase and maintain, from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located, property insurance written on a builder's risk “all-risks” completed value or equivalent policy form and sufficient to cover the total value of the entire Project on a replacement cost basis. The property insurance coverage shall be no less than the amount of the initial Contract Sum, plus the value of subsequent Modifications and labor performed and materials or equipment supplied by others. The property insurance shall be maintained until Substantial Completion and thereafter as provided in Section B.2.3.1.3, unless otherwise provided in the Contract Documents or otherwise agreed in writing by the parties to this Agreement. This insurance shall include the interests of the Owner, Construction Manager, Subcontractors, and Sub-subcontractors in the Project as insureds. This insurance shall include the interests of mortgagees as loss payees.
§ B.2.3.1.1 Causes of Loss. The insurance required by this Section B.2.3.1 shall provide coverage for direct physical loss or damage, and shall not exclude the risks of fire, explosion, theft, vandalism, malicious mischief, collapse, earthquake, flood, or windstorm. The insurance shall also provide coverage for ensuing loss or resulting damage from error, omission, or deficiency in construction methods, design, specifications, workmanship, or materials. Sub-limits, if any, are as follows:
(Indicate below the cause of loss and any applicable sub-limit.)
Cause of Loss Sub-Limit
§ B.2.3.1.2 Specific Required Coverages. The insurance required by this Section B.2.3.1 shall provide coverage for loss or damage to falsework and other temporary structures, and to building systems from testing and startup. The insurance shall also cover debris removal, including demolition occasioned by enforcement of any applicable legal requirements, and reasonable compensation for the Architect’s and Construction Manager’s services and expenses required as a result of such insured loss, including claim preparation expenses. Sub-limits, if any, are as follows:
(Indicate below type of coverage and any applicable sub-limit for specific required coverages.)
Coverage Sub-Limit
§ B.2.3.1.3 Reserved.
§ B.2.3.1.4 Deductibles and Self-Insured Retentions. If the insurance required by this Section B.2.3 is subject to deductibles or self-insured retentions, the Construction Manager shall be responsible for all loss not covered because of such deductibles or retentions.
§ A.2.2. Occupancy or Use Prior to Substantial Completion. The Owner’s occupancy or use of any completed or partially completed portion of the Work prior to Substantial Completion shall not commence until the insurance company or companies providing the insurance under Article A.3 have consented in writing to the continuance of coverage. The Owner and the Construction Manager shall take no action with respect to partial occupancy or use that would cause cancellation, lapse, or reduction of insurance, unless they agree otherwise in writing. The Owner and the Construction Manager shall take reasonable steps to obtain the consent of such insurance company or companies for such occupancy (whether full or partial).
§ A.2.3. Insurance for Existing Structures or Property Owner insures properties, whether real, personal, or both, at or adjacent to the Project site by property insurance under policies separate from those insuring the Project under Article B.3, whether during the performance of the Work or after final payment, the Owner shall waive all rights the Construction Manager and any Subcontractor, sub-contractors, suppliers, agents and employees, for damages caused by fire or other causes of loss to such other property, but only to the extent covered by such property insurance.
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
ARTICLE B.3 CONSTRUCTION MANAGER’S INSURANCE AND BONDS
§ B.3.1 General § B.3.1.1 Certificates of Insurance. The Construction Manager shall provide certificates of insurance acceptable to the Owner evidencing compliance with the requirements in this Article B.3 at the following times: (1) two copies within ten days of the issuance of the Notice of Award;(2)prior to commencement of the Work; (3)upon renewal or replacement of each required policy of insurance; and (4) upon the Owner’s written request from time to time. An additional certificate evidencing continuation of commercial liability coverage, including coverage for completed operations, shall be submitted with the final Application for Payment and thereafter upon renewal or replacement of such coverage until the expiration of the periods required by Section B.3.2.1 and Section B.3.3.1. The certificates will show the Owner as an additional insured on the Construction Manager’s Commercial General Liability and excess or umbrella liability policy or policies. The certificates shall be accepted only on the Accord Form 25S and/or 75%, as supplemented by AIA Form G715
§ B.3.1.2 Deductibles and Self-Insured Retentions. The Construction Manager shall disclose to the Owner any deductible or self- insured retentions applicable to any insurance required to be provided by the Construction Manager.
§ B.3.1.3 Additional Insured Obligations. To the fullest extent permitted by law, the Construction Manager shall cause the
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727) commercial general liability coverage to include (1) the Owner, the Architect, and the Architect’s consultants as additional insureds for claims caused in whole or in part by the Construction Manager’s negligent acts or omissions during the Construction Manager’s operations; and (2) the Owner as an additional insured for claims caused in whole or in part by the Construction Manager’s negligent acts or omissions for which loss occurs during completed operations.
The additional insured coverage shall be primary and non-contributory to any of the Owner’s general liability insurance policies and shall apply to both ongoing and completed operations. To the extent commercially available, the additional insured coverage shall be no less than that provided by Insurance Services Office, Inc. (ISO) forms CG 20 10 07 04, CG 20 37 07 04, and, with respect to the Architect and the Architect’s consultants, CG 20 32 07 04.
§ B.3.2 Construction Manager’s Required Insurance Coverage § B.3.2.1 The Construction Manager shall purchase and maintain the following types and limits of insurance from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located. The Construction Manager shall maintain the required insurance until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions, unless a different duration is stated below:
(If the Construction Manager is required to maintain insurance for a duration other than the expiration of the period for correction of Work, state the duration.)
With respect to products and completed operations, Construction Manager shall maintain such coverage in effect for two (2) years following the Substantial Completion of the Work.
§ B.3.2.2 Commercial General Liability § B.3.2.2.1 Commercial General Liability insurance for the Project written on an occurrence form with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) each occurrence, Two Million Dollars ($ 2,000,000.00 ) general aggregate, and Two Million Dollars ($ 2,000,000.00 ) aggregate for products-completed operations hazard, providing coverage for claims including
.1 damages because of bodily injury, sickness or disease, including occupational sickness or disease, and death of any person;
.2 personal injury and advertising injury;
.3 damages because of physical damage to or destruction of tangible property, including the loss of use of such property;
.4 bodily injury or property damage arising out of completed operations;
5. contractual liability coverage; and
6. the Construction Manager’s indemnity obligations under Section 3.18 of the General Conditions.
§ B.3.2.2.2 The Construction Manager’s Commercial General Liability policy under this Section B.3.2.2 shall not contain an exclusion or restriction of coverage for the following:
.1 Claims by one insured against another insured, if the exclusion or restriction is based solely on the fact that the claimant is an insured, and there would otherwise be coverage for the claim.
.2 Claims for property damage to the Construction Manager’s Work arising out of the products-completed operations hazard where the damaged Work or the Work out of which the damage arises was performed by a Subcontractor.
.3 Claims for bodily injury other than to employees of the insured.
.4 Claims for indemnity under Section 3.18 of the General Conditions arising out of injury to employees of the insured.
.5 Claims or loss excluded under a prior work endorsement or other similar exclusionary language.
.6 Claims or loss due to physical damage under a prior injury endorsement or similar exclusionary language.
.7 Claims related to residential, multi-family, or other habitational projects, if the Work is to be performed on such a project.
.8 Claims related to roofing, if the Work involves roofing.
.9 Claims related to exterior insulation finish systems (EIFS), synthetic stucco or similar exterior coatings or surfaces, if the Work involves such coatings or surfaces.
.10 Claims related to earth subsidence or movement, where the Work involves such hazards.
.11 Claims related to explosion, collapse and underground hazards, where the Work involves such hazards.
§ B.3.2.3 Automobile Liability covering vehicles owned, and non-owned vehicles used, by the Construction Manager, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per accident, for bodily injury, death of any person, and property damage arising out of the ownership, maintenance and use of those motor vehicles along with any other statutorily required automobile coverage.
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
§ B.3.2.4 The Construction Manager may achieve the required limits and coverage for Commercial General Liability and Automobile Liability through a combination of primary and excess or umbrella liability insurance, provided such primary and excess or umbrella insurance policies result in the same or greater coverage as the coverages required under Section B.3.2.2 and B.3.2.3, and in no event shall any excess or umbrella liability insurance provide narrower coverage than the primary policy. The excess policy shall not require the exhaustion of the underlying limits only through the actual payment by the underlying insurers.
§ B.3.2.5 Workers’ Compensation at statutory limits.
§ B.3.2.6 Employers’ Liability with policy limits not less than Five Hundred Thousand Dollars ($ 500,000.00 ) each accident, Five Hundred Thousand Dollars ($ 500,000.00 ) each employee, and Five Hundred Thousand Dollars ($ 500,000.00 ) policy limit.
§ B.3.2.7 Jones Act, and the Longshore & Harbor Workers’ Compensation Act, as required, if the Work involves hazards arising from work on or near navigable waterways, including vessels and docks
§ B.3.2.8 If the Construction Manager is required to furnish professional services as part of the Work, the Construction Manager shall procure Professional Liability insurance covering performance of the professional services, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.2.9 If the Work involves the transport, dissemination, use, or release of pollutants, the Construction Manager shall procure Pollution Liability insurance, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.2.10 Coverage under Sections B.3.2.8 and B.3.2.9 may be procured through a Combined Professional Liability and Pollution Liability insurance policy, with combined policy limits of not less than Two Million Dollars ($ 2,000,000.00 ) per claim and Two Million Dollars ($ 2,000,000.00 ) in the aggregate.
§ B.3.2.11 Insurance for maritime liability risks associated with the operation of a vessel, if the Work requires such activities, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.2.12 Insurance for the use or operation of manned or unmanned aircraft, if the Work requires such activities, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.3 Construction Manager’s Other Insurance Coverage § B.3.3.1 Insurance selected and described in this Section B.3.3 shall be purchased from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located. The Construction Manager shall maintain the required insurance until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions, unless a different duration is stated below:
(If the Construction Manager is required to maintain any of the types of insurance selected below for a duration other than the expiration of the period for correction of Work, state the duration.)
§ B.3.3.2 The Construction Manager shall purchase and maintain the following types and limits of insurance in accordance with Section B.3.3.1.
(Select the types of insurance the Construction Manager is required to purchase and maintain by placing an X in the box(es) next to the description(s) of selected insurance. Where policy limits are provided, include the policy limit in the appropriate fill point.)
[ X ] § B.3.3.2.1 Property insurance of the same type and scope satisfying the requirements identified in Section B.2.3, which, if selected in this Section B.3.3.2.1, relieves the Owner of the responsibility to purchase and maintain such insurance except insurance required by Section B.2.3.1.3 and Section B.2.3.3. The Construction Manager shall comply with all obligations of the Owner under Section B.2.3 except to the extent provided below. The Construction Manager shall disclose to the Owner the amount of any deductible, and the Owner shall be responsible for losses within the deductible. Upon request, the
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
Construction Manager shall provide the Owner with a copy of the property insurance policy or policies required. The Owner shall adjust and settle the loss with the insurer and be the trustee of the proceeds of the property insurance in accordance with Article 11 of the General Conditions unless otherwise set forth below:
(Where the Construction Manager’s obligation to provide property insurance differs from the Owner’s obligations as described under Section B.2.3, indicate such differences in the space below. Additionally, if a party other than the Owner will be responsible for adjusting and settling a loss with the insurer and acting as the trustee of the proceeds of property insurance in accordance with Article 11 of the General Conditions, indicate the responsible party below.)
[ ] § B.3.3.2.2 Railroad Protective Liability Insurance, with policy limits of not less than ($ ) per claim and ($ ) in the aggregate, for Work within fifty (50) feet of railroad property.
[ ] § B.3.3.2.3 Asbestos Abatement Liability Insurance, with policy limits of not less than ($ ) per claim and ($ ) in the aggregate, for liability arising from the encapsulation, removal, handling, storage, transportation, and disposal of asbestos-containing materials.
[ X ] § B.3.3.2.4 Insurance for physical damage to property while it is in storage and in transit to the construction site on an “all-risks” completed value form.
[ ] § B.3.3.2.5 Property insurance on an “all-risks” completed value form, covering property owned by the Construction Manager and used on the Project, including scaffolding and other equipment.
[ X ] § B.3.3.2.6 Other Insurance (List below any other insurance coverage to be provided by the Construction Manager and any applicable limits.)
Coverage Limits Umbrella Fidelity Bond (including third-party coverage
$5,000,000.00 per claim and per aggregate $5,000,000.00 per claim
§ B.3.4 Performance Bond and Payment Bond B.3.4.1 The Construction Manager shall provide surety bonds, from a company or companies lawfully authorized to issue surety bonds in the, State of Georgia as follows:
(Specify type and penal sum of bonds.)
Type Payment Bond 100% of the Contract Sum
Performance Bond 100% of the Contract Sum
B.3.4.2 Payment and Performance Bonds shall be AIA Document A312™, Payment Bond and Performance Bond, as modified by Owner.
B.3.4.3 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the Construction Manager shall promptly furnish a copy of the bonds or shall permit a copy to be made thereof. Upon any request for copies of the bonds or demand for payment thereon being submitted to the Owner, the Owner shall have the right to furnish a copy of the bonds to such person or entity.
B.3.4.4 The surety company issuing the bonds shall have an A.M. Best Company minimum rating and a minimum financial size in accordance with the following:
1. For projects with a Contract Sum of less than $2,000,000.00, and A.M. Best rating of “A-” with a financial size of VI (6) or greater; and
2. For projects with an initial Contract Sum of $2,000,000.00 or more, an A.M. Best rating “A-” with a financial Size of VII (7) or better.
AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
B.3.4.5 The agent issuing the bonds must submit a letter stating that the surety company meets the requirements stated above. The Attorney-in-Fact who executes the bonds on behalf of the surety company shall attach a current, certified copy of his Power of Attorney to the bonds.
B.3.4.6 The Construction Manager shall require that each Subcontractor who performs roofing, HVAC, plumbing, sprinkler system and electrical work with an initial Subcontract value of $50,000.00 or more, provide performance and payment bonds equal to one hundred percent (100%) of the Subcontract value. The surety company(ies) issuing such bonds shall meet the requirements set forth in Section B.3.4.4. The amount of such Subcontractor bonds shall be included in the Construction Manager base bid or proposal.
B.3.4.7 Prior to commencement of the Work, the Construction Manager shall post “Notice of Commencement” at the Project site and file it with the Clerk of the Superior Court of Cobb County. A copy of the Notice of Commencement with evidence of its having been filed shall be submitted to the Owner with the Construction Manager’s bonds
ARTICLE B.4 SPECIAL TERMS AND CONDITIONS
Special terms and conditions that modify this Insurance and Bonds Exhibit, if any, are as follows:
Additions and Deletions Report for AIA® Document A133® – 2019 Exhibit B
This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text.
Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 11:48:30 EDT on 09/08/2025.
Additions and Deletions Report for AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
Changes to original AIA text
Prior to commencement of the Work, the Owner shall secure the insurance, and provide evidence of the coverage, required under this Article B.2 and, upon the Construction Manager’s request, provide a copy of the property insurance policy or policies required by Section B.2.3. The copy of the policy or policies provided shall contain all applicable conditions, definitions, exclusions, and endorsements. The Owner does not intend to purchase any general liability, property, or other type of insurance in connection with Project.
The Owner shall be responsible for purchasing and maintaining the Owner’s usual does not intend to purchase general liability insurance.
§ B.2.3.1 Unless this obligation The obligation to purchase property insurance is placed on the Construction Manager pursuant to Section B.3.3.2.1, the Owner A.3.3.2.1. The Construction Manager shall purchase and maintain, from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is located, property insurance written on a builder's risk “all-risks” completed value or equivalent policy form and sufficient to cover the total value of the entire Project on a replacement cost basis.
The Owner’s property insurance coverage shall be no less than the amount of the initial Contract Sum, plus the value of subsequent Modifications and labor performed and materials or equipment supplied by others. The property insurance shall be maintained until Substantial Completion and thereafter as provided in Section B.2.3.1.3, unless otherwise provided in the Contract Documents or otherwise agreed in writing by the parties to this Agreement. This insurance shall include the interests of the Owner, Construction Manager, Subcontractors, and Sub-subcontractors in the Project as insureds. This insurance shall include the interests of mortgagees as loss payees.
§ B.2.3.1.3 Unless the parties agree otherwise, upon Substantial Completion, the Owner shall continue the insurance required by Section B.2.3.1 or, if necessary, replace the insurance policy required under Section B.2.3.1 with property insurance written for the total value of the Project that shall remain in effect until expiration of the period for correction of the Work set forth in Section 12.2.2 of the General Conditions.Reserved.
§ B.2.3.1.4 Deductibles and Self-Insured Retentions. If the insurance required by this Section B.2.3 is subject to deductibles or self-insured retentions, the Owner Construction Manager shall be responsible for all loss not covered because of such deductibles or retentions.
§ B.2.3.2 A.2.2. Occupancy or Use Prior to Substantial Completion. The Owner’s occupancy or use of any completed or partially completed portion of the Work prior to Substantial Completion shall not commence until the insurance company or companies providing the insurance under Section B.2.3.1 Article A.3 have consented in writing to the continuance of coverage. The Owner and the Construction Manager shall take no action with respect to partial occupancy or use that would cause cancellation, lapse, or reduction of insurance, unless they agree otherwise in writing. The Owner and the Construction Manager shall take reasonable steps to obtain the consent of such insurance company or companies for such occupancy (whether full or partial).
Additions and Deletions Report for AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
§ B.2.3.3 A.2.3. Insurance for Existing Structures or Property
If the Work involves remodeling an existing structure or constructing an addition to an existing structure, the Owner shall purchase and maintain, until the expiration of the period for correction of Work as set forth in Section
12.2.2 of the General Conditions, “all-risks” property insurance, on a replacement cost basis, protecting the existing structure against direct physical loss or damage from the causes of loss identified in Section B.2.3.1, notwithstanding the undertaking of the Work. The Owner shall be responsible for allco-insurance penalties. Owner insures properties, whether real, personal, or both, at or adjacent to the Project site by property insurance under policies separate from those insuring the Project under Article B.3, whether during the performance of the Work or after final payment, the Owner shall waive all
§ B.2.4 Optional Extended Property Insurance.
The Owner shall purchase and maintain the insurance selected anddescribed below.rights the Construction Manager and any Subcontractor, sub-contractors, suppliers, agents and
(Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es) next to the description(s) of selected insurance.For each type of insurance selected, indicate applicable limits of coverage or other conditions in the fill point below the selected item.)employees, for damages caused by fire or other causes of loss to such other property, but only to the extent covered by such property insurance.
[ ] § B.2.4.1 Loss of Use, Business Interruption, and Delay in Completion Insurance, to reimburse the Owner for loss of use of the Owner’s property, or the inability to conduct normal operations due to a covered cause of loss.§
[ ] § B.2.4.2 Ordinance or Law Insurance, for the reasonable and necessary costs to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, replacement or use of the Project.
[ ] § B.2.4.3 Expediting Cost Insurance, for the reasonable and necessary costs for the temporary repair of damage to insured property, and to expedite the permanent repair or replacement of the damaged property.
[ ] § B.2.4.4 Extra Expense Insurance, to provide reimbursement of the reasonable and necessary excess costs incurred during the period of restoration or repair of the damaged property that are over and above the total costs that would normally have been incurred during the same period of time had no loss or damage occurred.
[ ] § B.2.4.5 Civil Authority Insurance, for losses or costs arising from an order of a civil authority prohibiting access to the Project, provided such order is the direct result of physical damage covered under the required property insurance.
[ ] § B.2.4.6 Ingress/Egress Insurance, for loss due to the necessary interruption of the insured’s business due to physical prevention of ingress to, or egress from, the Project as a direct result of physical damage.
[ ] § B.2.4.7 Soft Costs Insurance, to reimburse the Owner for costs due to the delay of completion of the Work, arising out of physical loss or damage covered by the required property insurance:
including construction loan fees; leasing and marketing expenses; additional fees, including those of architects, engineers, consultants, attorneys and accountants, needed for the completion of the construction, repairs, or reconstruction; and carrying costs such as property taxes, building permits, additional interest on loans, realty taxes, and insurance premiums over and above normal expenses.
Additions and Deletions Report for AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
§ B.2.5 Other Optional Insurance.
The Owner shall purchase and maintain the insurance selected below.
(Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es) next to the description(s) of selected insurance.)
[ ] § B.2.5.1 Cyber Security Insurance for loss to the Owner due to data security and privacy breach, including costs of investigating a potential or actual breach of confidential or private information.
(Indicate applicable limits of coverage or other conditions in the fill point below.)
[ ] § B.2.5.2 Other Insurance
(List below any other insurance coverage to be provided by the Owner and any applicable limits.)
Coverage Limits
§ B.3.1.1 Certificates of Insurance. The Construction Manager shall provide certificates of insurance acceptable to the Owner evidencing compliance with the requirements in this Article B.3 at the following times: (1) prior to commencement of the Work; (2) upon two copies within ten days of the issuance of the Notice of Award;(2)prior to commencement of the Work; (3)upon renewal or replacement of each required policy of insurance; and (3) (4) upon the Owner’s written request. request from time to time. An additional certificate evidencing continuation of commercial liability coverage, including coverage for completed operations, shall be submitted with the final Application for Payment and thereafter upon renewal or replacement of such coverage until the expiration of the periods required by Section B.3.2.1 and Section B.3.3.1. The certificates will show the Owner as an additional insured on the Construction Manager’s Commercial General Liability and excess or umbrella liability policy or policies. The certificates shall be accepted only on the Accord Form 25S and/or 75%, as supplemented by AIA Form G715
.4 bodily injury or property damage arising out of completed operations;
5. contractual liability coverage; and
.5 6. the Construction Manager’s indemnity obligations under Section 3.18 of the General Conditions.
Coverage Limits Umbrella Fidelity Bond (including third-party coverage
$5,000,000.00 per claim and per aggregate $5,000,000.00 per claim
B.3.4.1 The Construction Manager shall provide surety bonds, from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located, the, State of Georgia as follows:
(Specify type and penal sum of bonds.)
Type
Additions and Deletions Report for AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727)
Payment Bond 100% of the Contract Sum
Performance Bond 100% of the Contract Sum
B.3.4.2 Payment and Performance Bonds shall be AIA Document A312™, Payment Bond and Performance Bond, as modified by Owner.
or contain provisions identical B.3.4.3 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the Construction Manager shall promptly furnish a copy of the bonds or shall permit a copy to be made thereof. Upon any request for copies of the bonds or demand for payment thereon being submitted to the Owner, the Owner shall have the right to furnish a copy of the bonds to such person or entity.
B.3.4.4 The surety company issuing the bonds shall have an A.M. Best Company minimum rating and a minimum financial size in accordance with the following:
1. For projects with a Contract Sum of less than $2,000,000.00, and A.M. Best rating of “A-” with a financial size of VI (6) or greater; and
2. For projects with an initial Contract Sum of $2,000,000.00 or more, an A.M. Best rating “A-” with a financial
Size of VII (7) or better.
B.3.4.5 The agent issuing the bonds must submit a letter stating that the surety company meets the requirements stated above. The Attorney-in-Fact who executes the bonds on behalf of the surety company shall attach a current, certified copy of his Power of Attorney to the bonds.
B.3.4.6 The Construction Manager shall require that each Subcontractor who performs roofing, HVAC, plumbing, sprinkler system and electrical work with an initial Subcontract value of $50,000.00 or more, provide performance and payment bonds equal to one hundred percent (100%) of the Subcontract value. The surety company(ies) issuing such bonds shall meet the requirements set forth in Section B.3.4.4. The amount of such Subcontractor bonds shall be included in the Construction Manager base bid or proposal.
to AIA Document A312™, current as of the date of this Agreement.B.3.4.7 Prior to commencement of the Work, the Construction Manager shall post “Notice of Commencement” at the Project site and file it with the Clerk of the Superior Court of Cobb County. A copy of the Notice of Commencement with evidence of its having been filed shall be submitted to the Owner with the Construction Manager’s bonds
Variable Information
This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Construction Manager, dated the Eighth day of September in the year Two Thousand Twenty-Five (In words, indicate day, month and year.)
Additions and Deletions Report for AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
McEachern High School Grandstand Replacement S6K486MCEH
2400 New Macland Road Power Springs, GA 30127
Cobb County School District 514 Glover Street Marietta, Ga. 30060
TBD
With respect to products and completed operations, Construction Manager shall maintain such coverage in effect for two (2) years following the Substantial Completion of the Work.
§ B.3.2.2.1 Commercial General Liability insurance for the Project written on an occurrence form with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) each occurrence, Two Million Dollars ($ 2,000,000.00 ) general aggregate, and Two Million Dollars ($ 2,000,000.00 ) aggregate for products-completed operations hazard, providing coverage for claims including
§ B.3.2.3 Automobile Liability covering vehicles owned, and non-owned vehicles used, by the Construction Manager, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per accident, for bodily injury, death of any person, and property damage arising out of the ownership, maintenance and use of those motor vehicles along with any other statutorily required automobile coverage.
§ B.3.2.6 Employers’ Liability with policy limits not less than Five Hundred Thousand Dollars ($ 500,000.00 ) each accident, Five Hundred Thousand Dollars ($ 500,000.00 ) each employee, and Five Hundred Thousand Dollars ($ 500,000.00 ) policy limit.
§ B.3.2.8 If the Construction Manager is required to furnish professional services as part of the Work, the Construction Manager shall procure Professional Liability insurance covering performance of the professional services, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.2.9 If the Work involves the transport, dissemination, use, or release of pollutants, the Construction Manager shall procure Pollution Liability insurance, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.2.10 Coverage under Sections B.3.2.8 and B.3.2.9 may be procured through a Combined Professional Liability and Pollution Liability insurance policy, with combined policy limits of not less than Two Million Dollars ($ 2,000,000.00 ) per claim and Two Million Dollars ($ 2,000,000.00 ) in the aggregate.
§ B.3.2.11 Insurance for maritime liability risks associated with the operation of a vessel, if the Work requires such activities, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
§ B.3.2.12 Insurance for the use or operation of manned or unmanned aircraft, if the Work requires such activities, with policy limits of not less than One Million Dollars ($ 1,000,000.00 ) per claim and One Million Dollars ($ 1,000,000.00 ) in the aggregate.
[ X ] § B.3.3.2.1 Property insurance of the same type and scope satisfying the requirements identified in
Section B.2.3, which, if selected in this Section B.3.3.2.1, relieves the Owner of the
Additions and Deletions Report for AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 11:48:30 EDT on 09/08/2025 under Subscription No.20240086109 which expires on 01/24/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (68befa7f8369e9f60a385727) responsibility to purchase and maintain such insurance except insurance required by Section B.2.3.1.3 and Section B.2.3.3. The Construction Manager shall comply with all obligations of the Owner under Section B.2.3 except to the extent provided below. The Construction Manager shall disclose to the Owner the amount of any deductible, and the Owner shall be responsible for losses within the deductible. Upon request, the Construction Manager shall provide the Owner with a copy of the property insurance policy or policies required. The Owner shall adjust and settle the loss with the insurer and be the trustee of the proceeds of the property insurance in accordance with Article 11 of the General Conditions unless otherwise set forth below:
[ X ] § B.3.3.2.4 Insurance for physical damage to property while it is in storage and in transit to the construction site on an “all-risks” completed value form.
[ X ] § B.3.3.2.6 Other Insurance
| ARTICLE B.1 GENERAL |
| ARTICLE B.2 OWNER’S INSURANCE |
| ARTICLE B.3 CONSTRUCTION MANAGER’S INSURANCE AND BONDS |
| ARTICLE B.4 SPECIAL TERMS AND CONDITIONS |
File details come from the government source that posted it. Updated .