This is a Request for Proposal (RFP) P26040 issued by the Cobb County School District (CCSD) for a Construction Manager at Risk (CMAR) project to replace the grandstand at McEachern High School. The project involves demolishing the existing precast concrete grandstand and associated support facilities, and constructing a new grandstand with aluminum bleachers, a new press box, and new restroom/concessions facilities. The total construction budget is approximately $8,500,000, with the facility expected to be approximately 6,500 square feet and include 2,850 new seats. The mandatory pre-proposal meeting is scheduled for September 17, 2025, at 10:00 AM ET, and proposal responses are due by October 8, 2025, at 2:00 PM ET. The project timeline anticipates construction activities starting in January 2026, with substantial completion expected by December 18, 2026.
The evaluation will be based on a 600-point system, with 400 points for non-cost factors (firm overview, financial information, project approach, and project experience) and 100 points for initial cost, plus 100 points for contractor interviews/presentations. Proposers must be prequalified according to CCSD Board Administrative Rule, provide proof of previous job experience, have a current Georgia General Contractor's license, and submit a bid bond equal to 5% of the total construction budget. The project will use the AIA A133-2019 agreement, and the design professional is Hussey Gay Bell. Preference will be given to companies with headquarters or branch offices within 150 miles of Marietta, Georgia, and to those with experience in grandstand, CM at Risk, or K12/Higher Education projects.
View the file
Other files for this state and local contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal (RFP) P26040
CMAR McEachern HS Grandstand Replacement RFP ISSUANCE DATE: September 10, 2025
PURCHASING CONTACT: Wendy Bell, 770-426-3333, wendy.bell@cobbk12.org
IMPORTANT DATES
The Cobb County School District (CCSD) central offices will be closed
September 22 and 23, 2025 for fall break.
EVENTS DATES
RFP issued and posted to CCSD Euna Procurement Portal https://cobbk12.bonfirehub.com/portal/?tab=openOpportunities September 10, 2025 Mandatory pre-proposal meeting at McEachern High School, 2400 New Macland Road, Powder Springs, GA 30127 Meet in the School's Main Administration Office September 17, 2025 at 10:00 AM ET Deadline for submitting prequalification requirements to Wendy Bell, wendy.bell@cobbk12.org September 26, 2025 at 2:00 PM ET Deadline for written questions submitted through the CCSD Euna Procurement Portal September 26, 2025 at 2:00 PM ET Responses to questions posted on the CCSD Euna Procurement Portal October 3, 2025, at 2:00 PM ET Deadline for RFP responses submitted to the CCSD Euna Procurement Portal October 8, 2025 at 2:00 PM ET
Evaluation October, 2025
Award November, 2025
CM to Begin Preconstruction Services November 14, 2025
Attendance at the pre-proposal meeting is mandatory in order to submit a proposal.
mailto:wendy.bell@cobbk12.org https://cobbk12.bonfirehub.com/portal/?tab=openOpportunities mailto:wendy.bell@cobbk12.org
Procurement Services Department
BOARD OF EDUCATION David Chastain, Chair • John Cristadoro, Vice Chair
Randy Scamihorn • Becky Sayler • Leroy Tre’ Hutchins • Nichelle Davis • Brad Wheeler
SUPERINTENDENT Chris Ragsdale
514 Glover Street Marietta, GA 30060 Telephone: (770) 426-3300 www.cobbk12.org One Team, One Goal: Student Success
September 10, 2025
TO ALL OFFERORS:
Cobb County School District (CCSD) invites proposals for providing Construction Manager at Risk services required for “Request For Proposal (RFP) P26040, CMAR McEachern HS Grandstand Replacement” as described in this document.
The CCSD Procurement Services Department General Terms and Conditions are hereby acknowledged, understood, and agreed to by the parties and are hereby fully incorporated into the solicitation document and the resulting contract. Refer to the CCSD Procurement Services website for the complete General Terms and Conditions. Go to www.cobbk12.org. From this screen, select “Menu”, select “Departments”, choose “Procurement Services” and find the link to “General Terms and Conditions” located in the center of the page under “Purchasing Resources”.
A mandatory pre-proposal meeting will be held at 10:00 AM ET on September 17, 2025 at McEachern High School, 2400 New Macland Road, Powder Springs, GA 30127.
Offerors are instructed to read carefully all terms, conditions, specifications, and requirements in this RFP.
Offerors are required to complete and return all forms in their entirety. Questions regarding the proposal must be submitted through the CCSD Euna Procurement Portal. Only questions received prior to September 26, 2025 at 2:00 PM ET shall be considered. Answers will be posted to the CCSD Euna Procurement Portal by October 3, 2025.
All proposals must be submitted through the CCSD Euna Procurement Portal. Proposals submitted in any manner other than through the CCSD Euna Procurement Portal will not be accepted.
The proposal acceptance period will close on October 8, 2025 at 2:00 p.m. Eastern Time. Please allow ample time to complete the submission through the CCSD Euna Procurement Portal. Proposals submitted after the due date/time will not be accepted, however, proposals can be submitted before the due date/time.
CCSD reserves the right to accept or reject any or all proposals and to waive any technicalities or informalities.
Your interest and participation in the CCSD solicitation process is appreciated.
Sincerely, Barbara Bates, CPPB, NIGP-CPP Director of Procurement Services http://www.cobbk12.org/
RFP P26040, CMAR McEachern HS Grandstand Replacement
COBB COUNTY SCHOOL DISTRICT
MARIETTA, GEORGIA
PROCUREMENT SERVICES DEPARTMENT
TABLE OF CONTENTS
Section Page #(s)
Submission Requirements 4 - 7
Special Terms and Conditions 8 - 17
Conflict of Interest 18
MARIETTA, GEORGIA
PROCUREMENT SERVICES DEPARTMENT
SUBMISSION REQUIREMENTS
1.0 COMMUNICATIONS WITH CCSD STAFF
1.1 All communications concerning this RFP must be submitted in writing through the CCSD
Euna Procurement Portal. Only written responses distributed by the Procurement Services Department and posted in the CCSD Euna Procurement Portal will be binding upon the CCSD. The Procurement Services Department, at its discretion, may call upon user departments for clarification in their area of expertise.
1.2 From the issue date of this RFP until the completion of the entire solicitation process and announcement of award notification, all offeror communication must be authorized by the Procurement Services Department including but not limited to communications with school system employees and/or contracted agents related to this RFP. Violation of this provision may result in the rejection of the offeror’s response.
1.3 It is the offeror’s responsibility to check the CCSD Euna Procurement Portal for any addenda, responses to offeror questions, or other communications that may be issued or released during the solicitation period. The proposal opening will be delayed by seventy-two (72) hours if addenda are issued within seventy-two (72) hours of the anticipated proposal opening. Following receipt of the offeror's responses to a solicitation, it is the offeror’s responsibility to be available via email and phone during the review process in the event clarification or additional information is required. If clarification or additional information is requested, the responsibility rests on the offeror to ensure that CCSD receives the requested information before the deadline(s) indicated.
2.0 SUBMISSION OF PROPOSALS
2.1 Responses must be submitted as directed on the CCSD Euna Procurement Portal.
Required forms must be completed in their entirety. Late proposals will not be accepted. CCSD is not responsible for the failure of the vendor’s computer hardware, software, or other communications systems or devices.
2.2 Offerors are instructed to read all terms, conditions, and specifications as outlined in the RFP carefully. Any correction made within the RFP submission (strikethrough) must be initialed by an authorized representative of the company submitting the proposal or the proposal may be rejected by CCSD.
2.3 All responses submitted become the property of the CCSD and are subject to applicable open records policies and laws.
2.4 CCSD reserves the right to declare the response non-responsive and to take such remedial action as it deems necessary or appropriate. Such remedial action includes but is not limited to, suspending the vendor from participating in future CCSD solicitations.
MARIETTA, GEORGIA
PROCUREMENT SERVICES DEPARTMENT
SUBMISSION REQUIREMENTS
2.5 Non-Cost Proposal Submission Requirements are located in Special Terms and Conditions, Sections 6.2 – 6.5. Each section should be clearly labeled with the corresponding RFP section name and number.
3.0 EVALUATION
3.1 Organization and Completeness of Proposal - Offeror’s proposal must provide straightforward, concise proof of the capabilities to satisfy RFP requirements. For ease of review, responses must be organized in the same order as the RFP or as stipulated in the RFP. Each section should be clearly labeled with the corresponding RFP section name and number. Any additional documents provided by the offeror must also be clearly labeled with the corresponding RFP section name and number. All requested information must be included, and all forms completed in their entirety. (All spaces must be completed on all requested documentation.) Any proposals that do not include all required information may be considered non-responsive and disqualified.
3.2 Evaluation Procedures – Review of Proposals - A committee comprised of representatives from the Planning/Construction/SPLOST, Design Team, and Procurement Services Departments will evaluate the proposal responses based on qualifications, relevant experience, responsiveness of proposers, as well as cost. Cost will not be the sole determining factor in the award.
Each proposal will be reviewed for completeness to ensure that all mandatory requirements are addressed satisfactorily. The committee may request additional clarification/information from the responding offeror(s).
The committee will evaluate the quality and completeness of each response as it addresses each requirement of the RFP. All non-cost related areas of the response are evaluated during this phase. A list of areas being reviewed for this specific RFP, along with the associated point values is included in the Evaluation Criteria located in section
3.5. The committee may, in its sole discretion and in the course of the evaluation, request presentation(s)/demonstration(s) with one or more selected offerors.
Responses must satisfactorily meet non-cost requirements before the cost is evaluated.
3.3 A determination of the competitive range may be made during the evaluation process.
Offerors not in the competitive range of being selected for an award shall be eliminated from further discussion.
3.4 During the evaluation phase, discussions may be conducted with offerors who submit proposals determined to be reasonably likely to be selected for award. These discussions are for negotiations, clarification, interviews, and to assure a full understanding of and responsiveness to the solicitation requirements. Offerors will be accorded fair and equal treatment with respect to an opportunity for discussion and revision of proposals. Procurement Services may permit revisions after submission and
MARIETTA, GEORGIA
PROCUREMENT SERVICES DEPARTMENT
SUBMISSION REQUIREMENTS
prior to award, to obtain the best and final offers. In all events, CCSD reserves the right to re-solicit the item(s)/services(s) involved.
3.5 Evaluation Criteria – The selection of a construction manager at risk for the CMAR McEachern HS Grandstand Replacement will be based on the review of several key elements in the proposals submitted. They include, but are not limited to the following criteria:
# Description Points Possible
1. Firm Overview (Special Terms & Conditions Section 6.2) 25
2. Financial Information (Special Terms & Conditions Section 6.3) 25
3. Project Approach (Special Terms & Conditions Section 6.4) 175
4. Project Experience (Special Terms & Conditions Section 6.5) 175
Non-Cost Subtotal 400
5. Initial Cost 100
TOTAL 500
The non-cost component of proposals (total of factors 1 – 4) can receive a maximum of 400 points out of 500 points possible. Cost will be scored for only those proposals that receive 70% or more of total non-cost points (280 or more points).
In the first stage, CCSD will evaluate the non-cost criteria (i.e. Factors 1-4). The non-cost criteria will be evaluated for quality and completeness and to ensure that all mandatory requirements of the RFP are addressed satisfactorily. All non-cost related areas of the response are evaluated during this phase.
In the second stage, the proposals that received 70% or more of the total non-cost points will have their cost evaluated (Factor 5). The Cost Evaluation Formula: (Lowest Price/R-where “R” represents the cost of the proposal currently being ranked) x Points = Score. The scores on the non-cost and cost criteria will then be combined to determine offerors within the competitive range.
During the third and final phase, a shortlist of offerors may be selected. Negotiations, interviews, and/or presentations may be conducted with the contractors on the shortlist. The contents of the proposals will remain confidential during such negotiations, interviews, and/or presentations. The evaluation committee may
MARIETTA, GEORGIA
PROCUREMENT SERVICES DEPARTMENT
SUBMISSION REQUIREMENTS
evaluate the information obtained during this phase and provide a score for this category.
Description Points Possible
Non-Cost Score 400
Initial Cost Score 100
Contractor Interviews/Presentations 100
TOTAL 600
After the second and/or third phases, the contractors in the competitive range may then be allowed to submit a best and final offer (“BAFO”) cost. A final score for each contractor will be computed based upon replacing the “Initial Cost” category score with scoring based on the BAFO Cost. BAFO Cost Evaluation Formula: (Lowest Price/R-where “R” represents the cost of the proposal currently being ranked) x Points = Score.
Description Points Possible
Non-Cost Score 400
BAFO Cost Score 100
Contractor Interviews/Presentations 100
TOTAL 600
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
The Special Terms and Conditions are customized specifically to this solicitation. Taking exception(s) to these terms and conditions or submitting conflicting language may be cause for rejection of the offeror’s response.
Should these Special Terms and Conditions conflict with the General Terms and Conditions, the Special Terms and Conditions will control.
1.0 PURPOSE – This solicitation is for the services of a construction manager at risk for the McEachern High School Grandstand Replacement.
1.1 OWNER’S REPRESENTATIVE. Supervision of and monitoring of the performance of the contract will be performed by CCSD’s representative, Wade Richardson, or his designee.
2.0 SCOPE OF WORK
2.1 The project is for the demolition of the existing precast concrete grandstand and associated support facilities below the stands. As well as to construct new/ replacement grandstand with aluminum bleachers, a new press box, and new restroom /concessions facilities.
2.2 It is understood that the existing artificial turf field may be impacted by this scope of work. If the field cannot be protected from damage or must otherwise be modified to complete the demolition of the existing grandstands and/or construction of the new grandstands, the field must be returned to its current condition as part of this scope of work. It is the owner’s expectation that this field will be ready for use by August 6, 2026, unless otherwise noted in the project approach as cited in the Project Timeline (Special Terms and Conditions, Section 3.4). The existing turf field was installed in June 2023 by Capital Sports Construction and is under an 8-year manufacturer’s warranty. The field turf is SporTurf - Game Changer. The contact for Capital Sports Construction is Layla Tippens at 678-779-1650.
2.3 The Preconstruction Services Phase Fee will be contracted at a lump sum amount.
Preconstruction services will be provided to help CCSD meet established programs, budgets, and quality levels. The preconstruction work will include cost estimating, scheduling, construction document review, and other services typically required for preconstruction services. At this time, it is anticipated that preconstruction services will begin on November 14, 2025.
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
2.4 The Construction Phase Fee will be a percentage of Construction Cost as described in Articles 5 and 6 of the A133-2019, Attachment B, as modified by CCSD. General Conditions will be negotiated and included as a part of the Guaranteed Maximum Price (s) (GMP) of the Construction Contract. Construction services will include all elements related to the site and building for CMAR McEachern HS Grandstand Replacement, P26040, located at 2400 New Macland Road, Powder Springs, GA 30127. The facility will be approximately 6,500 square feet in new gross floor area and approximately 2,850 new seats. Demolition and removal of approximately 6,000 seats of precast concrete bleachers and press box.
2.5 Work will include, but is not limited to, demolition, site work, concrete flatwork and foundations, structural steel, exterior and interior masonry, roofing, doors, windows, hardware, finishes, specialties, plumbing, HVAC, fire protection and electrical systems.
2.6 Work will include, but is not limited to the following:
2.6.1 Site:
2.6.1.1 Demolition of existing select site and building elements to facilitate new replacement grandstand with aluminum bleachers, new press box, and new restroom /concessions facilities.
2.6.2 Building:
2.6.2.1 Construction of approximately 6,500 square feet in new gross floor area, concession, restrooms, and approximately 2,850 new seats.
2.7 The awarded Construction Manager (CM) will prepare bid package(s) for contracting the entire work as described in Attachment B, B1, A133-2019, as modified by CCSD. The Construction Manager will receive competitive bids. The CCSD’s total construction budget for the project is approximately $8,500,000.00.
3.0 PROJECT TIMELINE
3.1 It is anticipated that construction activities will start in January 2026.
3.2 It is likely that there will be a separate site: demolition package and building package. Other packages, if needed, will be determined by the team as the project is designed.
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
3.3 It is the owners’ expectation to occupy the new grandstands and ancillary buildings with substantial completion of the project on or before December 18, 2026.
3.4 It is the owner’s expectation to use the stadium field for football games beginning August 7, 2026 through December 4, 2026 with the understanding that the new grandstands will not be complete and will not be able to be occupied. The school will have access to the East stands and North endzone stands, along with the entire field for all scheduled Friday night home games (5-6 games, dates TBD), but no practices would be scheduled on the field on other days. Access/Egress will need to be maintained to and from these areas and any work areas around the new stands will need to be secured by the Construction Manager during games.
If construction of the new stand and ancillary buildings will prevent the use of the stadium field and remaining stands during this time, it must be indicated in the Project Approach (Special Terms and Conditions, Section 6.4).
3.5 Building Package Anticipated Dates
Event Date 50% Demo Drawings & 40 % DD for GC Review September 9,2025 Final Building Drawings and Permit Submittal December 18,2025 Issue Bid Packages December 18, 2025 Substantial Completion December 18, 2026
4.0 CONTRACT DOCUMENTS
The design professional is Hussey Gay Bell. Hussey Gay Bell has completed the construction document phase.
5.0 LIQUIDATED DAMAGES – are listed in AIA Document A201-2017, General Conditions of the Contract for Construction, as modified by CCSD (Attachment A).
6.0 REQUIREMENTS FOR PROPOSALS
Reference the appropriate section number on all documents submitted in response to requirements in this section.
6.1 MANDATORY REQUIREMENTS
6.1.1 To be eligible to respond to this RFP, Construction Managers must pre-qualify as outlined in CCSD Board Administrative Rule FGC-R (Construction
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
Contractor Prequalification). Details are available on the CCSD website, www.cobbk12.org by selecting Menu, next select Board, click on Policies & Rules under Board on the left-hand side of the page, then select Section F, and choose FGC-R. The deadline for submitting prequalification requirements for this project is September 26, 2025 at 2:00 PM ET.
6.1.2 Construction Managers must provide proof of previous job experience within 30% of the Stated Cost Limitation (SCL) or scope of this project.
6.1.3 Attendance at the pre-proposal meeting is a required prerequisite to submitting a proposal.
6.1.4 Construction Manager must have a current General Contractor’s license issued by the state of Georgia.
6.1.5 A bid bond (A.I.A. Document A310) payable to the Cobb County School District in the amount equal to 5% of the total construction budget, (Special Terms and Conditions, Section 2.7), must be submitted with the proposal. The bid bond shall be executed by a surety company, licensed to do business in the State of Georgia listed in the Department of the Treasury Circular 570, latest revision. The Surety Company shall have an A.M. Best Company minimum rating with a minimum financial size in accordance with the General Conditions. No company, regardless of its size or financial rating, will be allowed to write its bond. CERTIFIED OR CASHIER'S CHECKS WILL NOT BE ACCEPTED IN LIEU OF A BID BOND. The surety company issuing the bid bond must be the same company that the contractor used in their qualification. A proposal will not be considered if a proper bid bond has not been submitted with the proposal.
6.1.6 GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT, O.C.G.A. §
13-10-90 et seq. Offeror’s full compliance with all applicable federal and state security and immigration laws, including without limitation the Georgia Security and Immigration Compliance Act as amended, O.C.G.A.
§13-10-91, and Georgia Department of Labor Rule 300-10-1-.02, is a condition to the proposal and contract. Contractor’s compliance shall be attested by the execution and return of the Georgia Security and Immigration Compliance Documents with the Offeror’s proposal, which documents will be attached to and become a part of the covered contract.
6.1.7 REQUIRED DOCUMENTS. Offeror must submit the following required documents with Offeror’s proposal:
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
6.1.7.1 Bid Bond;
6.1.7.2 Acknowledgment and Agreement;
6.1.7.3 Vendor Questionnaire;
6.1.7.4 References;
6.1.7.5 Georgia Security and Immigration Compliance Documents; and
6.1.7.6 Non-Collusion Affidavit.
6.2 FIRM OVERVIEW
6.2.1 Complete the Vendor Questionnaire (located in Required Documents) and provide the contact information for a Point of Contact during the evaluation period. This person must be available to answer any questions about your response that may arise before the award.
6.2.2 Location of Firm – Provide the firm name, address of firm headquarters and branch office handling these projects, as well as telephone numbers and contact email addresses. Preference will be given to companies with headquarters or a branch office handling this project within 150 miles of Marietta, Georgia.
6.2.3 Firm Profile – Include how many years in business under the name stated above. Describe firm ownership, structure, and history. Include the type of legal entity (corporation, LLC, etc.), where formed or incorporated, year of formation or incorporation. Provide a copy of the Business License of the firm and the GC license number.
6.2.4 Size and Resources of Firm – List the number of permanent employees by professional discipline, including preconstruction professionals. Provide an organizational chart of the firm.
6.2.5 Litigation – Describe any claims, mediation, arbitration, litigation, or other forms of a dispute filed by or against your company in the past five (5) years. Disclose any failure or failures to complete a contract, or contracts, and any instances of having defaulted or having been declared to be in default on any contract, or contracts.
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
6.2.6 OSHA Experience Modification Rate (EMR) – Provide documentation of your firm’s EMR for the past three (3) years.
6.3 FINANCIAL INFORMATION
6.3.1 CURRENT WORKLOAD
6.3.1.1 Provide the current value of work under contract, current bonding capacity, current value of bonded work, and percentage of work during the past five (5) years for each of the following delivery methods: 1) CM at Risk, 2) RFP, 3) Bid, and 4) Other.
6.3.1.2 Provide a confirmation letter from your bonding company indicating the bonding company’s A.M. Best financial rating and that the bonding company will provide Payment and Performance Bonds in the amount of 100% of the GMP on the exact forms prescribed by the CCSD in the modified A201-2017, Attachment A.
6.3.2 Financial Statements – Provide the firm’s audited or reviewed financial statements for the past three (3) fiscal years, which shall be prepared and signed by an independent Certified Public Accountant not interested, directly or indirectly, in the business of the firm.
6.4 PROJECT APPROACH
6.4.1 Proposed team, personnel list, and staffing plan:
6.4.1.1 Identify each employee that you intend to assign to the project including a paragraph outlining their role and responsibility, past relevant experience with similar projects, number of years in industry, number of years with the current firm, and their percentage availability for this project. Provide an organizational chart of the project team and resumes of key employees whom you intend to assign to this project. Identify team members who have worked together on past projects and list the project name and their role. Identify/document if any experience shown for a proposed team member was with a different employer.
6.4.1.2 Identify and provide a resume for the individual who will be the leader of your construction team and the principal point of contact between your firm and CCSD, design professional, and other consultants from start to finish. If this responsibility is to be divided
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
by different individuals during various phases of the project, identify their roles and provide the same information for all individuals.
6.4.2 PRE-CONSTRUCTION SERVICES
6.4.2.1 Describe your firm’s approach to Preconstruction Services and how your firm will interface with the Architect and CCSD concerning cost estimating, phasing planning, constructability reviews, and value engineering. Address how your firm would propose to resolve differences in cost estimates prepared by both your firm and the Architect or CCSD’s third-party cost estimator.
6.4.3 Construction Services - Describe your firm’s approach to Construction Phase Services and how you propose to manage the construction process, taking into consideration the information provided in this RFP, construction phasing, non-interference with ongoing school activities, safety, and schedule. Include site logistics plans for the demolition and construction phases of work based on the project timeline in Special Terms and Conditions, Section 3.0, which includes proposed locations of all materials and equipment (cranes, dumpsters, storage containers, material laydown area(s), job trailers, etc.).
6.4.4 Proposed Schedule – Provide a proposed schedule of pre-construction and construction activities to meet the timeline provided in Special Terms and Conditions, Section 3.0. Identify milestones needed to meet the timeline, including but not limited to shop drawing approvals and any fabrication lead times. Include a minimum of four weeks for the Owner to review pricing submittals before a GMP can be awarded.
6.4.5 Technical Expertise – Describe your firm's experience, technical expertise, and project controls, along with any tools your firm will employ concerning safety, schedule, cost, and quality control (including but not limited to project management software, scheduling software, in-house safety programs and quality control procedures).
6.5 PROJECT EXPERIENCE
6.5.1 Past Projects – (Note: Preference will be given to any similar grandstand projects, CM at Risk projects, and/or projects on an occupied K12 or Higher Education campus.) Provide a project listing of all athletic or educational
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
(K12 or Higher Education) projects, currently under contract or completed by your firm in the past five (5) years to include:
6.5.1.1 Project Name
6.5.1.2 Project Type
6.5.1.3 Project Delivery Method
6.5.1.4 Square footage of new and/or renovated construction, total seat count, or max occupancy (if applicable).
6.5.1.5 Total GMP award amounts and final cost
6.5.1.6 Construction start and substantial and final completion dates
6.5.1.7 Owner’s name, telephone number, and email address
6.5.1.8 Architect’s name, telephone number, and email address
6.5.2 References - (Use the References document in Euna Procurement under
Required Documentation) CCSD requests references on three (3) athletic or K12, or Higher Education projects. Preference will be given to references from grandstand projects, CM at Risk projects, projects on occupied K12 or Higher Education campuses, and/or projects completed within the last five (5) years. Failure of the contractor’s references to respond to reference requests will negatively affect evaluation scoring.
6.6 FEE PROPOSAL
CCSD has included a Project Cost Matrix (Attachment C) in the RFP. The Cost Matrix takes all categories of the project costs and allocates them to either construction fees, general conditions, cost of the work, or work by others. The purpose of this matrix is to ensure that all costs in the CM proposals are applied consistently to the categories specified by CCSD since proposal responses are being evaluated based, in part, on Construction Fees. It is CCSD’s goal to avoid misunderstandings as we move forward, beyond the award, into the GMP phases of the projects, as General Conditions costs are negotiated.
6.6.1 Preconstruction Services Phase Fee – Indicate your proposed preconstruction services phase lump sum fee for all preconstruction activities as contained in and required by the Owner’s Agreement on the Cost Proposal Form.
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
6.6.2 CM Construction Phase Fee - Indicate your proposed CM construction phase fee as a percentage (%) of the Cost of the Work as specified in Article 5 of AIA A133-2019, as modified by the CCSD, Attachment B, on the Cost Proposal Form.
7.0 AWARDS
7.1 The CCSD reserves the right to accept or reject any part of a submitted proposal, to accept the entire proposal from one contractor, or to reject all proposals submitted or waive any minor irregularity. The CCSD reserves the right to award the proposal under the most beneficial economic terms for the CCSD.
7.2 This procurement is being conducted as a competitive sealed proposal in accordance with State of Georgia Code Sections 36-91-20 and 36-91-21. Proposals will be received and evaluated accordingly.
7.3 Award will be made to the responsive and responsible contractor based on the evaluation criteria included in this solicitation. Evaluation criteria may include, but is not limited to price, availability, lead time, past contractor experience, references, and compliance with the RFP specifications and requirements.
7.4 A determination of the competitive range may be made during the evaluation process. Contractors not in the competitive range of being selected for an award shall be eliminated from further discussion.
7.5 During the evaluation phase, discussions may be conducted with contractors who submit proposals determined to be reasonably likely to be selected for an award.
These discussions are for negotiations, clarification, and to ensure full understanding of and responsiveness to the solicitation requirements.
Contractors will be accorded fair and equal treatment with respect to an opportunity for discussion and revision of proposals. Procurement Services may permit revisions after submission and before the award, to obtain the best and final offers. In all events, CCSD reserves the right to re-solicit the item(s)/services(s) involved.
8.0 CONTRACT
8.1 AIA A201-2017, General Conditions of the Contract for Construction, as modified and included as Attachment A, shall serve as the general conditions for the performance of the work.
PROCUREMENT SERVICES DEPARTMENT
SPECIAL TERMS AND CONDITIONS
8.2 The contractor selected for award must agree to the AIA A133 – 2019, Agreement Between Owner and Construction Manager as Contractor, as modified and included as Attachment B, B1.
9.0 BOND AND INSURANCE REQUIREMENTS
9.1 Performance Bond and Labor and Materials Payment Bond satisfactory to the Owner each in the amount of 100% of the contract sum will be required of the successful offeror to guarantee delivery of completed work under the contract and payment for labor and materials. These bonds shall be written on the bond form which is included in the project manual. No contractor, regardless of size or financial rating, will be allowed to write its own bonds. The Surety Company shall have an A.M. Best Company minimum rating with a minimum financial size in accordance with the General Conditions. Bonds must be accompanied by a letter stating the bonding company's current rating for verification before acceptance by the Owner and execution of the formal Contract. The Contract shall not be valid for any purpose unless the Contractor gives these required bonds. In accordance with O.C.G.A. §§ 36-91-70 and 36-91-90, the amount of these bonds will increase if and as the Contract amount is increased (through change orders or otherwise).
9.2 Bid Bonds and Performance and Labor and Material Payment Bonds must be accompanied by a Certificate of Power of Attorney showing that the party who executed the bonds is authorized to do so by the surety company.
9.3 Insurance. Contractor shall provide insurance coverages in the amounts, on the terms of, and in the form set out in AIA Document A201-2017 and Exhibit B to AIA Document A133-2019, both as modified by CCSD
MARIETTA, GEORGIA
PROCUREMENT SERVICES DEPARTMENT
CONFLICT OF INTEREST
ALL PROSPECTIVE VENDORS PLEASE READ CAREFULLY
Please refer to Board Policy BHA, Conflict of Interest, located on the Cobb County School District website at www.cobbk12.org. Select Menu, then select Board, then select Policies and Rules, then select Section B and choose BHA.
Any conflict with Board policy and/or administrative rules must be disclosed at the time of proposal submission.
BOARD MEMBERS:
David Chastain, Chairman
John Cristadoro, Vice Chairman
Nichelle Davis
Leroy Tre’ Hutchins
Becky Sayler
Randy Scamihorn
Brad Wheeler
EXECUTIVE CABINET MEMBERS:
Chris Ragsdale, Superintendent
Keeli Bowen
John Floresta
Sherri Hill
David Baker
Dr. Jasmine Kullar
Dr. Catherine Mallanda
Marc Smith
| CCSD reserves the right to accept or reject any or all proposals and to waive any technicalities or informalities. |
| Your interest and participation in the CCSD solicitation process is appreciated. |
| Sincerely, |
| Barbara Bates, CPPB, NIGP-CPP |
| Director of Procurement Services |
| TABLE OF CONTENTS |
| Please refer to Board Policy BHA, Conflict of Interest, located on the Cobb County School District website at www.cobbk12.org. Select Menu, then select Board, then select Policies and Rules, then select Section B and choose BHA. |