5.5_-_IFB_-_Grace_-_Phase_2_ELEC_Plans_2026-05-08.pdf

PDF 800 KB Posted

Attached to
South Soccer Sports Complex
Solicitation number
26-042
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This file comprises electrical plans and schedules for Phase 2 of the South Santa Rosa County Sports Complex project located in Gulf Breeze, Florida, prepared by Moffatt & Nichol engineering firm and sealed by licensed professional engineer Scott A. Adams on May 8, 2026. The electrical work includes installation of a new pad-mounted transformer rated at 480Y/277V, 3-phase, 4-wire secondary, a main power panel (MP1) with 400-amp main breaker, and a secondary panel (LP1) rated at 208Y/120V, 3-phase, 4-wire with 100-amp main breaker serving a restroom building. The project encompasses lighting systems including LED fixtures with vandal-resistant specifications, emergency lighting with battery backup units, occupancy and vacancy sensors with dual-technology controls, sports field lighting poles (F1 through F12), and mechanical equipment such as electric unit heaters, exhaust fans, and an electric water heater. Total connected load for the main panel is 41.14 kVA with 49.5 amps total load, while the secondary panel carries 15.94 kVA with 44.2 amps. The electrical plans specify conduit routing, grounding requirements connecting to foundation rebar and water/building steel, and interconnection to a current transformer (CT) cabinet and 3-phase CT meter base for utility metering through Florida Power and Light (FPL).

The plans detail specific manufacturer and model requirements for all electrical components, including substitution options limited to Acuity, Hubbell, or Cooper fixtures requiring engineer approval ten days prior to bid submission. All panelboard bussing is specified as copper, including neutral and ground, with door-in-door cabinet construction and factory-welded circuit directory holders. The project requires verification of all specifications with FPL and utility drawings provided by Volkert, with service conductors from the CT cabinet to the main panel to be routed underground below slab. A pre-bid meeting is scheduled for July 29, 2026, at 10:00 a.m., with questions due by 12:00 p.m. on August 6, 2026, and sealed bids due by 10:15 a.m. on August 20, 2026, through the Santa Rosa County Procurement Portal. The project is advertised as Bid 26-042 under the Santa Rosa County Board of County Commissioners, with preference for small businesses, minority/women-owned businesses, and disadvantaged business enterprises.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

S

S

CONDUIT RUN EXPOSED PERPENDICULAR OR PARALLEL TO BUILDING LINES

2#12, 1#12 GRD 1/2"C, 3#12, 1#12 GRD, 1/2"C, ETC.

HOMERUN TO PANELBOARD ANY CIRCUIT WITHOUT FURTHER DESIGNATION

CONDUIT RUN CONCEALED ABOVE CEILING OR IN WALLS

CONDUIT RUN BELOW GRADE OR IN SLAB.

NON-FUSED DISCONNECT SWITCH

SURFACE MOUNTED POWER PANELBOARD

DUPLEX RECEPTACLE MOUNT 18" AFF UNLESS NOTED OTHERWISE

GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE, MOUNTING HEIGHT AS NOTED

SINGLE POLE LIGHTING SWITCH, MOUNT 46" AFF

DUAL TECHNOLOGY CEILING MOUNTED MOTION SENSOR. SENSOR SWITCH

#CM-PDT-9-R. PROVIDE POWER PACK. PROVIDE WIRING IN CONDUIT FROM SENSOR

LED WALL MOUNTED LIGHT FIXTURE. SEE ARCHITECTURAL FOR MOUNTING HEIGHT

G

OS

NOMINAL 1'X4' VANDAL RESISTANT LED LIGHT FIXTURE, MARK 'LVR', TYPICAL

ELECTRICAL LEGEND - NEW WORK

TO POWER PACK PER MANUFACTURER'S RECOMMENDATIONS.

DUAL VOLTAGE POWER PACK MOUNTED ABOVE CEILING IN NEMA 1 ENCLOSURE.PP

POWER PACK SHALL BE SENSOR SWITCH #PP-20. PROVIDE WIRING IN CONDUIT

FROM POWER PACK TO ALL SENSORS IN SAME ROOM PER MANUFACTURER'S

RECOMMENDATIONS. PROVIDE ACCESS PANELS IN AREAS WITH HARD CEILING TYPES.

MOTOR RATED SWITCHM

EMERGENCY LIGHT FIXTURE WITH BATTERY BACKUP UNIT

DUAL TECHNOLOGY VACANCY SENSOR WALL MOUNTED LIGHTING SWITCH.VS

SENSOR SWITCH LINE VOLTAGE #WSD-PDT. MOUNT 46" AFF

GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE WITH WEATHERPROOF COVER

G,WP

DUAL TECHNOLOGY OCCUPANCY SENSOR WALL MOUNTED LIGHTING SWITCH.OS

SENSOR SWITCH LINE VOLTAGE #WSD-PDT. MOUNT 46" AFF

TIME AND LIGHTING CONTACTOR IN NEMA 1 ENCLOSURE FORTC LC

CONTROL OF EXTERIOR LIGHTING

REMARKSMOUNTINGBASIS OF DESIGN MANUFACTURER AND CATALOG No.MARK

LIGHTING FIXTURE SCHEDULE

LAMPS

1. SUBSTITUTIONS BY ACUITY, HUBBELL, OR COOPER SHALL BE SUBMITTED TO THE ENGINEER 10 DAYS PRIOR TO BID FOR PRIOR APPROVAL.

EMERGENCY LIGHTING UNIT. PROVIDE WITH EMERGENCY BATTERY

H.E. WILLIAMS # EMER/LED-WHT-D-277VBP SURFACE - WALL

WB SURFACE - WALLH.E. WILLIAMS # VWPH-L30-740-T3-SDGL-DIM-UNV 36W LED

NOTES:

1.8W LED BACKUP.

HORIZONTAL LED WALL PACK, TYPE III DISTRIBUTION

4000K, 3000 LUMENS, WET LOCATION LISTED

PHILLIPS #LPL-S-4L53-40K-UNV-F1 SURFACE - CEILINGLVR 53W LED

1x4 LED VANDAL-RESISTANT, LOW-PROFILE, LINEAR FIXTURE

4000K, 3500 LUMENS

PHILLIPS #LPL-S-4L53-40K-UNV-F1 SURFACE - WALLLWB 53W LED

1x4 LED VANDAL-RESISTANT, LOW-PROFILE, LINEAR FIXTURE

4000K, 3500 LUMENS

RECESSEDSL 26W LED

LISTED FOR WET LOCATIONS

.H.E. WILLIAMS # L60-L20C-835-CS-W-WET/CC-AC/CAL/DRV/UNV

T

POWER RISER DIAGRAM

SS

SCALE: NONE

NEW POWER COMPANY PAD MOUNTED

TRANSFORMER. 480Y/277V, 3-PHASE, 4W

SECONDARY. VERIFY LOCATION WITH

POWER COMPANY AND SITE UTILITY

DRAWINGS BY VOLKERT

MAIN PANEL "MP1"

480Y/277V, 3PH, 4W,

WITH 400 AMP MAIN

BREAKER

GRD PER

NEC 250

SEE PANELBOARD COORDINATION

SCHEDULE FOR CONDUCTOR SIZES

ON HOUSEKEEPING PAD

DRY TYPE TRANSFORMER

T1

"LP1"

480V - 208Y/120V

CT CABINET

METER

** AVAILABLE RMS SYMMETRICAL FAULT CURRENT IN kA AT PANEL.

ALL PANEL LUGS 100 AMPS AND GREATER SHALL BE COPPER.

ALL LUGS ON CIRCUIT BREAKERS GREATER THAN 400 AMPS SHALL BE COPPER.

ALL PANELBOARD CABINETS SHALL BE DOOR IN DOOR CONSTRUCTION WITH FACTORY WELDED METAL CIRCUIT DIRECTORY HOLDERS.

* MINIMUM EQUIPMENT RATING. ALL EQUIPMENT SHALL BE FULLY RATED. SERIES RATINGS SHALL NOT BE ALLOWED.

LP1 NEMA 1 SURFACE 208Y/120 3 4 100 NO 10 225 225 BOLT-ON 4#1 #6 1 1/2"C NO

NOTE ALL BUSSING COPPER, INCLUDING NEUTRAL AND GROUND.

CONDUCTORS GROUND CONDUIT

MP1 NEMA 1 SURFACE 480Y/277 3 4 400 YES 42 400 400 BOLT-ON 4#600 NONE 4"C YES

PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG PANELBOARD COORDINATION SCHEDULE (RESTROOM BLDG ---- PH II)PH II)PH II)PH II)

MARK TYPE MOUNTING VOLTAGE PH WIRE MAIN

SERVICE

RATED

KAIC

RATING

PH BUS

RATING

N BUS

RATING

C/B TYPE

FEEDER INTEGRAL

TVSS

T1 480 208Y/120 3 4 30 3#6,#8G, 1"C #8 #8

TRANSFORMER SCHEDULE (RESTROOM BLDG TRANSFORMER SCHEDULE (RESTROOM BLDG TRANSFORMER SCHEDULE (RESTROOM BLDG TRANSFORMER SCHEDULE (RESTROOM BLDG ---- PH II)PH II)PH II)PH II)

MARK PRIMARY VOLTAGE SECONDARY VOLTAGE PHASE WIRE KVA PRIMARY FEEDER SIZE

SIZE GROUND TO 3/4" x 10' GROUND

ROD

SIZE GND TO FOUNDATION REBAR, WATER & BLDG

STEEL

SEAL

W

G a rd e n S t.

S u ite

P e n s a c o la

F

L

F L A

R w w w .g ra c e -d e s ig n .c o m

P h o n e

.4

.5

Sheet Reference No.

G

U L F

B R

E E

Z E

P K

W Y

G

U L F

B R

E E

Z E

F

L

S A

N T

A R

O S

A C

O U

N T

Y

S O

U T

H S

A N

T A

R O

S A

C O

U N

T Y

S P

O R

T S

C O

M P

L E

X A

T P

S C

DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING

D w n b y:

D e s ig n e d b y:

R e vi e w e d b y:

D a te

R e v.

C k d b y:

S u b m itt e d b y:

D ra w in g S c a le

P lo t s c a le

M

O F

F A

T T

N

IC

H

O L

M

N P ro je c t

N o

D ra w in g c o d e

D e s c ri p tio n D a te

A p p r.

M a rk

:1

D

S H

E E

T

S U

B M

IT

T

E R

'S N

A M

E

SEAL

A

1 2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

A

B

C

D

E

This item has been digitally signed & sealed by Scott A. Adams, PE license No. FL 57949 on

May 8, 2026. Printed copies of this document are not considered signed & sealed and the signature must be verified on any electronic copies.

/8

/2

:1

:3

P

M S

\2

S

S R

C S p o rt s C o m p le x P h a s e

\2

S

S R

C S p o rt s C o m p le x

E L E

C

P h a s e

I I_

R

.r v t

E2-001

E L

E C

T R

IC

A

L L

E G

E N

D

S C

H E

D U

L E

S A

N D

D E

T A

IL

S

D A

H S

A A

S A

A

S A

A

-0

-0

TOTAL CONNECTED LOAD (kVA) 41.14 TOTAL LOAD (AMPS) 49.5

CIRCUIT & CIRCUIT BREAKER NOTES:

* VERIFY C.B. RATING, LOAD, CIRCUIT SIZE, ETC WITH UTILITY/SITE ELECTRICAL DRAWINGS BY VOLKERT PRIOR TO RELEASING PANELS.

41 - - - 0.60 - - - 42

4.2 4.2 4.2 11.0 9.3 8.2

TOTAL (kVA) A: 15.2 B: 13.5 C: 12.4 HIGH PHASE (AMPS) 55.0

PANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULE

MARK: MAIN PANEL "MP1" (480Y/277 VOLT, 3 PH, 4W, 400A MAIN BREAKER IN RESTROOM BLDG - PH II)

CKT

No.

LOAD DESCRIPTION

BREAKER PHASE (kVA) PHASE (kVA) BREAKER

LOAD DESCRIPTION

CKT

No.P TRIP A B C A B C TRIP P

1 SPORTS LIGHTING POLE 'F1' 3 *20 0.60 6.84 45 3 PANEL 'LP1' 2

3 - - - 0.60 5.06 - - (VIA TFMR T1) 4

5 - - - 0.60 4.04 - - - 6

7 SPORTS LIGHTING POLE 'F2' 3 *20 0.60 0.90 *30 3 SPORTS LIGHTING POLE 'F7' 8

33 - - - 0.9 0.60 - - - 34

35 - - - 0.9 0.60 - - - 36

37 SPARE 3 70 0.60 *30 3 SPORTS LIGHTING POLE 'F12' 38

39 - - - 0.60 - - - 40

9 - - - 0.60 0.90 - - - 10

11 - - - 0.60 0.90 - - - 12

13 SPORTS LIGHTING POLE 'F3' 3 *20 0.60 0.90 *30 3 SPORTS LIGHTING POLE 'F8' 14

15 - - - 0.60 0.90 - - - 16

17 - - - 0.60 0.90 - - - 18

19 SPORTS LIGHTING POLE 'F4' 3 *20 0.60 0.60 *30 3 SPORTS LIGHTING POLE 'F9' 20

21 - - - 0.60 0.60 - - - 22

23 - - - 0.60 0.60 - - - 24

25 SPORTS LIGHTING POLE 'F5' 3 *20 0.90 0.60 *30 3 SPORTS LIGHTING POLE 'F10' 26

27 - - - 0.90 0.60 - - - 28

29 - - - 0.90 0.60 - - - 30

31 SPORTS LIGHTING POLE 'F6' 3 *20 0.9 0.60 *30 3 SPORTS LIGHTING POLE 'F11' 32

** VERIFY C.B. RATING WITH ACTUAL EQUIPMENT PROVIDED.

TOTAL (kVA) A: 6.84 B: 5.06 C: 4.04 HIGH PHASE (AMPS) 57.0

TOTAL CONNECTED LOAD (kVA) 15.94 TOTAL LOAD (AMPS) 44.2

CIRCUIT & CIRCUIT BREAKER NOTES:

25 SPACE 1 20 20 1 SPACE 26

27 SPACE 1 20 20 1 SPACE 28

29 SPACE 1 20 20 1 SPACE 30

5.7 3.5 3.5 1.1 1.6 0.5

PANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULEPANELBOARD SCHEDULE

MARK: PANEL "LP1" (208Y/120V, 3PH, 4W, 100A M.B. IN RESTROOM BLDG - PH II)

CKT

No.

LOAD DESCRIPTION

BREAKER PHASE (kVA) PHASE (kVA) BREAKER

LOAD DESCRIPTION

CKT

No.P TRIP A B C A B C TRIP P

1 LIGHTS - INDOOR 1 20 1.20 0.54 20 1 RECEPTS - RM 104 2

3 LIGHTS - BLDG MTD EXT 1 20 0.50 0.36 20 1 RECEPTS - RM 103,OUTDOOR\ 4

5 EUH-1 2 **30 2.50 0.54 20 1 RECEPTS - RM 101,102,OTDR 6

7 - - - 2.50 0.60 20 1 RECEPTS - EWC 8

17 SPARE 1 20 20 1 SPARE 18

19 SPARE 1 20 20 1 SPARE 20

21 SPARE 1 20 20 1 SPARE 22

23 SPARE 1 20 20 1 SPARE 24

9 EUH-2 2 **15 1.00 1.20 **25 1 EWH-1 10

11 - - - 1.00 20 2 SPARE 12

13 EUH-3 2 **25 2.00 - - - 14

15 - - - 2.00 20 1 SPARE 16

EF-1 EXHAUST FAN 120/1 2.0 0.20 2#12,#12G,1/2"C LP1 20/1 20/1 3

EUH-1 ELECTRIC UNIT HEATER 208/1 30.0 5.00 2#10,#10G,1/2"C LP1 30/2 30/2 2

EUH-2 ELECTRIC UNIT HEATER 208/1 12.0 2.00 2#12,#12G,1/2"C LP1 15/2 30/2 2

EUH-3 ELECTRIC UNIT HEATER 208/1 24.0 4.00 2#10,#10G,1/2"C LP1 25/2 30/2 2

EF-2 EXHAUST FAN 120/1 1.0 0.10 2#12,#12G,1/2"C LP1 20/1 20/1 3

EF-3 EXHAUST FAN 120/1 1.0 0.10 2#12,#12G,1/2"C LP1 20/1 20/1 3

EWH-1 ELECTRIC WATER HEATER 120/1 21.0 2.00 2#10,#10G,1/2"C LP1 25/1 30/1 1

NOTES 1. PROVIDE NEMA 1 DISCONNECT. VERIFY RATING WITH EQUIPMENT PROVIDED.

2. PROVIDE NEMA 3R DISCONNECT. VERIFY RATING WITH EQUIPMENT PROVIDED.

3. PROVIDE 20/1 MOTOR RATED TOGGLE SWITCH DISCONNECTAT EF AND CONNECT TO LIGHTING CIRCUIT CONTROLLED BY OCCUPANCY SENSORS. VERIFY CONTROLS WITH MECHANICAL.

MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE (RESTROOM BLDG ---- PH II)PH II)PH II)PH II)

MARK ITEM VOLTAGE/ PHASE MCA

LOAD

(kVA)

WIRING PANEL FED FROM CIRCUIT BREAKER DISCONNECT NOTES

SEAL

W

G a rd e n S t.

S u ite

P e n s a c o la

F

L

F L A

R w w w .g ra c e -d e s ig n .c o m

P h o n e

.4

.5

Sheet Reference No.

G

U L F

B R

E E

Z E

P K

W Y

G

U L F

B R

E E

Z E

F

L

S A

N T

A R

O S

A C

O U

N T

Y

S O

U T

H S

A N

T A

R O

S A

C O

U N

T Y

S P

O R

T S

C O

M P

L E

X A

T P

S C

DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING

D w n b y:

D e s ig n e d b y:

R e vi e w e d b y:

D a te

R e v.

C k d b y:

S u b m itt e d b y:

D ra w in g S c a le

P lo t s c a le

M

O F

F A

T T

N

IC

H

O L

M

N P ro je c t

N o

D ra w in g c o d e

D e s c ri p tio n D a te

A p p r.

M a rk

:1

D

S H

E E

T

S U

B M

IT

T

E R

'S N

A M

E

SEAL

A

1 2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

A

B

C

D

E

This item has been digitally signed & sealed by Scott A. Adams, PE license No. FL 57949 on

May 8, 2026. Printed copies of this document are not considered signed & sealed and the signature must be verified on any electronic copies.

/8

/2

:1

:4

P

M S

\2

S

S R

C S p o rt s C o m p le x P h a s e

\2

S

S R

C S p o rt s C o m p le x

E L E

C

P h a s e

I I_

R

.r v t

E2-002

S C

H E

D U

L E

S

D A

H S

A A

S A

A

S A

A

-0

-0

OS

OS

PP

PP OS

OS

LVR

WB

LP1-31

LWB

LWB

V S

BP

BP

BP

LVR

LVR LVR

LVR

LVR

LVR LVR

LVR LVR

LVR

LVR

WB

WB WB

WB

WB

WBWB

MENS RR

102 JANITORIAL

ELEC

WOMENS RR

SL

SL

BP

LP1-1

BP

EF-3

EF-1

EF-2

M

M

M

"MP1"

"LP1"

G

G,WP

EWH-1

(ABOVE

SINK)

G,EWC

LP1-102

G,WP

MENS RR

ELEC

JANITORIAL

WOMENS RR

. LP1-8

LP1-4

EH-3

EH-2

EH-1

LP1-13/152

LP1-5/72

LP1-9/11

LP1-6

G

G

"MP1" G

G

G

LP1-2

TC LC

"LP1"

"T1"

2 CT CABINET AND

3-PHASE CT

METER BASE

SEAL

W

G a rd e n S t.

S u ite

P e n s a c o la

F

L

F L A

R w w w .g ra c e -d e s ig n .c o m

P h o n e

.4

.5

Sheet Reference No.

G

U L F

B R

E E

Z E

P K

W Y

G

U L F

B R

E E

Z E

F

L

S A

N T

A R

O S

A C

O U

N T

Y

S O

U T

H S

A N

T A

R O

S A

C O

U N

T Y

S P

O R

T S

C O

M P

L E

X A

T P

S C

DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING

D w n b y:

D e s ig n e d b y:

R e vi e w e d b y:

D a te

R e v.

C k d b y:

S u b m itt e d b y:

D ra w in g S c a le

P lo t s c a le

M

O F

F A

T T

N

IC

H

O L

M

N P ro je c t

N o

D ra w in g c o d e

D e s c ri p tio n D a te

A p p r.

M a rk

:1

D

S H

E E

T

S U

B M

IT

T

E R

'S N

A M

E

SEAL

A

1 2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

A

B

C

D

E

This item has been digitally signed & sealed by Scott A. Adams, PE license No. FL 57949 on

May 8, 2026. Printed copies of this document are not considered signed & sealed and the signature must be verified on any electronic copies.

/8

/2

:1

:4

P

M S

\2

S

S R

C S p o rt s C o m p le x P h a s e

\2

S

S R

C S p o rt s C o m p le x

E L E

C

P h a s e

I I_

R

.r v t

E2-101

L

IG

H T

IN

G

P

O W

E R

A N

D S

IG

N

A L

P L

A N

S

D A

H S

A A

S A

A

S A

A

-0

-0

PLAN

NORTH

1/4" = 1'-0"E2-101

1 LIGHTING PLAN

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

ROUTE EXTERIOR LIGHTING CIRCUIT THROUGH CONTACTOR WITH

TIME CLOCK CONTROL. PROVIDE 20A/2P LIGHTING CONTACTOR AND

7-DAY/24-HOUR PROGRAMMABLE DIGITAL TIME CLOCK ADJACENT

TO PANEL "LP1".

SEE "MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE" FOR

ELECTRICAL REQUIREMENTS.

KEY NOTES:

PLAN

NORTH

PROVIDE CT CABINET AND 3-PHASE CT METER. VERIFY ALL

REQUIREMENTS, LOCATION ETC. WITH FLORIDA POWER AND LIGHT

(FPL) PRIOR TO CONSTRUCTION. SERVICE CONDUCTORS FROM CT

CABINET TO MAIN POWER PANEL "MP1" SHALL BE ROUTED

UNDERGROUND (BELOW SLAB) UNLIT ENTERING MAIN PANEL "MP1".

SEE "MECHANICAL EQUIPMENT ELECTRICAL SCHEDULE" FOR

ELECTRICAL REQUIREMENTS.

KEY NOTES:

1/4" = 1'-0"E2-101

2 POWER & SIGNAL PLAN

2426102_SSRC Sports Complex_ELEC_Phase II_R26 - Sheet - E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS
Sheets
E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS
E2-002 - SCHEDULES
E2-101 - LIGHTING, POWER AND SIGNAL PLANS
2426102_SSRC Sports Complex_ELEC_Phase II_R26 - Sheet - E2-002 - SCHEDULES
Sheets
E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS
E2-002 - SCHEDULES
E2-101 - LIGHTING, POWER AND SIGNAL PLANS
2426102_SSRC Sports Complex_ELEC_Phase II_R26 - Sheet - E2-101 - LIGHTING, POWER AND SIGNAL PLANS
Sheets
E2-001 - ELECTRICAL LEGEND, SCHEDULES AND DETAILS
E2-002 - SCHEDULES
E2-101 - LIGHTING, POWER AND SIGNAL PLANS
2026-05-08T13:18:48-0500
Scott A Adams

File details come from the government source that posted it. Updated .