This Addendum #2 is a question-and-answer document issued by the Kansas Turnpike Authority (KTA) on September 22, 2026, addressing clarifications for the Roadside Toll Collection System RFP Section I related to the KTA Culvert Lining Install project at MM 181.05 (RFQ 160-260901). The project requires qualified contractors to provide and install culvert lining for an existing 58" x 36" metal arch corrugated pipe (MACP) measuring 145 feet long, located north of SE Wittenburg Road where it crosses Highway 470. An on-site project evaluation was conducted on Thursday, September 17, 2026, at 10:00 AM CST with attendance required via RSVP to mcummings@ksturnpike.com. The project completion window is September through December 2026. Bidders must submit one lump sum price on the bid table along with an itemized quote detailing the scope of work.

Key bidding requirements clarified in the addendum include: no bid bond is required; submissions must include an itemized quote with detailed scope of work and insurance documentation, with KORA (Kansas Open Records Act) documents required only if bidders have confidential information; no warranty period is required for the work or liner upon completion; and the project qualifies for tax exemption, with KTA issuing the tax exempt certificate after bid award. The correct project designation is MM 181.05 (not MM 185.05 as referenced in initial documentation). Prospective bidders should submit pricing and proposal documentation as specified in the RFP.

View the file

Other files

File Type Posted
3-KDOT SPECIAL PROVISION - LINER PIPE.pdf PDF
4-ADDENDUM 1.docx DOCX document
1-160-260901 - KORA redacted proposal agreement.docx DOCX document
2-KTA form 236.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roadside Toll Collection System RFP Section I - Administrative

REQUEST FOR PROPOSAL
KTA Culvert Lining Install MM181.05# 160-260901

RFQ 160-260901

ADDENDUM #2

QUESTION ANSWERS

Date: September 22, 2026

This Addendum is made part of and incorporated into the original agreement referenced above. The parties hereby agree to amend the original agreement as follows:

1. Will a bid bond be needed? NO

2. What documents are required with bid submissions? Itemized quote with scope of work detailed, Insurance and KORA if required by you.

3. Is there a warranty period for the work completed or the liner? NO

4. Project is titled with MM181.05, but in the general scope of work MM185.05 is referenced? Which is correct? MM181.05 is correct.

5. Is this culvert located just north of where SE Wittenburg Rd crosses over highway 470? This is the Google map link to the site - https://maps.app.goo.gl/Y4v3CQo4kKdKbBnz6

6. Will this project be Tax Exempt? Yes, KTA will issue the tax exempt certificate after bid is awarded.

7. Are KORA documents required? No, if you don’t have anything that is deemed confidential.

8. In the pricing section it looks like we are bidding this as a 1 LS but there is a section to upload itemized pricing as a PDF. Are you wanting us to break this down into line items or do you just want a scope of work? We ask for one lump sum pricing on the bid table but then ask that you submit a quote with scope of work or itemized quote.