5_ ADDENDUM NO 2 _ Electrical_Low Voltage.pdf

PDF 31 KB Posted

Attached to
New City of Dallas - City Hall: Electrical/Low Voltage
Solicitation number
PE-71050-NONST-2024-000000003
Issued by
Paulding County, Georgia

About this file

This document is an Addendum No. 2 to the Electrical/Low Voltage bid package for the New Dallas, Georgia City Hall project, which is being issued by CarterWatkins Associates Architects, Inc. The addendum includes revised MEP plan sheets to be used in the bidding process, and extends the bid opening date to July 10, 2024, with a quiet period beginning on July 5. Bids are due by 10:00 AM at Dallas City Hall, and the project involves the electrical and low voltage work associated with converting the 1892 Historic Paulding County Courthouse into the new Dallas City Hall.

The original solicitation for the Electrical/Low Voltage package was issued separately from this addendum, with a mandatory pre-bid conference scheduled for June 5, 2024. Bidders are required to visit the project site prior to submitting their proposals, and all bids must be accompanied by a bid bond. No further details on pricing, funding, or other terms are provided in this addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL/LOW

VOLTAGE

ADDENDUM NO: 02

CarterWatkins Associates

Architects, Inc.

137 E. Washington Street

Monroe, Georgia 30655

PROJECT: THE NEW DALLAS, GEORGIA CITY HALL

ELECTRICAL/LOW VOLTAGE PACKAGE

DATE OF ISSUE: 06.06.2024

Item #1: Attached are revised MEP pages dated May 29, 2024, which include page numbers E-4, E-5, E-8, E-9, E-10, E-13, E-14, M-4, M-5, P-4 and P-8. Updated sheets are to replace pages in previously released construction documents.

Item #2: The bid opening date for this package has been pushed back to July 10, 2024. Packages are due by 10:00 a.m. at Dallas City Hall. The quiet period now begins at 10:00 a.m. on July 5.

END OF ADDENDUM NO: 02

This addendum modifies the Contract Documents only in the manner and to the extent stated herein and shown on any accompanying drawings and will become a part of the Contract Documents. Except as specified or otherwise indicated by this addendum, all work shall be in accordance with the basic requirements of the Contract Documents.

PROPOSER SHALL ACKNOWLEDGE RECEIPT OF ADDENDUM IN A SPACE PROVIDED ON THE BID

PROPOSAL FORM; FAILURE TO DO SO MAY CONSTITUTE AN INFORMALITY IN THE PROPOSAL.

The following clarifications, amendments, additions, revisions, changes and/or modifications shall take precedence over the drawings and specifications for the above-named project only in the amount and to the extent hereinafter specified in this addendum. Where any item called for in the specifications or indicated on the drawings is not supplemented hereby, the original requirements shall remain in effect. Where any original item is amended, voided or superseded hereby, the provision of such item not specifically amended, voided or superseded shall remain in effect.

File details come from the government source that posted it. Updated .