5-Attachment C Technical Criteria.docx
DOCX document 23 KB Posted
- Solicitation number
- CS27-106
- Issued by
- Utah
About this file
This is a Technical Criteria attachment for a Request for Statements of Qualifications issued by the State of Utah's Governor's Office of Economic Development (GOED) for an Independent Consultant to evaluate Regionally Significant Development Zone (RSDZ) applications. The contract is not to exceed five years, and GOED anticipates awarding 1-5 RSDZ applications per year requiring individual study completion. The consultant will operate on a retainer basis to provide analyses as needed for future RSDZ zoning evaluations. Proposals must address four evaluation criteria: Vendor Qualifications (250 points), Scope of Services (250 points), Project Timeline (100 points), and Project Budget (100 points), totaling 700 available points. Responses must be point-by-point and detailed, with no cost documents or pricing information included in proposals.
The fixed maximum compensation is $20,000 per engagement, with an estimated annual volume of approximately five engagements, though this estimate is not guaranteed or a binding limit on GOED's procurement authority. The vendor must demonstrate mandatory technical expertise in real estate finance and development audit, municipal economics and tax increment financing, and urban planning and policy alignment, while maintaining strict independence from any party with financial stakes in proposed zones. The consultant must complete exhaustive forensic audits of applicant financial projections within 45 calendar days of proposal receipt (extendable to 75 days), with a 10-day conflict-of-interest disclosure period following application submission. Consultant responsibilities include analyzing pro forma documents, validating market conditions, assessing regional benefits, verifying statutory compliance by zone type (Transit-Oriented Development, First Home Village, Economic Development Opportunity), and evaluating criteria considerations including affordable housing provisions, infrastructure enhancements, and economic resilience contributions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Vendor Prerequisites - Part 15.pdf | ||
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 6-Attachment D Evaluator Score Sheet.xls | XLS spreadsheet | |
| 4-Attachment B Scope of Work.pdf | ||
| 3-Attachment A Terms and Conditions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C Technical Criteria Independent Consultant for Regionally Significant Development Zone Evaluation For ease of evaluation, the proposals must provide a point-by-point response, addressing in detail each area of the evaluation criteria, including addressing how the point-by-point response addresses the issues discussed in the Scoring Criteria. The criteria are not intended to limit a proposal’s content or exclude any relevant or essential data. Offerors are at liberty and are encouraged to expand upon the criteria to demonstrate the Offeror’s capability to provide the State with a solution. There shall be no cost documents included with any response.
Do NOT include pricing when you submit your qualifications.
Please respond in your statement of qualifications to each criteria listed below. Within your response, fully explain how you meet each scoreable item.
1. Vendor Qualifications (250 Points) The vendor must possess demonstrated expertise in analyzing economic and community development opportunities and managing increment financing. The study should also be nonpartisan, with opinions supported by quantitative data.
A. Mandatory Technical Expertise
· Real Estate Finance & Development Audit: Proven track record in auditing complex commercial, residential, and mixed-use pro formas, debt/equity structures, and capital stacks.
· Municipal Economics & Tax Increment Financing: Direct experience in evaluating tax increment captures mechanisms, public subsidy necessity (but-for" testing), and municipal debt capacity.
· Urban Planning & Policy Alignment: Demonstrated capacity to evaluate spatial layout, transit integration, and statutory compliance with state and local economic development frameworks.
B. Conflict of Interest The independent consultant is strictly prohibited from advising the creating entity (the municipality or county proposing the zone) or any party with a financial stake in the proposed regionally significant development zone.
2. Scope of Services (250 Points) It is critical that Utah uses the RSDZ tools armed with the best information available. The state needs independent analyses that consider the details of development proposals and, within the framework of the goals of RSDZ, including the specified requirements for each zone type (Transit-Oriented, First Home Village, and Economic Development Opportunity), and the market factors, produce professional opinions on the adequacy of the development.
The contracted vendor will be on retainer so that it can work with as needed for future RSDZ zoning analyses. GOED expects to have 1-5 RSDZ applications per year that will each need an individual study completed.
Vendors must perform an exhaustive forensic audit of the applicant’s financial projections to verify that public assistance is necessary, appropriate, and sized correctly.
A. Financial and Tax Evaluation
· Pro Forma Analysis: Evaluate the pro forma analysis submitted with the proposal to verify the data showing the cost difference between feasible development without the zone and the proposed development utilizing RSDZ revenue. Verify "but-for" cost gaps, ensuring public subsidy requests directly offset documented, verified extraordinary costs rather than standard developer overhead or inflated profit margins.
· Cost Prohibitive Assessment: Analyze the development impediments and market conditions described in the proposal to confirm whether the development would be cost-prohibitive, absent the financial incentives.
· Validation of Market Conditions: Audit all baseline underwriting assumptions against local market benchmarks. Assess market feasibility to confirm that proposed rent/price points are realistic given submarket demographics and absorption rates.
· Tax Increment Capture Analysis: Conduct stress-testing and sensitivity analysis on tax increment revenue projections under conservative, base, and aggressive growth scenarios. Review proposed increment capture percentages, duration, and debt service coverage ratios to minimize exposure and risk to taxing entities.
B. Regional Impact Assessment
· Broad Regional Benefits: Assist the executive director in determining whether the proposal demonstrates broad regional benefits to the state and its residents, such as the provision of affordable housing, enhancement of statewide infrastructure, or contribution to economic resilience. See criteria considerations listed below.
· Resident and Existing Increment Impact: Evaluate the potential impact of the proposed increment financing on local residents and identify the impact on existing uses of increment financing in the proposed area.
· Jobs-Housing Balance: Assess how the residential density supports local employment nodes and whether unit sizing accommodates local workforce demographic. Assess whether the local community has the housing capacity for jobs being brought in through the proposed development.
C. Objective Verification by Zone Type The vendor will verify that proposals adequately address the statutory objectives and minimum requirements based on their specific classification:
· Transit-Oriented Development: Verify provisions outlined in 63N-3a-301 are met, including but not limited to higher utilization of public transit, improved air quality, water conservation, and mixed-use development. Confirm compliance with strict housing requirements, including the housing density and affordable housing.
· First Home Village: Verify provision outlined in 63N-3a-302 and that the proposal is anchored by mid-density residential and mixed residential-commercial uses promoting walkability. Confirm compliance with strict housing requirements, including the housing density, affordable housing, and home ownership.
· Economic Development Opportunity (ED Opportunity): Evaluate the likelihood that the project constitutes a significant capital investment. While no metric requirements are required, the office has a list of criteria that applicants will consider and include in the proposal. The criteria encompass the following areas of consideration: provision of Affordable Housing, enhancing statewide infrastructure, and contribution to economic resilience. See criteria considerations listed below.
· ED Opportunity Zones with Energy Implications (Large Load Data Centers): If the zone proposes a large load data center, assess the existing electrical energy infrastructure and development plan (including anticipated improvements and projected economic benefits). Confirm the proposed land is suitable based on access to electrical energy resources and adequate water supply.
D. Criteria Considerations for RSDZs:
Based on the statute for RSDZs, the following criteria are proposed to show if a project meets a broad regional benefit to the state of Utah and its residents. Consideration may include:
· Provision of Affordable Housing: A project demonstrates broad regional benefit through affordable housing by meeting defined metrics for housing accessibility and sustained commitment:
· Quantity and Restriction: Does the project dedicate a percentage of all new residential units as long-term affordable housing?
· Affordability Target: What is the threshold for the affordable units? (e.g., 80% AMI or less, adjusted by household size).
· Duration of Affordability: Do the affordable units include a guarantee for a period of time. (e.g., deed restriction or other legally enforceable agreements)
· Regional Need: Is the project located in a region or county identified by a relevant state agency as having a critical shortage of affordable housing units?
· Enhancing Statewide Infrastructure: A project demonstrates broad regional benefit through infrastructure enhancements by extending or improving public assets that serve beyond immediate development:
· External Service Area: Does infrastructure improvement enhance capacity or reliability for users outside the RSDZ project boundary, such as a major highway interchange, water treatment facility, or utility trunk line?
· Transportation Impact: Does the project demonstrably reduce regional travel times (commute times), decrease congestion on key state or regional transportation corridors, or significantly expand public transit access.
· Critical Utilities: Does the project provide substantial upgrades to critical utilities? (e.g., water, power, or high-speed fiber-optic broadband) that increase redundancy or capacity for multiple municipalities or a defined economic region of the state)
· Investment Threshold: Does the project include investment in the region beyond the RSDZ project boundary? (e.g., percentage of the total development cost toward publicly owned or publicly accessible infrastructure improvements)
· Contributing to Economic Resilience: A project demonstrates broad regional benefit by strengthening the long-term, diverse economic health of the state:
· New, High-Quality Jobs: Does the project create new, permanent, full-time jobs within a specified timeframe?
· Above-Average Wages: Does the projected average wage of the new jobs created exceed the most recently published state or regional average wage by a set percentage?
· Industry Diversification: Does the project primarily support industries identified by the state as strategic growth sectors or as necessary for diversifying the regional economy away from existing concentrations?
· Community Revitalization & Amenities: Does the project foster economic and cultural growth, such as revitalizing the community's Main Street, enhancing cultural venues, or addressing local service gaps like grocery stores or childcare facilities to expand spending and quality of life?
· Supply Chain Support: Does the project create a new supply chain that may attract additional businesses?
· Net Fiscal Impact: Does the project show a positive projected net fiscal impact on state and local revenues in the long-term, accounting for increased public service costs?
· Workforce Training: Does the project include a formal partnership with a regional higher education or technical college institution to develop a curriculum and provide training programs that specifically supply a workforce pipeline for the new jobs created?
3. Project Timeline (100 Points)
After GOED receives an application to create an RSDZ zone, they will send details of the project to the contracted vendor.
After receiving the application, the vendor will have up to 10 days to disclose conflicts of interest.
GOED will then have up to 10 days to review the conflicts of interests. If it is determined that there is a conflict of interest that cannot be mitigated, GOED will pursue a different vendor for that application. If there is no conflict of interest, or if the vendor has a sufficient plan to mitigate any conflict of interest, then the GOED will send the full proposal to the contracted vendor.
The contracted entity will provide GOED with an update 3 weeks after the proposal is received.
The analysis should be completed within 45 calendar days after the proposal is sent to the independent contracted entity. If additional time is needed, an extension of 30 days may be granted by GOED.
The vendor will be invited to present the findings to the increment authorization committee at the committee meeting, as they may be available.
4. Project Budget (100 Points) The analysis by offeror is a fixed sum not to exceed $20,000 per engagement basis. This is a per engagement cost maximum that cannot be exceeded. Nonetheless, should statute be revised to adjust this engagement maximum, GOED may subsequently revise this cap in the resulting contract accordingly.
GOED anticipates roughly 5 engagements to be completed per year under the resulting contract. This estimate of 5 engagements is not guaranteed.
During the resulting contract term GOED may award more than 5 engagements per year, depending on actual needs. The estimate of 5 engagements per year is not to be construed as a limit on GOED’s ability to pursue less or more than 5 engagements per year.
Additional funding may be added to the resulting contract award based on newly appropriated legislative funding related to the scope of this contract.
File details come from the government source that posted it. Updated .