5.5_-_IFB_-_Grace_-_Phase_2_ELEC_Plans_2026-05-08.pdf
PDF 800 KB Posted
- Attached to
- South Soccer Sports Complex
- Solicitation number
- 26-042
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This file comprises electrical plans and schedules for Phase 2 of the South Santa Rosa County Sports Complex project located in Gulf Breeze, Florida, prepared by Moffatt & Nichol engineering firm and sealed by licensed professional engineer Scott A. Adams on May 8, 2026. The electrical work includes installation of a new pad-mounted transformer rated at 480Y/277V, 3-phase, 4-wire secondary, a main power panel (MP1) with 400-amp main breaker, and a secondary panel (LP1) rated at 208Y/120V, 3-phase, 4-wire with 100-amp main breaker serving a restroom building. The project encompasses lighting systems including LED fixtures with vandal-resistant specifications, emergency lighting with battery backup units, occupancy and vacancy sensors with dual-technology controls, sports field lighting poles (F1 through F12), and mechanical equipment such as electric unit heaters, exhaust fans, and an electric water heater. Total connected load for the main panel is 41.14 kVA with 49.5 amps total load, while the secondary panel carries 15.94 kVA with 44.2 amps. The electrical plans specify conduit routing, grounding requirements connecting to foundation rebar and water/building steel, and interconnection to a current transformer (CT) cabinet and 3-phase CT meter base for utility metering through Florida Power and Light (FPL).
The plans detail specific manufacturer and model requirements for all electrical components, including substitution options limited to Acuity, Hubbell, or Cooper fixtures requiring engineer approval ten days prior to bid submission. All panelboard bussing is specified as copper, including neutral and ground, with door-in-door cabinet construction and factory-welded circuit directory holders. The project requires verification of all specifications with FPL and utility drawings provided by Volkert, with service conductors from the CT cabinet to the main panel to be routed underground below slab. A pre-bid meeting is scheduled for July 29, 2026, at 10:00 a.m., with questions due by 12:00 p.m. on August 6, 2026, and sealed bids due by 10:15 a.m. on August 20, 2026, through the Santa Rosa County Procurement Portal. The project is advertised as Bid 26-042 under the Santa Rosa County Board of County Commissioners, with preference for small businesses, minority/women-owned businesses, and disadvantaged business enterprises.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
S
S
S
CONDUIT RUN EXPOSED PERPENDICULAR OR PARALLEL TO BUILDING LINES
2#12, 1#12 GRD 1/2"C, 3#12, 1#12 GRD, 1/2"C, ETC.
HOMERUN TO PANELBOARD ANY CIRCUIT WITHOUT FURTHER DESIGNATION
CONDUIT RUN CONCEALED ABOVE CEILING OR IN WALLS
CONDUIT RUN BELOW GRADE OR IN SLAB.
NON-FUSED DISCONNECT SWITCH
SURFACE MOUNTED POWER PANELBOARD
DUPLEX RECEPTACLE MOUNT 18" AFF UNLESS NOTED OTHERWISE
GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE, MOUNTING HEIGHT AS NOTED
SINGLE POLE LIGHTING SWITCH, MOUNT 46" AFF
DUAL TECHNOLOGY CEILING MOUNTED MOTION SENSOR. SENSOR SWITCH
#CM-PDT-9-R. PROVIDE POWER PACK. PROVIDE WIRING IN CONDUIT FROM SENSOR
LED WALL MOUNTED LIGHT FIXTURE. SEE ARCHITECTURAL FOR MOUNTING HEIGHT
G
OS
NOMINAL 1'X4' VANDAL RESISTANT LED LIGHT FIXTURE, MARK 'LVR', TYPICAL
ELECTRICAL LEGEND - NEW WORK
TO POWER PACK PER MANUFACTURER'S RECOMMENDATIONS.
DUAL VOLTAGE POWER PACK MOUNTED ABOVE CEILING IN NEMA 1 ENCLOSURE.PP
POWER PACK SHALL BE SENSOR SWITCH #PP-20. PROVIDE WIRING IN CONDUIT
FROM POWER PACK TO ALL SENSORS IN SAME ROOM PER MANUFACTURER'S
RECOMMENDATIONS. PROVIDE ACCESS PANELS IN AREAS WITH HARD CEILING TYPES.
MOTOR RATED SWITCHM
EMERGENCY LIGHT FIXTURE WITH BATTERY BACKUP UNIT
DUAL TECHNOLOGY VACANCY SENSOR WALL MOUNTED LIGHTING SWITCH.VS
SENSOR SWITCH LINE VOLTAGE #WSD-PDT. MOUNT 46" AFF
GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE WITH WEATHERPROOF COVER
G,WP
DUAL TECHNOLOGY OCCUPANCY SENSOR WALL MOUNTED LIGHTING SWITCH.OS
SENSOR SWITCH LINE VOLTAGE #WSD-PDT. MOUNT 46" AFF
TIME AND LIGHTING CONTACTOR IN NEMA 1 ENCLOSURE FORTC LC
CONTROL OF EXTERIOR LIGHTING
REMARKSMOUNTINGBASIS OF DESIGN MANUFACTURER AND CATALOG No.MARK
LIGHTING FIXTURE SCHEDULE
LAMPS
1. SUBSTITUTIONS BY ACUITY, HUBBELL, OR COOPER SHALL BE SUBMITTED TO THE ENGINEER 10 DAYS PRIOR TO BID FOR PRIOR APPROVAL.
EMERGENCY LIGHTING UNIT. PROVIDE WITH EMERGENCY BATTERY
H.E. WILLIAMS # EMER/LED-WHT-D-277VBP SURFACE - WALL
WB SURFACE - WALLH.E. WILLIAMS # VWPH-L30-740-T3-SDGL-DIM-UNV 36W LED
NOTES:
1.8W LED BACKUP.
HORIZONTAL LED WALL PACK, TYPE III DISTRIBUTION
4000K, 3000 LUMENS, WET LOCATION LISTED
PHILLIPS #LPL-S-4L53-40K-UNV-F1 SURFACE - CEILINGLVR 53W LED
1x4 LED VANDAL-RESISTANT, LOW-PROFILE, LINEAR FIXTURE
4000K, 3500 LUMENS
PHILLIPS #LPL-S-4L53-40K-UNV-F1 SURFACE - WALLLWB 53W LED
1x4 LED VANDAL-RESISTANT, LOW-PROFILE, LINEAR FIXTURE
4000K, 3500 LUMENS
RECESSEDSL 26W LED
LISTED FOR WET LOCATIONS
.H.E. WILLIAMS # L60-L20C-835-CS-W-WET/CC-AC/CAL/DRV/UNV
T
POWER RISER DIAGRAM
SS
SCALE: NONE
NEW POWER COMPANY PAD MOUNTED
TRANSFORMER. 480Y/277V, 3-PHASE, 4W
SECONDARY. VERIFY LOCATION WITH
POWER COMPANY AND SITE UTILITY
DRAWINGS BY VOLKERT
MAIN PANEL "MP1"
480Y/277V, 3PH, 4W,
WITH 400 AMP MAIN
BREAKER
GRD PER
NEC 250
SEE PANELBOARD COORDINATION
SCHEDULE FOR CONDUCTOR SIZES
ON HOUSEKEEPING PAD
DRY TYPE TRANSFORMER
T1
"LP1"
480V - 208Y/120V
CT CABINET
METER
** AVAILABLE RMS SYMMETRICAL FAULT CURRENT IN kA AT PANEL.
ALL PANEL LUGS 100 AMPS AND GREATER SHALL BE COPPER.
ALL LUGS ON CIRCUIT BREAKERS GREATER THAN 400 AMPS SHALL BE COPPER.
ALL PANELBOARD CABINETS SHALL BE DOOR IN DOOR CONSTRUCTION WITH FACTORY WELDED METAL CIRCUIT DIRECTORY HOLDERS.
* MINIMUM EQUIPMENT RATING. ALL EQUIPMENT SHALL BE FULLY RATED. SERIES RATINGS SHALL NOT BE ALLOWED.
LP1 NEMA 1 SURFACE 208Y/120 3 4 100 NO 10 225 225 BOLT-ON 4#1 #6 1 1/2"C NO
NOTE ALL BUSSING COPPER, INCLUDING NEUTRAL AND GROUND.
CONDUCTORS GROUND CONDUIT
MP1 NEMA 1 SURFACE 480Y/277 3 4 400 YES 42 400 400 BOLT-ON 4#600 NONE 4"C YES
PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG ---- PH II)PH II)PH II)PH II)
MARK TYPE MOUNTING VOLTAGE PH WIRE MAIN
SERVICE
RATED
KAIC
RATING
PH BUS
RATING
N BUS
RATING
C/B TYPE
FEEDER INTEGRAL
TVSS
T1 480 208Y/120 3 4 30 3#6,#8G, 1"C #8 #8
TRANSFORMER SCHEDULE (RESTROOM BLDG TRANSFORMER SCHEDULE (RESTROOM BLDG TRANSFORMER SCHEDULE (RESTROOM BLDG TRANSFORMER SCHEDULE (RESTROOM BLDG ---- PH II)PH II)PH II)PH II)
MARK PRIMARY VOLTAGE SECONDARY VOLTAGE PHASE WIRE KVA PRIMARY FEEDER SIZE
SIZE GROUND TO 3/4" x 10' GROUND
ROD
SIZE GND TO FOUNDATION REBAR, WATER & BLDG
STEEL
SEAL
W
G a rd e n S t.
S u ite
P e n s a c o la
F
L
F L A
R w w w .g ra c e -d e s ig n .c o m
P h o n e
.4
.5
Sheet Reference No.
G
U L F
B R
E E
Z E
P K
W Y
G
U L F
B R
E E
Z E
F
L
S A
N T
A R
O S
A C
O U
N T
Y
S O
U T
H S
A N
T A
R O
S A
C O
U N
T Y
S P
O R
T S
C O
M P
L E
X A
T P
S C
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
D w n b y:
D e s ig n e d b y:
R e vi e w e d b y:
D a te
R e v.
C k d b y:
S u b m itt e d b y:
D ra w in g S c a le
P lo t s c a le
M
O F
F A
T T
N
IC
H
O L
M
N P ro je c t
N o
D ra w in g c o d e
D e s c ri p tio n D a te
A p p r.
M a rk
:1
D
S H
E E
T
S U
B M
IT
T
E R
'S N
A M
E
SEAL
A
1 2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
This item has been digitally signed & sealed by Scott A. Adams, PE license No. FL 57949 on
May 8, 2026. Printed copies of this document are not considered signed & sealed and the signature must be verified on any electronic copies.
/8
/2
:1
:3
P
M S
\2
S
S R
C S p o rt s C o m p le x P h a s e
\2
S
S R
C S p o rt s C o m p le x
E L E
C
P h a s e
I I_
R
.r v t
E2-001
E L
E C
T R
IC
A
L L
E G
E N
D
S C
H E
D U
L E
S A
N D
D E
T A
IL
S
D A
H S
A A
S A
A
S A
A
-0
-0
TOTAL CONNECTED LOAD (kVA) 41.14 TOTAL LOAD (AMPS) 49.5
CIRCUIT & CIRCUIT BREAKER NOTES:
* VERIFY C.B. RATING, LOAD, CIRCUIT SIZE, ETC WITH UTILITY/SITE ELECTRICAL DRAWINGS BY VOLKERT PRIOR TO RELEASING PANELS.
41 - - - 0.60 - - - 42
4.2 4.2 4.2 11.0 9.3 8.2
TOTAL (kVA) A: 15.2 B: 13.5 C: 12.4 HIGH PHASE (AMPS) 55.0
PANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULE
MARK: MAIN PANEL "MP1" (480Y/277 VOLT, 3 PH, 4W, 400A MAIN BREAKER IN RESTROOM BLDG - PH II)
CKT
No.
LOAD DESCRIPTION
BREAKER PHASE (kVA) PHASE (kVA) BREAKER
LOAD DESCRIPTION
CKT
No.P TRIP A B C A B C TRIP P
1 SPORTS LIGHTING POLE 'F1' 3 *20 0.60 6.84 45 3 PANEL 'LP1' 2
3 - - - 0.60 5.06 - - (VIA TFMR T1) 4
5 - - - 0.60 4.04 - - - 6
7 SPORTS LIGHTING POLE 'F2' 3 *20 0.60 0.90 *30 3 SPORTS LIGHTING POLE 'F7' 8
33 - - - 0.9 0.60 - - - 34
35 - - - 0.9 0.60 - - - 36
37 SPARE 3 70 0.60 *30 3 SPORTS LIGHTING POLE 'F12' 38
39 - - - 0.60 - - - 40
9 - - - 0.60 0.90 - - - 10
11 - - - 0.60 0.90 - - - 12
13 SPORTS LIGHTING POLE 'F3' 3 *20 0.60 0.90 *30 3 SPORTS LIGHTING POLE 'F8' 14
15 - - - 0.60 0.90 - - - 16
17 - - - 0.60 0.90 - - - 18
19 SPORTS LIGHTING POLE 'F4' 3 *20 0.60 0.60 *30 3 SPORTS LIGHTING POLE 'F9' 20
21 - - - 0.60 0.60 - - - 22
23 - - - 0.60 0.60 - - - 24
25 SPORTS LIGHTING POLE 'F5' 3 *20 0.90 0.60 *30 3 SPORTS LIGHTING POLE 'F10' 26
27 - - - 0.90 0.60 - - - 28
29 - - - 0.90 0.60 - - - 30
31 SPORTS LIGHTING POLE 'F6' 3 *20 0.9 0.60 *30 3 SPORTS LIGHTING POLE 'F11' 32
** VERIFY C.B. RATING WITH ACTUAL EQUIPMENT PROVIDED.
TOTAL (kVA) A: 6.84 B: 5.06 C: 4.04 HIGH PHASE (AMPS) 57.0
TOTAL CONNECTED LOAD (kVA) 15.94 TOTAL LOAD (AMPS) 44.2
CIRCUIT & CIRCUIT BREAKER NOTES:
25 SPACE 1 20 20 1 SPACE 26
27 SPACE 1 20 20 1 SPACE 28
29 SPACE 1 20 20 1 SPACE 30
5.7 3.5 3.5 1.1 1.6 0.5
PANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULE
MARK: PANEL "LP1" (208Y/120V, 3PH, 4W, 100A M.B. IN RESTROOM BLDG - PH II)
CKT
No.
LOAD DESCRIPTION
BREAKER PHASE (kVA) PHASE (kVA) BREAKER
LOAD DESCRIPTION
CKT
No.P TRIP A B C A B C TRIP P
1 LIGHTS - INDOOR 1 20 1.20 0.54 20 1 RECEPTS - RM 104 2
3 LIGHTS - BLDG MTD EXT 1 20 0.50 0.36 20 1 RECEPTS - RM 103,OUTDOOR\ 4
5 EUH-1 2 **30 2.50 0.54 20 1 RECEPTS - RM 101,102,OTDR 6
7 - - - 2.50 0.60 20 1 RECEPTS - EWC 8
17 SPARE 1 20 20 1 SPARE 18
19 SPARE 1 20 20 1 SPARE 20
21 SPARE 1 20 20 1 SPARE 22
23 SPARE 1 20 20 1 SPARE 24
9 EUH-2 2 **15 1.00 1.20 **25 1 EWH-1 10
11 - - - 1.00 20 2 SPARE 12
13 EUH-3 2 **25 2.00 - - - 14
15 - - - 2.00 20 1 SPARE 16
EF-1 EXHAUST FAN 120/1 2.0 0.20 2#12,#12G,1/2"C LP1 20/1 20/1 3
EUH-1 ELECTRIC UNIT HEATER 208/1 30.0 5.00 2#10,#10G,1/2"C LP1 30/2 30/2 2
EUH-2 ELECTRIC UNIT HEATER 208/1 12.0 2.00 2#12,#12G,1/2"C LP1 15/2 30/2 2
EUH-3 ELECTRIC UNIT HEATER 208/1 24.0 4.00 2#10,#10G,1/2"C LP1 25/2 30/2 2
EF-2 EXHAUST FAN 120/1 1.0 0.10 2#12,#12G,1/2"C LP1 20/1 20/1 3
EF-3 EXHAUST FAN 120/1 1.0 0.10 2#12,#12G,1/2"C LP1 20/1 20/1 3
EWH-1 ELECTRIC WATER HEATER 120/1 21.0 2.00 2#10,#10G,1/2"C LP1 25/1 30/1 1
NOTES 1. PROVIDE NEMA 1 DISCONNECT. VERIFY RATING WITH EQUIPMENT PROVIDED.
2. PROVIDE NEMA 3R DISCONNECT. VERIFY RATING WITH EQUIPMENT PROVIDED.
3. PROVIDE 20/1 MOTOR RATED TOGGLE SWITCH DISCONNECTAT EF AND CONNECT TO LIGHTING CIRCUIT CONTROLLED BY OCCUPANCY SENSORS. VERIFY CONTROLS WITH MECHANICAL.
MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG ---- PH II)PH II)PH II)PH II)
MARK ITEM VOLTAGE/ PHASE MCA
LOAD
(kVA)
WIRING PANEL FED FROM CIRCUIT BREAKER DISCONNECT NOTES
SEAL
W
G a rd e n S t.
S u ite
P e n s a c o la
F
L
F L A
R w w w .g ra c e -d e s ig n .c o m
P h o n e
.4
.5
Sheet Reference No.
G
U L F
B R
E E
Z E
P K
W Y
G
U L F
B R
E E
Z E
F
L
S A
N T
A R
O S
A C
O U
N T
Y
S O
U T
H S
A N
T A
R O
S A
C O
U N
T Y
S P
O R
T S
C O
M P
L E
X A
T P
S C
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
D w n b y:
D e s ig n e d b y:
R e vi e w e d b y:
D a te
R e v.
C k d b y:
S u b m itt e d b y:
D ra w in g S c a le
P lo t s c a le
M
O F
F A
T T
N
IC
H
O L
M
N P ro je c t
N o
D ra w in g c o d e
D e s c ri p tio n D a te
A p p r.
M a rk
:1
D
S H
E E
T
S U
B M
IT
T
E R
'S N
A M
E
SEAL
A
1 2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
This item has been digitally signed & sealed by Scott A. Adams, PE license No. FL 57949 on
May 8, 2026. Printed copies of this document are not considered signed & sealed and the signature must be verified on any electronic copies.
/8
/2
:1
:4
P
M S
\2
S
S R
C S p o rt s C o m p le x P h a s e
\2
S
S R
C S p o rt s C o m p le x
E L E
C
P h a s e
I I_
R
.r v t
E2-002
S C
H E
D U
L E
S
D A
H S
A A
S A
A
S A
A
-0
-0
OS
OS
PP
PP OS
OS
LVR
WB
LP1-31
LWB
LWB
V S
BP
BP
BP
LVR
LVR LVR
LVR
LVR
LVR LVR
LVR LVR
LVR
LVR
WB
WB WB
WB
WB
WBWB
MENS RR
102 JANITORIAL
ELEC
WOMENS RR
SL
SL
BP
LP1-1
BP
EF-3
EF-1
EF-2
M
M
M
"MP1"
"LP1"
G
G,WP
EWH-1
(ABOVE
SINK)
G,EWC
LP1-102
G,WP
MENS RR
ELEC
JANITORIAL
WOMENS RR
. LP1-8
LP1-4
EH-3
EH-2
EH-1
LP1-13/152
LP1-5/72
LP1-9/11
LP1-6
G
G
"MP1" G
G
G
LP1-2
TC LC
"LP1"
"T1"
2 CT CABINET AND
3-PHASE CT
METER BASE
SEAL
W
G a rd e n S t.
S u ite
P e n s a c o la
F
L
F L A
R w w w .g ra c e -d e s ig n .c o m
P h o n e
.4
.5
Sheet Reference No.
G
U L F
B R
E E
Z E
P K
W Y
G
U L F
B R
E E
Z E
F
L
S A
N T
A R
O S
A C
O U
N T
Y
S O
U T
H S
A N
T A
R O
S A
C O
U N
T Y
S P
O R
T S
C O
M P
L E
X A
T P
S C
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
D w n b y:
D e s ig n e d b y:
R e vi e w e d b y:
D a te
R e v.
C k d b y:
S u b m itt e d b y:
D ra w in g S c a le
P lo t s c a le
M
O F
F A
T T
N
IC
H
O L
M
N P ro je c t
N o
D ra w in g c o d e
D e s c ri p tio n D a te
A p p r.
M a rk
:1
D
S H
E E
T
S U
B M
IT
T
E R
'S N
A M
E
SEAL
A
1 2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
This item has been digitally signed & sealed by Scott A. Adams, PE license No. FL 57949 on
May 8, 2026. Printed copies of this document are not considered signed & sealed and the signature must be verified on any electronic copies.
/8
/2
:1
:4
P
M S
\2
S
S R
C S p o rt s C o m p le x P h a s e
\2
S
S R
C S p o rt s C o m p le x
E L E
C
P h a s e
I I_
R
.r v t
E2-101
L
IG
H T
IN
G
P
O W
E R
A N
D S
IG
N
A L
P L
A N
S
D A
H S
A A
S A
A
S A
A
-0
-0
PLAN
NORTH
1/4" = 1'-0"E2-101
1 LIGHTING PLAN
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
ROUTE EXTERIOR LIGHTING CIRCUIT THROUGH CONTACTOR WITH
TIME CLOCK CONTROL. PROVIDE 20A/2P LIGHTING CONTACTOR AND
7-DAY/24-HOUR PROGRAMMABLE DIGITAL TIME CLOCK ADJACENT
TO PANEL "LP1".
SEE "MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE" FOR
ELECTRICAL REQUIREMENTS.
KEY NOTES:
PLAN
NORTH
PROVIDE CT CABINET AND 3-PHASE CT METER. VERIFY ALL
REQUIREMENTS, LOCATION ETC. WITH FLORIDA POWER AND LIGHT
(FPL) PRIOR TO CONSTRUCTION. SERVICE CONDUCTORS FROM CT
CABINET TO MAIN POWER PANEL "MP1" SHALL BE ROUTED
UNDERGROUND (BELOW SLAB) UNLIT ENTERING MAIN PANEL "MP1".
SEE "MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE" FOR
ELECTRICAL REQUIREMENTS.
KEY NOTES:
1/4" = 1'-0"E2-101
2 POWER & SIGNAL PLAN
| 2426102_SSRC Sports Complex_ELEC_Phase II_R26 - Sheet - E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS |
| Sheets |
| E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS |
| E2-002 - SCHEDULES |
| E2-101 - LIGHTING, POWER AND SIGNAL PLANS |
| 2426102_SSRC Sports Complex_ELEC_Phase II_R26 - Sheet - E2-002 - SCHEDULES |
| Sheets |
| E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS |
| E2-002 - SCHEDULES |
| E2-101 - LIGHTING, POWER AND SIGNAL PLANS |
| 2426102_SSRC Sports Complex_ELEC_Phase II_R26 - Sheet - E2-101 - LIGHTING, POWER AND SIGNAL PLANS |
| Sheets |
| E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS |
| E2-002 - SCHEDULES |
| E2-101 - LIGHTING, POWER AND SIGNAL PLANS |
| 2026-05-08T13:18:48-0500 | |
| Scott A Adams |
File details come from the government source that posted it. Updated .