5. Schedule of Materials.xlsx

XLSX spreadsheet 139 KB Posted

Attached to
RNV-ADD SECURITY FORCES FACILITY, B110 Federal contract opportunity
Solicitation number
FA557525B0011
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document is a comprehensive Schedule of Material Submittals for Project QUUG 24-1020, which involves renovating administrative offices at Building 110 on Moron Air Base in Spain. The schedule details over 330 line items of required material submittals across multiple sections including architectural, electrical, mechanical, plumbing, fire protection, and telecommunications systems. Each line item specifies the type of submittal required, such as shop drawings, manufacturer's warranties, technical data, test reports, installation instructions, and color selections, with specific submission timelines relative to contract administration (CA) or final inspection (FI) milestones.

The associated federal contract opportunity is a solicitation (FA557525B0011) for a construction project valued between $1-5 million, specifically targeting local Spanish contractors authorized to perform government works. Key procurement details include a pre-proposal conference on 16 July 2025, a deadline for questions on 23 July 2025, and bid submission deadline of 10:30 hours local time on 6 August 2025. The project is being executed by the Department of the Air Force's United States Air Forces in Europe - Air Forces Africa, with a bid acceptance period valid through 31 December 2025, contingent on fund availability.

View the file

Other files for this federal contract opportunity

Other files attached to RNV-ADD SECURITY FORCES FACILITY, B110, newest first.
File Type Posted
MFR QUUG 24-1020 Questions and Answers.pdf PDF
Solicitation - FA557525B0011.pdf PDF
3. Specifications (Spa).pdf PDF
4. Cost Estimate (Blank).xlsx XLSX spreadsheet
2. Specifications (Eng).pdf PDF
Moron AB Generators Justification and Approval.pdf PDF
Moron AB Fire Alarm Panels Justification and Approval.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Sch. (ENG)

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 24-1020PROJECT TITLE:
RENOVATE ADMIN OFFICES, B110SOLICITATION / CONTRACT NO.

FA5575-22-C-0019

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
01Warranty letter1Acceptance+15
02Construction Schedule1CA+7
03Progress Schedule1CA+10
04Work Plan1CA+7
05Mobility Plan1CA+15
06Project Sign1CA+15
07Quality Control Plan1CA+15
08Environmental Protection Plan1CA+15
09DD Form 13541FI+15
10Waste & construction debris management1Final Inspection (FI)
11As-Built drawings1FI+15
12Spatial Data1As Built+10
13Key Staff1CA+15
14Health and safety Plan1CA +15
15Operation and Maintenance Manuals1Final Inspection (FI)
SECTION 01 11 02
15Work Phasing Plan1Commencement of work - 15
16Utilities shut off Plan1Commencement of work - 15
17Salvage plan1CA + 15
18Operation & Maintenance (O&M) Manuals1FI + 15
SECTION 02 41 01
19Existing Conditions1
20Demolition and Deconstruction Plan1
21Receipts1
22Waste Management Plan1
23Delivery and disposal Certificate of Waste from Construction and Demolitions1
SECTION 03 30 00
24Reinforcement11
25Surface-Applied Corrosion Inhibitor1
26Concrete mix design11
27Compressive strength tests1
28Slump tests1
29Structural Verification Report1
SECTION 04 20 00
30Precast concrete blocks11
31Reinforcement bars
32Expansion Joint Material
33Lintels in Masonry Walls11
SECTION 05 05 23.16
34Welding Electrodes and Rods1
35Certified Welder Performance Qualifications1
SECTION 05 12 00
36Steel Columns and Beams1
37Steel Roof Structure1
38Steel Brackets, Plates, & Accessories1
39GSA door structure11
40Existing Structure Verifications1
41Shop Primer1
42Injection mortar1
43Steel1
44Bolts, Nuts, and Washers1
SECTION 05 30 00
45Steel Deck installation and execution1
46Accessories1
47Deck Units11
48Reinforcements11
SECTION 05 50 13
49Pergola detail drawings1
50Pergola Layout and Design drawings1
51Aluminum pergola1
52Pergola accessories1
53Pergola drainage and anchorage system1
54Pergola Manufacturer’s Color Chart1
55Pergola Manufacturer's Warranty1
56Pergola Qualifications of Installer1
57Pergola Manufacturer’s Installation Instructions1
58Pergola Manufacturer’s Operating Instructions1
59Retractacle ladder11111
SECTION 06 20 00
48Detail Drawings Indicating All Wood Assemblies1
49Manufacturer's Catalog Data and color chart1
50Samples1
51Manufacturer's certificates of compliance of AENOR1
SECTION 07 21 13
52Board Insulation11
53Projected insulation11
54Protection Board Insulation or coating1
55Adhesive1
SECTION 07 27 10
56Air Barrier System1
57Testing and Inspection1
58Air Barrier Inspector1
SECTION 07 32 13
59Technical system for pitched roofs11
60Manufacturer Installation Instructions1
61Concrete tile1
62Materials1
63Qualifications of roofing personnel1
64Warranty1
65Marine phenolic board1
66Fall arresting system111
67Gutters & Downspouts11
SECTION 07 81 00
68Spray-Applied Waterborne Intumescent Coating
System Product Data1
69Fire Resistance Rating1
70Field Tests1
71Evaluation Reports1
72Installer Qualifications1
73Preparation Report1
74Manufacturer's Inspection Report1
SECTION 07 84 00
75Firestopping Materials1
76Firestopping Materials Installer Qualifications1
SECTION 07 92 00
77Sealants1
78Primers1
79Bond Breakers1
SECTION 08 11 13
80Steel Door Manufacturer's Catalog Data1
81Fire Resistant Door11
82Bullet resistant door11
83Sectional door11
84Cell door11
85Controlled-access Pass-Through Window11
SECTION 08 14 00
86Manufacturer's Catalog Data1
87Color for doors1
SECTION 08 51 13
88Aluminium windows and doors111
89Bullet proof aluminum window111
SECTION 08 71 00
90Hardware Items1
91Installation1
SECTION 08 81 00
92Descriptive product data1
93Insulating glass1
94Bullet proof spy glass1
95Spy glass1
96Setting and sealing materials1
97Glass setting1
SECTION 09 24 23
98Cement plaster and gypsum stucco1
99Manufacturer's Instructions1
100Sample panel1
SECTION 09 29 00
101Standard gypsum boards1
102Galvanized steel profiles for gypsum board systems1
103Micro-perforated paper tape for gypsum board systems1
104Drying joint paste for gypsum board systems1
105High hardness acoustical gypsum board mixed with fibers1
106Acoustic perimeter band for gypsum board system1
107Water repellent gypsum board1
108Sound absorbing gypsum boards1
109Sound absorbing gypsum panels1
110Gypsum board manufacturer.11
SECTION 09 30 10
111Tiles, adhesives and joint sealants1
112Porcelanic gres floor tile1
113Ceramic wall tile1
114Granite floor tile1
SECTION 09 51 00
115Gypsum/Cement boards11
116Suspension system1
117Registers1
118Manufacturer's installation instructions1
119Exterior and interior ceiling1
120Suspension system1
121Asbestos free materials1
SECTION 09 62 38
122Primer1
123Finish sealer1
124Flooring system - colors1
125Manufacture's warranty1
126Application1
SECTION 09 90 00
127Coating1
128Manufacturer's Technical Data Sheets1
129Sealant1
130Color1
131Application instructions1
132Manufacturer's Material Safety Data Sheets1
133Delivery repots1
SECTION 10 14 00.20
134Detail Drawings of interior Signage1
135Interior Signage1
SECTION 10 28 13
136Plumbing fixtures and accesories1
SECTION 10 44 16
137Cabinets1
138Wall Brackets1
SECTION 21 13 13
139Automatic sprinklers11
140Piping and accesories11
141Pipe hangers and supports1
142Fire riser components1
143Backflow preventer1
144Gate Valve1
145Valve Box1
146Fire Department connection1
147Post Indicator valve1
148Fire Riser Main Control Valve1
149Qualifications of installer1
150Inspection by Specialized Fire Protection Engineer1
151Sprinkler system hydraulic calculation1
152Final Sprinkler heads, piping and hangers layout1
153As-Built drawings1
SECTION 22 00 00
154Reduced Pressure Backflow preventer1
155Valves and accessories1
156High-density polyethylene piping and accessories1
157Polypropylene PP-RP Piping and accessories1
158Electric water heater1
159Strainer1
160Rigid PVC piping1
161Floor drain, floor and wall cleanouts and traps1
162Trap primer1
163Valve box1
164Gate valve1
165Hose bib and hose connection vacuum breaker1
166Water meter gage with pulse emitter
167Plumbing system supports1
SECTION 23 07 00
168Domestic cold-water, hot water and refrigerant piping insulation.1
169HVAC Duct insulation1
SECTION 23 30 00
170Sheet metal rectangular/circular ducts1
171Linear Diffusers1
172Suplly / Return grilles1
173Cassette Units1
174VRV Exterior units1
175Multi Split units1
176Ducted air conditioning system1
177Mechanical Ventilation with Heat Recovery Units1
178Ventilation exhaust fan1
179Control System (including wiring, diagrams, panels and all related accessories)1
180Pipes1
181Thermostats1
182Control Panels1
183Fire Dampers1
184Low Leakage Dampers1
185HVAC System calculations1
186Supply/return ducts1
187Duct supports and seismic bracing if required1
188Control diagrams of air conditioning system1
189Performance Tests1
190Testing, adjusting and balancing of air conditioning systems1
191Manufacturer’s representative Certificate1
SECTION 26 11 16
192Prefabricated Transformer Shelter1
193Transformer1
194HV Switchgear1
195Spare Parts1
196Field Quality Control1
197Transformer Losses Report1
198Contractor’s or sub-contractor’s certification for installation of High Voltage electrical installations not exceeding 30 kV1
199Contractor or sub-contractor individual’s personal license for installation of High Voltage electrical installations not exceeding 30 kV1
200Transformer routine test1
SECTION 26 20 00
201Rigid Metal Conduit and fittings RMC (one of each size)1
202Electrical Metal Tubing and fittings (EMT) (one of each size)1
203Flexible nonmetal (NM) conduits (polyamide) and fittings (one of each size)1
204Flexible Metal Conduit (FMC) and fittings (one of each size)1
205Junction and pull boxes1
206Receptacles1
207Toggle switches1
208Wires and cables1
209Circuit breakers1
210Panelboards111
211Panelboard, switchboard and meter enclosures1
212Power analyzer1
213Safety switch1
214Surge protection device1
215Emergency HVAC shut off button1
216Actuator damper1
217Panelboards11
218Wiring diagrams1
219Devices Subject to Manual Operation1
2201000-Volt Wiring Test1
221Grounding System Test1
222Harmonic Distortion Test1
SECTION 26 32 15.00
223Engine-Generator Set and Auxiliary Equipment111
224Generator Grounding System1
225Manufacturer’s Installation Instructions1
226Performance Tests1
227Factory Tests1
228Onsite Inspection and Tests1
229Functional Acceptance Test Procedure1
230Engine Emission Limits1
231Instructor's Qualification Resume1
232Start-up Engineer qualifications1
233Operation and Maintenance Manuals for Engine-Generator Set and Auxiliary Equipment.1
234Training Plan1
SECTION 26 36 23
235Detail drawings (ATS y BP/IS)1
236Installation1
237Automatic transfer switch1
238By-Pass isolation switch1
239Acceptance checks and tests1
240Funcional acceptance tests1
241Factory testing1
242Equipment1
243Switching equipment11
SECTION 26 41 00
244Overall lighning protection system1
245Each major component1
246Air terminals1
247Conductors1
248Ground rods1
249Lightning protection system hardware1
250Cable and air terminals fixation fitings1
251Exothermic welding1
252Strike counter device1
253Grounding test wells / test bars1
254Lightning protection and groundind system test1
SECTION 26 51 00
255Luminaire warranty1
256LED Luminaires1
257Luminaire Light Sources1
258LED Drivers1
259Occupancy sensor11
260Combined occupancy-Daylight sensor11
261Dimmers11
262Luminaire Useful Life Certificate1
263Lighting fixtures operating field tests report1
264Spare Parts Certificate1
SECTION 26 56 00
265LED Luminaire Warranty1
266LED Luminaires1
267Luminaire Light Sources1
268Lighting contactor1
269LED Drivers1
270Luminaire Useful Life Certificate1
271Lighting Fixtures1
272Lighting Control Devices1
SECTION 27 10 00
273Cable trays1
274Conduits, boxes and accesories1
275Telecommunications grounding busbar (TGB)1
276Floor boxes1
SECTION 28 31 76
277Fire Alarm system1
278Battery power calculations1
279Fire Alarm Control Panel (FACP)1
280Autonomous Control Unit (ACU)1
281Local Operating Console (LOC)
282Smoke sensor1
283Wiring and cable1
284Conduits1
285System monitoring1
286Addressable interface devices1
287Audio-visual alarm devices (strobes)1
288Manual pull stations1
289Valve monitor switches (tamper switches)1
290Retardant Chamber Pressure Switch1
291Test Procedures1
292Qualifications of installer1
293Record of completion1
294Verification of Compliant Installation1
295Interior Fire Alarm and Mass Notification System.1
296Record drawing software1
297As-built drawings1
298Riser diagram and drawings1
SECTION 31 00 00
299Artificial Graded-Aggregate1
300Backfill material1
SECTION 32 04 22
301Geotextile1
302Executiion control1
SECCIÓN 32 05 10
303Aggregates origin control111
304Job mix formula1
305Test section11
306Acceptance control1
SECTION 36 16 19
307Reinforcement1
308Curing material1
309Concrete mix design11
310Slump tests1
SECTION 32 93 00
311Time Restrictions and Planting Conditions1
312Dates and locations for each type of planting1
313Product Data1
314Topsoil Composition Tests1
315Percolation Test1
316Nursery Certifications1
SECTION 33 30 00
317PVC pipe and fittings1
318Round manhole1
319Round manhole frame and over1
320Sewer pipe protection film and sealant1
321Plan and topographic profile1
SECTION 33 71 02
322Precast underground Concrete Structures, Manholes11
323Manhole frames and covers11
324Conduits and spacers1
325Cables and conductors1
326Warning and identifiaction tape1
327Field Acceptance Check and Test1
328Manhole and cover certificate1
SECTION 33 82 00
329Conduits1
330Manholes1
331Warning and identification tape1
316
317

&"Arial,Negrita"&8QUUG 24-1020. 100%REV2 DESIGN SUBMITTAL Schedule of Material Submittals, JUNE 2025 Page &P of &N

Resumen Muestras de Mat. (ESP)

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 24-1020TÍTULO DE PROYECTO:

RENOVATE ADMIN OFFICES, B110

SOLICITACIÓN / CONTRATO NO.

FA5575-22-C-0019

(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 01
01Carta de garantía1Aceptación+15
02Plan de obra1CA+7
03Programa de avance de obras1CA+10
04Plan de obra1CA+7
05Plan de movilización1CA+15
06Cartel de proyecto1CA+15
07Plan de control de calidad1CA+15
08Plan de protección medioambiental1CA+15
09Formulario DD 13541IF + 15
10Certificado de gestión de residuos y escombros1Inspección final (IF)
11Planos As-Builts1IF + 15
12Datos espaciales1As Built+10
13Personal Clave1CA+15
14Plan de salud y seguridad1CA+15
15Manuales de uso y mantenimientoInspección final (IF)
SECCIÓN 01 11 02
15Plan de Fases del Trabajo1Comienzo de los Trabajos - 15
16Plan de cortes de suministros1Comienzo de los Trabajos - 15
17Plan de recuperación1CA + 15
18Manuales de Operación y Mantenimiento1IF + 15
SECCIÓN 02 41 01
19Condiciones Existentes1
20Plan de Demoliciones y Desmontaje1
21Comprobantes de Recepción (Albaranes)1
22Plan de Gestión de Residuos1
23Certificado de Entregas y Eliminación de Residuos de Construcción y Demolición1
SECCIÓN 03 30 00
24Refuerzos11
25Inhibidor de corrosión aplicado en la superficie1
26Diseño de la mezcla de hormigón11
27Pruebas de resistencia a compresión1
28Pruebas de consistencia1
29Informe de Verificación Estructural1
SECCIÓN 04 20 00
30Bloques de hormigón prefabricado11
31Varillas de refuerzo1
32Material de juntas de expansión1
33Dinteles en paredes de Albañilería11
SECCIÓN 05 05 23.16
34Electrodos y varillas de soldadura1
35Cualificaciones de Soldador Certificado1
SECCIÓN 05 12 00
36Vigas y pilares de acero1
37Soportes, Placas y Accesorios de Acero1
38Estructura de acero de cubierta1
39Estructura puerta GSA11
40Verificación de estructuras existentes1
41Imprimación en taller1
42Mortero de inyección1
43Acero1
44Pernos, Tuercas y Arandelas1
SECCIÓN 05 30 00
45Instalación y ejecución de forjados de chapa colaborante1
46Accesorios1
47Unidades de chapa colaborante11
48Refuerzos11
SECCIÓN 05 50 13
49Pérgola. Planos de detalle1
50Pergola. Planos de diseño y distribución1
51Pérgola de aluminio1
52Pérgola. Accesorios1
53Pérgola. Sistema de drenaje y anclaje
54Pérgola. Carta de colores del fabricante1
55Pérgola. Garantía del fabricante.1
56Pérgola. Cualificaciones del instalador.1
57Pérgola. Instrucciones de instalación del fabricante1
58Pérgola. Instrucciones de uso del fabricante1
59Escalera escamoteable11111
SECCIÓN 06 20 00
48Planos de detalle que indican todos los conjuntos de madera1
49Catálogo de fabricante y carta de colores1
50Muestras1
51Certificados de conformidad del fabricante1
SECCIÓN 07 21 13
52Panel de aislamiento11
53Aislamiento proyectado11
54Tablero de protección del aislamiento1
55Adhesivo1
SECCIÓN 07 27 10
56Sistema de Barrera de Aire1
57Pruebas e inspección1
58Inspector de barreras de aire1
SECCIÓN 07 32 13
59Sistema técnico paera cubiertas inclinadas11
60Instrucciones de instalación del fabricante1
61Tejas de hormigón1
62Materiales1
63Cualificación del personal de cubierta1
64Garantía1
65Tablero fenólico marino1
66Sistema de detención de caídas111
67Bajantes y canalones11
SECCIÓN 07 81 00
68Sistema de recubrimiento intumescente1
69Clasificación de resistencia al fuego1
70Pruebas in situ1
71Informe de evaluación1
72Cualificaciones del instalador1
73Informe de preparación1
74Informe de inspección del fabricante1
SECCIÓN 07 84 00
75Materiales de cortafuegos1
76Calificaciones del instalador de materiales cortafuegos1
SECCIÓN 07 92 00
77Sellantes1
78Imprimaciones1
79Antiadherentes1
SECCIÓN 08 11 13
80Datos del catálogo del fabricante de puerta de acero1
81Puertas Contraincendios11
82Puerta resistente a las balas11
83Puerta seccional11
84Puerta de celda11
85Ventanilla de paso controlado11
SECCIÓN 08 14 00
86Datos del catálogo del fabricante1
87Color de puertas1
SECCIÓN 08 51 13
88Ventanas y puertas de aluminio111
89Ventana de aluminio a prueba de balas111
SECCIÓN 08 71 00
90Artículos de cerrajería1
91Instalación1
SECCIÓN 08 81 00
92Datos del catálogo del fabricante1
93Cristal aislante1
94Cristal espía antibalas1
95Cristal espía1
96Matereriales de fijación y sellado1
97Instalación del vidrio1
SECCIÓN 09 24 23
98Enfoscado de cemento y Enlucido de yeso1
99Instrucciones del Fabricante1
100Panel de muestra1
SECCIÓN 09 29 00
101Placa de yeso laminado standard.1
102Perfiles de acero galvanizado para sistemas de placas de yeso.1
103Cinta de papel microperforado para placas de yeso1
104Pasta de juntas de secado para sistemas de placas de yeso.1
105Placa acústica de yeso de alta dureza mezclada con fibras1
106Banda perimetral acústica para sistemas de placas de yeso.1
107Placa de yeso repelente al agua1
108Placa fonoabsorbente de yeso1
109Panel fonoabsorbente de yeso
110Fabricante de placas de yeso11
SECCIÓN 09 30 10
111Azulejos, adhesivos y selladores de juntas1
112Baldosa de gres porcelánico1
113Azueljo cerámico de pared1
114Baldosa de suelo de granito1
SECCIÓN 09 51 00
115Placas de yeso/cemento11
116Sistema de suspensión1
117Registros1
118Instrucciones de instalación del fabricante1
119Distribución del techo exterior e interior1
120Sistema de suspensión1
121Materiales sin amianto1
SECCIÓN 09 62 38
122Imprimación1
123Sellador de acabado1
124Sistema de pavimento - colores1
125Garantía del fabricante1
126Aplicación1
SECCIÓN 09 90 00
127Revestimientos1
128Fichas de Datos técnicos del Fabricante1
129Sellante1
130Color1
131Instrucciones de aplicación1
132Hojas de Datos de Seguridad del Material1
133Informes de entrega1
SECTION 10 14 00.20
134Planos de detalle de la señalización interior1
135Señalización interior1
SECCIÓN 10 28 13
136Accesorios sanitarios y accesorios1
SECTION 10 44 16
137Armarios1
138Soportes de pared1
SECCIÓN 21 13 13
139Rociadores automáticos11
140Tuberías y accesorios11
141Colgadores y soportes de tuberías1
142Componentes del Fire Riser1
143Dispositivo antirretorno1
144Válvula de compuerta1
145Caja de válvula
146Conexión con el departamento de bomberos1
147Válvula indicadora de poste1
148Válvula de control principal del Fire Riser1
149Cualificación del instalador1
150Inspección realizada por un ingeniero especializado en protección contraincendios1
151Cálculo hidráulico del sispetma de rociadores1
152Diseño final de los rociadores, tuberías y colgadores1
153Planos As-Built1
SECCIÓN 22 00 00
154Prevención de reflujo de presión reducida1
155Válcula y accesorios1
156Tuberías de polietileno de alta densidad y accesorios1
157Tubería de polipropileno PP-RP y accesorios1
158Calentador de agua eléctrico1
159Filtro tamiz1
160Tubería rígida de PVC1
161Desagües de suelo, limpiezas y trampillas1
162Dispositivo de cebado de sumidero1
163Caja de válvula1
164Válvula de compuerta1
165Llave de salida para manguera con dispositivo anti-retorno (interruptor de vacío)1
166Contador de agua con emisor de impulsos1
167Soportes para sistemas de fontanería1
SECCIÓN 23 07 00
168Aislamiento de tuberías de agua fría, agua caliente y de refrigerante1
169Aislamiento de conductos HVAC1
SECCIÓN 23 30 00
170Conductos rectangulares/circulares de chapa1
171Difusores lineales1
172Rejillas de impulsión/retorno1
173Unidades de casete1
174Unidad exterior VRV1
175Unidades multi Split1
176Unidad de climatización por conductos1
177Ventilación mecánica con unidades de recuperación de calor1
178Extractor de ventilación1
179Sistema de control1
180Tuberías1
181Termostatos1
182Paneles de control1
183Compuertas cortafuegos1
184Compuertas de baja en fuga1
185Cálculos del systema HVAC1
186Conductos de impulsión y retorno para las unidades de tratamiento de aire1
187Soportes de conductos y arriostramiento sísmico1
188Diagramas de control del sistema de aire acondicionado1
189Prueba de funcionamiento1
190Prueba, ajuste y equilbtado del sistema de a.a.1
191Certificado del representante del fabricante1
SECCIÓN 26 11 16
192Carcasa de transformador prefabricado1
193Transformador1
194Aparamenta de alta tensión1
195Piezas de repuesto1
196Control de calidad en campo1
197Reporte de pérdidas de transformadores1
198Certificación del contratista o subcontratista para la instalación de instalaciones eléctricas de alta tensión no superiores a 30kV1
199Licencia del contratista o subcontratista para la instalación de instalaciones eléctricas de alta tensión no superiores a 30kV1
200Prueba de rutina del transformador1
SECCIÓN 26 20 00
201Conducto Metálico Rígido (RMC) y accesorios (uno de cada tamaño)1
202Conducto Eléctrico Metálico (EMT) y accesorios (uno de cada tamaño)1
203Conducto flexible No Metálico (NM) (poliamida) y accesorios (uno de cada tamaño)1
204Conducto metálico flexible (FMC) y accesorios (uno de cada tamaño)1
205Cajas de empalme y extracción1
206Enchufes1
207Interruptores de palanca1
208Alambres y cables1
209Interruptores automáticos1
210Cuadro eléctrico111
211Armarios de paneles, cuadros eléctricos y armarios de contadores1
212Contadores1
213Interruptor de seguridad1
214Dispositivo de protección contra sobretensiones1
215Botoón de apagado de emergencia de HVAC1
216Actuador damper1
217Cuadro de distribución11
218Esquemas de cableado1
219Dispositivos sujetos a operación manual1
220Prueba de cableado de 1000 Voltios1
221Prueba del sistema de toma de tierra1
222Prueba de distorsión de armónicos1
SECCIÓN 26 32 15.00
223Motor-Grupo electrógeno y equipos auxiliares111
224Sistema de puesta a tierra del generador1
225Instrucciones de instalación del fabricante1
226Pruebas de rendimiento1
227Pruebas de fábrica1
228Inspección y pruebas in situ1
229Procedimiento de prueba de aceptación funcional1
230Límites de emisiones del motor1
231Currículum vitae de calificación del instructor1
232Titulaciones del ingeniero de puesta en marcha1
233Manuales de operación y mantenimiento del motor-grupo electrógeno y equipos auxiliares1
234Plan de formación1
SECCIÓN 26 36 23
235Dibujos de detalle (ATS y BP/IS)1
236Instalación1
237Interruptor de transferencia automática1
238Interruptor de aislamiento de derivación1
239Comprobaciones y pruebas de aceptación1
240Pruebas de aceptaciones funcionales1
241Pruebas en fábrica1
242Equipo1
243Equipos de conmutación11
SECCIÓN 26 41 00
244Sistema general deprotección contra rayos1
245Cada componente principal1
246Terminales aéreas1
247Conductores1
248Varillas de tierra1
249Hardware del sistema de protección contra rayos1
250Accesorios de fijación de terminales de cable y aire1
251Soldadura exotérmica1
252Dispositivo de contador de huelgas1
253Pozos de prueba de puesta a tierra / barras de prueba1
254Prueba del sistema de protección contra rayos y puesta a tierra1
SECCIÓN 26 51 00
255Garantías de Luminarias1
256Luminarias LED1
257Fuentes de Luz de Luminarias1
258Controladores LED1
259Sensores de ocupación-luz diurna combinados11
260Sensor de ocupación11
261Reguladores11
262Certificado de Vida útil de la Luminaria1
263Prueba de campo de Luminarias1
264Certificado de piezas de recambio1
SECCIÓN 26 56 00
265Garantías de Luminarias LED1
266Luminarias LED1
267Fuentes de Luz de Luminarias1
268Contactor de iluminación1
269Controladores LED1
270Certificado de Vida útil de la Luminaria1
271Prueba de Luminarias1
272Prueba de los sistemas de control1
SECCIÓN 27 10 00
273Bandeja de cables1
274Conductos, cajas y accesorios1
275Barra colectora de tierra para telecomunicaciones (TGB)1
276Caja de suelo1
SECCIÓN 28 31 76
277Sistema de alarma1
278Cálculo de la potencia de la batería1
279Panel de control alarma de incendio (FACP)1
280Unidad de control autónoma (ACU)1
281Consola de operación Local (LOC)
282Detector de humos1
283Cableado y cables1
284Conductos1
285Monitoreo del sistema1
286Dispositivos de interfaz direccionables1
287Dispositivos de alarma audiovisuales1
288Estaciones de extracción manuales1
289Interruptores de monitor de válvulas1
290Presostato de cámara retardante1
291Procedimientos de prueba1
292Cualificaciones del instalador1
293Registro de finalización1
294Verificación de la conformidad de la instalación1
295Sistema de Alarma de Incendio y Notificación de Masiva en el interior.1
296Software de dibujo de registros1
297Planos As-built1
298Diagrama y planos as-built del "riser"1
SECCIÓN 31 00 00
299Árido artificial1
300Material de relleno1
SECCIÓN 32 04 22
301Geotextil1
302Control de ejecución1
SECTION 32 05 10
303Control de origen de áridos111
304Fórmula de trabajos1
305Sección de prueba11
306Control de aceptación1
SECCIÓN 36 16 19
307Acero de refuerzo1
308Material de curado1
309Diseño de mezclas de hormigón11
310Pruebas de consistencia1
SECCIÓN 32 93 00
311Restricciones de tiempo y condiciones de plantación1
312Fechas y lugares para cada tipo de plantación1
313Datos de productos1
314Prueba de composición de la capa superior del suelo1
315Prueba de percusión1
316Certificado de semilleros1
SECCION 33 30 00
317Tubería y accesorios de PVC1
318Boca de registro redonda1
319Marco y tapa de alcantarilla redondos1
320Película protectora y sellador de tuberías de alcantarillado1
321Planta y perfil topográfico.1
SECCIÓN 33 71 02
322Estructuras subterráneas de hormigón prefabricado, pozos de registro11
323Marcos y tapas de arquetas11
324Conductos y espaciadores1
325Cables y conductores1
326Cinta de advertencia e identificación1
327Comprobaciones y pruebas de aceptación de la obra1
328Certifficado de arquetas y tapas1
SECCIÓN 33 82 00
329Conductos1
330Arquetas1
331Cinta de advertencia e identificación1

&"Arial,Negrita"&8QUUG 24-1020. 100%REV2 DESIGN SUBMITTAL Resumen de muestras de material, JUNIO 2025 Página &P de &N