5. Sunland_Past_Performance_Questionnaire.pdf

PDF 634 KB Posted

Attached to
Sunland Park Levee Rehabilitation
Solicitation number
191BWC22R0002
Issued by

View the file

Other files

File Type Posted
191BWC22R0002 Amendment A00006.pdf PDF
191BWC22R0002 Solicitation Revised A00006.pdf PDF
Answers_to_Added - 2_Questions_Received_Against_191BWC22R0002.pdf PDF
191BWC22R0002_A00006_Drawings_20220523_FS.pdf PDF
191BWC22R0002_Specifications_20220510.pdf PDF
191BWC22R0002 Amendment A00005.pdf PDF
191BWC22R0002 Solicitation Revised A00005.pdf PDF
Answers_to_Added_Questions_Received_191BWC22R0002.pdf PDF
Amendment A00004 of 191BWC22R0002.pdf PDF
Answers_to_Questions_Received_191BWC22R0002_20220429.pdf PDF
191BWC22R0002 Solicitation Revised A00004.pdf PDF
191BWC22R0002_A00004 Drawings_20220426_FS.pdf PDF
191BWC22R0002_Specifications_20220426.pdf PDF
191BWC22R0002_A00004 Drawings_20220426_HS.pdf PDF
RGCP-SEDQ_LiDAR_and_Orthoimagery_Report_2021_12_22.pdf PDF
191BWC22R0002_Specifications_20220414.pdf PDF
191BWC22R0002_A00003 Drawings_20220414_FS.pdf PDF
191BWC22R0002_A00003 Drawings_20220414_HS.pdf PDF
191BWC22R0002 Amendment A00003.pdf PDF
191BWC22R0002 Solicitation Revised A00003.pdf PDF
191BWC22R0002 Solicitation Revised A00002.pdf PDF
191BWC22R0002_Prebid_Agenda.pdf PDF
191BWC22R0002 Amendment A00002.pdf PDF
Prebid_Sign-In.pdf PDF
11b 00-31-19_1-4-A-3_IBM10C0018_Drawings.pdf PDF
191BWC22R0002 Solicitation Revised A00001.pdf PDF
11a 00-31-19_1-4-A-3_IBM10C0018_Drawings.pdf PDF
23. 191BWC22R0002_Google_Earth.zip ZIP file
Amendment A00001 of Solicitation 191BWC22R0002.pdf PDF
21. Wage_Determination_TX20220035_01072022.pdf PDF
15. 00-31-32_1-3-A_20120729_Forensic_Geotech_Sunland_Levee_Kenall_EDITED.pdf PDF
13. 00-31-19_1-4-C_Installed_Rodney_Hunt_Gates.pdf PDF
2. 191BWC22R0002_Drawings_20220304_FS.pdf PDF
14. 00-31-21_1-4-A-1_20190509_Survey_Report.pdf PDF
191BWC22R0002 Sunland Park Levee Rehabilitation.pdf PDF
19. 35-24-90_1_7_20200918_Excerpt_RGCP_Aquatic_Habitat_Draft_Designs.pdf PDF
3. 191BWC22R0002_Drawings_20220304_HS.pdf PDF
8. IBWC_Form_117_Statement_of_Attendance.pdf PDF
4. RFP_Client_Authorization_Letter.pdf PDF
18. 00-31-50 1-6-D Los Ranchos del Rio Subdivision Plat.pdf PDF
16. 00-31-32_1-3-C_20081222_Geotech_Canutillo_Final_VI_S&B.pdf PDF
1. 191BWC22R0002_Specifications_20220304.pdf PDF
17. 00-31-32_1-3-C_20081222_Geotech_Canutillo_Final_VII_S&B_EDITED.pdf PDF
22. Wage_Determination_NM20220039_01142022.pdf PDF
10. 00-31-19_1-4-A-2_20100723_S&B_Design_Report.pdf PDF
7. IBWC_Form_116_Statement_of_Equipment.pdf PDF
12. 00-31-19_1-4-B_FloodBreak_50'x2'.pdf PDF
6. IBWC_Form_110_Cert_of_Authority_for_Signing.pdf PDF
20. 35-49-53-56_MOA_Country_Club_Floodgates.pdf PDF
9. 00-31-19_1-4-A-1_20220204_Arcadis_DDR.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

International Boundary and Water Commission United States and Mexico United States Section

Past Performance Questionnaire Sunland Park Levee Repair Solicitation No. 191BWC22R0002

RETURN ALL QUESTIONNAIRES TO:

Carmella Speer

(915) 832-4120 carmella.speer@ibwc.gov

Solicitation 191BWC22R0002 Sunland Park Levee Repair

Note: Past performance information is required for each team member and each major subcontractor. The Offeror shall ensure that a Past Performance Questionnaire is completed for each project used to demonstrate experience and past performance ratings in Volume II. Relevant past performance information is defined as work of a similar nature to that shown in the

Solicitation and accomplished during the past 10 years.

Questionnaires are to be completed by the contracting activity (e.g., owners, clients, and prime

Contractors) responsible for the particular projects and furnished by the completing party directly to:

Carmella Speer

Contracting Officer

(915) 832-4120 carmella.speer@ibwc.gov

Questionnaires provided by the Offeror will not be considered.

Notes for emailing:

• If using the form fields contained in this pdf, either sign the form electronically or scan

Respondent Information (Page 15 of 16) page at a minimum resolution of 300 dpi in color.

• If filling out the form by hand, please scan the whole document at a minimum resolution of 300 dpi in color.

• Only pages 4 through 15/16 need be returned.

Instructions for Completing Past Performance Questionnaire

A. Questions 1 through 11 on page 5 shall be completed by the Offeror. All other parts of the questionnaire shall be completed by companies or agencies who hired the Offeror. Offerors shall not fill out a questionnaire for themselves.

B. Indicate, based on the adjectives listed (using letter designation below), the Contractor’s performance on the identified program. Assessments should reflect only Contractor-liable performance. The following is a definition of the rating levels:

RATING DEFINITION NOTE

E

(Exceptional)

Performance meets contractual requirements and exceeds many requirements to the benefit of the Government.

The contractual performance of the element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

An exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an exceptional rating. Also, there should have been no significant weaknesses identified.

V

(Very Good)

Performance meets contractual requirements and exceeds some requirements. The contractual performance of the element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

A very good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government. There should have been no significant weaknesses identified.

S

(Satisfactory)

Performance meets minimum contractual requirements.

The contractual performance of the element being assessed contains some minor problems for which corrective actions taken by the Contractor were, or appear to be, satisfactory.

A satisfactory rating is appropriate when there were only minor problems, or major problems that the Contractor recovered from without impact to the contract. There should have been no significant weaknesses identified.

M

(Marginal)

Performance does not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions or the Contractor’s proposed actions appear only marginally effective or were not fully implemented.

A marginal is appropriate when a significant event occurred that the Contractor had trouble overcoming which impacted the Government.

U

(Unsatisfactory)

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element being assessed contains serious problem(s) for which the Contractor’s corrective actions were, or appear to be, ineffective.

An unsatisfactory rating is appropriate when multiple significant events occurred that the Contractor had trouble overcoming and which impacted the Government. A singular problem, however could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

N/A (Not

Applicable)

Self-explanatory. Use if you are unable to provide a rating for an area.

Rating will be neither positive nor negative.

C. Please provide narrative explanations for your answers. Space for your narrative remarks is provided after each area. If more space is required, attach additional sheets.

D. In addition to completing the attached questionnaire for the identified program, please provide your comments on other programs for which your activity has contracts with this firm.

You are urged to supplement your own knowledge of the Contractor’s performance with the judgment of others in your organization.

OFFEROR COMPLETE THIS PAGE

OFFEROR

COMPLETE PAGES 4 AND 5

Offeror Teaming Details for Solicitation 191BWC22R0002

(must match Client Authorization Letter)

Name of Offeror Requesting Questionnaire: __________________________________________

Name of Prime Contractor for 191BWC22R0002 team: _________________________________

Offeror is: Prime Contractor

Subcontractor

Vendor

Other: ___________________________________________________

OFFEROR COMPLETE THIS PAGE

Business and Project Identification (This page to be completed by Offeror for project related to past performance)

1. Offeror's company name: ___________________________________________________

2. Project title: ___________________________________________________________

3. Project/Contract number: ___________________________________________________

4. Description of the project: __________________________________________________

5. Period of performance: _____________________________________________________

a. Original scheduled completion date: ____________________________________

b. Current or actual completion date: ______________________________________

c. Number of times it changed: __________________________________________

d. Primary causes of changes: ___________________________________________

e. If not complete, percentage of completion: _______________________________

6. Was Offeror prime Contractor, subcontractor, or vendor: _________________________*

7. Percentage of work physically performed by Offeror: ____________________________

8. Total project dollar value (prime contract value): ________________________________

9. Offeror's original contract dollar value: ________________________________________

a. Current or actual value at time of completion: ____________________________

b. Number of times it changed: __________________________________________

c. Primary causes of changes: ___________________________________________

10. Location of project: _______________________________________________________

11. Specific role of Offeror and persons/organization identified as participants in the project (please provide work task(s) performed and provide name, project role, and telephone number for each participant):

* Prime Contractor indicates that the Offeror held the contract. Subcontractor indicates that the Offeror provided services (designs, construction, surveying, testing, etc.) for the prime. Vendor indicates that the

Offeror provided supplies, materials, equipment, etc. for the prime or a subcontractor.

REVIEWER COMPLETE THIS PAGE

REVIEWER/RESPONDENT

COMPLETE PAGES 7 THROUGH 16

REVIEWER COMPLETE THIS PAGE

Description of Contract (This and all additional pages to be completed by Reviewer/Respondent)

What function did the Contractor fill on this project? (Check all that apply)

Construction Architect-Engineer

Construction Management (CM) Vendor

Design-Build Other:

How was the Contract awarded? (Check all that apply)

Sealed Bid 8(a) Direct Award

Competitive Sole Source

Negotiated Small Business Set Aside

Task Order/Delivery Order Other:

How was the Contract paid? (Check all that apply)

Unit Price Line Items Time and Materials

Lump Sum Line Items Cost Plus

Lump Sum Contract Other:

Yes No N/A

1. Do you agree with the Contractor's response to 5.d. on page 5?

2. Do you agree with the Contractor's response to 9.d. on page 5?

Please provide additional information to any “no” answers.

Complexity of Project

What was the complexity of project being reviewed: ___________________________________

For example: highly complex - multiple construction disciplines with a short time frame moderately complex - simpler construction with one or two difficult areas average - one or two construction disciplines with no problems simple - straight forward construction with nothing out of the average

Please indicate items that the Contractor performed as part of this project.

'Performed' indicates that items were constructed by Contractor, designed by Contractor, inspected by Contractor, or supplied by Contractor, depending upon role indicated on Page 5.

Type of Work Performed Type of Work Performed

Clearing and grubbing

Structural cast-in-place concrete (this excludes curbs, gutters, slabs, parking lots, and roads)

Excavation/earthwork Concrete pavement

Compacted backfill Concrete sidewalks, curbs, and gutters

Earthen embankment/levee construction

Concrete headwalls/culverts

Construction with restrictive soil types

Concrete formwork

Borrow site utilization Stoplogs

Borrow site establishment Metal fabrication

Hauling Asphalt paving

Gravel roadways Traffic control

Reseeding/revegetation Sign installation

Stormwater control Reinforced Concrete Pipe installation

Sluice/slide gate installation or modification

Utility excavation

Riprap

Saltcedar removal

Gabions

Evaluation of Contractor's Performance

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable See page 3 for complete rating descriptions.

Quality

Quality E V S M U N/A

1. Overall quality of the project.

2. Key management/design/construction personnel qualifications to perform the requirements of project.

3. Quality of the subcontractor’s work.

4. Accuracy of the record keeping procedure and the ability to prepare accurate reports.

5. Procedures that ensured that the level of quality remains constant throughout the project.

6. Contractor's quality program in identifying, correcting, and preventing initial and recurring discrepancies.

7. Contractor's quality control manager was onsite during project work.

Comments: ____________________________________________________________________

Timeliness

Timeliness E V S M U N/A

1. Timeliness in starting up the project.

2. Timeliness in completing the project.

3. Meeting project schedule and monitoring critical milestones.

4. Timeliness in completing reports.

5. Provided a process for timely responses to requests for modifications.

6. Timeliness in providing all project documents.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Cost Controls

Cost Control E V S M U N/A

1. Provided good products/materials, considering the price paid for the items.

2. Demonstrated financial stability during the project performance period.

3. Demonstrated reasonableness of proposed modification costs.

Business Relationships

Business Relationships E V S M U N/A

1. Cooperation in solving problems.

2. A good relationship with technical personnel.

3. A good relationship with contracting office personnel.

4. A good relationship with subcontractors.

5. Compliance with the terms of the contract.

Customer Satisfaction

Customer Satisfaction Yes No N/A

1. You, as the end user, were satisfied with the services performed.

2. You would be their advocate for future work.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Management

Management E V S M U N/A

1. Adequate, qualified overall project management.

2. Site supervisor understood project scope and work.

3. Management kept crews busy, materials on site, and equipment in working order.

4. Contractor's ability to manage subcontractors.

5. Site supervisor was onsite during project work.

Technical

Technical E V S M U N/A

1. Met the general and detailed design specifications requirements.

2. Ensured the technical data and details submitted were acceptable.

3. Submittals were well researched and clearly identified the proposed item.

Environmental

Environmental E V S M U N/A

1. Met the general environmental requirements.

2. Adequacy of Contractor's environmental program, oversight, compliance, and management.

3. Contractor promoted environmental awareness.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Design and Construction

Construction E V S M U N/A

1. Your satisfaction with the methods of construction.

2. The promptness and quality of completion of punch list items.

3. Your satisfaction with the response to warranty calls.

4. General housekeeping and site upkeep.

Safety

Safety E V S M U N/A

1. Offeror maintained the site in a safe manner.

2. There was a comprehensive safety plan in place that was enforced.

3. Any unsafe work methods, materials, or employees were removed or changed immediately.

4. Employees viewed safety equipment as a necessity.

5. Contractor promoted safety awareness.

Safety Yes No N/A

6. Were there any injuries on this project?

7. Were there any accidents on this project?

Please provide additional information to any “yes” answers.

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Financial Management

Financial Management Yes No N/A

1. Were there any instances where subcontractors were not paid?

2. Were any liens placed against the project?

3. To your knowledge, have any key personnel associated with this Offeror been indicted on any criminal charges within the past 10 years?

4. Did any submitted payrolls fail to meet minimum wage rates?

5. Did employees complain about not being paid?

Please provide additional information to any “yes” answers.

General Information

General Information Yes No N/A

1. Has this Offeror demonstrated capability to work independently and without significant customer oversight?

2. Given a choice, would you use this Offeror again?

REVIEWER COMPLETE THIS PAGE

Ratings: E = Exceptional V = Very Good S = Satisfactory M = Marginal U = Unsatisfactory N/A = Not Applicable

Project Specific Questions

Coordination Required Yes No N/A

1. Did project involve work within multiple rights-of-way and/or properties?

2. Did project involve coordination with multiple stakeholders? (For example, property owners and different government entities)

Coordination E V S M U N/A

1. Coordination with stakeholders and adjacent property owners.

2. Scheduling of work with affected stakeholders.

3. Compliance with requirements from other government entities (local/state/federal) and work within their ROW.

Respondent Information

The following information will assist with the analysis of the data.

This information will be kept CONFIDENTIAL and will not be released to Contractor.

Name (please print): _____________________________________________________________

Signature: _____________________________________________________________________

Agency/company: ______________________________________________________________

Address: ______________________________________________________________________

Address: ______________________________________________________________________

Address: ______________________________________________________________________

Work phone number: ____________________________________________________________

Email address: __________________________________________________________________

Your role relative to the project/contract: ____________________________________________

(e.g., Contracting Officer, Inspector, Contract Administration, Buyer, Quality Assurance Evaluator, Other - explain)

Length of involvement in project/contract: ___________________________________________

Date the questionnaire was completed: ______________________________________________

Do you know anyone else who can provide information regarding this Offeror’s performance?

Name: Phone:

Project Owner Information (Provide information if the Respondent is not the project owner)

Agency/company: ______________________________________________________________

Address: ______________________________________________________________________

Address: ______________________________________________________________________

Work phone number: ____________________________________________________________

THANK YOU FOR COMPLETING THIS QUESTIONNAIRE.

REVIEWER COMPLETE THIS PAGE

Additional Remarks Use additional pages if necessary.

Instructions for Completing Past Performance Questionnaire
Business and Project Identification
Description of Contract
Complexity of Project
Evaluation of Contractor's Performance
Quality
Timeliness
Cost Control
Business Relationships
Customer Satisfaction
Management
Technical
Environmental
Design and Construction
Safety
Financial Management
General Information
Project Specific Questions
Respondent Information
Additional Remarks
Blank Page
Blank Page
Project title:
Description of the project:
Period of performance:
Original schedule:
Current or actual schedule:
Number of times it changed:
Primary causes of changes:
Current or actual completion date and if not complete percentage of completion:
Offeror_Type: [Prime Contractor]
Original project dollar value:
Current or actual value at time of completion:
Number of times it changed_2:
Primary causes of changes_2:
Location of Project:
each team member 2:
Complexity: [Simple]
Box1:
12:
0:
0: Off
1: Off
1:
0: Off
1: Off
2:
0: Off
1: Off
3:
0: Off
1: Off
0:
0: Off
1: Off
1:
0: Off
1: Off
2:
0: Off
1: Off
3:
0: Off
1: Off
4:
0: Off
1: Off
5:
0: Off
1: Off
6:
0: Off
1: Off
7:
0: Off
1: Off
8:
0: Off
1: Off
9:
0: Off
1: Off
10:
0: Off
1: Off
11:
0: Off
1: Off
BoxQ1: Off
BoxQ2: Off
BoxQ3: Off
BoxQ4: Off
BoxQ5: Off
BoxQ6: Off
BoxQ7: Off
BoxT1: Off
BoxT2: Off
BoxT3: Off
BoxT4: Off
TIMELINESS:
BoxCC1: Off
BoxCC2: Off
BoxCC3: Off
COST CONTROL:
BoxB1: Off
BoxB2: Off
BoxB3: Off
BoxB4: Off
BoxB5: Off
BoxCS1: Off
BoxCS2: Off
CUSTOMER SATISFACTION:
BoxM1: Off
BoxM2: Off
BoxM3: Off
BoxM4: Off
BoxM5: Off
MANAGEMENT:
BoxTT1: Off
BoxTT2: Off
BoxTT3: Off
TECHNICAL:
BoxE1: Off
BoxE2: Off
BoxE3: Off
ENVIRONMENTAL:
BoxD1: Off
BoxD2: Off
BoxD3: Off
BoxD4: Off
BoxS1: Off
BoxS2: Off
BoxS3: Off
BoxS4: Off
BoxS5: Off
BoxS6: Off
BoxS7: Off
SAFETY:
BoxF1: Off
BoxF2: Off
BoxF3: Off
BoxF4: Off
BoxF5: Off
BoxG1: Off
BoxG2: Off
GENERAL INFORMATION:
Name:
email:
Your role relative to the projectcontract:
Length of involvement in projectcontract:
Date the questionnaire was completed:
Name1:
Phone1:
Name2:
Phone2:
Name3:
Phone3:
Company:
Work Address 1:
Additional:
Project-Contract Number:
Percent of Work:
Contract dollar value at time of selection:
Responses:
QUALITY:
BoxCR1: Off
BoxCR2: Off
OtherDC1:
OtherDC2:
OtherDC3:
Paid1: Off
Paid4: Off
Paid2: Off
Paid5: Off
Paid3: Off
Paid6: Off
Award1: Off
Award2: Off
Award3: Off
Award4: Off
Award5: Off
Award6: Off
Award7: Off
Award8: Off
Work Address 2:
Work Address 3:
Work phone number:
POCompany:
POWork Address 1:
POWork Address 2:
POWork phone number:
Fill1: Off
FINANCIAL MANAGEMENT:
DESIGN AND CONSTRUCTION:
BoxPSO1: Off
BoxPSO2: Off
BoxPSO3: Off
BoxPSO4: Off
BoxPSO5: Off
PSOComments1:
Offeror1: Off
Companyagency name:
Offeror Company Name:
Prime Contractor Company Name:
Offeror Other:
BoxT5: Off
BoxT6: Off
BUSINESS RELATIONSHIP:

File details come from the government source that posted it. Updated .