5. Schedule of Materials.xlsx
XLSX spreadsheet 139 KB Posted
- Attached to
- RNV-ADD SECURITY FORCES FACILITY, B110 Federal contract opportunity
- Solicitation number
- FA557525B0011
About this file
This document is a comprehensive Schedule of Material Submittals for Project QUUG 24-1020, which involves renovating administrative offices at Building 110 on Moron Air Base in Spain. The schedule details over 330 line items of required material submittals across multiple sections including architectural, electrical, mechanical, plumbing, fire protection, and telecommunications systems. Each line item specifies the type of submittal required, such as shop drawings, manufacturer's warranties, technical data, test reports, installation instructions, and color selections, with specific submission timelines relative to contract administration (CA) or final inspection (FI) milestones.
The associated federal contract opportunity is a solicitation (FA557525B0011) for a construction project valued between $1-5 million, specifically targeting local Spanish contractors authorized to perform government works. Key procurement details include a pre-proposal conference on 16 July 2025, a deadline for questions on 23 July 2025, and bid submission deadline of 10:30 hours local time on 6 August 2025. The project is being executed by the Department of the Air Force's United States Air Forces in Europe - Air Forces Africa, with a bid acceptance period valid through 31 December 2025, contingent on fund availability.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MFR QUUG 24-1020 Questions and Answers.pdf | ||
| Solicitation - FA557525B0011.pdf | ||
| 3. Specifications (Spa).pdf | ||
| 4. Cost Estimate (Blank).xlsx | XLSX spreadsheet | |
| 2. Specifications (Eng).pdf | ||
| Moron AB Generators Justification and Approval.pdf | ||
| Moron AB Fire Alarm Panels Justification and Approval.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Sch. (ENG)
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 24-1020 | PROJECT TITLE: | |||
| RENOVATE ADMIN OFFICES, B110 | SOLICITATION / CONTRACT NO. |
FA5575-22-C-0019
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | ||||||||||||||
| 01 | Warranty letter | 1 | Acceptance+15 | |||||||||||
| 02 | Construction Schedule | 1 | CA+7 | |||||||||||
| 03 | Progress Schedule | 1 | CA+10 | |||||||||||
| 04 | Work Plan | 1 | CA+7 | |||||||||||
| 05 | Mobility Plan | 1 | CA+15 | |||||||||||
| 06 | Project Sign | 1 | CA+15 | |||||||||||
| 07 | Quality Control Plan | 1 | CA+15 | |||||||||||
| 08 | Environmental Protection Plan | 1 | CA+15 | |||||||||||
| 09 | DD Form 1354 | 1 | FI+15 | |||||||||||
| 10 | Waste & construction debris management | 1 | Final Inspection (FI) | |||||||||||
| 11 | As-Built drawings | 1 | FI+15 | |||||||||||
| 12 | Spatial Data | 1 | As Built+10 | |||||||||||
| 13 | Key Staff | 1 | CA+15 | |||||||||||
| 14 | Health and safety Plan | 1 | CA +15 | |||||||||||
| 15 | Operation and Maintenance Manuals | 1 | Final Inspection (FI) | |||||||||||
| SECTION 01 11 02 | ||||||||||||||
| 15 | Work Phasing Plan | 1 | Commencement of work - 15 | |||||||||||
| 16 | Utilities shut off Plan | 1 | Commencement of work - 15 | |||||||||||
| 17 | Salvage plan | 1 | CA + 15 | |||||||||||
| 18 | Operation & Maintenance (O&M) Manuals | 1 | FI + 15 | |||||||||||
| SECTION 02 41 01 | ||||||||||||||
| 19 | Existing Conditions | 1 | ||||||||||||
| 20 | Demolition and Deconstruction Plan | 1 | ||||||||||||
| 21 | Receipts | 1 | ||||||||||||
| 22 | Waste Management Plan | 1 | ||||||||||||
| 23 | Delivery and disposal Certificate of Waste from Construction and Demolitions | 1 | ||||||||||||
| SECTION 03 30 00 | ||||||||||||||
| 24 | Reinforcement | 1 | 1 | |||||||||||
| 25 | Surface-Applied Corrosion Inhibitor | 1 | ||||||||||||
| 26 | Concrete mix design | 1 | 1 | |||||||||||
| 27 | Compressive strength tests | 1 | ||||||||||||
| 28 | Slump tests | 1 | ||||||||||||
| 29 | Structural Verification Report | 1 | ||||||||||||
| SECTION 04 20 00 | ||||||||||||||
| 30 | Precast concrete blocks | 1 | 1 | |||||||||||
| 31 | Reinforcement bars | |||||||||||||
| 32 | Expansion Joint Material | |||||||||||||
| 33 | Lintels in Masonry Walls | 1 | 1 | |||||||||||
| SECTION 05 05 23.16 | ||||||||||||||
| 34 | Welding Electrodes and Rods | 1 | ||||||||||||
| 35 | Certified Welder Performance Qualifications | 1 | ||||||||||||
| SECTION 05 12 00 | ||||||||||||||
| 36 | Steel Columns and Beams | 1 | ||||||||||||
| 37 | Steel Roof Structure | 1 | ||||||||||||
| 38 | Steel Brackets, Plates, & Accessories | 1 | ||||||||||||
| 39 | GSA door structure | 1 | 1 | |||||||||||
| 40 | Existing Structure Verifications | 1 | ||||||||||||
| 41 | Shop Primer | 1 | ||||||||||||
| 42 | Injection mortar | 1 | ||||||||||||
| 43 | Steel | 1 | ||||||||||||
| 44 | Bolts, Nuts, and Washers | 1 | ||||||||||||
| SECTION 05 30 00 | ||||||||||||||
| 45 | Steel Deck installation and execution | 1 | ||||||||||||
| 46 | Accessories | 1 | ||||||||||||
| 47 | Deck Units | 1 | 1 | |||||||||||
| 48 | Reinforcements | 1 | 1 | |||||||||||
| SECTION 05 50 13 | ||||||||||||||
| 49 | Pergola detail drawings | 1 | ||||||||||||
| 50 | Pergola Layout and Design drawings | 1 | ||||||||||||
| 51 | Aluminum pergola | 1 | ||||||||||||
| 52 | Pergola accessories | 1 | ||||||||||||
| 53 | Pergola drainage and anchorage system | 1 | ||||||||||||
| 54 | Pergola Manufacturer’s Color Chart | 1 | ||||||||||||
| 55 | Pergola Manufacturer's Warranty | 1 | ||||||||||||
| 56 | Pergola Qualifications of Installer | 1 | ||||||||||||
| 57 | Pergola Manufacturer’s Installation Instructions | 1 | ||||||||||||
| 58 | Pergola Manufacturer’s Operating Instructions | 1 | ||||||||||||
| 59 | Retractacle ladder | 1 | 1 | 1 | 1 | 1 | ||||||||
| SECTION 06 20 00 | ||||||||||||||
| 48 | Detail Drawings Indicating All Wood Assemblies | 1 | ||||||||||||
| 49 | Manufacturer's Catalog Data and color chart | 1 | ||||||||||||
| 50 | Samples | 1 | ||||||||||||
| 51 | Manufacturer's certificates of compliance of AENOR | 1 | ||||||||||||
| SECTION 07 21 13 | ||||||||||||||
| 52 | Board Insulation | 1 | 1 | |||||||||||
| 53 | Projected insulation | 1 | 1 | |||||||||||
| 54 | Protection Board Insulation or coating | 1 | ||||||||||||
| 55 | Adhesive | 1 | ||||||||||||
| SECTION 07 27 10 | ||||||||||||||
| 56 | Air Barrier System | 1 | ||||||||||||
| 57 | Testing and Inspection | 1 | ||||||||||||
| 58 | Air Barrier Inspector | 1 | ||||||||||||
| SECTION 07 32 13 | ||||||||||||||
| 59 | Technical system for pitched roofs | 1 | 1 | |||||||||||
| 60 | Manufacturer Installation Instructions | 1 | ||||||||||||
| 61 | Concrete tile | 1 | ||||||||||||
| 62 | Materials | 1 | ||||||||||||
| 63 | Qualifications of roofing personnel | 1 | ||||||||||||
| 64 | Warranty | 1 | ||||||||||||
| 65 | Marine phenolic board | 1 | ||||||||||||
| 66 | Fall arresting system | 1 | 1 | 1 | ||||||||||
| 67 | Gutters & Downspouts | 1 | 1 | |||||||||||
| SECTION 07 81 00 | ||||||||||||||
| 68 | Spray-Applied Waterborne Intumescent Coating | |||||||||||||
| System Product Data | 1 | |||||||||||||
| 69 | Fire Resistance Rating | 1 | ||||||||||||
| 70 | Field Tests | 1 | ||||||||||||
| 71 | Evaluation Reports | 1 | ||||||||||||
| 72 | Installer Qualifications | 1 | ||||||||||||
| 73 | Preparation Report | 1 | ||||||||||||
| 74 | Manufacturer's Inspection Report | 1 | ||||||||||||
| SECTION 07 84 00 | ||||||||||||||
| 75 | Firestopping Materials | 1 | ||||||||||||
| 76 | Firestopping Materials Installer Qualifications | 1 | ||||||||||||
| SECTION 07 92 00 | ||||||||||||||
| 77 | Sealants | 1 | ||||||||||||
| 78 | Primers | 1 | ||||||||||||
| 79 | Bond Breakers | 1 | ||||||||||||
| SECTION 08 11 13 | ||||||||||||||
| 80 | Steel Door Manufacturer's Catalog Data | 1 | ||||||||||||
| 81 | Fire Resistant Door | 1 | 1 | |||||||||||
| 82 | Bullet resistant door | 1 | 1 | |||||||||||
| 83 | Sectional door | 1 | 1 | |||||||||||
| 84 | Cell door | 1 | 1 | |||||||||||
| 85 | Controlled-access Pass-Through Window | 1 | 1 | |||||||||||
| SECTION 08 14 00 | ||||||||||||||
| 86 | Manufacturer's Catalog Data | 1 | ||||||||||||
| 87 | Color for doors | 1 | ||||||||||||
| SECTION 08 51 13 | ||||||||||||||
| 88 | Aluminium windows and doors | 1 | 1 | 1 | ||||||||||
| 89 | Bullet proof aluminum window | 1 | 1 | 1 | ||||||||||
| SECTION 08 71 00 | ||||||||||||||
| 90 | Hardware Items | 1 | ||||||||||||
| 91 | Installation | 1 | ||||||||||||
| SECTION 08 81 00 | ||||||||||||||
| 92 | Descriptive product data | 1 | ||||||||||||
| 93 | Insulating glass | 1 | ||||||||||||
| 94 | Bullet proof spy glass | 1 | ||||||||||||
| 95 | Spy glass | 1 | ||||||||||||
| 96 | Setting and sealing materials | 1 | ||||||||||||
| 97 | Glass setting | 1 | ||||||||||||
| SECTION 09 24 23 | ||||||||||||||
| 98 | Cement plaster and gypsum stucco | 1 | ||||||||||||
| 99 | Manufacturer's Instructions | 1 | ||||||||||||
| 100 | Sample panel | 1 | ||||||||||||
| SECTION 09 29 00 | ||||||||||||||
| 101 | Standard gypsum boards | 1 | ||||||||||||
| 102 | Galvanized steel profiles for gypsum board systems | 1 | ||||||||||||
| 103 | Micro-perforated paper tape for gypsum board systems | 1 | ||||||||||||
| 104 | Drying joint paste for gypsum board systems | 1 | ||||||||||||
| 105 | High hardness acoustical gypsum board mixed with fibers | 1 | ||||||||||||
| 106 | Acoustic perimeter band for gypsum board system | 1 | ||||||||||||
| 107 | Water repellent gypsum board | 1 | ||||||||||||
| 108 | Sound absorbing gypsum boards | 1 | ||||||||||||
| 109 | Sound absorbing gypsum panels | 1 | ||||||||||||
| 110 | Gypsum board manufacturer. | 1 | 1 | |||||||||||
| SECTION 09 30 10 | ||||||||||||||
| 111 | Tiles, adhesives and joint sealants | 1 | ||||||||||||
| 112 | Porcelanic gres floor tile | 1 | ||||||||||||
| 113 | Ceramic wall tile | 1 | ||||||||||||
| 114 | Granite floor tile | 1 | ||||||||||||
| SECTION 09 51 00 | ||||||||||||||
| 115 | Gypsum/Cement boards | 1 | 1 | |||||||||||
| 116 | Suspension system | 1 | ||||||||||||
| 117 | Registers | 1 | ||||||||||||
| 118 | Manufacturer's installation instructions | 1 | ||||||||||||
| 119 | Exterior and interior ceiling | 1 | ||||||||||||
| 120 | Suspension system | 1 | ||||||||||||
| 121 | Asbestos free materials | 1 | ||||||||||||
| SECTION 09 62 38 | ||||||||||||||
| 122 | Primer | 1 | ||||||||||||
| 123 | Finish sealer | 1 | ||||||||||||
| 124 | Flooring system - colors | 1 | ||||||||||||
| 125 | Manufacture's warranty | 1 | ||||||||||||
| 126 | Application | 1 | ||||||||||||
| SECTION 09 90 00 | ||||||||||||||
| 127 | Coating | 1 | ||||||||||||
| 128 | Manufacturer's Technical Data Sheets | 1 | ||||||||||||
| 129 | Sealant | 1 | ||||||||||||
| 130 | Color | 1 | ||||||||||||
| 131 | Application instructions | 1 | ||||||||||||
| 132 | Manufacturer's Material Safety Data Sheets | 1 | ||||||||||||
| 133 | Delivery repots | 1 | ||||||||||||
| SECTION 10 14 00.20 | ||||||||||||||
| 134 | Detail Drawings of interior Signage | 1 | ||||||||||||
| 135 | Interior Signage | 1 | ||||||||||||
| SECTION 10 28 13 | ||||||||||||||
| 136 | Plumbing fixtures and accesories | 1 | ||||||||||||
| SECTION 10 44 16 | ||||||||||||||
| 137 | Cabinets | 1 | ||||||||||||
| 138 | Wall Brackets | 1 | ||||||||||||
| SECTION 21 13 13 | ||||||||||||||
| 139 | Automatic sprinklers | 1 | 1 | |||||||||||
| 140 | Piping and accesories | 1 | 1 | |||||||||||
| 141 | Pipe hangers and supports | 1 | ||||||||||||
| 142 | Fire riser components | 1 | ||||||||||||
| 143 | Backflow preventer | 1 | ||||||||||||
| 144 | Gate Valve | 1 | ||||||||||||
| 145 | Valve Box | 1 | ||||||||||||
| 146 | Fire Department connection | 1 | ||||||||||||
| 147 | Post Indicator valve | 1 | ||||||||||||
| 148 | Fire Riser Main Control Valve | 1 | ||||||||||||
| 149 | Qualifications of installer | 1 | ||||||||||||
| 150 | Inspection by Specialized Fire Protection Engineer | 1 | ||||||||||||
| 151 | Sprinkler system hydraulic calculation | 1 | ||||||||||||
| 152 | Final Sprinkler heads, piping and hangers layout | 1 | ||||||||||||
| 153 | As-Built drawings | 1 | ||||||||||||
| SECTION 22 00 00 | ||||||||||||||
| 154 | Reduced Pressure Backflow preventer | 1 | ||||||||||||
| 155 | Valves and accessories | 1 | ||||||||||||
| 156 | High-density polyethylene piping and accessories | 1 | ||||||||||||
| 157 | Polypropylene PP-RP Piping and accessories | 1 | ||||||||||||
| 158 | Electric water heater | 1 | ||||||||||||
| 159 | Strainer | 1 | ||||||||||||
| 160 | Rigid PVC piping | 1 | ||||||||||||
| 161 | Floor drain, floor and wall cleanouts and traps | 1 | ||||||||||||
| 162 | Trap primer | 1 | ||||||||||||
| 163 | Valve box | 1 | ||||||||||||
| 164 | Gate valve | 1 | ||||||||||||
| 165 | Hose bib and hose connection vacuum breaker | 1 | ||||||||||||
| 166 | Water meter gage with pulse emitter | |||||||||||||
| 167 | Plumbing system supports | 1 | ||||||||||||
| SECTION 23 07 00 | ||||||||||||||
| 168 | Domestic cold-water, hot water and refrigerant piping insulation. | 1 | ||||||||||||
| 169 | HVAC Duct insulation | 1 | ||||||||||||
| SECTION 23 30 00 | ||||||||||||||
| 170 | Sheet metal rectangular/circular ducts | 1 | ||||||||||||
| 171 | Linear Diffusers | 1 | ||||||||||||
| 172 | Suplly / Return grilles | 1 | ||||||||||||
| 173 | Cassette Units | 1 | ||||||||||||
| 174 | VRV Exterior units | 1 | ||||||||||||
| 175 | Multi Split units | 1 | ||||||||||||
| 176 | Ducted air conditioning system | 1 | ||||||||||||
| 177 | Mechanical Ventilation with Heat Recovery Units | 1 | ||||||||||||
| 178 | Ventilation exhaust fan | 1 | ||||||||||||
| 179 | Control System (including wiring, diagrams, panels and all related accessories) | 1 | ||||||||||||
| 180 | Pipes | 1 | ||||||||||||
| 181 | Thermostats | 1 | ||||||||||||
| 182 | Control Panels | 1 | ||||||||||||
| 183 | Fire Dampers | 1 | ||||||||||||
| 184 | Low Leakage Dampers | 1 | ||||||||||||
| 185 | HVAC System calculations | 1 | ||||||||||||
| 186 | Supply/return ducts | 1 | ||||||||||||
| 187 | Duct supports and seismic bracing if required | 1 | ||||||||||||
| 188 | Control diagrams of air conditioning system | 1 | ||||||||||||
| 189 | Performance Tests | 1 | ||||||||||||
| 190 | Testing, adjusting and balancing of air conditioning systems | 1 | ||||||||||||
| 191 | Manufacturer’s representative Certificate | 1 | ||||||||||||
| SECTION 26 11 16 | ||||||||||||||
| 192 | Prefabricated Transformer Shelter | 1 | ||||||||||||
| 193 | Transformer | 1 | ||||||||||||
| 194 | HV Switchgear | 1 | ||||||||||||
| 195 | Spare Parts | 1 | ||||||||||||
| 196 | Field Quality Control | 1 | ||||||||||||
| 197 | Transformer Losses Report | 1 | ||||||||||||
| 198 | Contractor’s or sub-contractor’s certification for installation of High Voltage electrical installations not exceeding 30 kV | 1 | ||||||||||||
| 199 | Contractor or sub-contractor individual’s personal license for installation of High Voltage electrical installations not exceeding 30 kV | 1 | ||||||||||||
| 200 | Transformer routine test | 1 | ||||||||||||
| SECTION 26 20 00 | ||||||||||||||
| 201 | Rigid Metal Conduit and fittings RMC (one of each size) | 1 | ||||||||||||
| 202 | Electrical Metal Tubing and fittings (EMT) (one of each size) | 1 | ||||||||||||
| 203 | Flexible nonmetal (NM) conduits (polyamide) and fittings (one of each size) | 1 | ||||||||||||
| 204 | Flexible Metal Conduit (FMC) and fittings (one of each size) | 1 | ||||||||||||
| 205 | Junction and pull boxes | 1 | ||||||||||||
| 206 | Receptacles | 1 | ||||||||||||
| 207 | Toggle switches | 1 | ||||||||||||
| 208 | Wires and cables | 1 | ||||||||||||
| 209 | Circuit breakers | 1 | ||||||||||||
| 210 | Panelboards | 1 | 1 | 1 | ||||||||||
| 211 | Panelboard, switchboard and meter enclosures | 1 | ||||||||||||
| 212 | Power analyzer | 1 | ||||||||||||
| 213 | Safety switch | 1 | ||||||||||||
| 214 | Surge protection device | 1 | ||||||||||||
| 215 | Emergency HVAC shut off button | 1 | ||||||||||||
| 216 | Actuator damper | 1 | ||||||||||||
| 217 | Panelboards | 1 | 1 | |||||||||||
| 218 | Wiring diagrams | 1 | ||||||||||||
| 219 | Devices Subject to Manual Operation | 1 | ||||||||||||
| 220 | 1000-Volt Wiring Test | 1 | ||||||||||||
| 221 | Grounding System Test | 1 | ||||||||||||
| 222 | Harmonic Distortion Test | 1 | ||||||||||||
| SECTION 26 32 15.00 | ||||||||||||||
| 223 | Engine-Generator Set and Auxiliary Equipment | 1 | 1 | 1 | ||||||||||
| 224 | Generator Grounding System | 1 | ||||||||||||
| 225 | Manufacturer’s Installation Instructions | 1 | ||||||||||||
| 226 | Performance Tests | 1 | ||||||||||||
| 227 | Factory Tests | 1 | ||||||||||||
| 228 | Onsite Inspection and Tests | 1 | ||||||||||||
| 229 | Functional Acceptance Test Procedure | 1 | ||||||||||||
| 230 | Engine Emission Limits | 1 | ||||||||||||
| 231 | Instructor's Qualification Resume | 1 | ||||||||||||
| 232 | Start-up Engineer qualifications | 1 | ||||||||||||
| 233 | Operation and Maintenance Manuals for Engine-Generator Set and Auxiliary Equipment. | 1 | ||||||||||||
| 234 | Training Plan | 1 | ||||||||||||
| SECTION 26 36 23 | ||||||||||||||
| 235 | Detail drawings (ATS y BP/IS) | 1 | ||||||||||||
| 236 | Installation | 1 | ||||||||||||
| 237 | Automatic transfer switch | 1 | ||||||||||||
| 238 | By-Pass isolation switch | 1 | ||||||||||||
| 239 | Acceptance checks and tests | 1 | ||||||||||||
| 240 | Funcional acceptance tests | 1 | ||||||||||||
| 241 | Factory testing | 1 | ||||||||||||
| 242 | Equipment | 1 | ||||||||||||
| 243 | Switching equipment | 1 | 1 | |||||||||||
| SECTION 26 41 00 | ||||||||||||||
| 244 | Overall lighning protection system | 1 | ||||||||||||
| 245 | Each major component | 1 | ||||||||||||
| 246 | Air terminals | 1 | ||||||||||||
| 247 | Conductors | 1 | ||||||||||||
| 248 | Ground rods | 1 | ||||||||||||
| 249 | Lightning protection system hardware | 1 | ||||||||||||
| 250 | Cable and air terminals fixation fitings | 1 | ||||||||||||
| 251 | Exothermic welding | 1 | ||||||||||||
| 252 | Strike counter device | 1 | ||||||||||||
| 253 | Grounding test wells / test bars | 1 | ||||||||||||
| 254 | Lightning protection and groundind system test | 1 | ||||||||||||
| SECTION 26 51 00 | ||||||||||||||
| 255 | Luminaire warranty | 1 | ||||||||||||
| 256 | LED Luminaires | 1 | ||||||||||||
| 257 | Luminaire Light Sources | 1 | ||||||||||||
| 258 | LED Drivers | 1 | ||||||||||||
| 259 | Occupancy sensor | 1 | 1 | |||||||||||
| 260 | Combined occupancy-Daylight sensor | 1 | 1 | |||||||||||
| 261 | Dimmers | 1 | 1 | |||||||||||
| 262 | Luminaire Useful Life Certificate | 1 | ||||||||||||
| 263 | Lighting fixtures operating field tests report | 1 | ||||||||||||
| 264 | Spare Parts Certificate | 1 | ||||||||||||
| SECTION 26 56 00 | ||||||||||||||
| 265 | LED Luminaire Warranty | 1 | ||||||||||||
| 266 | LED Luminaires | 1 | ||||||||||||
| 267 | Luminaire Light Sources | 1 | ||||||||||||
| 268 | Lighting contactor | 1 | ||||||||||||
| 269 | LED Drivers | 1 | ||||||||||||
| 270 | Luminaire Useful Life Certificate | 1 | ||||||||||||
| 271 | Lighting Fixtures | 1 | ||||||||||||
| 272 | Lighting Control Devices | 1 | ||||||||||||
| SECTION 27 10 00 | ||||||||||||||
| 273 | Cable trays | 1 | ||||||||||||
| 274 | Conduits, boxes and accesories | 1 | ||||||||||||
| 275 | Telecommunications grounding busbar (TGB) | 1 | ||||||||||||
| 276 | Floor boxes | 1 | ||||||||||||
| SECTION 28 31 76 | ||||||||||||||
| 277 | Fire Alarm system | 1 | ||||||||||||
| 278 | Battery power calculations | 1 | ||||||||||||
| 279 | Fire Alarm Control Panel (FACP) | 1 | ||||||||||||
| 280 | Autonomous Control Unit (ACU) | 1 | ||||||||||||
| 281 | Local Operating Console (LOC) | |||||||||||||
| 282 | Smoke sensor | 1 | ||||||||||||
| 283 | Wiring and cable | 1 | ||||||||||||
| 284 | Conduits | 1 | ||||||||||||
| 285 | System monitoring | 1 | ||||||||||||
| 286 | Addressable interface devices | 1 | ||||||||||||
| 287 | Audio-visual alarm devices (strobes) | 1 | ||||||||||||
| 288 | Manual pull stations | 1 | ||||||||||||
| 289 | Valve monitor switches (tamper switches) | 1 | ||||||||||||
| 290 | Retardant Chamber Pressure Switch | 1 | ||||||||||||
| 291 | Test Procedures | 1 | ||||||||||||
| 292 | Qualifications of installer | 1 | ||||||||||||
| 293 | Record of completion | 1 | ||||||||||||
| 294 | Verification of Compliant Installation | 1 | ||||||||||||
| 295 | Interior Fire Alarm and Mass Notification System. | 1 | ||||||||||||
| 296 | Record drawing software | 1 | ||||||||||||
| 297 | As-built drawings | 1 | ||||||||||||
| 298 | Riser diagram and drawings | 1 | ||||||||||||
| SECTION 31 00 00 | ||||||||||||||
| 299 | Artificial Graded-Aggregate | 1 | ||||||||||||
| 300 | Backfill material | 1 | ||||||||||||
| SECTION 32 04 22 | ||||||||||||||
| 301 | Geotextile | 1 | ||||||||||||
| 302 | Executiion control | 1 | ||||||||||||
| SECCIÓN 32 05 10 | ||||||||||||||
| 303 | Aggregates origin control | 1 | 1 | 1 | ||||||||||
| 304 | Job mix formula | 1 | ||||||||||||
| 305 | Test section | 1 | 1 | |||||||||||
| 306 | Acceptance control | 1 | ||||||||||||
| SECTION 36 16 19 | ||||||||||||||
| 307 | Reinforcement | 1 | ||||||||||||
| 308 | Curing material | 1 | ||||||||||||
| 309 | Concrete mix design | 1 | 1 | |||||||||||
| 310 | Slump tests | 1 | ||||||||||||
| SECTION 32 93 00 | ||||||||||||||
| 311 | Time Restrictions and Planting Conditions | 1 | ||||||||||||
| 312 | Dates and locations for each type of planting | 1 | ||||||||||||
| 313 | Product Data | 1 | ||||||||||||
| 314 | Topsoil Composition Tests | 1 | ||||||||||||
| 315 | Percolation Test | 1 | ||||||||||||
| 316 | Nursery Certifications | 1 | ||||||||||||
| SECTION 33 30 00 | ||||||||||||||
| 317 | PVC pipe and fittings | 1 | ||||||||||||
| 318 | Round manhole | 1 | ||||||||||||
| 319 | Round manhole frame and over | 1 | ||||||||||||
| 320 | Sewer pipe protection film and sealant | 1 | ||||||||||||
| 321 | Plan and topographic profile | 1 | ||||||||||||
| SECTION 33 71 02 | ||||||||||||||
| 322 | Precast underground Concrete Structures, Manholes | 1 | 1 | |||||||||||
| 323 | Manhole frames and covers | 1 | 1 | |||||||||||
| 324 | Conduits and spacers | 1 | ||||||||||||
| 325 | Cables and conductors | 1 | ||||||||||||
| 326 | Warning and identifiaction tape | 1 | ||||||||||||
| 327 | Field Acceptance Check and Test | 1 | ||||||||||||
| 328 | Manhole and cover certificate | 1 | ||||||||||||
| SECTION 33 82 00 | ||||||||||||||
| 329 | Conduits | 1 | ||||||||||||
| 330 | Manholes | 1 | ||||||||||||
| 331 | Warning and identification tape | 1 | ||||||||||||
| 316 | ||||||||||||||
| 317 |
&"Arial,Negrita"&8QUUG 24-1020. 100%REV2 DESIGN SUBMITTAL Schedule of Material Submittals, JUNE 2025 Page &P of &N
Resumen Muestras de Mat. (ESP)
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | ||
| QUUG 24-1020 | TÍTULO DE PROYECTO: |
RENOVATE ADMIN OFFICES, B110
SOLICITACIÓN / CONTRATO NO.
FA5575-22-C-0019
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | |||||||||||||
| 01 | Carta de garantía | 1 | Aceptación+15 | ||||||||||
| 02 | Plan de obra | 1 | CA+7 | ||||||||||
| 03 | Programa de avance de obras | 1 | CA+10 | ||||||||||
| 04 | Plan de obra | 1 | CA+7 | ||||||||||
| 05 | Plan de movilización | 1 | CA+15 | ||||||||||
| 06 | Cartel de proyecto | 1 | CA+15 | ||||||||||
| 07 | Plan de control de calidad | 1 | CA+15 | ||||||||||
| 08 | Plan de protección medioambiental | 1 | CA+15 | ||||||||||
| 09 | Formulario DD 1354 | 1 | IF + 15 | ||||||||||
| 10 | Certificado de gestión de residuos y escombros | 1 | Inspección final (IF) | ||||||||||
| 11 | Planos As-Builts | 1 | IF + 15 | ||||||||||
| 12 | Datos espaciales | 1 | As Built+10 | ||||||||||
| 13 | Personal Clave | 1 | CA+15 | ||||||||||
| 14 | Plan de salud y seguridad | 1 | CA+15 | ||||||||||
| 15 | Manuales de uso y mantenimiento | Inspección final (IF) | |||||||||||
| SECCIÓN 01 11 02 | |||||||||||||
| 15 | Plan de Fases del Trabajo | 1 | Comienzo de los Trabajos - 15 | ||||||||||
| 16 | Plan de cortes de suministros | 1 | Comienzo de los Trabajos - 15 | ||||||||||
| 17 | Plan de recuperación | 1 | CA + 15 | ||||||||||
| 18 | Manuales de Operación y Mantenimiento | 1 | IF + 15 | ||||||||||
| SECCIÓN 02 41 01 | |||||||||||||
| 19 | Condiciones Existentes | 1 | |||||||||||
| 20 | Plan de Demoliciones y Desmontaje | 1 | |||||||||||
| 21 | Comprobantes de Recepción (Albaranes) | 1 | |||||||||||
| 22 | Plan de Gestión de Residuos | 1 | |||||||||||
| 23 | Certificado de Entregas y Eliminación de Residuos de Construcción y Demolición | 1 | |||||||||||
| SECCIÓN 03 30 00 | |||||||||||||
| 24 | Refuerzos | 1 | 1 | ||||||||||
| 25 | Inhibidor de corrosión aplicado en la superficie | 1 | |||||||||||
| 26 | Diseño de la mezcla de hormigón | 1 | 1 | ||||||||||
| 27 | Pruebas de resistencia a compresión | 1 | |||||||||||
| 28 | Pruebas de consistencia | 1 | |||||||||||
| 29 | Informe de Verificación Estructural | 1 | |||||||||||
| SECCIÓN 04 20 00 | |||||||||||||
| 30 | Bloques de hormigón prefabricado | 1 | 1 | ||||||||||
| 31 | Varillas de refuerzo | 1 | |||||||||||
| 32 | Material de juntas de expansión | 1 | |||||||||||
| 33 | Dinteles en paredes de Albañilería | 1 | 1 | ||||||||||
| SECCIÓN 05 05 23.16 | |||||||||||||
| 34 | Electrodos y varillas de soldadura | 1 | |||||||||||
| 35 | Cualificaciones de Soldador Certificado | 1 | |||||||||||
| SECCIÓN 05 12 00 | |||||||||||||
| 36 | Vigas y pilares de acero | 1 | |||||||||||
| 37 | Soportes, Placas y Accesorios de Acero | 1 | |||||||||||
| 38 | Estructura de acero de cubierta | 1 | |||||||||||
| 39 | Estructura puerta GSA | 1 | 1 | ||||||||||
| 40 | Verificación de estructuras existentes | 1 | |||||||||||
| 41 | Imprimación en taller | 1 | |||||||||||
| 42 | Mortero de inyección | 1 | |||||||||||
| 43 | Acero | 1 | |||||||||||
| 44 | Pernos, Tuercas y Arandelas | 1 | |||||||||||
| SECCIÓN 05 30 00 | |||||||||||||
| 45 | Instalación y ejecución de forjados de chapa colaborante | 1 | |||||||||||
| 46 | Accesorios | 1 | |||||||||||
| 47 | Unidades de chapa colaborante | 1 | 1 | ||||||||||
| 48 | Refuerzos | 1 | 1 | ||||||||||
| SECCIÓN 05 50 13 | |||||||||||||
| 49 | Pérgola. Planos de detalle | 1 | |||||||||||
| 50 | Pergola. Planos de diseño y distribución | 1 | |||||||||||
| 51 | Pérgola de aluminio | 1 | |||||||||||
| 52 | Pérgola. Accesorios | 1 | |||||||||||
| 53 | Pérgola. Sistema de drenaje y anclaje | ||||||||||||
| 54 | Pérgola. Carta de colores del fabricante | 1 | |||||||||||
| 55 | Pérgola. Garantía del fabricante. | 1 | |||||||||||
| 56 | Pérgola. Cualificaciones del instalador. | 1 | |||||||||||
| 57 | Pérgola. Instrucciones de instalación del fabricante | 1 | |||||||||||
| 58 | Pérgola. Instrucciones de uso del fabricante | 1 | |||||||||||
| 59 | Escalera escamoteable | 1 | 1 | 1 | 1 | 1 | |||||||
| SECCIÓN 06 20 00 | |||||||||||||
| 48 | Planos de detalle que indican todos los conjuntos de madera | 1 | |||||||||||
| 49 | Catálogo de fabricante y carta de colores | 1 | |||||||||||
| 50 | Muestras | 1 | |||||||||||
| 51 | Certificados de conformidad del fabricante | 1 | |||||||||||
| SECCIÓN 07 21 13 | |||||||||||||
| 52 | Panel de aislamiento | 1 | 1 | ||||||||||
| 53 | Aislamiento proyectado | 1 | 1 | ||||||||||
| 54 | Tablero de protección del aislamiento | 1 | |||||||||||
| 55 | Adhesivo | 1 | |||||||||||
| SECCIÓN 07 27 10 | |||||||||||||
| 56 | Sistema de Barrera de Aire | 1 | |||||||||||
| 57 | Pruebas e inspección | 1 | |||||||||||
| 58 | Inspector de barreras de aire | 1 | |||||||||||
| SECCIÓN 07 32 13 | |||||||||||||
| 59 | Sistema técnico paera cubiertas inclinadas | 1 | 1 | ||||||||||
| 60 | Instrucciones de instalación del fabricante | 1 | |||||||||||
| 61 | Tejas de hormigón | 1 | |||||||||||
| 62 | Materiales | 1 | |||||||||||
| 63 | Cualificación del personal de cubierta | 1 | |||||||||||
| 64 | Garantía | 1 | |||||||||||
| 65 | Tablero fenólico marino | 1 | |||||||||||
| 66 | Sistema de detención de caídas | 1 | 1 | 1 | |||||||||
| 67 | Bajantes y canalones | 1 | 1 | ||||||||||
| SECCIÓN 07 81 00 | |||||||||||||
| 68 | Sistema de recubrimiento intumescente | 1 | |||||||||||
| 69 | Clasificación de resistencia al fuego | 1 | |||||||||||
| 70 | Pruebas in situ | 1 | |||||||||||
| 71 | Informe de evaluación | 1 | |||||||||||
| 72 | Cualificaciones del instalador | 1 | |||||||||||
| 73 | Informe de preparación | 1 | |||||||||||
| 74 | Informe de inspección del fabricante | 1 | |||||||||||
| SECCIÓN 07 84 00 | |||||||||||||
| 75 | Materiales de cortafuegos | 1 | |||||||||||
| 76 | Calificaciones del instalador de materiales cortafuegos | 1 | |||||||||||
| SECCIÓN 07 92 00 | |||||||||||||
| 77 | Sellantes | 1 | |||||||||||
| 78 | Imprimaciones | 1 | |||||||||||
| 79 | Antiadherentes | 1 | |||||||||||
| SECCIÓN 08 11 13 | |||||||||||||
| 80 | Datos del catálogo del fabricante de puerta de acero | 1 | |||||||||||
| 81 | Puertas Contraincendios | 1 | 1 | ||||||||||
| 82 | Puerta resistente a las balas | 1 | 1 | ||||||||||
| 83 | Puerta seccional | 1 | 1 | ||||||||||
| 84 | Puerta de celda | 1 | 1 | ||||||||||
| 85 | Ventanilla de paso controlado | 1 | 1 | ||||||||||
| SECCIÓN 08 14 00 | |||||||||||||
| 86 | Datos del catálogo del fabricante | 1 | |||||||||||
| 87 | Color de puertas | 1 | |||||||||||
| SECCIÓN 08 51 13 | |||||||||||||
| 88 | Ventanas y puertas de aluminio | 1 | 1 | 1 | |||||||||
| 89 | Ventana de aluminio a prueba de balas | 1 | 1 | 1 | |||||||||
| SECCIÓN 08 71 00 | |||||||||||||
| 90 | Artículos de cerrajería | 1 | |||||||||||
| 91 | Instalación | 1 | |||||||||||
| SECCIÓN 08 81 00 | |||||||||||||
| 92 | Datos del catálogo del fabricante | 1 | |||||||||||
| 93 | Cristal aislante | 1 | |||||||||||
| 94 | Cristal espía antibalas | 1 | |||||||||||
| 95 | Cristal espía | 1 | |||||||||||
| 96 | Matereriales de fijación y sellado | 1 | |||||||||||
| 97 | Instalación del vidrio | 1 | |||||||||||
| SECCIÓN 09 24 23 | |||||||||||||
| 98 | Enfoscado de cemento y Enlucido de yeso | 1 | |||||||||||
| 99 | Instrucciones del Fabricante | 1 | |||||||||||
| 100 | Panel de muestra | 1 | |||||||||||
| SECCIÓN 09 29 00 | |||||||||||||
| 101 | Placa de yeso laminado standard. | 1 | |||||||||||
| 102 | Perfiles de acero galvanizado para sistemas de placas de yeso. | 1 | |||||||||||
| 103 | Cinta de papel microperforado para placas de yeso | 1 | |||||||||||
| 104 | Pasta de juntas de secado para sistemas de placas de yeso. | 1 | |||||||||||
| 105 | Placa acústica de yeso de alta dureza mezclada con fibras | 1 | |||||||||||
| 106 | Banda perimetral acústica para sistemas de placas de yeso. | 1 | |||||||||||
| 107 | Placa de yeso repelente al agua | 1 | |||||||||||
| 108 | Placa fonoabsorbente de yeso | 1 | |||||||||||
| 109 | Panel fonoabsorbente de yeso | ||||||||||||
| 110 | Fabricante de placas de yeso | 1 | 1 | ||||||||||
| SECCIÓN 09 30 10 | |||||||||||||
| 111 | Azulejos, adhesivos y selladores de juntas | 1 | |||||||||||
| 112 | Baldosa de gres porcelánico | 1 | |||||||||||
| 113 | Azueljo cerámico de pared | 1 | |||||||||||
| 114 | Baldosa de suelo de granito | 1 | |||||||||||
| SECCIÓN 09 51 00 | |||||||||||||
| 115 | Placas de yeso/cemento | 1 | 1 | ||||||||||
| 116 | Sistema de suspensión | 1 | |||||||||||
| 117 | Registros | 1 | |||||||||||
| 118 | Instrucciones de instalación del fabricante | 1 | |||||||||||
| 119 | Distribución del techo exterior e interior | 1 | |||||||||||
| 120 | Sistema de suspensión | 1 | |||||||||||
| 121 | Materiales sin amianto | 1 | |||||||||||
| SECCIÓN 09 62 38 | |||||||||||||
| 122 | Imprimación | 1 | |||||||||||
| 123 | Sellador de acabado | 1 | |||||||||||
| 124 | Sistema de pavimento - colores | 1 | |||||||||||
| 125 | Garantía del fabricante | 1 | |||||||||||
| 126 | Aplicación | 1 | |||||||||||
| SECCIÓN 09 90 00 | |||||||||||||
| 127 | Revestimientos | 1 | |||||||||||
| 128 | Fichas de Datos técnicos del Fabricante | 1 | |||||||||||
| 129 | Sellante | 1 | |||||||||||
| 130 | Color | 1 | |||||||||||
| 131 | Instrucciones de aplicación | 1 | |||||||||||
| 132 | Hojas de Datos de Seguridad del Material | 1 | |||||||||||
| 133 | Informes de entrega | 1 | |||||||||||
| SECTION 10 14 00.20 | |||||||||||||
| 134 | Planos de detalle de la señalización interior | 1 | |||||||||||
| 135 | Señalización interior | 1 | |||||||||||
| SECCIÓN 10 28 13 | |||||||||||||
| 136 | Accesorios sanitarios y accesorios | 1 | |||||||||||
| SECTION 10 44 16 | |||||||||||||
| 137 | Armarios | 1 | |||||||||||
| 138 | Soportes de pared | 1 | |||||||||||
| SECCIÓN 21 13 13 | |||||||||||||
| 139 | Rociadores automáticos | 1 | 1 | ||||||||||
| 140 | Tuberías y accesorios | 1 | 1 | ||||||||||
| 141 | Colgadores y soportes de tuberías | 1 | |||||||||||
| 142 | Componentes del Fire Riser | 1 | |||||||||||
| 143 | Dispositivo antirretorno | 1 | |||||||||||
| 144 | Válvula de compuerta | 1 | |||||||||||
| 145 | Caja de válvula | ||||||||||||
| 146 | Conexión con el departamento de bomberos | 1 | |||||||||||
| 147 | Válvula indicadora de poste | 1 | |||||||||||
| 148 | Válvula de control principal del Fire Riser | 1 | |||||||||||
| 149 | Cualificación del instalador | 1 | |||||||||||
| 150 | Inspección realizada por un ingeniero especializado en protección contraincendios | 1 | |||||||||||
| 151 | Cálculo hidráulico del sispetma de rociadores | 1 | |||||||||||
| 152 | Diseño final de los rociadores, tuberías y colgadores | 1 | |||||||||||
| 153 | Planos As-Built | 1 | |||||||||||
| SECCIÓN 22 00 00 | |||||||||||||
| 154 | Prevención de reflujo de presión reducida | 1 | |||||||||||
| 155 | Válcula y accesorios | 1 | |||||||||||
| 156 | Tuberías de polietileno de alta densidad y accesorios | 1 | |||||||||||
| 157 | Tubería de polipropileno PP-RP y accesorios | 1 | |||||||||||
| 158 | Calentador de agua eléctrico | 1 | |||||||||||
| 159 | Filtro tamiz | 1 | |||||||||||
| 160 | Tubería rígida de PVC | 1 | |||||||||||
| 161 | Desagües de suelo, limpiezas y trampillas | 1 | |||||||||||
| 162 | Dispositivo de cebado de sumidero | 1 | |||||||||||
| 163 | Caja de válvula | 1 | |||||||||||
| 164 | Válvula de compuerta | 1 | |||||||||||
| 165 | Llave de salida para manguera con dispositivo anti-retorno (interruptor de vacío) | 1 | |||||||||||
| 166 | Contador de agua con emisor de impulsos | 1 | |||||||||||
| 167 | Soportes para sistemas de fontanería | 1 | |||||||||||
| SECCIÓN 23 07 00 | |||||||||||||
| 168 | Aislamiento de tuberías de agua fría, agua caliente y de refrigerante | 1 | |||||||||||
| 169 | Aislamiento de conductos HVAC | 1 | |||||||||||
| SECCIÓN 23 30 00 | |||||||||||||
| 170 | Conductos rectangulares/circulares de chapa | 1 | |||||||||||
| 171 | Difusores lineales | 1 | |||||||||||
| 172 | Rejillas de impulsión/retorno | 1 | |||||||||||
| 173 | Unidades de casete | 1 | |||||||||||
| 174 | Unidad exterior VRV | 1 | |||||||||||
| 175 | Unidades multi Split | 1 | |||||||||||
| 176 | Unidad de climatización por conductos | 1 | |||||||||||
| 177 | Ventilación mecánica con unidades de recuperación de calor | 1 | |||||||||||
| 178 | Extractor de ventilación | 1 | |||||||||||
| 179 | Sistema de control | 1 | |||||||||||
| 180 | Tuberías | 1 | |||||||||||
| 181 | Termostatos | 1 | |||||||||||
| 182 | Paneles de control | 1 | |||||||||||
| 183 | Compuertas cortafuegos | 1 | |||||||||||
| 184 | Compuertas de baja en fuga | 1 | |||||||||||
| 185 | Cálculos del systema HVAC | 1 | |||||||||||
| 186 | Conductos de impulsión y retorno para las unidades de tratamiento de aire | 1 | |||||||||||
| 187 | Soportes de conductos y arriostramiento sísmico | 1 | |||||||||||
| 188 | Diagramas de control del sistema de aire acondicionado | 1 | |||||||||||
| 189 | Prueba de funcionamiento | 1 | |||||||||||
| 190 | Prueba, ajuste y equilbtado del sistema de a.a. | 1 | |||||||||||
| 191 | Certificado del representante del fabricante | 1 | |||||||||||
| SECCIÓN 26 11 16 | |||||||||||||
| 192 | Carcasa de transformador prefabricado | 1 | |||||||||||
| 193 | Transformador | 1 | |||||||||||
| 194 | Aparamenta de alta tensión | 1 | |||||||||||
| 195 | Piezas de repuesto | 1 | |||||||||||
| 196 | Control de calidad en campo | 1 | |||||||||||
| 197 | Reporte de pérdidas de transformadores | 1 | |||||||||||
| 198 | Certificación del contratista o subcontratista para la instalación de instalaciones eléctricas de alta tensión no superiores a 30kV | 1 | |||||||||||
| 199 | Licencia del contratista o subcontratista para la instalación de instalaciones eléctricas de alta tensión no superiores a 30kV | 1 | |||||||||||
| 200 | Prueba de rutina del transformador | 1 | |||||||||||
| SECCIÓN 26 20 00 | |||||||||||||
| 201 | Conducto Metálico Rígido (RMC) y accesorios (uno de cada tamaño) | 1 | |||||||||||
| 202 | Conducto Eléctrico Metálico (EMT) y accesorios (uno de cada tamaño) | 1 | |||||||||||
| 203 | Conducto flexible No Metálico (NM) (poliamida) y accesorios (uno de cada tamaño) | 1 | |||||||||||
| 204 | Conducto metálico flexible (FMC) y accesorios (uno de cada tamaño) | 1 | |||||||||||
| 205 | Cajas de empalme y extracción | 1 | |||||||||||
| 206 | Enchufes | 1 | |||||||||||
| 207 | Interruptores de palanca | 1 | |||||||||||
| 208 | Alambres y cables | 1 | |||||||||||
| 209 | Interruptores automáticos | 1 | |||||||||||
| 210 | Cuadro eléctrico | 1 | 1 | 1 | |||||||||
| 211 | Armarios de paneles, cuadros eléctricos y armarios de contadores | 1 | |||||||||||
| 212 | Contadores | 1 | |||||||||||
| 213 | Interruptor de seguridad | 1 | |||||||||||
| 214 | Dispositivo de protección contra sobretensiones | 1 | |||||||||||
| 215 | Botoón de apagado de emergencia de HVAC | 1 | |||||||||||
| 216 | Actuador damper | 1 | |||||||||||
| 217 | Cuadro de distribución | 1 | 1 | ||||||||||
| 218 | Esquemas de cableado | 1 | |||||||||||
| 219 | Dispositivos sujetos a operación manual | 1 | |||||||||||
| 220 | Prueba de cableado de 1000 Voltios | 1 | |||||||||||
| 221 | Prueba del sistema de toma de tierra | 1 | |||||||||||
| 222 | Prueba de distorsión de armónicos | 1 | |||||||||||
| SECCIÓN 26 32 15.00 | |||||||||||||
| 223 | Motor-Grupo electrógeno y equipos auxiliares | 1 | 1 | 1 | |||||||||
| 224 | Sistema de puesta a tierra del generador | 1 | |||||||||||
| 225 | Instrucciones de instalación del fabricante | 1 | |||||||||||
| 226 | Pruebas de rendimiento | 1 | |||||||||||
| 227 | Pruebas de fábrica | 1 | |||||||||||
| 228 | Inspección y pruebas in situ | 1 | |||||||||||
| 229 | Procedimiento de prueba de aceptación funcional | 1 | |||||||||||
| 230 | Límites de emisiones del motor | 1 | |||||||||||
| 231 | Currículum vitae de calificación del instructor | 1 | |||||||||||
| 232 | Titulaciones del ingeniero de puesta en marcha | 1 | |||||||||||
| 233 | Manuales de operación y mantenimiento del motor-grupo electrógeno y equipos auxiliares | 1 | |||||||||||
| 234 | Plan de formación | 1 | |||||||||||
| SECCIÓN 26 36 23 | |||||||||||||
| 235 | Dibujos de detalle (ATS y BP/IS) | 1 | |||||||||||
| 236 | Instalación | 1 | |||||||||||
| 237 | Interruptor de transferencia automática | 1 | |||||||||||
| 238 | Interruptor de aislamiento de derivación | 1 | |||||||||||
| 239 | Comprobaciones y pruebas de aceptación | 1 | |||||||||||
| 240 | Pruebas de aceptaciones funcionales | 1 | |||||||||||
| 241 | Pruebas en fábrica | 1 | |||||||||||
| 242 | Equipo | 1 | |||||||||||
| 243 | Equipos de conmutación | 1 | 1 | ||||||||||
| SECCIÓN 26 41 00 | |||||||||||||
| 244 | Sistema general deprotección contra rayos | 1 | |||||||||||
| 245 | Cada componente principal | 1 | |||||||||||
| 246 | Terminales aéreas | 1 | |||||||||||
| 247 | Conductores | 1 | |||||||||||
| 248 | Varillas de tierra | 1 | |||||||||||
| 249 | Hardware del sistema de protección contra rayos | 1 | |||||||||||
| 250 | Accesorios de fijación de terminales de cable y aire | 1 | |||||||||||
| 251 | Soldadura exotérmica | 1 | |||||||||||
| 252 | Dispositivo de contador de huelgas | 1 | |||||||||||
| 253 | Pozos de prueba de puesta a tierra / barras de prueba | 1 | |||||||||||
| 254 | Prueba del sistema de protección contra rayos y puesta a tierra | 1 | |||||||||||
| SECCIÓN 26 51 00 | |||||||||||||
| 255 | Garantías de Luminarias | 1 | |||||||||||
| 256 | Luminarias LED | 1 | |||||||||||
| 257 | Fuentes de Luz de Luminarias | 1 | |||||||||||
| 258 | Controladores LED | 1 | |||||||||||
| 259 | Sensores de ocupación-luz diurna combinados | 1 | 1 | ||||||||||
| 260 | Sensor de ocupación | 1 | 1 | ||||||||||
| 261 | Reguladores | 1 | 1 | ||||||||||
| 262 | Certificado de Vida útil de la Luminaria | 1 | |||||||||||
| 263 | Prueba de campo de Luminarias | 1 | |||||||||||
| 264 | Certificado de piezas de recambio | 1 | |||||||||||
| SECCIÓN 26 56 00 | |||||||||||||
| 265 | Garantías de Luminarias LED | 1 | |||||||||||
| 266 | Luminarias LED | 1 | |||||||||||
| 267 | Fuentes de Luz de Luminarias | 1 | |||||||||||
| 268 | Contactor de iluminación | 1 | |||||||||||
| 269 | Controladores LED | 1 | |||||||||||
| 270 | Certificado de Vida útil de la Luminaria | 1 | |||||||||||
| 271 | Prueba de Luminarias | 1 | |||||||||||
| 272 | Prueba de los sistemas de control | 1 | |||||||||||
| SECCIÓN 27 10 00 | |||||||||||||
| 273 | Bandeja de cables | 1 | |||||||||||
| 274 | Conductos, cajas y accesorios | 1 | |||||||||||
| 275 | Barra colectora de tierra para telecomunicaciones (TGB) | 1 | |||||||||||
| 276 | Caja de suelo | 1 | |||||||||||
| SECCIÓN 28 31 76 | |||||||||||||
| 277 | Sistema de alarma | 1 | |||||||||||
| 278 | Cálculo de la potencia de la batería | 1 | |||||||||||
| 279 | Panel de control alarma de incendio (FACP) | 1 | |||||||||||
| 280 | Unidad de control autónoma (ACU) | 1 | |||||||||||
| 281 | Consola de operación Local (LOC) | ||||||||||||
| 282 | Detector de humos | 1 | |||||||||||
| 283 | Cableado y cables | 1 | |||||||||||
| 284 | Conductos | 1 | |||||||||||
| 285 | Monitoreo del sistema | 1 | |||||||||||
| 286 | Dispositivos de interfaz direccionables | 1 | |||||||||||
| 287 | Dispositivos de alarma audiovisuales | 1 | |||||||||||
| 288 | Estaciones de extracción manuales | 1 | |||||||||||
| 289 | Interruptores de monitor de válvulas | 1 | |||||||||||
| 290 | Presostato de cámara retardante | 1 | |||||||||||
| 291 | Procedimientos de prueba | 1 | |||||||||||
| 292 | Cualificaciones del instalador | 1 | |||||||||||
| 293 | Registro de finalización | 1 | |||||||||||
| 294 | Verificación de la conformidad de la instalación | 1 | |||||||||||
| 295 | Sistema de Alarma de Incendio y Notificación de Masiva en el interior. | 1 | |||||||||||
| 296 | Software de dibujo de registros | 1 | |||||||||||
| 297 | Planos As-built | 1 | |||||||||||
| 298 | Diagrama y planos as-built del "riser" | 1 | |||||||||||
| SECCIÓN 31 00 00 | |||||||||||||
| 299 | Árido artificial | 1 | |||||||||||
| 300 | Material de relleno | 1 | |||||||||||
| SECCIÓN 32 04 22 | |||||||||||||
| 301 | Geotextil | 1 | |||||||||||
| 302 | Control de ejecución | 1 | |||||||||||
| SECTION 32 05 10 | |||||||||||||
| 303 | Control de origen de áridos | 1 | 1 | 1 | |||||||||
| 304 | Fórmula de trabajos | 1 | |||||||||||
| 305 | Sección de prueba | 1 | 1 | ||||||||||
| 306 | Control de aceptación | 1 | |||||||||||
| SECCIÓN 36 16 19 | |||||||||||||
| 307 | Acero de refuerzo | 1 | |||||||||||
| 308 | Material de curado | 1 | |||||||||||
| 309 | Diseño de mezclas de hormigón | 1 | 1 | ||||||||||
| 310 | Pruebas de consistencia | 1 | |||||||||||
| SECCIÓN 32 93 00 | |||||||||||||
| 311 | Restricciones de tiempo y condiciones de plantación | 1 | |||||||||||
| 312 | Fechas y lugares para cada tipo de plantación | 1 | |||||||||||
| 313 | Datos de productos | 1 | |||||||||||
| 314 | Prueba de composición de la capa superior del suelo | 1 | |||||||||||
| 315 | Prueba de percusión | 1 | |||||||||||
| 316 | Certificado de semilleros | 1 | |||||||||||
| SECCION 33 30 00 | |||||||||||||
| 317 | Tubería y accesorios de PVC | 1 | |||||||||||
| 318 | Boca de registro redonda | 1 | |||||||||||
| 319 | Marco y tapa de alcantarilla redondos | 1 | |||||||||||
| 320 | Película protectora y sellador de tuberías de alcantarillado | 1 | |||||||||||
| 321 | Planta y perfil topográfico. | 1 | |||||||||||
| SECCIÓN 33 71 02 | |||||||||||||
| 322 | Estructuras subterráneas de hormigón prefabricado, pozos de registro | 1 | 1 | ||||||||||
| 323 | Marcos y tapas de arquetas | 1 | 1 | ||||||||||
| 324 | Conductos y espaciadores | 1 | |||||||||||
| 325 | Cables y conductores | 1 | |||||||||||
| 326 | Cinta de advertencia e identificación | 1 | |||||||||||
| 327 | Comprobaciones y pruebas de aceptación de la obra | 1 | |||||||||||
| 328 | Certifficado de arquetas y tapas | 1 | |||||||||||
| SECCIÓN 33 82 00 | |||||||||||||
| 329 | Conductos | 1 | |||||||||||
| 330 | Arquetas | 1 | |||||||||||
| 331 | Cinta de advertencia e identificación | 1 |
&"Arial,Negrita"&8QUUG 24-1020. 100%REV2 DESIGN SUBMITTAL Resumen de muestras de material, JUNIO 2025 Página &P de &N