5_Atch 1 TD.pdf

PDF 188 KB Posted

Attached to
Natural Gas at Naval Air Facilities Atsugi
Solicitation number
FA520925R8000
Issued by

About this file

This Technical Description outlines a natural gas supply contract for Naval Air Facilities Atsugi in Japan. The contractor will provide natural gas 24/7 to the Main Boiler Plant (Building 1600) via a gas pipeline, with a projected annual consumption of 6,700,000 m3, including a minimum order amount of 6,030,000 m3 per year. The gas must meet specific requirements: supply pressure of 0.3 - 1.0 MPa, heat content of 40.6 MJ/Nm3, and be City Gas 13A type.

The contract includes detailed provisions for meter reading, gas price calculations, and monthly resource cost adjustments. Contractors must submit an Inspection/Maintenance Plan and Emergency Response Plan within 10 business days of award, conduct periodic gas line inspections, and maintain a 30-minute emergency response time. The contract guarantees a minimum amount of ¥50,000 and requires a mandatory post-award conference. Pricing will be calculated based on usage, with potential penalty fees for failing to meet minimum order amounts, exceeding hourly maximum flow volumes, or not meeting the yearly load factor of 75%.

View the file

Other files

File Type Posted
Pre-Proposal Conference Minutes FA520925R8000_sig.pdf PDF
1_Policies Procedures Ltr.pdf PDF
2_NTO.pdf PDF
4_Exhibit A Pricing Schedule.pdf PDF
3_RFP-FA520925R8000.pdf PDF
6_Atch 2 Est consumption Atsugi.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Solicitation No. FA520925R8000

Technical Description for

Natural Gas at

Naval Air Facilities Atsugi

29 Jan 2025

1. General Description of the Natural Gas Requirements: The Contractor shall provide all personnel, equipment, tools, materials, supervision and other items and services necessary to provide natural gas, twenty four (24) hours a day, seven (7) days a week, to the Main Boiler Plant, Building 1600, at Naval Air Facility (NAF) Atsugi via a gas pipeline. The Contractor shall coordinate with General Gas Pipeline Service Provider (Tokyo Gas Network) and conduct periodic and emergency inspections on US Government-owned gas line from the NAF Atsugi property boundary to the Main Boiler Plant connection point listed above in accordance with Japanese Gas Business Act (Act No. 51 of March 31, 1954) and all other relevant laws. The distance from the existing gas supply point at the property boundary to the Main Boiler Plant connection point is approximately 1,007 meters.

1.1. Required Natural Gas Pressure/Volume at the Main Boiler Plant at Supply:

The Contractor shall ensure the following pressure, quality, and type of gas is provided to the boiler plant, twenty-four (24) hours a day, seven (7) days a week:

- Supply Pressure at the plant: 0.3 - 1.0 MPa at normal supply temperature of 30oC or below

- Quality of gas/heat content: 40.6 MJ/Nm3(LHV)

- Type of gas: City Gas 13A

It is estimated that the following natural gas volumes will be required:

- Projected Hourly Maximum Flow: 1,700 m3/hour

- Projected Annual Consumption: 6,700,000 m3/year

- Annual Minimum Order Amount: 6,030,000 m3/ year

1.2. Required Technical Submittals: The Contractor will provide the following technical submittals as part of this contract within 10 business days after award:

- Inspection/Maintenance Plan, and Emergency Response Plan.

1.2.1. Inspection/Maintenance Plan: The Contractor shall submit an Inspection/Maintenance Plan for government acceptance. The Contractor’s Inspection/Maintenance Plan shall include maintenance in accordance with the manufacturer’s recommendations, as well as all relevant gas and construction laws, including but not limited to: all filters and valves, the emergency shut-off valve system, and all above ground gas piping systems to include leak detection as outlined by the following:

- Leak-Detection of Gas Pipes: Leak-detection will be inspected with a gas leak detector. This inspection will occur at least once every 48 months according to Gas Utility Industry Law or upon request.

- Open-close Test of Valve: Each valve will be inspected by shutting it half-way to ensure that it is functioning properly. This inspection will be provided upon request by NAVFAC Far East and/or Public Works Department (PWD) Atsugi.

- Measurement of Potential at each Magnesium-Electrode: The potential of each magnesium-electrode will be measured and the condition of buried gas pipes checked as part of this inspection. The inspection will occur once every 48 months or as recommended by the manufacturer, whichever is shorter.

- Inspection of Emergency Shut-Off Valve: This inspection will only occur under the condition that the gas supply will be interrupted or in accordance with the most recent relevant gas and construction laws. It will include an operation test and a total test. There will be an inspection of the appearance, and batteries. Measurement of the insulation resistance and a horizontal check of seismometer will also be performed. The inspection will be performed every 12 months or as recommended by the manufacturer.

1.2.2. Emergencies: The Contractor shall provide an Emergency Response Plan to the Government for acceptance. The Emergency Response Plan shall define the procedure by which service shall be restored in the event of an emergency, including but not limited to: the size and composition of the response team, the initial equipment brought to diagnose the issue, the maximum response time to an emergency call, and any leak detection/damage sensing methods employed. For the purposes of this Technical Description, an emergency is defined as any unscheduled interruption of service, including but not limited to: natural disasters, leaks and line maintenance performed without prior notification., The Contractor must be able to receive trouble calls from the Government, 24 hours a day, 7 days a week, and respond within thirty (30) minutes of an emergency call and inspect the gas system. The Contractor shall report to the Contracting Officer/Technical Representative upon arrival on site.

No later than the first day of performance, after contract award, the Contractor shall provide to the Contracting Officer the Point of Contact (POC) list so that NAVFAC Far East and/or PWD Atsugi can contact the Contractor POC, 24 hours a day, 7 days a week in case of emergency, including but not limited to gas or gas stoppage. The Contractor shall provide an updated list to the Contracting Officer no later than the date the POC list change takes effect during the contract term. The Contractor shall contact at least thirty (30) calendar days in advance to schedule periodic inspection, on the Government-owned gas line.

1.3. Periodic and Emergency Inspection on Government-Owned Gas Line: In accordance with Japanese Gas Business Act, the Contractor shall conduct periodic and emergency inspections on the Government-owned gas lines between Supply Point and Connection Point. A schedule of these inspections will be provided to NAVFAC Far East and/or PWD Atsugi in accordance with paragraph

1.2.1. The Contractor shall notify the Government if it finds the Government-owned gas lines to be in an unsafe condition or needs repair in accordance with industrial standards. All repairs to the Government owned gas lines will be made at Government expense, except those that have been determined to be caused by the Contractor’s negligent acts or omissions. Any debris and materials generated from the inspection at the site shall be cleaned and disposed of by the Contractor.

1.4. Meter Reading and Calculation of Gas Consumption

1.4.1. Meter Devices: The Contractor shall install suitable metering equipment of standard manufacture, and maintain and repair them at the Contractor’s expense. When more than a single meter is installed at a service location, the readings thereof may be billed conjunctively, if appropriate. In the event any meter fails to register, or registers incorrectly, the services furnished, the parties shall agree upon the length of time of meter malfunction and the quantity of service delivered during such period of time. An appropriate adjustment shall be made to the next invoice for the purpose of correcting such errors. Meter devices shall be certified and inspected in accordance with Japanese Measurement Act (Act No. 51 of May 20, 1992).

1.4.2. Meter Reading: The Contractor shall read all meters at periodic intervals of approximately 30 calendar days or in accordance with the policy of the cognizant regulatory body or applicable bylaws in the presence of Government representatives. The Contractor shall include the date of the meter reading in all official communications whenever meter readings are included or required.

1.4.3. Meter Test: At the written request of the Contracting Officer, the Contractor shall test any and all identified meters in the presence of Government representatives. The cost of such additional tests shall be borne by the Government if the percentage of errors is found to be not more than 1 percent slow or fast. In the event the meter is found to be out of tolerance, the cost shall be borne by the Contractor.

1.5. Estimate Order: An Estimate Order will be issued each fiscal year (prior to gas being supplied) to inform the Contractor of the estimated quantity, estimated monthly usage, and unit price fixed in

Attachment 1, Pricing Schedule for the year.

1.6. Post Award Conference: The contract guarantees a minimum amount of ¥50,000 for the life of the contract. Upon award of the contract, a delivery order for the guaranteed minimum amount of ¥50,000 will be placed to the Contractor as a record of obligation. This guarantee will be met by the Contractor’s attendance and participation in a Post-award Conference at NAF Atsugi. The conference shall provide a contract overview covering program requirements and procedures. Attendance is mandatory. The Contractor shall determine which member(s) of their team will attend. Key team members that are involved with program/project management, quality control, and superintendence are encouraged to attend.

The Government will not be liable for any costs that the Contractor incurs that exceed the delivery order amount for attendance at this conference.

Reference: Guaranteed Minimum Amount and Minimum Order Amount. The guaranteed minimum amount is to obligate the Government funding at the time of contract award via the first order. Minimum Order Amount is the guaranteed order amount for each year after the natural gas supply stated in accordance with the natural gas commercial practice.

2. Gas Price

2.1. Rates and Charges of Service: In accordance with Article VII of the Agreement Under Article VI of the Treaty of Mutual Cooperation and Security Between the United States of America and Japan, Regarding Facilities and Areas and the Status of United States Armed Forces in Japan (i.e., Status of Forces Agreement; SOFA), the rates and charges of natural gas under this contract shall be no less favorable than those that may be applicable from time to time to the ministries and agencies of the Government of Japan.

2.2. Gas price shall be calculated as follows:

Gas Price = Usage x (Unit Price ± Gas Resource Cost Adjustment Price)

2.3. Gas Resource Cost Adjustments: The unit price shall be adjusted on a monthly basis in accordance with the Ordinance for Enforcement of the Gas Business Act and Contractor’s latest version of rules and regulations, so called “Ooguchi Gas Jukyuu Yakkan” in Japanese, submitted to the Ministry of Economy, Trade and Industry of Government of Japan. The Gas Resource Base is ¥57,300/ton.

2.4. Charges: If the certain price factors are in excess or below the specified amount, penalty fees are charged as follows:

Minimum Order: The Government shall order a yearly Minimum Order amount specified in paragraph

1.1 of this Technical Description. If the actual yearly usage does not reach the yearly Minimum Order, a settlement amount for shortage of Minimum Order will be charged. The fee shall be calculated in accordance with the Contractor’s rules and regulations, so called “Ooguchi Gas Jukyuu Yakkan” in Japanese.

2.4.1.1. Exceptions: No penalty shall be assessed for failing to achieve the minimum purchase order in the event that circumstances beyond the control of the government prevent the flow of gas from reaching the contracted buildings.

2.4.2. Excess of Hourly Max Flow Volume Charge:

When the Hourly Max Flow Volume exceeds the contract Hourly Max Flow Volume, an overage fee shall be assessed. The fee shall be calculated in accordance with the Contractor’s rules and regulations, so called “Ooguchi Gas Jukyuu Yakkan” in Japanese.

2.4.3. Yearly Load Factor: Yearly Load Factor is calculated as follows:

Yearly Load Factor = Monthly average usage in a year / Monthly average usage in the Peak Demand Season (December, January, February, and March)

When the actual yearly Load Factor is less than 75 %, shortage of yearly Load Factor will be charged.

The fee shall be calculated in accordance with the Contractor’s rules and regulations, so called “Ooguchi Gas Jukyuu Yakkan” in Japanese

2.4.4. Invoices:

An invoice shall include calculation formula to cite evidence for a Gas Resource Cost Adjustment Price of the month. Unit price of Gas Resource Cost Adjustment as well as the gas price shall be listed separately on the invoice. Charges for a settlement amount for shortage of yearly minimum order, excess of hourly max flow volume, and shortage of yearly load factor, if any, shall be listed separately on the invoice.

1.1. Required Natural Gas Pressure/Volume at the Main Boiler Plant at Supply:
1.4. Meter Reading and Calculation of Gas Consumption
2. Gas Price
2.2. Gas price shall be calculated as follows:

File details come from the government source that posted it. Updated .