5-3. Planset AKA-21-OME SCATTERED SITES IFC 073125.pdf
PDF 17 MB Posted
- Solicitation number
- IFB ANTHC 25-B-391043
- Issued by
- Nome Census Area, Alaska
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOME, ALASKA
SCATTERED SITES
ISSUED FOR CONSTRUCTION
PLAN SET NUMBER: AKA-21-OME
ANTHC PROJECT NUMBER: AKA.C9G-1276
RUSSIA
A L E U T I A N
OF
ANCHORAGE
BRISTOL BAY
CO
O K
IN
LE
T
NORTON SOUND
NOME
KOTZEBUE
JUNEAU
FAIRBANKS
CANADA
ARCTIC OCEAN
GULF
ALASKA
I S L A N D S
BERING SEA
CHUKCHI SEA
KODIAK
BETHEL
UNALASKA
Su si tn a
Koyukuk Yukon
Yu ko n
Ku sk ok wi m
River
River Rive r
River
Tanana
River
River
Kobuk
Colville Rive r
C op pe r
Rive r
River
ST. LAWRENCE
ISLAND
ST.
MATTHEW
ISLAND
NUNIVAK
ISLAND
PRIBILOF
ISLANDS
SEC 26, T11S, R34W, KATEEL
RIVER MERIDIAN
NOME
UTQIAGVIK
TOTAL SHEETSOFUSER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STLGND.dwg LAYOUT: COVR PRINTED: 1/6/2023 12:21:57 PM 1 36
SHEET LIST TABLE
SHEET # SHEET TITLE PG #
- COVER SHEET 1
C-001 SCATTERED SITES LEGEND 2
C-002 DESIGN CRITERIA 3
C-101 SHANTAH ESPARZA SITE PLAN 4
C-102 SHANTAH ESPARZA DESIGN PLAN 5
C-103 BRENDON GOLOGERGEN-TRAN SITE PLAN 6
C-104 BRENDON GOLOGERGEN-TRAN DESIGN PLAN 7
C-105 SHARON SPARKS SITE PLAN 8
C-106 SHARON SPARKS DESIGN PLAN 9
SSSD-100 SEPTIC SYSTEM SCHEMATIC 10
SSSD-200 ARCTIC GRAVITY PIPE AND FITTINGS 11
SSSD-202 ARCTIC PIPE CONNECTIONS 12
SSSD-303 SERVICE UTILITY BOX SEWER HOUSE CONNECTION 13
SSSD-304 SERVICE UTILITY BOX 14
SSSD-306 SERVICE UTILITY BOX SEWER HOUSE - BELOW FINISHED FLOOR 15
SSSD-523 IM-1530 - 1500 GALLON SEPTIC TANK - ANCHORING SYSTEM 16
SSSD-556 INFILTRATOR SEPTIC TANK WITH LIBERTY PUMP BASIN - PERMAFROST 17
SSSD-566 LIBERTY PUMP LIFT STATION 18
SSSD-600 DISTRIBUTION BOXES 19
SSSD-610 BED STYLE ABSORBTION FIELD INSTALLATION 20
SSSD-639 PRESSURIZED MOUND SYSTEM (AT-GRADE) 21
SSSD-641 GRAVITY DRAINFIELD LATERALS WITH PERFORATED PIPE 22
SSSD-642 PRESSURE DISTRIBUTION DRAINFIELD (BELOW-GRADE) 23
SSSD-643 PRESSURE MOUND LATERAL ORIFICE SPACING 24
SSSD-701 ARCTIC BOX - WATER SERVICE CONNECTION 25
SSSD-730 ARCTIC DRAINBACK WELL WITH PRESSURE SYSTEM 26
SSSD-731 ARCTIC WELL DETAILS (DRAINBACK SYSTEM) 27
SSSD-740 CIRCULATING WELL WITH PRESSURE SYSTEM 28
SSSD-741 CIRCULATING WELL DETAILS 29
SSSD-781 CIRC PUMP FOR ARCTIC CIRCULATION LONG HEAT TRACE 30
SSSD-800 PRESSURE TANK DETAIL 31
SSSD-801 PRESSURE TANK DETAIL WITH DRAINBACK 32
SSSD-900 ELECTRICAL LEGEND 33
SSSD-940 ELECTRICAL - CIRCULATING WELL DETAILS 34
SSSD-951 ELECTRICAL SEWER SERVICE - LIFT STATION 35
SSSD-960 EFFLUENT PUMP CONTROL PANEL 36
ALASKA NATIVE
TRIBAL HEALTH
CONSORTIUM
DIVISION OF ENVIRONMENTAL
HEALTH AND ENGINEERING
4500 DIPLOMACY DRIVE
ANCHORAGE, ALASKA, 99508-3440
PHONE: (907) 729-3600
FAX: (907) 729-4090
http://www.dehe.org
DCVR#1 WAS TO INSTALL A NEW WELL (WELL#4) AT THE
ESPARZA SITE, AND NOT CONVERT EXISTING WELL#3
SSSD-850 BOLLARD DETAIL 331
DESIGN CLARIFICATION VERIFICATION REQUEST
1 OF 37 TOTAL SHEETS
THE SHARON SPARKS SITE WAS REMOVED FROM THIS
PLANSET FOR PROJECT AND CONTRACTING PURPOSES AND
MAY BE SERVED AT A LATER DATE. STANDARD DETAIL
SHEETS WERE ALSO UPDATED - KDS 4-15-25
SSSD-520 IM-1530 - 1500 GALLON SEPTIC TANK - SECTION2
SSSD-521 IM-1530 - 1500 GALLON SEPTIC TANK - ARCTIC PIPING2
SSSD-611 SPLIT MOUND GRAVITY FED DRAINFIELD (BELOW GRADE)2
http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org
VICINITY MAP
SCALE: 1" = 5280'
SECTION 26, T11S, R34W, KATEEL RIVER MERIDIAN, ALASKA, USGS QUAD:
GENERAL SYMBOLS
GENERAL NOTES:
THESE DRAWINGS HAVE BEEN DEVELOPED FOR CONSTRUCTION BY
CONSTRUCTION CONTRACT METHODOLOGY. CONSTRUCTION SPECIFICATIONS
HAVE ALSO BEEN DEVELOPED SPECIFICALLY FOR THIS PROJECT. TOGETHER,
THE DRAWINGS AND CONSTRUCTION SPECIFICATIONS CONSTITUTE A
COMPLETE AND INSEPARABLE SET OF CONSTRUCTION DOCUMENTS,
INCLUDING ALL NECESSARY CONSTRUCTION AND MATERIALS SPECIFICATIONS
TO ENSURE THE PROJECT AS CONSTRUCTED MEETS THE DESIGN INTENT. ANY
CHANGES TO CONSTRUCTION METHODS OR MATERIALS SHALL BE APPROVED
IN ADVANCE BY THE RESPONSIBLE REGISTERED PROFESSIONAL.
0 1" 2"
X
X-XXX
X
X-XXX
X-XXX
X
X
0 10000' 20000'
HORZ. SCALE
VERT. SCALE
VIEW TITLEX
XX"-XX'
XX"-XX'
VIEW TITLEX XX"-XX'
DRAWING TITLE
OR SECTION TITLE
DRAWING TITLE OR
SECTION TITLE WITH
VERTICAL AND
HORIZONTAL SCALE
SECTION INDICATOR
DRAWING OR
PHOTO/IMAGE
ELEVATION INDICATOR
CALL OUT BUBBLE
ARCHITECTURAL
GRAPHIC SCALE
ENGINEERING
GRAPHIC SCALE
BREAK LINE
KEY NOTE INDICATOR
(REFERS TO NOTE
ON SAME SHEET)
REVISION INDICATOR
MATCH LINE, SEE X-XXX
MATCH LINE
VIEW NUMBER
VIEW NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
VIEW NUMBER
VIEW NUMBER
VIEW NUMBER
TOPO AND VEGETATION
SLOPE ARROW
TEST HOLETH
DRAINAGE CHANNEL
ROAD OR DRIVEWAY
GROUND WATER
3%
SITE DRAINAGE
TM
(89-242)
E
SITE STRUCTURESWATER
POWER AND COMMUNICATION
ELECTRIC PED
ELECTRIC METER
THERMISTOR
TELEPHONE BOOTH
CABLE PED
ELECTRICAL ACCESS PANEL
OR HEAT TRACE ACCESS
PROPERTY SYMBOLS
SANITARY SEWER
LOT # (PROPERTY)
BLOCK (PROPERTY)
PLAT NUMBER
W
W
W
A
CO
E
FG
HG
WG
L
S
TP
V
WS
GS
R
BM
CW
PK
PC
RR
SP
E
EM
TB
C
HYDRANT
WATER VALVE
WATER WELL
WATER MANHOLE
WATER VALVE VAULT
SEWER MANHOLE
CLEANOUT
SEPTIC VENT
SEWER LIFT STATION
SEPTIC TANK
ARCTIC BOX
POWER POLE
GUY ANCHOR
GUY POLE
ELECTRIC TRANSFORMER
TELEPHONE PEDESTAL
ANTENNA
FUEL POWERED
GENERATOR
HYDRO POWERED
GENERATOR
WIND POWERED
GENERATOR
RUNWAY LIGHT
CULTURAL OBJECT
GRAVE SITE
RESTRICTED PROPERTY
WINDSOCK
SPIKE
ROCK
REBAR-NO CAP
RAILROAD SPIKE
PLASTIC CAP
ALCAP
BM/TBM ELEV ONLY
BLM-GLO BRASS CAP
BRASS CAP
COPPERWELD
HUB
HV CONTROL POINT
IRON PIPE
PK NAIL
ST
AB
B
F
FT
G
MW
PT
BOLLARD
CULVERT
FLAG POLE
FUEL TANK
PROPANE TANK
GATE POST
MONITOR WELL
SIGN
THERMOSYPHON
RAILROAD
TREE LINE
LINE LABELS
WATER
SANITARY SEWER
PROPERTY
TOPOGRAPHY AND VEGETATION
ELECTRIC AND COMMUNICATION
RW
W W
WS
S S
C C
F F
SITE STRUCTURES
NON-POTABLE WATER
WATER MAIN
WATER SERVICE
SS
FM
GRAVITY SEWER MAIN
SEWER SERVICE
SEWER FORCE MAIN
DITCH BOTTOM
OVERHEAD ELECTRIC LINE
CABLE TV LINE
COMMUNICATION LINE
FUEL LINE
D D
X X FENCE LINE
MAJOR CONTOUR
MINOR CONTOUR
TRAIL
CB CATCH BASIN
HB HISTORICAL BUILDING
UTILITY PULL BOXPB
JUNCTION BOXJB
EASEMENT
G GAS METER
GAS VALVEG
UTILITIES
UNDERGROUND ELECTRIC LINE
PROPERTY
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
NOME
C-101
AIRPORT
C-105
C-103
NO
M
E-
TE
LL
ER
R D/
HW
Y
DE
XT
ER
B
YP
AS
S
BE
AM
R D
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STLGND.dwg LAYOUT: LGND PRINTED: 1/6/2023 12:21:58 PM
0 1"
TOTAL SHEETSOF
C-001 2 9
MY
RS
KS
AKA-21-OME
SCATTERED SITES
LEGEND
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
3622 OF 37 TOTAL SHEETS
http://www.dehe.org
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
GENERAL DESIGN NOTES
1. GRAVITY WASTEWATER SERVICE LINE FROM HOUSE TO TANK SHALL BE
SET AT A MINIMUM OF 2% SLOPE. HOWEVER, THIS MAY BE A BIT STEEPER
AS SLOPE VARIES BASED ON LENGTH AND DISTANCE AND THE SLOPE
EQUALS RISE OVER RUN.
2. SEWER SERVICE LINES TO BE ARCTIC PIPE; SEPTIC TANKS, DRAINFIELD,
AND REPS UNITS WILL NEED 4” OF RIGID BOARDSTOCK OVER THEM.
3. THERE SHALL BE A MINIMUM OF 4 FT OF COVER OVER PIPE, TANK, AND
DRAINFIELD TO PREVENT FREEZING.
4. PER DEC THE BOTTOM OF DRAINFIELD (GRAVEL BASE) MUST HAVE 4 FT
OF CLEARANCE TO GROUNDWATER AND 6 FT TO IMPERMEABLE LAYER.
5. A 100 FT SEPARATION DISTANCE MUST BE MAINTAINED BETWEEN THE
WELL AND SEPTIC TANK AND DRAINFIELD. INCLUDING 100 FT FROM
NEIGHBORING WELLS, LAKES, RIVERS, SLOUGHS, AND STREAMS.
6. THERE MUST BE 10 FT OF SEPARATION FROM THE SEPTIC SYSTEM TO
THE PROPERTY LINES.
7. THE DRAINFIELD MUST BE LOCATED GREATER THAN 50 FT AWAY FROM A
25% SLOPE.
GENERAL CONSTRUCTION NOTES:
1. CONTRACTOR MUST COMPLY WITH ALL OSHA TRENCHING
REQUIREMENTS, REFER TO SECTION 31 23 16.13, TRENCHING.
EXCAVATION LIMITS AND SLOPES SHOWN ARE 1:1 AND ASSUMED TO BE
TYPE B SOILS, BUT MUST BE VERIFIED BY CONTRACTOR. MOUND SYSTEM
FINISHED GRADE SLOPES SHOULD BE 3:1 FOR EASE OF MAINTENANCE.
2. GENERAL LANDSCAPING AND SITE CLEAN-UP - IN GENERAL, ALL
DISTURBED AREAS SHALL BE GRADED, COMPACTED, LEVELED, AND HAND
OR MACHINE RAKED. ROCKS LARGER THAN 3” SHOULD BE REMOVED
FROM THE SURFACE. ALL CONSTRUCTION DEBRIS, BRUSH, ROOT BALLS,
AND LIMBED TREE BRANCHES SHALL BE REMOVED FROM THE SITE.
BUCKED LOGS CAN BE NEATLY STACKED AND LEFT, IF HOMEOWNER
AGREES. ALL SEPTIC SYSTEM OBSERVATION PORTS SHALL BE VERTICAL
AND PLUMB, AND CAPPED, AND SHALL BE CLEANED OFF OF ALL MUD,
DIRT AND MARKINGS. ACCESS RISERS ON SEPTIC TANKS SHALL BE
SECURED AND BE CLEARED OF DIRT AND MUD. IF GRAVEL OR PAVED
DRIVEWAYS ARE IMPACTED THEY MUST BE REPLACED TO AN “OR
BETTER” STATUS.
3. THE GRAVEL/SEWER ROCK FOR THE DRAINFIELD MUST BE RAKED LOOSE
AND NOT COMPACTED BY EQUIPMENT.
4. THE BOARDSTOCK LAYER MUST BE LAID ONTO SMOOTH SOIL SURFACE
WITHOUT LARGE ROCKS OR VOIDS, AND CAPPED WITH CLEAN BACKFILL
WITHOUT LARGE ROCKS OR VOIDS.
5. CONSTRUCTION PHOTOS AND WORK LOGS MUST BE SUBMITTED DAILY,
AS WORK PROCEEDS.
6. THE SYSTEM MUST BE INSTALLED AS DESIGNED, AND ONLY CHANGED OR
RE-POSITIONED WITH APPROVAL OF THE ENGINEER.
7. UNDERGROUND UTILITIES MUST BE IDENTIFIED AND LOCATED PRIOR TO
EXCAVATION. PLEASE CALL ALASKA DIGLINE, INC AT 811, A MINIMUM OF
THREE WORKING DAYS PRIOR TO INSTALLATION OF THE SYSTEM.
8. ONCE LOCATED, UNDERGROUND UTILITIES MAY NEED TO BE PROTECTED
FROM DAMAGE DURING INSTALLATION.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOT ENCROACH
OVER PROPERTY LINES.
10. SEWER ROCK AND COARSE FILTER SAND MUST MEET AK DEC
SPECIFICATIONS
11. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL BURIED UTILITIES,
EASEMENTS, PROPERTY LINES, RIGHT-OF-WAYS, SURFACE WATER
SET-BACKS, WELL RADIUS, AND WATER SERVICE LINES, THAT MAY
INTRUDE INTO THE DESIGN LAYOUT OF THE PROPOSED ON-SITE SEPTIC
SYSTEM.
12. ANY ENCROACHMENTS FOUND, THAT WERE NOT IDENTIFIED ON THE
ENGINEERING PLANS SHOULD BE BROUGHT TO THE ATTENTION OF THE
ENGINEER-OF-RECORD.
13. CONTRACTOR TO ESTABLISH SURVEY BENCHMARKS, FROM WHICH TO
ESTABLISH ELEVATIONS. THE ON-SITE SEPTIC SYSTEM HAS BEEN
DESIGNED USING ELEVATIONS.
14. SITE INSPECTIONS - THE CONTRACTOR MUST NOTIFY THE PROJECT
MANAGER AND ENGINEER AT LEAST 24 HRS PRIOR TO BEGINNING
CONSTRUCTION. INSPECTIONS SHOULD TAKE PLACE DURING NORMAL
BUSINESS HOURS.
a. THE FOLLOWING ARE INSPECTION POINTS THAT MUST BE PHOTO
DOCUMENTED BY THE CONTRACTOR.
i. INITIAL BEFORE PHOTOS OF THE SITE, PRIOR TO THE START OF
CONSTRUCTION
ii. THE BOTTOM OF ALL TRENCHES
iii. THE BOTTOM /BEDDING OF THE SEPTIC TANK AND PUMP CHAMBERS iv.THE BOTTOM OF THE PRESSURE MOUND DRAINFIELD
v. TOP OF SAND LINER OF PRESSURE MOUND DRAINFIELD vi.TOP OF SEWER ROCK OF PRESSURE MOUND DRAINFIELD
vii. LAYOUT OF PERFORATED DISTRIBUTION MANIFOLD AND DRAINFIELD
CHAMBERS
viii. BOARDSTOCK COVERING OF BED SYSTEM ix.GEO-FABRIC COVERING OF BED SYSTEM
x. TOP OF SEPTIC TANK, RISERS, AND PUMP CHAMBERS xi.CONTROL AND ALARM PANEL KIOSK, INTERIOR OF PANELS, AND
EXTERIOR
xii. SEWER SERVICE LINE AND CLEAN-OUT
xiii. SEWER SERVICE LINE HOUSE PENETRATION OF CONNECTION POINT
xiv. FINAL GRADING AND FINISHED GRADE OF SEPTIC SYSTEM FROM
MULTIPLE ANGLES
15. THE CONTRACTOR SHALL PROVIDE ANTHC OPERATION AND
MAINTENANCE MATERIALS, AND ANY COPIES OF MANUFACTURER'S
LITERATURE OF THE SYSTEM COMPONENTS. ANTHC WILL COMPILE THE
O&M MANUAL FOR THE HOMEOWNER.
REFERENCES
· STATE OF ALASKA ADEC ONSITE WASTEWATER SYSTEM INSTALLERS
MANUAL, JANUARY 2016
· ONSITE WASTEWATER TREATMENT SYSTEMS: SOIL AND SITE EVALUATIONS,
DESIGN, CONSTRUCTION AND MAINTENANCE, TYLER AND ASSOCIATES, INC.
· WISCONSIN MOUND SOIL ABSORPTION SYSTEMS: SITING, DESIGN, AND
CONSTRUCTION MANUAL, JC CONVERSE AND EJ TYLER, JANUARY 2000
· PRESSURE DISTRIBUTION NETWORK DESIGN, JC CONVERSE, JANUARY 2000
· WASHINGTON STATE DEPT. OF HEALTH, PRESSURE DISTRIBUTION
SYSTEMS, 2012
· ADEC WASTEWATER DISPOSAL REGULATIONS 18AAC72, NOVEMBER 2017
· ANTHC TECHNICAL SPECIFICATIONS - 2021
DEC DESIGN LOADING CRITERIA I
DESCRIPTION DESIGN LOADING
GW
WELL GRADED GRAVEL, FASTER THAN 1 MIN/IN;
ADD 2' OF COARSE FILTER SAND UNDER
DRAINFIELD, WHEN PERC RATE IS FASTER THAN 1
MIN/IN
150 SF/BR
GW WELL GRADED GRAVEL, SLOWER THAN 1 MIN/IN 125 SF BR
GP
POORLY GRADED GRAVEL, FASTER THAN 1 MIN/IN;
ADD 2' OF COARSE FILTER SAND UNDER
DRAINFIELD, WHEN PERC RATE IS FASTER THAN 1
MIN/IN
150 SF BR
GP POORLY GRADED GRAVEL, SLOWER THAN 1 MIN/IN 125 SF BR
SW WELL GRADED SAND 150 SF BR
SP POORLY GRADED SAND 150 SF BR
GM SILTY GRAVEL PERC TEST
SM SILTY SAND PERC TEST
ML SILT PERC TEST
DEC DESIGN LOADING CRITERIA II
PERC TEST DESIGN LOADING
1-5 MIN / IN 125 SF BR
6-15 MIN / IN 190 SF BR
16 - 30 MIN / IN 250 SF BR
31 - 60 MIN / IN 335 SF BR
61-120 MIN / IN ENGINEER
120 AND GREATER NOPE
SEPTIC TANK SIZING
@ BEDROOMS MIN SIZE
1-3 1,000 GAL
4 1,250 GAL
5 1,500 GAL
6 1,750 GAL
7 2,000 GAL
8 2,250 GAL
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STLGND.dwg LAYOUT: DSGN PRINTED: 1/6/2023 12:21:59 PM
0 1"
TOTAL SHEETSOF
C-002 3 9
MY
RS
KS
AKA-21-OME
DESIGN CRITERIA
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
3633 OF 37 TOTAL SHEETS
100'
85'
95'
TH
90'
85'
100'
90'
95'
95'
100'
SS
SS
WEM
O H/
E
O H/
E
O H/
E
O H/
E
O H/
E
OH/E OH/E OH/E OH/E
FT
ST
SP
W W
AB
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
SITE PLANA1 1" = 30'
MP 9.5 NOME-TAYLOR ROAD, PO BOX 1929, NOME, ALASKA 99762
64°35'49.99"N 165°17'32.49"W; 108,965 SF (2.5 AC)
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STSITE_SEsparza.dwg LAYOUT: SITE PRINTED: 4/18/2025 10:13:52 AM
0 1"
TOTAL SHEETSOF
C-101 6 9
MY
RS
KS
AKA-21-OME
SHANTAH ESPARZA
SITE PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
TEST HOLE
PLAN AND PROFILE,
SEE SHEET C-102
100'R WELL
CLEARANCE
0 30' 60'
NOME-TAYLOR ROAD
SCOPE OF WORK
SEWER
· INSTALL NEW SEPTIC SYSTEM TO REPLACE EXISTING LIFEWATER
SYSTEM.
· INSTALL NEW INSULATED UTILIDOR FOR SEWER PIPING UNDER THE
HOUSE TO REPLACE EXISTING FIBERGLASS BATT WRAPPED SEWER
PIPING.
· INSTALL NEW ARCTIC BOX TO CONNECT UTILIDOR AND ARCTIC PIPE.
· INSTALL NEW SEWER SERVICE LINE. 4” X 12” ARCTIC PIPE, WITH 2” OF
BOARDSTOCK INSULATION OVER THE PIPE, AND CONNECT TO NEW
SEPTIC TANK.
· INSTALL NEW 1,500 GALLON INSULATED INFILTRATOR SEPTIC TANK,
WITH 4” OF BOARDSTOCK INSULATION OVER THE TANK.
· INSTALL NEW INSULATED MOUND SYSTEM DRAINFIELD, WITH 4” OF
BOARDSTOCK INSULATION OVER CHAMBERS.
§ ABSORPTION FIELD CONTAINS:
§ TWO SUB FIELDS OF 8 ROWS OF 6 CHAMBERS, FOR A TOTAL OF 96
CHAMBERS AND 1,086 SQ FT OF TREATMENT AREA (DISTRIBUTION
PIPING IS COVERED WITH INFILTRATOR CHAMBERS, GEOTEXTILE,
AND BOARDSTOCK INSULATION). SEWER ROCK FOOTPRINT IS
LARGER.
· DISINFECT EXISTING LIFEWATER SYSTEM. EMPTY SYSTEM, RUN ~100
GALLONS OF CLEAN WATER THROUGH THE SYSTEM, PRESSURE WASH
OR HOSE DOWN CLEAN, AND DISINFECT SYSTEM WITH BLEACH.
· FINAL LANDSCAPING: COMPACT, LEVEL, GRASS SEED, AND FERTILIZE
AREA. CLEAN UP SITE. ENSURE DRAINAGE DOES NOT POOL UP ALONG
SEPTIC SYSTEM. MOUND OVER SERVICE LINE, SEPTIC TANK, REPS AND
DRAINFIELD TO COMPENSATE FOR SETTLEMENT. ENSURE DRAINAGE
DOES NOT RUN TOWARD THE HOUSE OR STRUCTURES ON PROPERTY.
WATER
· DRILL NEW RESIDENTIAL ARCTIC WATER WELL (WELL #4)
· OPTION 1 - DRAINBACK WELL (IF NO PERMAFROST ENCOUNTERED, BUT
STILL ARCTIC)
§ WEEP HOLE ON DROP PIPE AND DRAINBACK VALVE ON PRESSURE
TANK
· OPTION 2 - CIRCULATING WELL (IF PERMAFROST ENCOUNTERED)
§ CIRCULATING PUMP, SUPPLY AND RETURN LINES ON SERVICE
LINE, DOUBLE PITLESS ADAPTER, AND SUPPLY AND RETURN
DROP PIPES.
· INSTALL NEW WELL PUMP, CONTROLS, AND PRESSURE SYSTEM.
§ PRESSURE SYSTEM TO BE INSTALLED IN UTILITY ROOM,
SOUTHWEST CORNER OF HOUSE
§ INSTALL SEDIMENT FILTER ON INCOMING WATER LINE IN UTILITY
ROOM.
· INSTALL ARCTIC BOX, FOR WATER LINE CONNECTION TO HOUSE. THE
UTILITY ROOM IS ON THE OTHER SIDE OF THE SOUTHWEST WALL, IN
THE SOUTHWEST CORNER OF THE HOUSE.
· INSTALL NEW WATER SERVICE LINE, TO CONNECT THE WELL TO THE
HOUSE (10FT). OPTION #1 (DRAINBACK WELL): WATER LINE IS 1” SDR 11,
HDPE PIPE, INSIDE A 4”X12” ARCTIC CARRIER PIPE, WITH HEAT TRACE.
OPTION #2 (CIRCULATING WELL), THE WATER LINE IS A 1” SUPPLY AND
1” RETURN AND 1” HEAT TRACE CARRIER WITH HEAT TRACE. IF NO
PERMAFROST ENCOUNTERED, COVER ARCTIC PIPE WITH 2” OF
BOARDSTOCK INSULATION. IF PERMAFROST IS ENCOUNTERED, THEN
THE ARCTIC PIPE IS ENCLOSED WITH 4” OF BOARDSTOCK ON ALL 4
SIDES.
· THERE ARE TWO HEAT TRACE RUNS. ONE LONG AND ONE SHORT. THE
LONG RUN HEAT TRACE, IS INSIDE A 1” PEX CARRIER PIPE, RUNS FROM
THE ARCTIC BOX, ALONG THE SERVICE LINE, AND DOWN THE WELL,
BELOW THE PUMP. THE SHORT RUN COVERS THE ARCTIC BOX, AND
DOWN TO THE BOTTOM OF THE LONG SWEEP 90 FITTING. (BELOW
FROST LEVEL), AND IS NOT INSIDE A 1” CARRIER PIPE. INSTALL HEAT
TRACE CONTROLS FOR BOTH THE LONG AND THE SHORT RUN, WHICH
ARE NEEDED FOR BOTH FREEZE PROTECTION AND FROST RECOVERY.
THE HEAT TRACE CONTROLS CONSIST OF AN HOA SWITCH, LED RUN
LIGHT, AND A 12 HR COUNTDOWN TIMER, AND A 24 HR, PROGRAMMABLE
TIMER.
· DECOMMISSION EXISTING WELL #3 PER ADEC RECOMMENDATIONS.
· THE WELL NEEDS TO BE OPERATED TO ENSURE THAT THE SYSTEM IS
FULLY FUNCTIONAL. THE WELL CANNOT BE CONNECTED TO HOUSE
PLUMBING UNTIL AFTER THE WATER ANALYSIS SHOWS THAT THE
WATER IS SAFE TO DRINK (AIR-BREAK IN PLUMBING). WATER
TREATMENT EQUIPMENT MAY BE NEEDED TO BE INSTALLED TO
ACHIEVE THIS (UNDER SEPARATE CONTRACT)
· DISINFECT WELL AFTER INSTALLATION, EITHER AS STAND-ALONE WELL,
OR AFTER WATER SERVICE LINE, PUMP, AND PLUMBING ARE
INSTALLED.
· OBTAIN A RAW WATER SAMPLE FOR BACTERIA AND THE FULL LIST OF
CONTAMINANTS OUTLINED IN THE TECHNICAL SPECIFICATIONS.
· PROVIDE FINAL LANDSCAPING OVER WATER SERVICE LINE. COMPACT,
LEVEL, GRASS SEED AND FERTILIZE AREA. MOUND UP OVER SERVICE
LINE TO COMPENSATE FOR SETTLEMENT. ENSURE SURFACE WATER
DRAINAGE DOES NOT FLOW TOWARD HOUSE OR STRUCTURES ON
PROPERTY. REPAIR DRIVEWAY AREA AND TOP WITH D1 GRAVEL
MATERIAL, LEVEL, AND COMPACT AREA.
ABSORPTION FIELD DESIGN CRITERIA
· 2 BEDROOM HOUSE; UPSIZE AND USE 3 BEDROOMS FOR FLOW RATE
DUE TO NUMBER OF PEOPLE LIVING IN THE HOME (7 PEOPLE)
· DESIGN FLOW RATE: 150 GAL/DAY/BEDROOM
· TOTAL DESIGN FLOW: 450 GAL/DAY
· SOIL TYPE @ 4FT IS: SILTY SAND - USCS CLASSIFICATION: SM
· SOIL TYPE @ 8FT IS: SILTY SAND W/ GRAVEL - USCS CLASSIFICATION:
SM
· TEST HOLE DEPTH WAS 11FT DUE TO WALLS COLLAPSING BELOW 9FT.
· IMPERMEABLE LAYER IS ASSUMED TO BE 11FT.
· NO GROUNDWATER ENCOUNTERED IN TEST HOLE.
· A PERCOLATION TEST WAS NOT PERFORMED DUE TO GROUNDWATER
AT 3FT IN THE PERCOLATION TEST HOLES.
· THE LOADING RATE FOR SM SOILS REQUIRES A LOADING RATE BASED
ON A PERCOLATION TEST. TO BE MORE CONSERVATIVE, USE A
PERCOLATION RATE OF 31-60 MIN/IN FOR A LOADING RATE OF 335
SQFT/BR.
· DUE TO POOR SOIL CONDITIONS A SAND LINER WILL BE ADDED.
· DESIGN WILL BE BED-STYLE DRAINFIELD (SOIL ABSORPTION FIELD)
· IT WILL INCLUDE 2FT OF 3” MINUS COARSE-GRADED SEWER ROCK
· THE SYSTEM WILL HAVE 2FT OF DEC APPROVED COARSE-GRADED
FILTER SAND.
· IT WILL INCLUDE UTILIZING PERFORATED PIPE, CHAMBERS,
GEOTEXTILE FABRIC, AND BOARDSTOCK.
· ELEVATION OF EXISTING GROUND AT TEST HOLE: 94 FT ASL (ABOVE
SEA LEVEL)
· INFILTRATION AREA REQUIRED = 3 BEDROOMS * 335 SQ FT
/BEDROOM/DAY = 1003 SQ FT
· CHAMBER AREA PER UNIT IS: 2.83FT X 4FT LONG = 11.32 SQ
FT/CHAMBER
· # OF CHAMBERS REQUIRED IS = 1,005 SQ FT / 11.32 SQ FT/CHAMBER =
88.8 CHAMBERS
· DUE TO HISTORIC SNOW DRIFTS ON THE DRIVEWAY, UTILIZE TWO SUB
FIELDS OF 8 ROWS EACH.
· USE 96 CHAMBERS, TWO SUB FIELDS WITH 8 ROWS OF 6 CHAMBERS
PER ROW (1,086 SQ FT)
· FINAL LOADING RATE IS: 450 GAL/DAY / 1,086 SQ FT = 0.41 GAL/DAY/SQ
FT
· 0.41 GAL/DAY/SQ FT IS CLOSE TO THE E.J. TYLER RECOMMENDED 0.4
GAL/DAY/SQ FT FOR SILT MATERIAL FOR BOD5 LOADING GREATER THAN
30MG/L WASTEWATER STRENGTH. ACTUAL FOOTPRINT OF SEWER
ROCK IS 26.6FT X 52FT (1,385 SQ FT) OR 0.32 GAL/DAY/SQ FT WHICH IS
BETTER THAN THE RECOMMENDED 0.4 GAL/DAY/SQ FT.
· SEPTIC TANK SIZING: DEC REQUIREMENT FOR 3 BEDROOM HOME IS A
1,000 GAL SEPTIC TANK. UPSIZE AND USE A 1,500 GALLON INSULATED
INFILTRATOR SEPTIC TANK.
· NO ANTI-BUOYANCY ANCHORING SYSTEM IS NEEDED AT THIS SITE.
SITE SPECIFIC DESIGN AND CONSTRUCTION NOTES
· THE SEWER SERVICE LINE WILL BE 4” X 12” ARCTIC PIPE WITH 2” OF
BOARDSTOCK INSULATION OVER THE ARCTIC PIPE AND HAVE 4” OF
BOARDSTOCK INSULATION OVER THE SEPTIC TANK AND DRAINFIELD.
· THERE WILL BE A MINIMUM 4FT OF COVER OVER THE SEWER PIPE,
SEPTIC TANK, AND DRAINFIELD.
TH 92' (07-07-21)
0'-0"
4'-0"
8'-0"
2'-0"
6'-0"
10'-0"
LIGHT GRAY SILT MH
SILTY SAND SM/SP
WATER SEEPS @ 9'
ORGANICS
DARK BLUE SOIL SP
BOH @ 11'
WET MUDDY GRAVEL
LAYER GM/GW
1,000
COBBLES
Sample Esparza - Nome - 4 ft
Esparza - Nome - 8 ft
Sample Esparza - Nome - 4 ft
Esparza - Nome - 8 ft
D100 12.5 37.5
GRAVEL
coarse fine
10 1
GRAIN SIZE IN MILLIMETERS
SAND
coarse medium
USCS Classification Silty Sand (SM)
Silty Sand with Gravel (SM)
D60 0.15 0.37
D30 0.02 0.09
D10
0.01 fine
LL
NP
NP
%Gravel %Sand
PL
NP
NP
%Silt
PI
NP
NP
Cc 1.4 2.3
Cu 57.3 41.7
%Clay
0.1 0.01
SILT OR CLAY
0.001
U.S. SIEVE OPENING IN INCHES
1 1/26 4 3 2 1 3/4 1/2 3/8 1/4 #4 #10
U.S. SIEVE NUMBERS
#20 #40
HYDROMETER
#60 #100 #200
PE
R
C
EN
T
FI
N
ER
B Y
W
EI
G H
T
100'-0"
-2 2-
W
EL
L
R
EL
O C
AT
IO
N
04/21/2025
95'
TH
95'
97'
94'
0'
SSSSSSSSSSSSSS
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
ALDERS /LARGE BRUSH
ST 01
HB 01
W 0+
0+20 0+40 0+60 0+80 1+00
1+
1+
DB 01
94'
DB 03
AB
AB 01
DB 02
80'
90'
100'
110'
80'
90'
100'
110'
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50
AB
SS 01 SS 02
SS 03
ST
H B
AB
D B
EG
EG
: 9
9.
1'
EG
: 9
9.
2'
EG
: 9
8.
3'
EG
: 9
7.
4'
EG
: 9
6.
5'
EG
: 9
5.
5'
EG
: 9
4.
6'
EG
: 9
3.
7'
EG
: 9
3.
3'
EG
: 9
3.
7'
EG
: 9
3.
9'
EG
: 9
3.
2'
EG
: 9
3.
2'
EG
: 9
3.
3'
EG
: 9
3.
4'
EG
: 9
3.
4'
FG
FG
FG
FG
FG
FG
: 9
6.
9'
FG
: 9
6.
8'
FG
: 9
6.
7'
FG
: 9
6.
6'
FG
: 9
6.
5'
FG
: 9
6.
5'
FG
: 9
5.
0'
FG
: 9
5.
0'
FG
: 9
5.
0'
FG
: 9
5.
0'
FG
: 9
5.
0'
FG
: 9
3.
6'
D B
SS 04
SEWER SERVICE
ID
SS 01
SS 02
SS 03
SS 04
START
0+01
0+11
0+90
1+11
END
0+11
0+76
1+10
1+13
LENGTH
10 LF
65 LF
20 LF
2 LF
SLOPE
2.8%
2.8%
2.0%
2.0%
DESCRIPTION
4" x 12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200 .
4" x 12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200
4" x 12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200
4" x 12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200
MAJOR STRUCTURES
ID
AB 01
HB 01
ST 01
DB 01
DB 02
DB 03
STATION
0+01
0+11
0+83
1+10
1+11
1+13
DESCRIPTION
ARCTIC BOX, SEE SSSD-304
4" 45° ARCTIC BEND, SEE SSSD-200
1500 GAL INFILTRATOR SEPTIC TANK, SEE SSSD-521 .
4HD DISTRIBUTION BOX, SEE SSSD-600
9HD DISTRIBUTION BOX, SEE SSSD-600
9HD DISTRIBUTION BOX, SEE SSSD-600
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
HORZ. SCALE
VERT. SCALE
PLAN AND PROFILEA1
1" = 10' 1" = 10'
HOUSE
FF=103.4'
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STSITE_SEsparza.dwg LAYOUT: DSGN PRINTED: 1/6/2023 12:22:06 PM
0 1"
TOTAL SHEETSOF
C-102 7 9
MY
RS
KS
AKA-21-OME
SHANTAH ESPARZA
DESIGN PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
3 4
A
B
5:1
IMPORTANT !!!
SEE DETAIL FOR SEPTIC SYSTEM
INSTALLATION AND MATERIALS C
A
DEF
B
SWING TIE TABLE
DESC DSGN AB DESC DSGN AB
ST RISER I 64' DF PORT II 108'
ST RISER I 62' DF PORT II 100'
ST RISER II 74' DF PORT III 111'
ST RISER II 72' DF PORT III 113'
DF PORT I 87' DF PORT IV 92'
DF PORT I 78' DF PORT IV 95'
A 1 A 4
B 1 B 4
A 2 A 5
B 2 B 5
A 3 A 6
B 3 B 6
C
H
AM
BE
R
S;
R O
W S
O F
C
H
AM
BE
R
S (5
S
F)
7.
3'
SHED
DRIVEWAY
SHOP
CAUTION:
OVERHEAD
ELECTRIC
2 BEDROOMS
FF=103.4'
CABIN
.0
GRADING TABLE
ID DESCRIPTION VOL (CuYd) ELEV
CUT 617 -
FILL 287 95'
DRAINFIELD INFILTRATORS CHAMBERS 44 90'
DRAINFIELD 2' COARSE SEWER ROCK 126 88'
DRAINFIELD 2' COARSE SAND 126 86'
SEPTIC TANK 15 88'
SEPTIC TANK 2' SAND BEDDING 11 86'
NET VOLUME A - (B+C+D+E+F) -35 -
- VALUES ARE ESTIMATED | EXPANSION & COMPACTION NOT FACTORED IN
- NEGATIVE VOLUME = EXCESS SOIL | POSITIVE VOLUME = SOIL NEEDED
A
B
C
D
E
F
CONTRACTOR AS-BUILTS:
COVER OVER SEWER SERVICE LINE:
SEPTIC TANK INVERT IN:
SEPTIC TANK INVERT OUT:
COVER OVER SEPTIC TANK:
COVER OVER CHAMBERS/ DRAINFIELD:
26.7'
0 10' 20'
BOH @ 82'
6.
0'
TEST HOLE
21.5'
C
H
AM
BE
R
S;
R O
W S
O F
C
H
AM
BE
R
S (5
S
F)
VIEW 1
C-104
VIEW 1
VIEW 2
C-104
VIEW 2
NOTES:
1. TIE IN TO EXISTING WASTEWATER PLUMBING AND INSTALL INSULATED
UTILIDOR AROUND PIPE, MAKE SURE EXISTING WASTEWATER
PLUMBING IS SLOPING DOWNWARD AT 2%TO CONNECTION POINT.
2. THERE ARE THREE WELLS ON THIS PROPERTY.
3. UNUSED WELL #1 TO BE ABANDONED.
4. UNUSED WELL #2 TO BE ABANDONED.
5. EXISTING WELL #3 WILL BE CONVERTED TO AN ARCTIC CIRCULATING
WELL.
1 3
OPEN
CRAWL
SPACE
DECK
EXISTING LIFEWATER TREATMENT
SYSTEM TO BE RELOCATED TO
ANOTHER AREA- SEE HOMEOWNER
FOR LOCATION
5 OF 36 TOTAL SHEETS
INSTALL NEW WELL
INSTALL
NEW
BOLLARDS
(TYP OF 2)
R=100FT
A
B
67'
77'
77'
86'
90'
88'
111'
109'
115'
128'
95''
111'
-2 2-
W
EL
L
R
EL
O C
AT
IO
N
100'-0"
UNUSED WELL #3 TO BE ABANDONED.
C
D
WELL #3
WELL #2
WELL #4
WELL #1
11'
21'
C
D
WELL
WELL
SWING TIE TABLE
DESC DSGN AB
WSL APPROX 10FT
NOTE: DECKS HAVE
BEEN REMOVED
5 OF 37 TOTAL SHEETS
P
P P
P P
P
P
P
P
P
P
P
P
EM
X
X
X
X
X
X
X
X
SP
V
V
CO
SS
SS
ST
ST
W
FT
91'
92'
TH
91'
AB
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
SITE PLANA1 1" = 20'
331 LESTER BENCH ROAD, NOME AK 99762 PO BOX 1853
LOT 1A FLAT CREEK SUBD, PLAT 96-12 CAPE NOME RECORDING DISTRICT
LAT: N 64° 32' 08.35" LONG: W 165° 24' 06.09"; ± 28,688 SF (± 0.66 AC)
LE
ST
ER
B
EN
C
H R
O A
D
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STSITE_BGologergen-Tran.dwg LAYOUT: SITE PRINTED: 1/6/2023 12:22:09 PM
0 1"
TOTAL SHEETSOF
C-103 4 9
MY
RS
KS
AKA-21-OME
BRENDON
GOLOGERGEN-TRAN
SITE PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
SCOPE OF WORK
· INSTALL NEW SEPTIC SYSTEM TO REPLACE EXISTING FAILED SEPTIC
SYSTEM.
· INSTALL NEW INSULATED UTILIDOR FOR SEWER PIPING UNDER THE
HOUSE TO REPLACE EXISTING FIBERGLASS BATT WRAPPED SEWER
PIPING.
· INSTALL NEW ARCTIC BOX WITH WINDOW WELL. SEE NOTES ABOUT
WINDOW WELL.
· INSTALL NEW SEWER SERVICE LINE. 4” X 12” ARCTIC PIPE, WITH 2” OF
BOARDSTOCK INSULATION OVER PIPE, AND CONNECT TO EXISTING
SEWER SERVICE LINE.
· INSTALL NEW 1,500 GALLON INSULATED POLYETHYLENE INFILTRATOR
SEPTIC TANK, WITH 4” OF BOARDSTOCK INSULATION OVER TANK, AND
SEPTIC TANK ANCHORS.
· INSTALL NEW INSULATED RESIDENTIAL EFFLUENT PUMPING STATION
(REPS) UNIT
§ PROVIDE A 1/2 HP SUBMERSIBLE SEWAGE (EFFLUENT) PUMP
CAPABLE OF DELIVERING
§ 40 GPM @ 39 FT OF HEAD. (LIBERTY EFFLUENT PUMP, FL50)
· INSTALL NEW ANCHOR SYSTEM FOR THE SEPTIC TANK.
· INSTALL NEW PRESSURE DOSING EFFLUENT MOUND DRAINFIELD
SYSTEM, WITH 4” OF BOARDSTOCK INSULATION OVER CHAMBERS.
§ MOUND SYSTEM CONTAINS:
§ 6 ROWS OF 9 CHAMBERS, FOR A TOTAL OF 54 CHAMBERS AND 611
SQ FT OF TREATMENT AREA (DISTRIBUTION PIPING IS COVERED
WITH INFILTRATOR CHAMBERS, GEOTEXTILE, AND BOARDSTOCK
INSULATION).
· PUMP-OUT, LIME, ABANDON AND CRUSH IN PLACE THE EXISTING
SEPTIC TANK. ABANDON EXISTING DRAINFIELD IN-PLACE, REMOVE
MONITORING PORTS. COMPACT, LEVEL AND LANDSCAPE AREA.
· FINAL LANDSCAPING: COMPACT, LEVEL, GRASS SEED, AND FERTILIZE
AREA. CLEAN UP SITE. ENSURE DRAINAGE DOES NOT POOL UP ALONG
SEPTIC SYSTEM. MOUND OVER SERVICE LINE, SEPTIC TANK, REPS UNIT,
AND DRAINFIELD TO COMPENSATE FOR SETTLEMENT. ENSURE
DRAINAGE DOES NOT RUN TOWARD THE HOUSE OR STRUCTURES ON
PROPERTY.
ABSORPTION FIELD DESIGN CRITERIA
· 4 BEDROOM HOUSE
· DESIGN FLOW RATE: 150 GAL/DAY/BEDROOM
· TOTAL DESIGN FLOW: 600 GAL/DAY
· SOIL TYPE @ 4FT IS: POORLY GRADED GRAVEL W/ SILT - USCS
CLASSIFICATION: GP-GM
· SOIL TYPE @ 8FT IS: SILTY GRAVEL - USCS CLASSIFICATION: GM
· TEST HOLE DEPTH WAS 10.5FT.
· IMPERMEABLE LAYER IS ASSUMED TO BE 10.5FT.
· GROUNDWATER ENCOUNTERED AT 7.5FT.
· A PERCOLATION TEST WAS INCONCLUSIVE DUE TO A 0.04 MIN/IN
PERCOLATION RATE AND THE WATER IN THE TEST HOLE COULD NOT
GET HIGHER THAN 2IN DURING THE TEST.
· THE LOADING RATE FOR GP SOILS IS 150 SQ FT/ BEDROOM.
· DESIGN WILL BE BED-STYLE DRAINFIELD (SOIL ABSORPTION FIELD)
· IT WILL INCLUDE 2FT OF 3” MINUS COARSE-GRADED SEWER ROCK
· THE SYSTEM WILL HAVE 2FT OF COARSE-GRADED FILTER SAND DUE
THE PERCOLATION RATE AND GROUNDWATER AT 7.5FT IN THE TEST
HOLE.
· IT WILL INCLUDE UTILIZING PERFORATED PIPE, CHAMBERS,
GEOTEXTILE FABRIC, AND BOARDSTOCK.
· THE PRESSURE DISTRIBUTION PIPING WILL BE PROTECTED WITH THE
USE OF INFILTRATOR CHAMBERS, THAT WILL PROTECT THE DISCHARGE
PIPING FROM CLOGGING AND PROVIDE VOID SPACE THAT CAN HANDLE
SEVERE PEAK FLOW EVENTS, AND HELPS WITH THE DISTRIBUTION OF
THE WASTEWATER. IT ALSO EXTENDS THE LIFE OF THE DRAINFIELD.
· ELEVATION OF EXISTING GROUND AT TEST HOLE: 91 FT ASL (ABOVE
SEA LEVEL)
· INFILTRATION AREA REQUIRED = 4 BEDROOMS * 150 SQ FT
/BEDROOM/DAY = 600 SQ FT
· CHAMBER AREA PER UNIT IS: 2.83FT X 4FT LONG = 11.32 SQ
FT/CHAMBER
· # OF CHAMBERS REQUIRED IS = 600 SQ FT / 11.32 SQ FT/CHAMBER = 53
CHAMBERS
· USE 54 CHAMBERS WITH 6 ROWS OF 9 CHAMBERS PER ROW (611 SQ FT)
· FINAL LOADING RATE IS: 600 GAL/DAY / 611 SQ FT = 0.98 GAL/DAY/SQ FT
· 0.98 GAL/DAY/SQ FT IS CLOSE TO THE E.J. TYLER RECOMMENDED 0.8
GAL/DAY/SQ FT FOR COARSE MATERIAL FOR BOD5 LOADING GREATER
THAN 30MG/L WASTEWATER STRENGTH. ACTUAL FOOTPRINT OF
SEWER ROCK IS 16.9FT X 36FT (839 SQ FT) OR 0.71 GAL/DAY/SQ FT
WHICH IS BETTER THAN THE RECOMMENDED 0.8 GAL/DAY/SQ FT.
· SEPTIC TANK SIZING: DEC REQUIREMENT FOR 4 BEDROOM HOME IS A
1,250 GAL SEPTIC TANK. UPSIZE AND USE A 1,500 GALLON INSULATED
POLYETHYLENE INFILTRATOR SEPTIC TANK.
· THE PUMP CHAMBER WILL BE A SEPARATE PUMP BASIN, USE LIBERTY
EFFLUENT INSULATED PUMP BASIN, 36” DIAMETER X 11FT LONG.
DESIGN OF PRESSURE DISTRIBUTION LATERALS AND PUMP DESIGN
· USE 2” SDR 11 HDPE PRESSURE SEWER FORCE MAIN, RUN INSIDE
4”X12” INSULATED ARCTIC PIPE, FROM THE LIFT STATION TO THE
HEADER ASSEMBLY OF THE PRESSURE MOUND DRAINFIELD (6 FT).
· TRANSITION TO 1½” SCH 40 PVC FOR HEADER AND DISTRIBUTION
LATERALS (230FT)
· THERE ARE 6 LATERALS OF 9 CHAMBERS, 16.9FT WIDE BY 36FT LONG
(611 SQ FT)
· THERE ARE 54 CHAMBERS (@11.32SQ FT/CHAMBER = 611 SQ FT)
· USE ¼” CLEAN DRILLED HOLES EVERY 24”, POINTED DOWNWARD
(6-O'CLOCK) AND HUNG UNDER THE CHAMBER. THE SYSTEM NEEDS TO
DRAIN AND DRAINBACK TO THE PUMP CHAMBER FOR FREEZE
PROTECTION.
· THERE ARE 2 HOLES PER CHAMBER OR 108 HOLES TOTAL, AND/OR 18
ORIFICES PER LATERAL WITH 6 LATERALS.
· ONE UPWARD FACING ¼” ORIFICE WILL NEED TO DRILLED AT THE END
OF EACH LATERAL, TO ALLOW AIR INTO THE SYSTEM AND THE
LATERALS TO FULLY DRAIN.
· EACH HOLE WILL COVER/PROVIDE: 611 SQ FT / 108 HOLES = 5.66 SQ FT
PER ORIFICE OF APPLICATION
· E. J. TYLER RECOMMENDS ABOUT A MAXIMUM TREATMENT AREA OF 6
SQ FT PER ORIFICE, SO OKAY.
· THEY RECOMMEND A LATERAL DISTAL PRESSURE OF 2.5FT OF HEAD
PRESSURE AT END OF LATERAL (OR ABOUT 1.1PSI)
· PER E.J. TYLER, TABLE A-1 DISCHARGE RATE FOR ORIFICES, ¼” ORIFICE
@ 2.5' DISTAL PRESSURE = 1.17 GPM PER ORIFICE
· IDEAL FLOW RATE TO MAINTAIN PRESSURE AT FAR END OF
DISTRIBUTION SYSTEM = 1.17 GPM * 108 ORIFICES = 126 GPM
· STATIC ELEVATION HEAD = 6 FT
· ASSUMED HEADLOSS = 33 FT
· TOTAL DYNAMIC HEAD = 39 FT
· ACTUAL FLOW RATE OF SEWAGE PUMP SELECTED IS:
§ LIBERTY EFFLUENT PUMP, FL50, ½ HP PUMP. BASED ON PUMP
CURVE AT 39 FT OF HEAD PUMP PRODUCES 40 GPM
§ 40 GPM IS BELOW THE 210.6 GPM NEEDED TO MAINTAIN AN IDEAL
2.5 PSI, AT EACH ORIFICE, SO IDEAL PRESSURE WILL NOT BE
MAINTAINED TO THE FAR END OF THE DRAINFIELD. HOWEVER,
ORIFICES ARE TURNED DOWN, SO DISTRIBUTION LATERALS WILL
STILL DRAIN BY GRAVITY, EVEN UNDER 0 PSI PRESSURE.
§ RESULT WILL BE A LITTLE UNEVEN DISTRIBUTION WITHIN THE
DRAINFIELD, BUT KEEPS THE PUMP SIZE REASONABLE FOR
OPERATIONAL COSTS AND DOSING. IT IS NOT IDEAL, BUT WILL
WORK. POSITIVE PRESSURE WILL STILL BE MAINTAINED.
· 40 GPM / 108 ORIFICES = 0.37 GPM/ORIFICE (MUCH LESS THAN THE
RECOMMENDED 1.17 GPM/ORIFICE, BUT ACCEPTABLE)
DOSING OF DISTRIBUTION SYSTEM
· VOLUME OF PUMPING CHAMBER
§ 36” DIAMETER, SAY FLOATS ARE 4 FT APART
§ PUMP VOLUME IS ((3.14)*(D^2)/4) *(L) *(7.48 GAL/CU FT) =
((3.14)*(3FT^2)/4)*(2FT)*(7.48 GAL/CU FT) = 106 GALLONS.
§ SET PUMP-OFF FLOAT AT 1FT FROM BOTTOM OF TANK, AND
PUMP-ON WILL BE ABOUT 3FT FROM THE BOTTOM OF TANK,
RESULTING IN A PUMP VOLUME OF ABOUT 106 GALLONS
· PUMP RUN TIME = 106 GAL/CYCLE / 40 GAL/MIN = 2.65 MIN/CYCLE
· PUMP CYCLE TIME = 600 GPD / 106 GAL/CYCLE = 5.66 CYCLES PER DAY
(ACCEPTABLE)
· THE REPS PUMP WILL RUN FOR 2.65 MIN/CYCLE * 5.66 CYCLES/DAY =
15.0 MINUTES PER DAY
§ A ½ HP PUMP USES ROUGHLY 1,380 WATTS TO RUN AND WOULD
USE 345 WATT-HOURS PER DAY. EQUIVALENT TO A 65 WATT
LIGHT BULB RUNNING FOR 5.3 HOURS PER DAY.
SITE SPECIFIC DESIGN AND CONSTRUCTION NOTES
· THE SYSTEM MUST DRAINBACK INTO THE PUMP CHAMBER AFTER EACH
PUMP CYCLE, SO THE PRESSURE LINE MUST SLOPE BACK TO THE PUMP
CHAMBER AND A 1/4” WEEP HOLE DRILLED UPSTREAM OF THE CHECK
VALVE, BUT DOWNSTREAM OF BALL VALVE. AN UPWARD FACING
ORIFICE WILL NEED TO BE INSTALLED AT THE END OF THE LATERAL TO
ALLOW AIR INTO THE SYSTEM TO DRAIN.
· AS THIS SYSTEM IS REPS UNIT, AND PRESSURE DISTRIBUTION MOUND
DRAINFIELD, THE START-UP OF THE FACILITY SHALL BE COORDINATED
AND ARRANGED WITH THE PROJECT MANAGER AND ENGINEER.
SUCCESSFUL SYSTEM START-UP, TROUBLESHOOTING, AND
ADDRESSING ANY INSPECTION CONCERNS, MUST ALL BE COMPLETED
BEFORE FINAL CONTRACT PAYMENT.
· THE SEWER SERVICE LINE WILL BE 4” X 12” ARCTIC PIPE WITH 2” OF
BOARDSTOCK INSULATION OVER THE ARCTIC PIPE AND HAVE 4” OF
BOARDSTOCK INSULATION OVER THE SEPTIC TANK, REPS UNIT, AND
DRAINFIELD.
· THE 2” HDPE PRESSURE LINE, FROM THE LIFT STATION TO THE HEADER
PIPING (AND HEADER), WILL BE INSIDE A 4” X 12” INSULATED ARCTIC
CARRIER PIPE AND COVERED WITH 2” OF BOARDSTOCK INSULATION.
· THERE WILL BE A MINIMUM 4FT OF COVER OVER THE SEWER PIPE,
REPS UNIT, SEPTIC TANK, AND DRAINFIELD.
· NEW WINDOW WELL TO BE GALVANIZED STEEL (50" W X 36" D X 36" H).
THE WINDOW WELL WILL ALLOW FOR EASIER ACCESS TO THE ARCTIC
BOX AT EG.
PLAN AND PROFILE,
SEE SHEET C-104
0 20' 40'10'
TH 90'-6" (7-26-2021)
0'-0"
4'-0"
8'-0"
2'-0"
6'-0"
10'-0"
MINUS, GRAY, GP / GW
GW
GROUNDWATER @ 7.5'
ORGANICS
SILTY CLUMPS IN
GRAVEL GW / GM
SILTY GRAVEL GM
BOH @ 10.5'
1,000
COBBLES
Sample Tran - Nome - 4 ft
Tran - Nome - 8 ft
Sample Tran - Nome - 4 ft
Tran - Nome - 8 ft
D100
GRAVEL
coarse fine
10 1
GRAIN SIZE IN MILLIMETERS
SAND
coarse medium
USCS Classification Poorly Graded Gravel with Silt (GP-GM)
Silty Gravel (GM)
D60 17.66 21.82
D30 9.49 5.41
D10 0.12 0.01 fine
LL
NP
NP
%Gravel %Sand
PL
NP
NP
%Silt
PI
NP
NP
Cc 42.6 92.7
Cu 147.5 1507.3
%Clay
0.1 0.01
SILT OR CLAY
0.001
U.S. SIEVE OPENING IN INCHES
1 1/26 4 3 2 1 3/4 1/2 3/8 1/4 #4 #10
U.S. SIEVE NUMBERS
#20 #40
HYDROMETER
#60 #100 #200
PE
R
C
EN
T
FI
N
ER
B Y
W
EI
G H
T
0 38 76 114 151 189 227 265 303 341 379
0 10 20 30 40 50 60 70 80 90 100
H
EA
D (F
T)
H
EA
D (M
ET
ER
S)
FLOW (LITERS PER MINUTE)
FLOW (LITERS PER MINUTE)
FL50 SERIES 1/25 HP SUBMERSIBLE EFFLUENT PUMP
100'R WELL CLEARANCE
6 OF 36 TOTAL SHEETS
6 OF 37 TOTAL SHEETS
P
P
P
P
P
P
P P
P P
P P
PEM
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X X
V
V
CO
SS
SS
SS
SS
ST
ST
FT
92'
TH
91'
ST 01
AB
0+00
0+
0+
0+600+801+001+20
ST
70'
80'
90'
100'
70'
80'
90'
100'
-0+100+000+100+200+300+400+500+600+700+800+901+001+101+201+30
EG
: 9
1.
6'
EG
: 9
1.
9'
EG
: 9
1.
2'
EG
: 9
1.
0'
EG
: 9
0.
4'
EG
: 9
0.
3'
EG
: 9
0.
7'
EG
: 9
0.
8'
EG
: 9
0.
8'
EG
: 9
0.
9'
EG
: 9
0.
9'
EG
: 9
0.
9'
EG
: 9
0.
9'
EG
: 9
0.
9'
EG
: 9
1.
0'
FG
FG
FG
: 9
1.
8'
FG
: 9
1.
6'
FG
: 9
1.
4'
FG
: 9
1.
2'
FG
: 9
1.
3'
FG
: 9
1.
5'
FG
: 9
1.
9'
FG
: 9
4.
0'
FG
: 9
4.
0'
FG
: 9
4.
0'
FG
: 9
4.
0'
FG
: 9
2.
1'
FG
AB
SS 01SS 02
SS 03
AB
VB
VB
T
SS 04
SS 05
HOUSE
MAJOR STRUCTURES
ID
AB 01
ST 01
VB 01
VB 02
T 01
STATION
0+00
0+59
0+73
0+74
0+75
DESCRIPTION
ARCTIC BOX, SEE SSSD-304
1,500 GALLON INFILTRATOR SEPTIC TANK AND
LIBERTY PUMP LIFT STATION, SEE SSSD-555 .
4" 45° ARCTIC VERT BEND, SEE SSSD-200
4" 45° ARCTIC VERT BEND, SEE SSSD-200
2" ARCTIC TEE DRAINFIELD CONNECTION, SEE SSSD-642
SEWER SERVICE
ID
SS 01
SS 02
SS 03
SS 04
SS 05
START
0+00
0+66
0+71
0+73
0+74
END
0+51
0+68
0+73
0+74
0+75
LENGTH
51 LF
2 LF
2 LF
3 LF
1 LF
SLOPE
2.0%
2.0%
0.0%
-100.0%
0.0%
DESCRIPTION
4" x 12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200 .
4" x 12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200
2" HDPE INSIDE AN INSULATED
4" x 12" AGP, SEE SSSD-200
2" HDPE INSIDE AN INSULATED
4" x 12" AGP, SEE SSSD-200
2" HDPE INSIDE AN INSULATED
4" x 12" AGP, SEE SSSD-200
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
HORZ. SCALE
VERT. SCALE
PLAN AND PROFILEA1
1" = 10' 1" = 10'
SWING TIE TABLE
DESC DSGN AB DESC DSGN AB
ST RISER I 49' DF PORT I 64'
ST RISER I 78' DF PORT II 60'
ST RISER II 50' DF PORT II 79'
ST RISER II 74' DF PORT III 80'
LS 51' DF PORT III 82'
LS 73' DF PORT IV 69'
DF PORT I 46' DF PORT IV 68'
A 1 B 4
B 1 A 5
A 2 B 5
B 2 A 6
A 3 B 6
B 3 A 7
A 4 B 7
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STSITE_BGologergen-Tran.dwg LAYOUT: DSGN PRINTED: 1/6/2023 12:22:13 PM
0 1"
TOTAL SHEETSOF
C-104 5 9
MY
RS
KS
AKA-21-OME
BRENDON
GOLOGERGEN-TRAN
DESIGN PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
GRADING TABLE
ID DESCRIPTION VOL (CuYd) ELEV
CUT 311 -
FILL 160 94'
DRAINFIELD INFILTRATORS CHAMBERS 24 89'
DRAINFIELD 2' COARSE SEWER ROCK 65 87'
DRAINFIELD 2' COARSE SAND 65 85'
SEPTIC TANK / LIFT STATION 18 84'
SEPTIC TANK 2' SAND BEDDING 14 81'
NET VOLUME A - (B+C+D+E+F) -26 -
- VALUES ARE ESTIMATED | EXPANSION & COMPACTION NOT FACTORED IN
- NEGATIVE VOLUME = EXCESS SOIL | POSITIVE VOLUME = SOIL NEEDED
A
B
C
D
E
F
IMPORTANT !!!
SEE DETAIL FOR SEPTIC SYSTEM
INSTALLATION AND MATERIALS
A
B
.0
42.0'
2:1
1:
C
A
D E F
CAUTION !!!
AVOID BACKYARD FENCE
54 CHAMBERS; 6 ROWS
OF 9 CHAMBERS (611 SF)
GW @ 83.5'
4.
0'
CONTRACTOR AS-BUILTS:
COVER OVER SEWER SERVICE LINE:
SEPTIC TANK INVERT IN:
SEPTIC TANK INVERT OUT:
COVER OVER SEPTIC TANK:
COVER OVER CHAMBERS/ DRAINFIELD:
B
21.5'
7.
3'
ABANDON EXISTING
SEPTIC SYSTEM PER
ADEC GUIDELINES
AND REMOVE ABOVE
GRADE PIPES
LESTER BENCH RO
AD
EXC
TEST
HOLE
2 STORY
4 BEDROOM
FF=94'
DRIVEWAY
0 10' 20'
CAUTION !!!
OVERHEAD POWER LINES
4.2'W x 3'D x 3'H
WINDOW WELL
100' WELL CLEARANCE
INSTALL SEPTIC
TANK ANCHOR DUE
TO GROUNDWATER
UNHEATED
CRAWLSPACE
CRUSH AND
ABANDON IN PLACE
EXISTING SEPTIC
TANK PER ADEC
WARNING !!!
DO NOT EXCAVATE OR FILL
BEYOND PROPERTY BOUNDARY
WATER STORAGE
CONNEX
7 OF 36 TOTAL SHEETS
7 OF 37 TOTAL SHEETS
45'
EM
SP
45'
45'
45'50'
TH
AB
B B
WS
W
AB
1,000
COBBLES
Sample Sparks - Nome - 4 ft
GRAVEL
coarse fine
10 1
GRAIN SIZE IN MILLIMETERS
SAND
coarse medium
USCS Classification Well Graded Gravel with Sand (GW)
Sample Sparks - Nome - 4 ft
D100
D60
26.15 9.84
D30 D10 1.25 fine
LL
NP
%Gravel %Sand 81 15
PL
NP
%Silt
PI
NP
Cc 3.0
Cu 21.0
%Clay
0.1 0.01
SILT OR CLAY
0.001
U.S. SIEVE OPENING IN INCHES
1 1/26 4 3 2 1 3/4 1/2 3/8 1/4 #4 #10
U.S. SIEVE NUMBERS
#20 #40
HYDROMETER
#60 #100 #200
PE
R
C
EN
T
FI
N
ER
B Y
W
EI
G H
T
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
SITE PLANA1 1" = 20'
NOME, ALASKA 99762 PO BOX 1343
LOTS 11 & 12, BLOCK 113, NOME TOWNSITE
64°29'48.95"N, 165°22'33.50"W
PLAN AND PROFILE,
SEE SHEET C-106EAST 6TH
AVE
SCOPE OF WORK
SEWER
· RELOCATE EXISTING CONNEX LOCATED TO THE NORTH (NORTHEAST)
OF THE HOUSE, COORDINATE WITH HOMEOWNER ON NEW LOCATION.
· INSTALL NEW SEPTIC SYSTEM.
· INSTALL NEW INSULATED UTILIDOR FOR SEWER PIPING UNDER THE
HOUSE.
· INSTALL NEW ARCTIC BOX TO CONNECT UTILIDOR AND ARCTIC PIPE.
· INSTALL NEW SEWER SERVICE LINE. 4” X 12” ARCTIC PIPE, WITH 2” OF
BOARDSTOCK INSULATION ALL AROUND THE PIPE DUE TO
PERMAFROST, AND CONNECT TO NEW SEPTIC TANK.
· INSTALL NEW 1,000 GALLON INSULATED INFILTRATOR SEPTIC TANK,
WITH 4” OF BOARDSTOCK INSULATION ALL AROUND TANK, WITH 12” OF
BEDDING PLUS 4” OF BOARDSTOCK PLUS ANOTHER 12” OF BEDDING
UNDER TANK TO PROTECT THE PERMAFROST.
· INSTALL NEW INSULATED RESIDENTIAL EFFLUENT PUMPING STATION
(REPS) UNIT
§ PROVIDE A 1/2 HP SUBMERSIBLE SEWAGE (EFFLUENT) PUMP
CAPABLE OF DELIVERING
§ 46 GPM @ 35 FT OF HEAD. (LIBERTY EFFLUENT PUMP, FL50)
· INSTALL NEW PRESSURE DOSING EFFLUENT MOUND DRAINFIELD
SYSTEM, WITH 4” OF BOARDSTOCK INSULATION OVER CHAMBERS.
§ MOUND SYSTEM CONTAINS:
§ 4 ROWS OF 7 CHAMBERS, FOR A TOTAL OF 28 CHAMBERS AND 316
SQ FT OF TREATMENT AREA (DISTRIBUTION PIPING IS COVERED
WITH INFILTRATOR CHAMBERS, GEOTEXTILE, AND BOARDSTOCK
INSULATION).
· FINAL LANDSCAPING: COMPACT, LEVEL, GRASS SEED, AND FERTILIZE
AREA. CLEAN UP SITE. ENSURE DRAINAGE DOES NOT POOL UP ALONG
SEPTIC SYSTEM. MOUND OVER SERVICE LINE, SEPTIC TANK, REPS UNIT,
AND DRAINFIELD TO COMPENSATE FOR SETTLEMENT. ENSURE
DRAINAGE DOES NOT RUN TOWARD THE HOUSE OR STRUCTURES ON
PROPERTY.
WATER
· INSTALL NEW ARCTIC RESIDENTIAL WELL.
§ A CIRCULATING SYSTEM WILL BE REQUIRED.
· INSTALL 2 BOLLARDS ALONG ROADWAY TO PROTECT WELL.
· INSTALL NEW ARCTIC BOX TO WATER PENETRATION POINT ON THE
HOUSE.
· INSTALL NEW WATER SERVICE LINE.
§ A CIRCULATING SYSTEM IS NEEDED AND THE WATER SERVICE
LINE WILL HAVE AN ADDITIONAL 1” RETURN LINE WITH THE 1”
SUPPLY LINE IN PEX OR HDPE, WITH A 1” PEX HEAT TRACE
CARRIER PIPE, CONTAINING HEAT TRACE, ALL INSIDE A 4”X12”
ARCTIC CARRIER PIPE.
§ THE CIRCULATING SYSTEM REQUIRES A CIRCULATION PUMP
INSIDE THE HOUSE.
§ INSTALL HEAT TRACE AND TIMER CONTROLS ON WATER SERVICE
LINE.
§ INSTALL SHORT RUN (10') OF HEAT TAPE AND CONTROLS FOR
ARCTIC BOX (IN ADDITION TO LONG RUN ON WATER SERVICE
LINE).
§ HEAT TRACE CONTROLS WILL NEED TO BE INSIDE THE HOUSE.
· INSTALL NEW WELL PUMP AND PRESSURE SYSTEM.
· INSTALL TWO NEW BOLLARDS TO PROTECT WELL HEAD FROM STREET
TRAFFIC.
· OPERATE WELL SYSTEM TO ENSURE THE SYSTEM IS FULLY
OPERATIONAL.
· OBTAIN WATER SAMPLE AT PRESSURE TANK AFTER WELL IS FULLY
OPERATIONAL.
· MOUND OVER SERVICE LINE TO COMPENSATE FOR SETTLEMENT.
ENSURE DRAINAGE DOES NOT RUN TOWARD THE HOUSE OR
STRUCTURES ON PROPERTY.
ABSORPTION FIELD DESIGN CRITERIA
· 1 BEDROOM HOUSE; UPSIZE AND USE 2 BEDROOMS FOR FLOW RATE TO
BE MORE CONSERVATIVE
· DESIGN FLOW RATE: 150 GAL/DAY/BEDROOM
· TOTAL DESIGN FLOW: 300 GAL/DAY
· SOIL TYPE @ 4FT IS: WELL GRADED GRAVEL WITH SAND - USCS
CLASSIFICATION: GW
· SOIL TYPE @ 8FT IS: NO SAMPLE COLLECTED AT 8FT DUE TO
PERMAFROST AT 5FT
· TEST HOLE DEPTH WAS 5FT DUE TO PERMAFROST.
· IMPERMEABLE LAYER IS 5FT.
· WATER SEEPS ENCOUNTERED AT 4.5FT.
· A PERCOLATION TEST WAS NOT PERFORMED DUE TO THE
PERMAFROST BEING ENCOUNTERED AT 5FT IN THE TEST HOLE.
· THE LOADING RATE FOR GW SOILS REQUIRES A LOADING RATE IS 150
SQFT/BR ASSUMING A PERCOLATION TEST FASTER THAN 1 MIN/IN TO BE
MORE CONSERVATIVE.
· DESIGN WILL BE BED-STYLE DRAINFIELD (SOIL ABSORPTION FIELD)
· IT WILL INCLUDE 2FT OF 3” MINUS COARSE-GRADED SEWER ROCK.
· THE SYSTEM WILL HAVE 4FT OF COARSE-GRADED FILTER SAND DUE
THE PERMAFROST AT 5FT IN THE TEST HOLE.
· IT WILL INCLUDE UTILIZING PERFORATED PIPE, CHAMBERS,
GEOTEXTILE FABRIC, AND BOARDSTOCK.
· THE PRESSURE DISTRIBUTION PIPING WILL BE PROTECTED WITH THE
USE OF INFILTRATOR CHAMBERS, THAT WILL PROTECT THE DISCHARGE
PIPING FROM CLOGGING AND PROVIDE VOID SPACE THAT CAN HANDLE
SEVERE PEAK FLOW EVENTS, AND HELPS WITH THE DISTRIBUTION OF
THE WASTEWATER. IT ALSO EXTENDS THE LIFE OF THE DRAINFIELD.
· ELEVATION OF EXISTING GROUND AT TEST HOLE: 13 FT ASL (ABOVE
SEA LEVEL)
· INFILTRATION AREA REQUIRED = 2 BEDROOMS * 150 SQ FT
/BEDROOM/DAY = 300 SQ FT
· CHAMBER AREA PER UNIT IS: 2.83FT X 4FT LONG = 11.32 SQ
FT/CHAMBER
· # OF CHAMBERS REQUIRED IS = 300 SQ FT / 11.32 SQ FT/CHAMBER =
26.5 CHAMBERS
· USE 28 CHAMBERS WITH 4 ROWS OF 7 CHAMBERS PER ROW (316 SQ FT)
· FINAL LOADING RATE IS: 300 GAL/DAY / 316 SQ FT = 0.95 GAL/DAY/SQ FT
· 0.95 GAL/DAY/SQ FT IS CLOSE TO THE E.J. TYLER RECOMMENDED 0.8
GAL/DAY/SQ FT FOR COARSE SAND MATERIAL FOR BOD5 LOADING
GREATER THAN 30MG/L WASTEWATER STRENGTH. ACTUAL FOOTPRINT
OF SEWER ROCK IS 15.3FT X 32FT (490 SQ FT) OR 0.61 GAL/DAY/SQ FT
WHICH IS BETTER THAN THE RECOMMENDED 0.8 GAL/DAY/SQ FT.
· SEPTIC TANK SIZING: DEC REQUIREMENT FOR 2 BEDROOM HOME IS A
1,000 GAL SEPTIC TANK. USE A 1,000 GALLON INSULATED
POLYETHYLENE INFILTRATOR SEPTIC TANK.
· THE PUMP CHAMBER WILL BE A SEPARATE PUMP BASIN, USE LIBERTY
EFFLUENT INSULATED PUMP BASIN, 36” DIAMETER X 11FT LONG.
DESIGN OF PRESSURE DISTRIBUTION LATERALS & PUMP DESIGN
· USE 2” SDR 11 HDPE PRESSURE SEWER FORCE MAIN, RUN INSIDE
4”X12” INSULATED ARCTIC PIPE, FROM THE LIFT STATION TO THE
HEADER ASSEMBLY OF THE PRESSURE MOUND DRAINFIELD (21FT).
· TRANSITION TO 1½” SCH 40 PVC FOR HEADER AND DISTRIBUTION
LATERALS (121FT)
· THERE ARE 4 LATERALS OF 7 CHAMBERS, 11.3FT WIDE BY 28FT LONG
(316 SQ FT)
· THERE ARE 28 CHAMBERS (@11.32SQ FT/CHAMBER = 316 SQ FT)
· USE ¼” CLEAN DRILLED HOLES EVERY 24”, POINTED DOWNWARD
(6-O'CLOCK) AND HUNG UNDER THE CHAMBER. THE SYSTEM NEEDS TO
DRAIN AND DRAINBACK TO THE PUMP CHAMBER FOR FREEZE
PROTECTION.
· THERE ARE 2 HOLES PER CHAMBER OR 56 HOLES TOTAL, AND/OR 14
ORIFICES PER LATERAL WITH 4 LATERALS.
· ONE UPWARD FACING ¼” ORIFICE WILL NEED TO DRILLED AT THE END
OF EACH LATERAL, TO ALLOW AIR INTO THE SYSTEM AND THE
LATERALS TO FULLY DRAIN.
· EACH HOLE WILL COVER/PROVIDE: 316 SQ FT / 56 HOLES = 5.66 SQ FT
PER ORIFICE OF APPLICATION
· E. J. TYLER RECOMMENDS ABOUT A MAXIMUM TREATMENT AREA OF 6
SQ FT PER ORIFICE, SO OKAY.
· THEY RECOMMEND A LATERAL DISTAL PRESSURE OF 2.5FT OF HEAD
PRESSURE AT END OF LATERAL (OR ABOUT 1.1PSI)
· PER E.J. TYLER, TABLE A-1 DISCHARGE RATE FOR ORIFICES, ¼” ORIFICE
@ 2.5' DISTAL PRESSURE = 1.17 GPM PER ORIFICE
· IDEAL FLOW RATE TO MAINTAIN PRESSURE AT FAR END OF
DISTRIBUTION SYSTEM = 1.17 GPM * 56 ORIFICES = 65.5 GPM
· STATIC ELEVATION HEAD = 12 FT
· ASSUMED HEADLOSS = 23 FT
· TOTAL DYNAMIC HEAD = 35 FT
· ACTUAL FLOW RATE OF SEWAGE PUMP SELECTED IS:
§ LIBERTY EFFLUENT PUMP, FL50, 1/2 HP PUMP. BASED ON PUMP
CURVE AT 35 FT OF HEAD PUMP PRODUCES 46 GPM
§ 46 GPM IS BELOW THE 65.5 GPM NEEDED TO MAINTAIN AN IDEAL
2.5 PSI, AT EACH ORIFICE, SO IDEAL PRESSURE WILL NOT BE
MAINTAINED TO THE FAR END OF THE DRAINFIELD. HOWEVER,
ORIFICES ARE TURNED DOWN, SO DISTRIBUTION LATERALS WILL
STILL DRAIN BY GRAVITY, EVEN UNDER 0 PSI PRESSURE.
§ RESULT WILL BE A LITTLE UNEVEN DISTRIBUTION WITHIN THE
DRAINFIELD, BUT KEEPS THE PUMP SIZE REASONABLE FOR
OPERATIONAL COSTS AND DOSING. IT IS NOT IDEAL, BUT WILL
WORK. POSITIVE PRESSURE WILL STILL BE MAINTAINED.
· 46 GPM / 56 ORIFICES = 0.82 GPM/ORIFICE (MUCH LESS THAN THE
RECOMMENDED 1.17 GPM/ORIFICE, BUT ACCEPTABLE)
DOSING OF DISTRIBUTION SYSTEM
· VOLUME OF PUMPING CHAMBER
§ 36” DIAMETER, SAY FLOATS ARE 4 FT APART
§ PUMP VOLUME IS ((3.14)*(D^2)/4) *(L) *(7.48 GAL/CU FT) =
((3.14)*(3FT^2)/4)*(1FT)*(7.48 GAL/CU FT) = 53 GALLONS.
§ SET PUMP-OFF FLOAT AT 1FT FROM BOTTOM OF TANK, AND
PUMP-ON WILL BE ABOUT 2FT FROM THE BOTTOM OF TANK,
RESULTING IN A PUMP VOLUME OF ABOUT 53 GALLONS
· PUMP RUN TIME = 53 GAL/CYCLE / 46 GAL/MIN = 1.15 MIN/CYCLE
· PUMP CYCLE TIME = 300 GPD / 53 GAL/CYCLE = 5.66 CYCLES PER DAY
(ACCEPTABLE)
· THE REPS PUMP WILL RUN FOR 1.15 MIN/CYCLE * 5.66 CYCLES/DAY = 6.5
MINUTES PER DAY
§ A 1/2 HP PUMP USES ROUGHLY 1,380 WATTS TO RUN AND WOULD
USE 149.7 WATT-HOURS PER DAY. EQUIVALENT TO A 65 WATT
LIGHT BULB RUNNING FOR 2.5 HOURS PER DAY.
SITE SPECIFIC DESIGN AND CONSTRUCTION NOTES
· THE SYSTEM MUST DRAINBACK INTO THE PUMP CHAMBER AFTER EACH
PUMP CYCLE, SO THE PRESSURE LINE MUST SLOPE BACK TO THE PUMP
CHAMBER AND A 1/4” WEEP HOLE DRILLED UPSTREAM OF THE CHECK
VALVE, BUT DOWNSTREAM OF BALL VALVE. AN UPWARD FACING
ORIFICE WILL NEED TO BE INSTALLED AT THE END OF THE LATERAL TO
ALLOW AIR INTO THE SYSTEM TO DRAIN.
· AS THIS SYSTEM IS REPS UNIT, AND PRESSURE DISTRIBUTION MOUND
DRAINFIELD, THE START-UP OF THE FACILITY SHALL BE COORDINATED
AND ARRANGED WITH THE PROJECT MANAGER AND ENGINEER.
SUCCESSFUL SYSTEM START-UP, TROUBLESHOOTING, AND
ADDRESSING ANY INSPECTION CONCERNS, MUST ALL BE COMPLETED
BEFORE FINAL CONTRACT PAYMENT.
· THE SEWER SERVICE LINE WILL BE 4” X 12” ARCTIC PIPE WITH 2” OF
BOARDSTOCK INSULATION ALL AROUND THE ARCTIC PIPE.
· THE SEPTIC TANK AND REPS UNIT TO HAVE 4” OF BOARDSTOCK
INSULATION ALL AROUND THE SEPTIC TANK AND REPS UNIT, AT THE
BOTTOM THERE WILL BE 12” OF BEDDING FOLLOWED BY 4” OF
BOARDSTOCK INSULATION FOLLOWED BY ANOTHER 12” OF BEDDING.
· THE 2” HDPE PRESSURE LINE, FROM THE LIFT STATION TO THE HEADER
PIPING (AND HEADER), WILL BE INSIDE A 4” X 12” ARCTIC CARRIER PIPE
AND COVERED WITH 2” OF BOARDSTOCK INSULATION.
· THE DRAINFIELD WILL BE COVER WITH 4” OF BOARDSTOCK INSULATION.
· THERE WILL BE A MINIMUM 4FT OF COVER OVER THE ARCTIC SEWER
PIPE, REPS UNIT, SEPTIC TANK, AND DRAINFIELD.
TH 66'-0" (7-6-2021)
0'-0"
4'-0"
2'-0" GW
FILL GRAVEL PAD
TUNDRA
WATER SEEPS @4.5'
FROZEN SOLID @5'
BOH @ 5'
0 38 76 114 151 189 227 265 303 341 379
0 10 20 30 40 50 60 70 80 90 100
H
EA
D (F
T)
H
EA
D (M
ET
ER
S)
FLOW (LITERS PER MINUTE)
FLOW (LITERS PER MINUTE)
FL50 SERIES 1/2 HP SUBMERSIBLE EFFLUENT PUMP
0 20' 40'10'
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\Nome\AKA-21-OME\CAD\Civil\OME-C-STSITE_SSparks.dwg LAYOUT: SITE PRINTED: 1/6/2023 12:22:16 PM
0 1"
TOTAL SHEETSOF
C-105 8 9
MY
RS
KS
AKA-21-OME
SHARON SPARKS SITE
PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
3688 OF 36 TOTAL SHEETS8 OF 37 TOTAL SHEETS
NOT SERVED UNDER
THIS PROJECT
45'
44' 43'
44' 43'
42'
47'
EM
SP
45'
45'
45'
50'
TH
E. 6TH
AVE.
AB 01
VB 01
VB 02
T 01
ST 01
0+20
0+
0+
0+
AB
B
B WS
WS
WS
W
AB
ST
AB
30'
40'
50'
60'
30'
40'
50'
60'
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20
EG
: 4
6.
1'
EG
: 4
6.
0'
EG
: 4
6.
1'
EG
: 4
6.
4'
EG
: 4
6.
6'
EG
: 4
7.
2'
EG
: 4
7.
5'
EG
: 4
7.
0'
EG
: 4
6.
9'
EG
: 4
6.
8'
EG
: 4
6.
7'
EG
: 4
6.
5'
EG
: 4
3.
4'
EG
: 4
3.
9'
VB
VB
VB
T
AB
FG
FG
: 4
7.
5'
FG
: 4
7.
5'
FG
: 4
7.
5'
FG
: 4
7.
5'
FG
: 4
7.
5'
FG
: 4
7.
7'
FG
: 5
4.
3'
FG
: 5
5.
0'
FG
: 5
5.
0'
FG
: 5
5.
0'
FG
: 5
1.
7'
FG
: 4
5.
0'
FG
SS 01 SS 02 SS 03
SS 04
SS 05
MAJOR STRUCTURES
ID
AB 01
ST 01
VB 01
VB 02
T 01
STATION
0+01
0+33
0+54
0+61
0+62
DESCRIPTION
ARCTIC BOX, SEE SSSD-304
1,500 GALLON INFILTRATOR SEPTIC TANK AND
LIBERTY PUMP LIFT STATION, SEE SSSD-555
4" 45° ARCTIC VERT BEND
4" 45° ARCTIC VERT BEND
2" ARCTIC TEE DRAINFIELD CONNECTION, SEE SSSD-642 .
SEWER SERVICE
ID
SS 01
SS 02
SS 03
SS 04
SS 05
START
0+01
0+38
0+44
0+54
0+61
END
0+28
0+41
0+54
0+61
0+62
LENGTH
27 LF
3 LF
10 LF
10 LF
1 LF
SLOPE
2.0%
2.0%
0.0%
100.0%
0.0%
DESCRIPTION
4"x12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200 .
4"x12" INSULATED ARCTIC
GRAVITY PIPE, SEE SSSD-200
2" HDPE INSIDE AN INSULATED
4"x12" AGP, SEE SSSD-200
2" HDPE INSIDE AN INSULATED
4"x12" AGP, SEE SSSD-200
2" HDPE INSIDE AN INSULATED
4"x12" AGP, SEE SSSD-200
49 THST
ATE OF ALASKA
REENIGN
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .