4-4. Planset AKA-22-OME IFC SCATTERED SITES PHASE II.pdf
PDF 16 MB Posted
- Solicitation number
- IFB ANTHC 25-B-391043
- Issued by
- Nome Census Area, Alaska
About this file
This is a construction plan set for scattered wastewater and water infrastructure improvements in Nome, Alaska, prepared by the Alaska Native Tribal Health Consortium's Division of Environmental Health and Engineering for the Jessica Blanford property. The project involves installing a new residential water and sewer system including a 1,500-gallon steel septic tank with lift station, pressure mound drainfield system with 64 infiltrator chambers, arctic water well with drainback or circulation system, insulated arctic pipe systems, and associated electrical controls. The comprehensive 37-sheet plan set includes detailed drawings for septic system schematics, arctic pipe fittings, well details, pressure systems, electrical components, and construction specifications for cold-climate installations requiring freeze protection measures.
The project addresses the challenging arctic construction environment with specialized components including 4-inch insulated arctic pipe carriers, heat trace systems, pressure tank details with drainback capabilities, and arctic service boxes designed for permafrost conditions. The plans specify extensive insulation requirements, including 4-inch rigid boardstock insulation over all septic system components and specialized arctic well caps and sleeves. Construction must comply with Alaska Department of Environmental Conservation regulations and incorporate anchoring systems for high groundwater conditions, with all installations requiring minimum 4-foot cover depths and specialized cold-weather materials and techniques throughout the system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOME, ALASKA
SCATTERED SITES - PHASE II
ISSUED FOR CONSTRUCTION
PLAN SET NUMBER: AKA-22-OME
ANTHC PROJECT NUMBER: AKA-C6K.1276
RUSSIA
A L E U T I A N
OF
ANCHORAGE
BRISTOL BAY
CO
O K
IN
LE
T
NORTON SOUND
NOME
KOTZEBUE
JUNEAU
FAIRBANKS
CANADA
ARCTIC OCEAN
GULF
ALASKA
I S L A N D S
BERING SEA
CHUKCHI SEA
KODIAK
BETHEL
UNALASKA
Su si tn a
Koyukuk Yukon
Yu ko n
Ku sk ok wi m
River
River Rive r
River
Tanana
River
River
Kobuk
Colville Rive r
C op pe r
Rive r
River
ST. LAWRENCE
ISLAND
ST.
MATTHEW
ISLAND
NUNIVAK
ISLAND
PRIBILOF
ISLANDS
SEC 26, T11S, R34W, KATEEL
RIVER MERIDIAN
NOME
UTQIAGVIK
TOTAL SHEETSOFUSER: JEELLORIN PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STLGND.dwg LAYOUT: COVR PRINTED: 5/1/2024 1:43:29 PM 1 37
ALASKA NATIVE
TRIBAL HEALTH
CONSORTIUM
DIVISION OF ENVIRONMENTAL
HEALTH AND ENGINEERING
4500 DIPLOMACY DRIVE
ANCHORAGE, ALASKA, 99508-3440
PHONE: (907) 729-3600
FAX: (907) 729-4090
http://www.dehe.org
SHEET LIST TABLE
SHEET # SHEET TITLE PG #
- COVER SHEET 1
C-001 COMMUNITY MAP 2
C-002 LEGEND AND DESIGN CRITERIA 3
C-101 JESSICA BLANFORD PLAT 4
C-102 JESSICA BLANDFORD SITE PLAN 5
C-103 JESSICA BLANDFORD DESIGN NOTES 6
C-104 JESSICA BLANDFORD DESIGN PLAN 7
SSSD-100 SEPTIC SYSTEM SCHEMATIC 8
SSSD-200 ARCTIC GRAVITY PIPE AND FITTINGS 9
SSSD-201 ARCTIC PRESSURE PIPE FITTINGS 10
SSSD-202 ARCTIC PIPE CONNECTIONS 11
SSSD-300 SEWER SERVICE AND CLEANOUT - ARCTIC PIPE 12
SSSD-304 SERVICE UTILITY BOX 13
SSSD-306 SERVICE UTILITY BOX SEWER HOUSE - BELOW FINISHED FLOOR 14
SSSD-400 SEWER SERVICE LINE TRENCH 15
SSSD-401 WATER SERVICE LINE TRENCH 16
SSSD-523 IM-1530 - 1500 GALLON SEPTIC TANK - ANCHORING SYSTEM 17
SSSD-545 STEEL SEPTIC TANK FROM ANC TANK AND LIFT STATION - PERMAFROST 18
SSSD-566 LIBERTY PUMP LIFT STATION 19
SSSD-567 ANCHORAGE SEPTIC TANK 20
SSSD-640 MOUND SYSTEM (ABOVE-GRADE) 21
SSSD-643 PRESSURE MOUND LATERAL ORIFICE SPACING 22
SSSD-700 ARCTIC BOX - WATER SERVICE CONNECTION 23
SSSD-701 ARCTIC BOX - WATER SERVICE CONNECTION 24
SSSD-730 ARCTIC DRAINBACK WELL WITH PRESSURE SYSTEM 25
SSSD-731 ARCTIC WELL DETAILS (DRAINBACK SYSTEM) 26
SSSD-740 CIRCULATING WELL WITH PRESSURE SYSTEM 27
SSSD-741 CIRCULATING WELL DETAILS 28
SSSD-781 CIRC PUMP FOR ARCTIC CIRCULATION LONG HEAT TRACE 29
SSSD-800 PRESSURE TANK DETAIL 30
SSSD-801 PRESSURE TANK DETAIL WITH DRAINBACK 31
SSSD-850 BOLLARD DETAIL 32
SSSD-900 ELECTRICAL LEGEND 33
SSSD-930 ELECTRICAL - ARCTIC WELL DETAILS 34
SSSD-940 ELECTRICAL - CIRCULATING WELL DETAILS 35
SSSD-951 ELECTRICAL SEWER SERVICE - LIFT STATION 36
SSSD-960 EFFLUENT PUMP CONTROL PANEL 37
http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://anthc.org http://www.dehe.org
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STLGND.dwg LAYOUT: COMM PRINTED: 5/1/2024 11:32:54 AM
0 1"
TOTAL SHEETSOF
C-001 1 6
MY
ML
KS
AKA-22-OME
COMMUNITY MAP
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
PH
A
SE
II
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
BESSIE RD JESSICA BLANFORD,
SEE SHEET C-104
BEAM RD
DE
XT
ER
B
YP
AS
S
B
EA
M R
D
BEAM R
D
OSBORNE RD
OSBORNE RDNO
M
E
TE
LL
ER
H W
Y
CE
NT
ER
CR
EE
K
RD
NOME
AIRPORT
NOME TELLER HWY
NORTON SOUND
05/01/2024
Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STLGND.dwg LAYOUT: CRTR PRINTED: 5/1/2024 11:32:55 AM
0 1"
TOTAL SHEETSOF
C-002 2 6
MY
ML
KS
AKA-22-OME
LEGEND AND DESIGN
CRITERIA
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
PH
A
SE
II
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
GENERAL DESIGN NOTES
1. GRAVITY WASTEWATER SERVICE LINE FROM HOUSE TO TANK SHALL BE
SET AT A MINIMUM OF 2% SLOPE. HOWEVER, THIS MAY BE A BIT STEEPER
AS SLOPE VARIES BASED ON LENGTH AND DISTANCE AND THE SLOPE
EQUALS RISE OVER RUN.
2. SEWER SERVICE LINES TO BE ABS; SEPTIC TANKS, DRAINFIELD, AND
REPS UNITS WILL NEED 4” OF RIGID BOARDSTOCK OVER THEM.
3. THERE SHALL BE A MINIMUM OF 4 FT OF COVER OVER PIPE, TANK, AND
DRAINFIELD TO PREVENT FREEZING.
4. PER DEC THE BOTTOM OF DRAINFIELD (GRAVEL BASE) MUST HAVE 4 FT
OF CLEARANCE TO GROUNDWATER AND 6 FT TO IMPERMEABLE LAYER.
5. A 100 FT SEPARATION DISTANCE MUST BE MAINTAINED BETWEEN THE
WELL AND SEPTIC TANK AND DRAINFIELD. INCLUDING 100 FT FROM
NEIGHBORING WELLS, LAKES, RIVERS, SLOUGHS, AND STREAMS.
6. THERE MUST BE 10 FT OF SEPARATION FROM THE SEPTIC SYSTEM TO
THE PROPERTY LINES.
7. THE DRAINFIELD MUST BE LOCATED GREATER THAN 50 FT AWAY FROM A
25% SLOPE.
GENERAL CONSTRUCTION NOTES:
1. CONTRACTOR MUST COMPLY WITH ALL OSHA TRENCHING
REQUIREMENTS, REFER TO SECTION 31 23 16.13, TRENCHING.
EXCAVATION LIMITS AND SLOPES SHOWN ARE 1:1 AND ASSUMED TO BE
TYPE B SOILS, BUT MUST BE VERIFIED BY CONTRACTOR. MOUND SYSTEM
FINISHED GRADE SLOPES SHOULD BE 3:1 FOR EASE OF MAINTENANCE.
2. GENERAL LANDSCAPING AND SITE CLEAN-UP - IN GENERAL, ALL
DISTURBED AREAS SHALL BE GRADED, COMPACTED, LEVELED, AND HAND
OR MACHINE RAKED. ROCKS LARGER THAN 3” SHOULD BE REMOVED
FROM THE SURFACE. ALL CONSTRUCTION DEBRIS, BRUSH, ROOT BALLS,
AND LIMBED TREE BRANCHES SHALL BE REMOVED FROM THE SITE.
BUCKED LOGS CAN BE NEATLY STACKED AND LEFT, IF HOMEOWNER
AGREES. ALL SEPTIC SYSTEM OBSERVATION PORTS SHALL BE VERTICAL
AND PLUMB, AND CAPPED, AND SHALL BE CLEANED OFF OF ALL MUD,
DIRT AND MARKINGS. ACCESS RISERS ON SEPTIC TANKS SHALL BE
SECURED AND BE CLEARED OF DIRT AND MUD. IF GRAVEL OR PAVED
DRIVEWAYS ARE IMPACTED THEY MUST BE REPLACED TO AN “OR
BETTER” STATUS.
3. THE GRAVEL/SEWER ROCK FOR THE DRAINFIELD MUST BE RAKED LOOSE
AND NOT COMPACTED BY EQUIPMENT.
4. THE BOARDSTOCK LAYER MUST BE LAID ONTO SMOOTH SOIL SURFACE
WITHOUT LARGE ROCKS OR VOIDS, AND CAPPED WITH CLEAN BACKFILL
WITHOUT LARGE ROCKS OR VOIDS.
5. CONSTRUCTION PHOTOS AND WORK LOGS MUST BE SUBMITTED DAILY,
AS WORK PROCEEDS.
6. THE SYSTEM MUST BE INSTALLED AS DESIGNED, AND ONLY CHANGED OR
RE-POSITIONED WITH APPROVAL OF THE ENGINEER.
7. UNDERGROUND UTILITIES MUST BE IDENTIFIED AND LOCATED PRIOR TO
EXCAVATION. PLEASE CALL ALASKA DIGLINE, INC AT 811, A MINIMUM OF
THREE WORKING DAYS PRIOR TO INSTALLATION OF THE SYSTEM.
8. ONCE LOCATED, UNDERGROUND UTILITIES MAY NEED TO BE PROTECTED
FROM DAMAGE DURING INSTALLATION.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOT ENCROACH
OVER PROPERTY LINES.
10. SEWER ROCK AND COARSE FILTER SAND MUST MEET AK DEC
SPECIFICATIONS
11. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL BURIED UTILITIES,
EASEMENTS, PROPERTY LINES, RIGHT-OF-WAYS, SURFACE WATER
SET-BACKS, WELL RADIUS, AND WATER SERVICE LINES, THAT MAY
INTRUDE INTO THE DESIGN LAYOUT OF THE PROPOSED ON-SITE SEPTIC
SYSTEM.
12. ANY ENCROACHMENTS FOUND, THAT WERE NOT IDENTIFIED ON THE
ENGINEERING PLANS SHOULD BE BROUGHT TO THE ATTENTION OF THE
ENGINEER-OF-RECORD.
13. CONTRACTOR TO ESTABLISH SURVEY BENCHMARKS, FROM WHICH TO
ESTABLISH ELEVATIONS. THE ON-SITE SEPTIC SYSTEM HAS BEEN
DESIGNED USING ELEVATIONS.
14. SITE INSPECTIONS - THE CONTRACTOR MUST NOTIFY THE PROJECT
MANAGER AND ENGINEER AT LEAST 24 HRS PRIOR TO BEGINNING
CONSTRUCTION. INSPECTIONS SHOULD TAKE PLACE DURING NORMAL
BUSINESS HOURS.
a. THE FOLLOWING ARE INSPECTION POINTS THAT MUST BE PHOTO
DOCUMENTED BY THE CONTRACTOR.
i. INITIAL BEFORE PHOTOS OF THE SITE, PRIOR TO THE START OF
CONSTRUCTION
ii. THE BOTTOM OF ALL TRENCHES
iii. THE BOTTOM /BEDDING OF THE SEPTIC TANK AND PUMP CHAMBERS iv.THE BOTTOM OF THE PRESSURE MOUND DRAINFIELD
v. TOP OF SAND LINER OF PRESSURE MOUND DRAINFIELD vi.TOP OF SEWER ROCK OF PRESSURE MOUND DRAINFIELD
vii. LAYOUT OF PERFORATED DISTRIBUTION MANIFOLD AND DRAINFIELD
CHAMBERS
viii. BOARDSTOCK COVERING OF BED SYSTEM ix.GEO-FABRIC COVERING OF BED SYSTEM
x. TOP OF SEPTIC TANK, RISERS, AND PUMP CHAMBERS xi.CONTROL AND ALARM PANEL KIOSK, INTERIOR OF PANELS, AND
EXTERIOR
xii. SEWER SERVICE LINE AND CLEAN-OUT
xiii. SEWER SERVICE LINE HOUSE PENETRATION OF CONNECTION POINT
xiv. FINAL GRADING AND FINISHED GRADE OF SEPTIC SYSTEM FROM
MULTIPLE ANGLES
15. THE CONTRACTOR SHALL PROVIDE ANTHC OPERATION AND
MAINTENANCE MATERIALS, AND ANY COPIES OF MANUFACTURER'S
LITERATURE OF THE SYSTEM COMPONENTS. ANTHC WILL COMPILE THE
O&M MANUAL FOR THE HOMEOWNER.
REFERENCES
· STATE OF ALASKA ADEC ONSITE WASTEWATER SYSTEM INSTALLERS
MANUAL, JANUARY 2016
· ONSITE WASTEWATER TREATMENT SYSTEMS: SOIL AND SITE EVALUATIONS,
DESIGN, CONSTRUCTION AND MAINTENANCE, TYLER AND ASSOCIATES, INC.
· WISCONSIN MOUND SOIL ABSORPTION SYSTEMS: SITING, DESIGN, AND
CONSTRUCTION MANUAL, JC CONVERSE AND EJ TYLER, JANUARY 2000
· PRESSURE DISTRIBUTION NETWORK DESIGN, JC CONVERSE, JANUARY 2000
· WASHINGTON STATE DEPT. OF HEALTH, PRESSURE DISTRIBUTION
SYSTEMS, 2012
· ADEC WASTEWATER DISPOSAL REGULATIONS 18AAC72, NOVEMBER 2017
· ANTHC TECHNICAL SPECIFICATIONS - 2021
DEC DESIGN LOADING CRITERIA I
DESCRIPTION DESIGN LOADING
GW
WELL GRADED GRAVEL, FASTER THAN 1 MIN/IN;
ADD 2' OF COARSE FILTER SAND UNDER
DRAINFIELD, WHEN PERC RATE IS FASTER THAN 1
MIN/IN
150 SF/BR
GW WELL GRADED GRAVEL, SLOWER THAN 1 MIN/IN 125 SF BR
GP
POORLY GRADED GRAVEL, FASTER THAN 1 MIN/IN;
ADD 2' OF COARSE FILTER SAND UNDER
DRAINFIELD, WHEN PERC RATE IS FASTER THAN 1
MIN/IN
150 SF BR
GP POORLY GRADED GRAVEL, SLOWER THAN 1 MIN/IN 125 SF BR
SW WELL GRADED SAND 150 SF BR
SP POORLY GRADED SAND 150 SF BR
GM SILTY GRAVEL PERC TEST
SM SILTY SAND PERC TEST
ML SILT PERC TEST
DEC DESIGN LOADING CRITERIA II
PERC TEST DESIGN LOADING
1-5 MIN / IN 125 SF BR
6-15 MIN / IN 190 SF BR
16 - 30 MIN / IN 250 SF BR
31 - 60 MIN / IN 335 SF BR
61-120 MIN / IN ENGINEER
120 AND GREATER NOPE
SEPTIC TANK SIZING
@ BEDROOMS MIN SIZE
1-3 1,000 GAL
4 1,250 GAL
5 1,500 GAL
6 1,750 GAL
7 2,000 GAL
8 2,250 GAL
GENERAL NOTES:
THESE DRAWINGS HAVE BEEN DEVELOPED FOR CONSTRUCTION BY
CONSTRUCTION CONTRACT METHODOLOGY. CONSTRUCTION SPECIFICATIONS
HAVE ALSO BEEN DEVELOPED SPECIFICALLY FOR THIS PROJECT. TOGETHER,
THE DRAWINGS AND CONSTRUCTION SPECIFICATIONS CONSTITUTE A
COMPLETE AND INSEPARABLE SET OF CONSTRUCTION DOCUMENTS, INCLUDING
ALL NECESSARY CONSTRUCTION AND MATERIALS SPECIFICATIONS TO ENSURE
THE PROJECT AS CONSTRUCTED MEETS THE DESIGN INTENT. ANY CHANGES
TO CONSTRUCTION METHODS OR MATERIALS SHALL BE APPROVED IN ADVANCE
BY THE RESPONSIBLE REGISTERED PROFESSIONAL.
REGARDING BRAND NAMES IN ENGINEERING DRAWINGS AND TECHNICAL
SPECIFICATIONS. WHILE SPECIFIC BRANDS ARE LISTED BASED ON AVAILABILITY
AND MEETING CERTAIN CRITERIA, ALTERNATIVES CAN BE CONSIDERED.
HOWEVER, ANY SUBSTITUTIONS MUST UNDERGO REVIEW BY THE ENGINEER-OF
RECORD TO ENSURE THEY MEET PROJECT REQUIREMENTS AND DESIGN
INTENT.
SITE STRUCTURES
WATER
POWER AND COMMUNICATION
ELECTRIC METER
SANITARY SEWER
TOPO AND VEGETATION
WATER WELL
SEWER MANHOLE
CLEANOUT
SEPTIC VENT
SEWER LIFT STATION
SEPTIC TANK
ARCTIC BOX
POWER POLE
ANTENNA
BOLLARD
CULVERT
FUEL TANK
PROPANE TANK
GATE POST
TEST HOLE
WATER
SANITARY SEWER
SITE
WATER MAIN
WATER SERVICE
GRAVITY SEWER MAIN
SEWER SERVICE
SEWER FORCE MAIN
FENCE LINE
W
A
CO
L
S
V
EM
ST
AB
B
FT
G
PT
TH
DRAINAGE CHANNEL
WATER ELEVATION
SILT FENCE LINE
X
O
W
WS
W
SS
FM
SITE PLAN LEGEND
BUILDING SERVED THIS PLANSET
RESTRICTED LOT
BURIAL GROUND, GRAVES
OR CEMETERY
RUINS
WETLANDS - MARSH - SWAMP
DRIVEWAY - MINOR ROAD - PATH
BUILDING NOT SERVED THIS PLANSET
OCEAN - LAKE - POND
SOIL - EXCAVATION
SOIL - FILL
05/01/2024
Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STSITE_JBlandford.dwg LAYOUT: PLAT PRINTED: 5/1/2024 11:32:57 AM
0 1"
TOTAL SHEETSOF
C-101 3 6
MY
ML
KS
AKA-22-OME
JESSICA BLANFORD
PLAT
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
PH
A
SE
II
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
JESSICA AND JESS BLANFORD -
LOT4, BLOCK 6 DEXTER TOWNSITE
05/01/2024
W S
W S
SP
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
OH/E
FT
S S
S
S S
S S
FT
EM
ST
ST
CO
C
W
A
W
N77°59'37"W
190.00'
N
°0 0'
"E
4.
N77°59'36"W
190.00' N
°0
0'
"E
5.
TH
W
B
B
56'
54'
53'
54'
53'
WS
WS
WS
WS
AB
TH
60'
AB
SITE PLANA1 1" = 20'
MILE 8.5 KOUGARAK ROAD NOME, AK 99762
LOT 4 BLK 5 DEXTER TOWNSITE PLAT 83-14 CAPE NOME R.D.
LAT: 64°35'2.73"N LONG: 165°16'12.03"W; 46,609.2 SF (±1.07 AC)
SHEET OF
4500 Diplomacy Drive
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STSITE_JBlandford.dwg LAYOUT: SITE PRINTED: 5/1/2024 3:12:35 PM
0 1"
TOTAL SHEETSOF
C-102 4 6
MY
ML
KS
AKA-22-OME
JESSICA BLANDFORD
SITE PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
PH
A
SE
II
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
0 20' 40'10'
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
SCOPE OF WORK
WATER
· DRILL NEW RESIDENTIAL ARCTIC WATER WELL.
· THE WELL WILL BE EITHER AN ARCTIC DRAIN-BACK SYSTEM OR IT WILL BE A
CIRCULATING WELL, WITH CIRCULATING WATER SERVICE LINES AND DROP
PIPES. THIS DEPENDS ON THE DEPTH OF PERMAFROST ENCOUNTERED.
· INSTALL NEW WELL PUMP, DROP PIPE, PITLESS ADAPTER, AND PRESSURE
SYSTEM.
§ PRESSURE SYSTEM TO BE INSTALLED INSIDE HOUSE.
· INSTALL NEW INSULATED WATER SERVICE LINE, TO CONNECT THE WELL TO
THE HOUSE (40FT). WATER LINE IS 1” PEX OR HDPE PIPE, INSIDE A 4”X12”
ARCTIC PIPE CARRIER PIPE, WITH 4” OF BOARDSTOCK INSULATION OVER
PIPE.
· INSTALL LONG RUN HEAT TRACE WITH TIMERS AND CONTROLS. HEAT
TRACE TO RUN ALONG SERVICE LINE, AND DOWN WELL CASING TO BELOW
WELL PUMP.
· INSTALL SHORT RUN HEAT TRACE IN UTILIDOR AND ARCTIC BOX WITH
TIMERS AND CONTROLS
· INSTALL NEW ARCTIC BOX AND INSULATED UTILIDOR TO CONNECT WATER
LINE TO THE HOUSE, FROM THE BACK OF THE ARCTIC BOX TO THE FLOOR
PENETRATION.
· THE WELL NEEDS TO BE OPERATED TO ENSURE THAT THE SYSTEM IS
FULLY FUNCTIONAL. THE WELL CANNOT BE CONNECTED TO HOUSE
PLUMBING UNTIL AFTER THE WATER ANALYSIS SHOWS THAT THE WATER IS
SAFE TO DRINK. WATER TREATMENT EQUIPMENT MAY BE NEEDED TO BE
INSTALLED TO ACHIEVE THIS.
· OBTAIN A RAW WATER SAMPLE FOR BACTERIA AND THE LIST OF
CONTAMINANTS OUTLINED IN THE TECHNICAL SPECIFICATIONS,
APPROXIMATELY 35 ANALYTES.
· PROVIDE FINAL LANDSCAPING OVER WATER SERVICE LINE. COMPACT,
LEVEL, GRASS SEED AND FERTILIZE AREA. MOUND UP OVER SERVICE LINE
TO COMPENSATE FOR SETTLEMENT. ENSURE SURFACE WATER DRAINAGE
DOES NOT FLOW TOWARD HOUSE OR STRUCTURES ON PROPERTY.
SEWER
· INSTALL NEW SEPTIC TANK AND LIFT STATION AND A PRESSURE DOSING
MOUND DRAINFIELD.
· INSTALL NEW ARCTIC BOX AND INSULATED UTILIDOR IN CRAWLSPACE TO
CONNECT TO EXISTING SEWER SERVICE LINE AND HOUSE PLUMBING.
· INSTALL NEW INSULATED SEWER SERVICE LINE, 4”X12” INSULATED ARCTIC
PIPE, WITH 4” OF BOARDSTOCK INSULATION OVER PIPE, FROM THE HOUSE
TO THE SEPTIC TANK (30FT). THIS GRAVITY PIPE WILL NEED A HEAT TRACE
CHANNEL.
· INSTALL NEW 1,500 GALLON, EPOXY-COATED STEEL SEPTIC TANK FROM
ANCHORAGE TANK, WITH 4” OF BOARDSTOCK INSULATION OVER AND
AROUND SEPTIC TANK. NO INSULATION IS NEEDED UNDER TANK, UNLESS
PERMAFROST IS ENCOUNTERED. HIGH FLOWING GROUNDWATER TO BE
PUMPED FOR EXCAVATION AND INSTALLATION OF TANK. SEPTIC TANK TO
BE ANCHORED DUE TO HIGH GROUNDWATER.
· INSTALL NEW RESIDENTIAL EFFLUENT PUMPING STATION (REPS) UNIT
§ PROVIDE A 3/4 HP SUBMERSIBLE SEWAGE (EFFLUENT) PUMP CAPABLE
OF DELIVERING
§ 43 GPM @ 53 FT OF HEAD. (LIBERTY EFFLUENT PUMP, FL70 SERIES,
MODEL # FL72M-2, 2” DISCHARGE, WITH WEATHERPROOF CONTROL
PANEL ON KIOSK)
§ LIFT STATION BASIN TO BE A LIBERTY FIBERGLASS BASIN, 36”
DIAMETER X 11FT TALL.
· INSTALL NEW 2” HDPE PRESSURE FORCE MAIN INSIDE A 4”X12” INSULATED
ARCTIC PIPE CARRIER PIPE, WITH 4” OF BOARDSTOCK INSULATION OVER
PIPE, FROM THE LIFT STATION TO THE PRESSURE MOUND DRAINFIELD
(30FT).
· INSTALL 3 IMMERSION HEATERS, 2 IN THE SEPTIC TANK AND 1 IN THE LIFT
STATION.
· HEAT TRACE WILL BE RUN ON THE SEWER LINE, FROM THE ARCTIC BOX, TO
THE SEPTIC TANK AND LIFT STATION, TO THE FORCE MAIN GOING TO THE
MOUND DRAINFIELD.
· INSTALL NEW PRESSURE DOSING EFFLUENT MOUND DRAINFIELD.
§ THE MOUND CONSISTS OF 16 ROWS OF 4 CHAMBERS, FOR A TOTAL OF
64 CHAMBERS AND 724 SQ FT OF TREATMENT AREA. THE PERFORATED
PIPING IS PLACED UNDER DRAINFIELD CHAMBERS, THE CHAMBERS ARE
COVERED WITH GEOTEXTILE FABRIC AND 4” OF BOARDSTOCK
INSULATION. THERE IS 2FT OF DEC APPROVED SEWER ROCK UNDER
THE CHAMBERS AND 4FT OF DEC APPROVED COARSE-GRADED FILTER
SAND, BETWEEN THE GROUNDWATER TABLE AND THE BOTTOM OF THE
SEWER ROCK. FROM TEST HOLES, THE GROUNDWATER IS ESTIMATED
TO BE 3FT BELOW GRADE, AND THERE NEEDS TO BE A 4FT SEPARATE
BETWEEN GROUNDWATER AND BOTTOM OF THE SEWER ROCK (FILTER
SAND CAN BE WITHIN THIS DISTANCE).
· FINAL LANDSCAPING: COMPACT, LEVEL, GRASS SEED, AND FERTILIZE AREA.
CLEAN UP SITE. ENSURE DRAINAGE DOES NOT POOL UP ALONG SEPTIC
SYSTEM. MOUND-OVER SERVICE LINE, SEPTIC TANK, REPS UNIT, AND
MOUND DRAINFIELD SYSTEM TO COMPENSATE FOR SETTLEMENT. ENSURE
DRAINAGE DOES NOT POOL UP ANYWHERE NOR RUN TOWARD THE HOUSE
OR STRUCTURES ON PROPERTY.
· INSTALL A DRAINAGE SWALE BETWEEN THE HOUSE AND THE DRAINFIELD
MOUND TO DIRECT WATER TO THE WEST AND SOUTH OF THE HOUSE.
100' EXISTING
WELL RADIUS
RED FOX ROAD
TEST HOLE
TEST HOLE
100.00'
OFFSET TO LAKE
LOT 4 LOT 5
LOT 3
WETLAND
AREA
100' NEW WELL RADIUS
PLAN AND PROFILE,
SEE SHEET C-104
05/01/2024
BOH @ 12'
GROUNDWATER SEEPS AT 10FT
NO IMPERMEABLE LAYER
ENCOUNTERED
ABSORPTION FIELD DESIGN CRITERIA
· 5 BEDROOM HOUSE
· DESIGN FLOW RATE: 150 GAL/DAY/BEDROOM
· TOTAL DESIGN FLOW: 750 GAL/DAY
· TEST HOLE #1 - GROUNDWATER AT 3FT BG
· TEST HOLE #2 - SOIL TYPE @ 4FT IS: WELL-GRADED GRAVEL W/ SAND -
USCS CLASSIFICATION: GW
· TEST HOLE #2 - SOIL TYPE @ 8FT IS: WELL-GRADED GRAVEL W/ SAND -
USCS CLASSIFICATION: GW
· GROUNDWATER ENCOUNTERED AT 3FT - AT BOTH HOLES
· ELEVATION OF EXISTING GROUND AT TEST HOLE: 55 FT ASL (ABOVE SEA
LEVEL)
· THE PERCOLATION TEST WAS NOT PERFORMED DUE TO HIGH
GROUNDWATER
· GW SOILS ARE EITHER 125 SF/BEDROOM OR 150 SF/BEDROOM BASED ON
THE PERCOLATION RATE. ASSUME WORSE CASE SCENARIO AND USE 150
SF/BEDROOM AND ADD 2' SAND LINER
· IN ORDER TO PROVIDE 4FT SEPARATION TO GROUNDWATER, A
RESIDENTIAL EFFLUENT PUMPING STATION (REPS) OR LIFT STATION WILL
BE REQUIRED
· DESIGN WILL BE AN ABOVE-GRADE PRESSURE DISTRIBUTION MOUND
DRAINFIELD
· THE SYSTEM WILL HAVE 2FT OF 3” MINUS, DEC APPROVED, SEWER ROCK
· IT WILL INCLUDE 4FT OF DEC APPROVED COARSE-GRADED FILTER SAND -
DUE TO HIGH GROUNDWATER AND GW SOILS WITHOUT PERC TEST. NEED
TO MAKE UP FILL TO GET 4FT SEPARATION DISTANCE, AND GW 3FT BG
· THE PRESSURE DISTRIBUTION PIPING WILL BE PROTECTED WITH THE USE
OF INFILTRATOR CHAMBERS, THAT WILL PROTECT THE DISCHARGE PIPING
FROM CLOGGING AND PROVIDE VOID SPACE THAT CAN HANDLE SEVERE
PEAK FLOW EVENTS, AND HELPS WITH THE DISTRIBUTION OF THE
WASTEWATER.
· INFILTRATION AREA REQUIRED = 5 BEDROOMS * 150 SQ FT /BEDROOM =
750 SQ FT
· CHAMBER AREA PER UNIT IS: 2.83FT X 4FT LONG = 11.32 SQ FT/CHAMBER
· # OF CHAMBERS REQUIRED IS = 750 SQ FT / 11.32 SQ FT/CHAMBER = 66
CHAMBERS
· USE 64 CHAMBERS WITH 16 ROWS OF 4 CHAMBERS PER ROW (724 SQ FT)
· FINAL LOADING RATE IS: 750 GAL/DAY / 724 SQ FT = 1.04 GAL/DAY/SQ FT
· 1.04 GAL/DAY/SQ FT IS CLOSE TO THE E.J. TYLER RECOMMENDED LOADING
RATE OF 0.8 GAL/DAY/SQ FT FOR COARSE SAND WITH A BOD5 LOADING
RATE GREATER THAN 30MG/L WASTEWATER STRENGTH. HOWEVER, THE
ACTUAL FOOTPRINT OF THE SEWER ROCK WILL BE 24' x 49' = 1,078 SQ FT
FOR A FINAL INFILTRATION RATE OF 750 GAL/DAY / 1,078 SF = 0.70
GAL/DAY/SQ FT. (AN ACCEPTABLE LOADING RATE)
· SEPTIC TANK SIZING: DEC REQUIREMENT FOR 5 BEDROOM HOME IS A
1,500 GAL SEPTIC TANK. USE A 1,500 GALLON INSULATED EPOXY COATED
STEEL SEPTIC TANK FROM ANCHORAGE TANK
· THE SEPTIC TANK WILL NEED TO BE ANCHORED IN THE GROUNDWATER.
· THE PUMP CHAMBER WILL BE A SEPARATE PUMP BASIN, USE LIBERTY
EFFLUENT PUMP BASIN, 36” DIAMETER X 11FT LONG. (DUE TO HIGH
GROUNDWATER)
DESIGN OF PRESSURE DISTRIBUTION LATERALS AND PUMP DESIGN
· USE 2”, SDR 11, HDPE PRESSURE SEWER FORCE MAIN, RUN INSIDE A 4” X
12” ARCTIC PIPE CARRIER PIPE, FROM THE LIFT STATION TO THE HEADER
ASSEMBLY OF THE PRESSURE MOUND DRAINFIELD (12FT).
· TRANSITION TO 1½” SCH 40 PVC FOR HEADER AND DISTRIBUTION
LATERALS (300FT)
· THERE ARE 16 LATERALS OF 4 CHAMBERS
· THERE ARE 64 CHAMBERS (@11.32SQ FT/CHAMBER = 724 SQ FT)
· USE ¼” CLEAN DRILLED HOLES EVERY 24”, POINTED DOWNWARD
(6-O'CLOCK) AND HUNG UNDER THE CHAMBER. THE SYSTEM NEEDS TO
DRAIN AND DRAINBACK TO THE PUMP CHAMBER FOR FREEZE
PROTECTION.
· THERE ARE 2 HOLES PER CHAMBER OR 128 HOLES TOTAL, AND/OR 8
ORIFICES PER LATERAL WITH 16 LATERALS.
· ONE UPWARD FACING ¼” ORIFICE WILL NEED TO DRILLED AT THE END OF
EACH LATERAL, TO ALLOW AIR INTO THE SYSTEM AND THE LATERALS TO
FULLY DRAIN.
· EACH HOLE WILL COVER/PROVIDE: 724 SQ FT / 128 HOLES = 5.7 SQ FT PER
ORIFICE OF APPLICATION
· E. J. TYLER RECOMMENDS ABOUT A MAXIMUM TREATMENT AREA OF 6 SQ
FT PER ORIFICE, SO OKAY.
· THEY RECOMMEND A LATERAL DISTAL PRESSURE OF 2.5FT OF HEAD
PRESSURE AT END OF LATERAL (OR ABOUT 1.1PSI)
· PER E.J. TYLER, TABLE A-1 DISCHARGE RATE FOR ORIFICES, ¼” ORIFICE @
2.5' DISTAL PRESSURE = 1.17 GPM PER ORIFICE
· IDEAL FLOW RATE TO MAINTAIN PRESSURE AT FAR END OF DISTRIBUTION
SYSTEM = 1.17 GPM * 128 ORIFICES = 150 GPM
· STATIC ELEVATION HEAD = 10 FT
· ASSUMED HEADLOSS = 43 FT (300FT @ 14.3FT PER 100FT OF 1.5" SCH 40
PVC PIPE)
· TOTAL DYNAMIC HEAD = 53 FT
· ACTUAL FLOW RATE OF SEWAGE PUMP SELECTED IS:
· LIBERTY EFFLUENT PUMP, FL75, ¾ HP PUMP. BASED ON PUMP CURVE AT
53 FT OF HEAD PUMP PRODUCES 43 GPM
· 43 GPM IS BELOW THE 150 GPM NEEDED TO MAINTAIN AN IDEAL 2.5 PSI, AT
EACH ORIFICE, SO IDEAL PRESSURE WILL NOT BE MAINTAINED TO THE
FAR END OF THE DRAINFIELD. HOWEVER, ORIFICES ARE TURNED DOWN,
SO DISTRIBUTION LATERALS WILL STILL DRAIN BY GRAVITY, EVEN UNDER
0 PSI PRESSURE.
· RESULT WILL BE A LITTLE UNEVEN DISTRIBUTION WITHIN THE DRAINFIELD,
BUT KEEPS THE PUMP SIZE REASONABLE FOR OPERATIONAL COSTS AND
DOSING. IT IS NOT IDEAL, BUT WILL WORK. POSITIVE PRESSURE WILL
STILL BE MAINTAINED.
· 43 GPM / 128 ORIFICES = 0.34 GPM/ORIFICE (LESS THAN THE
RECOMMENDED 1.17 GPM/ORIFICE, BUT ACCEPTABLE)
DOSING OF DISTRIBUTION SYSTEM
· VOLUME OF PUMPING CHAMBER (LIBERTY PUMP BASIN)
· 36” DIAMETER, SAY FLOATS ARE 4 FT APART
· PUMP VOLUME IS ((3.14)*(D^2)/4) *(L) *(7.48 GAL/CU FT) =
((3.14)*(3FT^2)/4)*(4FT)*(7.48 GAL/CU FT) = 211 GALLONS.
· SET PUMP-OFF FLOAT AT 1FT FROM BOTTOM OF TANK, AND PUMP-ON WILL
BE ABOUT 5FT FROM THE BOTTOM OF TANK, RESULTING IN A PUMP
VOLUME OF ABOUT 211 GALLONS
· PUMP RUN TIME = 211 GAL/CYCLE / 43 GAL/MIN = 4.9 MIN/CYCLE
· PUMP CYCLE TIME = 750 GPD / 211 GAL/CYCLE = 3.6 CYCLES PER DAY
(ACCEPTABLE)
· THE REPS PUMP WILL RUN FOR 4.9 MIN/CYCLE * 3.6 CYCLES/DAY = 17.6
MINUTES PER DAY
SITE SPECIFIC DESIGN AND CONSTRUCTION NOTES
SEWER
· INSTALL 3 IMMERSION HEATERS, 2 IN THE SEPTIC TANK AND 1 IN THE LIFT
STATION. MIRACO, 110V, 500 WATT STOCK CERAMIC COATED STOCK TANK
HEATER, OR APPROVED EQUAL.
· HEAT TRACE WILL BE RUN ON THE SEWER LINE, FROM THE ARCTIC BOX,
TO THE SEPTIC TANK, AND PAST THE SEPTIC TANK AND LIFT STATION, TO
THE FORCE MAIN GOING TO THE MOUND DRAINFIELD.
· THE SYSTEM MUST DRAINBACK INTO THE PUMP CHAMBER AFTER EACH
PUMP CYCLE, SO THE PRESSURE LINE MUST SLOPE BACK TO THE PUMP
CHAMBER AND A 1/4” WEEP HOLE DRILLED UPSTREAM OF THE CHECK
VALVE, BUT DOWNSTREAM OF THE BALL VALVE. AN UPWARD FACING
ORIFICE WILL NEED TO BE INSTALLED AT THE END OF THE LATERAL IN THE
DRAINFIELD TO ALLOW AIR INTO THE SYSTEM TO DRAIN.
· AS THIS SYSTEM IS A REPS UNIT WITH PRESSURE DISTRIBUTION
DRAINFIELD, THE START-UP OF THE FACILITY SHALL BE COORDINATED
AND ARRANGED WITH THE PROJECT MANAGER AND ENGINEER.
SUCCESSFUL SYSTEM START-UP, TROUBLESHOOTING, AND ADDRESSING
ANY INSPECTION CONCERNS, MUST ALL BE COMPLETED BEFORE FINAL
CONTRACT PAYMENT.
· THE SEWER SERVICE LINE FROM THE HOUSE TO THE SEPTIC TANK WILL
BE 4” x 12” ARCTIC PIPE.
· THE SEPTIC TANK AND REPS UNIT WILL NEED TO BE INSULATED AND
COVERED WITH 4” OF INSULATION
· THE 2” HDPE PRESSURE LINE WILL BE RUN INSIDE A 4”X12” ARCTIC PIPE
CARRIER PIPE.
· THERE WILL BE A MINIMUM 4FT OF COVER OVER THE SEWER PIPE, SEPTIC
TANK, REPS UNIT, AND DRAINFIELD.
WATER
· THIS WELL IS CONSIDERED AN ARCTIC WELL AND WILL REQUIRE AN
INSULATED SLEEVE AROUND THE TOP 10FT OF WELL CASING AND
INCLUDE A FABRICATED ARCTIC CAP.
· THE 1” WATER SERVICE LINE WILL BE RUN INSIDE A 4” X 12” ARCTIC PIPE
CARRIER, WILL HAVE A MINIMUM OF 4' OF SOIL COVER.
· HEAT TRACE, INSIDE 1” PEX CARRIER PIPE, SHOULD EXTEND ALONG THE
WATER SERVICE LINE, INSIDE THE ARCTIC PIPE CARRIER, AND RUN UP
BETWEEN THE OUTSIDE OF THE CASING AND ARCTIC SLEEVE FOR EASE
OF REPLACEMENT. IT TRANSITIONS AT A JUNCTION BOX AT THE WELL
HEAD AND THEN ALSO RUNS BACK DOWN THE INSIDE OF THE CASING,
PAST THE PITLESS ADAPTER, DOWN BELOW WHERE THE PUMP IS SET,
WHEN IN PERMAFROST.
· THE PITLESS ADAPTER SHOULD BE INSTALLED A MINIMUM OF 8' BELOW
EXISTING GRADE TO PREVENT FREEZING ISSUES.
· A STANDARD ARCTIC WELL IS A DRAIN-BACK SYSTEM, BUT IF
PERMAFROST IS ENCOUNTERED, THEN A CIRCULATION SYSTEM IS
REQUIRED.
· IF THE SYSTEM IS A CIRCULATION SYSTEM, THEN THERE WILL BE TWO, 1”
WATERLINES INSIDE THE 4” X 12” CARRIER PIPE, ALONG WITH THE 1” HEAT
TRACE CARRIER PIPE. THIS REQUIRES A DOUBLE PITLESS ADAPTER. THE
RETURN OF THE DROP PIPE WILL OCCUR BELOW THE PERMAFROST
LAYER.
TH 8' (9-21-2021)
TH EL = 55'TH PHOTO (7-7-2021)
TH NOTES:
ENCOUNTERED WATER AT 3'.
PERC TEST LOG
DUE TO HIGH GROUNDWATER
AT 3FT BG, NO PERCOLATION
TEST WAS PERFORMED.
0'-0"
4'-0"
8'-0"
2'-0"
6'-0"
10'-0"
WELL-GRADED
GRAVEL W/ SAND (GW)
ORGANIC
WELL GRADED SAND,
FINE TO COARSE SAND
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
SHEET OF
4500 Diplomacy Drive
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STSITE_JBlandford.dwg LAYOUT: NOTES PRINTED: 5/1/2024 11:33:02 AM
0 1"
TOTAL SHEETSOF
C-103 5 6
MY
ML
KS
AKA-22-OME
JESSICA BLANDFORD
DESIGN NOTES
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
PH
A
SE
II
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
12'-0"
GROUNDWATER
WELL-GRADED
GRAVEL W/ SAND (GW)
SOIL ANALYSIS
3'-0"
05/01/2024
WS
WS
WS
WS
WS
O H
/E O
H /E
O H
/E O
H /E
O H
/E O
H /E
O H
/E O
H /E
FTSS
S S S S
S S
S S S S
S S S S
FT
ST
STCO
W
N12°00'20"E 245.00'
TH
W
B B
T 01
HB 01
HB 02
ST 01
LS 01
AB 01
55'
54'
56'
53'
W S
W S
W S
W S
W S
W S
W S
W S
W S
AB
TH
AB
0+00 0+20
0+
0+
1+
EL
EV
AT
IO
N
ELEVATIO
N
40'
50'
60'
70'
40'
50'
60'
70'
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00
EG
: 5
5.
8'
EG
: 5
5.
7'
EG
: 5
6.
2'
EG
: 5
6.
0'
EG
: 5
5.
8'
EG
: 5
5.
6'
EG
: 5
5.
2'
EG
: 5
4.
8'
EG
: 5
4.
5'
EG
: 5
4.
3'
EG
: 5
4.
1'
EG
: 5
4.
0'
FG
FG
FG
: 5
8.
2'
FG
: 5
8.
3'
FG
: 5
8.
3'
FG
: 5
9.
2'
FG
: 6
3.
0'
FG
: 6
3.
0'
FG
: 6
3.
0'
FG
: 5
9.
8'
FG
: 5
4.
8'
FG
HOUSE
FF=59.9'
ST
LS
VB
VB
T
AB
H B
H B
FM 04
FM 05
FM 06
AB
FM 07
SS 02 FM 03SS 01
MAJOR STRUCTURES
ID
AB 01
ST 01
LS 01
HB 01
HB 02
T 01
STATION
0+00.0
0+22.0
0+32.5
0+37.5
0+39.5
0+49.5
DESCRIPTION
ARCTIC BOX, SEE SSSD-303
1,500 GALLON ANC STEEL SEPTIC TANK, SEE SSSD-546
LIBERTY PUMP BASIN 36' X 11', SEE-SSSD-566 .
45° HORIZONTAL BEND, SEE SSSD-201
45° HORIZONTAL BEND, SEE SSSD-201
4" TEE, SEE SSSD-201
SEWER SERVICE
ID
SS 01
SS 02
FM 03
FM 04
FM 05
FM 06
FM 07
START
0+00
0+28
0+34
0+38
0+40
0+43
0+48
END
0+16
0+31
0+38
0+40
0+43
0+48
0+50
LENGTH
16 LF
3 LF
4 LF
2 LF
4 LF
7 LF
2 LF
SLOPE
2.0%
2.0%
0.0%
0.0%
0.0%
-100.0%
0.0%
DESCRIPTION
4" x 12" AGP W/ 4" INSULATION .
4" x 12" AGP W/ 4" INSULATION
4" x 12" ARCTIC PIPE
2" HDPE IN 4" x 12" AGP
W/ 2" INSULATION
2" HDPE IN 4" x 12" AGP
W/ 2" INSULATION
2" HDPE IN 4" x 12" AGP
W/ 2" INSULATION
2" HDPE IN 4" x 12" AGP
W/ 2" INSULATION
49 THST
ATE OF ALASKA
REENIGN
ANOISSE L E
FORPDERETS
GE
R
I
KURT D. SAUERS
CE-10280
HORZ. SCALE
VERT. SCALE
PLAN AND PROFILEA1
1" = 10' 1" = 10'
SEWER SWING TIE TABLE
DESC DSGN AB DESC DSGN AB
ST RISER I 19' DF PORT II 42'
ST RISER I 21' DF PORT II 26'
ST RISER II 28' DF PORT III 72'
ST RISER II 29' DF PORT III 64'
LIFT
STATION 33' DF PORT IV 65'
LIFT
STATION 34' DF PORT IV 61'
DF PORT I 28' WELL 16'
DF PORT I 17' WELL 14'
A 1 A 5
B 1 B 5
A 2 A 6
B 2 B 6
A 3 A 7
B 3 B 7
A 4 C W
B 4 D W
SHEET OF
4500 Diplomacy Drive
B
C
1 2 3 4
M R
K D
AT
E
D
ES
C R
IP
TI
O N
PROJ MGR:
DRAWN BY:
DRUMS ENG:
PROJ ENG:
PLAN SET:
SHEET TITLE
Division of Environmental Health and Engineering
IN
IT
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\Nome\AKA-22-OME_Phase_II\CAD\Civil\OME-C-STSITE_JBlandford.dwg LAYOUT: DSGN PRINTED: 5/1/2024 3:53:48 PM
0 1"
TOTAL SHEETSOF
C-104 6 6
MY
ML
KS
AKA-22-OME
JESSICA BLANDFORD
DESIGN PLAN
N O
M E, A K
SC
A
TT
ER
ED
S
IT
ES
PH
A
SE
II
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
CONTRACTOR AS-BUILTS:
COVER OVER SEWER SERVICE LINE:
SEPTIC TANK INVERT IN:
SEPTIC TANK INVERT OUT:
COVER OVER SEPTIC TANK:
COVER OVER CHAMBERS/ DRAINFIELD:
0 10' 20'
TWO STORY HOUSE
5 BEDROOM
FF= 59.9'
BED STYLE DRAINFIELD
64 CHAMBERS; 16 ROWS
OF 4 CHAMBERS (724 SF)
GRADING TABLE
ID DESCRIPTION VOL (CuYd) ELEV
EXCAVATION (EXC) 109 -
FILL (FG) 840 -
BOTTOM OF INFILTRATORS CHAMBERS 30 58'
BOTTOM OF 2' COARSE SEWER ROCK 80 56'
BOTTOM OF 2' COARSE SAND 80 54
BOTTOM OF SEPTIC TANK & LIFT STATION 14 49'
BOTTOM OF 2' SAND TANK BEDDING 9 48'
NET VOLUME: (A+B+C+D+E) - FILL (FG) -627 -
NET VOLUME = SEPTIC SYSTEM (EXCESS SOIL) - MOUND
POSITIVE VOLUME = EXCESS SOIL | NEGATIVE VOLUME = SOIL NEEDED
VALUES ARE ESTIMATED | EXPANSION & COMPACTION NOT FACTORED IN
A
B
C
D
E
EG
C
A
B
DE
100' EXISTING
WELL RADIUS
DRIVEWAY
RED FOX
ROAD
TEST HOLE
CAUTION:
OVERHEAD
ELECTRIC
GRAY WATER
DISCHARGE 4" PVC
ONE STORY HOUSE
TEST HOLE
1 2 3
5 6
A
B
FG = 63'
FG = 58.5'
49.33' MOUND & GRAVEL
.0
0'
CAUTION: AVOID CROSSING OVER PROPERTY
LINES. CONTRACTOR IS RESPONSIBLE FOR
ESTABLISHING PROPERTY LINES
NOTE:
1. ABANDON EXISTING SEPTIC SYSTEM PER DEC. REMOVE WOOD
STRUCTURE OVER TANK. CRUSH SEPTIC TANK IN PLACE. BUT KEEP
AWAY FROM NEW SEWER SERVICE LINE, PULL EXPOSED PIPES.
100'R EXISTING WELL CLEARANCE
C
D
.0
0'
53.33' SAND
INSTALL BOLLARDS
SEE SSSD-850
2:1
4" TEE4" TEE
CRAWL
SPACE
GW @ 3' BG
SEWER ROCK ELEVATION WAS SET TO MEET SEPARATION
DISTANCE TO AN ASSUMED IMPERMEABLE LAYER
INSTALL LIFT STATION ANCHOR
DUE TO GROUNDWATER SEE SSSD-566
WSL ~40LF
WSL ~73LF
INSTALL WELL,
SEE SSSD-730
GW @ 3' BG
CAUTION: THERE IS HIGH, FAST FLOWING
GROUNDWATER AT THIS SITE. APPROPRIATE
GROUNDWATER PUMPS WILL BE REQUIRED TO
DEWATER THE SITE IN ORDER TO SET THE
SEPTIC TANK AND LIFT STATION BASIN.
3'
1'
1'
2" THICK OF
3/4" MINUS SEWER
DRAIN ROCK
KEY GEOFABRIC
INTO BANK
USE PROPEX
WOVEN GEOTEXTILE
GEOTEX 200ST OR
FABRIC DRAINFIELD
DRAINAGE SWALE
3'W x 1'H x 50'L
DRAINAGE SWALE
HORIZONTAL SEPARATION
DISTANCES (NEAREST EDGE TO NEAREST EDGE IN FEET)
LIST DISTANCES
TO ALL
NEAREST:
PRIVATE
WELL
PUBLIC
WELL WATERLINE SURFACE
WATER
PROPERTY
LINE
SEPTIC TANK
SOIL
ABSORPTION
SYSTEM
LIFT STATION
SEWER LINE (S)
HORIZONTAL SEPARATION DISTANCE FROM SOIL ABSORPTION SYSTEM TO
SLOPE EXCEEDING 25%:
HOUSE
DUAL
COMPARTMENT
SEPTIC TANK
INFILTRATORS
2' MIN2' MIN
5' MAX
4' MIN
6' MIN
GROUND
WATER TABLE
IMPERMEABLE LAYER
ELEVATION VIEW
PLAN VIEW
INFILTRATORS
HOUSE
DISTRIBUTION BOX
SEPTIC TANK AND ABSORPTION FIELD SCHEMATICA1 NTS
SEPTIC TANK WITH PUMP AND PRESSURE MOUND SYSTEM SCHEMATICA3 NTS
HOUSE
DUAL
COMPARTMENT
SEPTIC TANK
INFILTRATORS
2' MIN
5' MAX
4' MIN
6' MIN
GROUND
WATER TABLE
IMPERMEABLE LAYER
ELEVATION VIEW
PLAN VIEW
DUAL
COMPARTMENT
SEPTIC TANK
HOUSE
PUMP CHAMBER
DUAL
COMPARTMENT
SEPTIC TANK
PUMP CHAMBER
CLEANOUT CLEANOUT
CLEANOUT
CLEANOUT
INSPECTION PIPE (TYP)
DISTRIBUTION BOX
INSPECTION PIPE (TYP)
INSPECTION PIPE (TYP)
INFILTRATORS
PRESSURE PIPE
INSPECTION PIPE (TYP)
PRESSURE PIPE
PUMP OUT PORTS
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-G-STSCOP.dwg LAYOUT: SSSD-100 SEPTIC SYSTEM SCHEMATIC PRINTED: 4/18/2024 3:58:07 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-100
1 1
SE
PT
IC
S
YS
TE
M S
C H
EM
A
TI
C
1.0
NOT USED
8 OF 37 TOTAL SHEETS
05/01/2024
12" (TYP)
CONTINUOUS
WELD (TYP)CONTINUOUS
WELD (TYP)
SEE
SPECIFICATION
33 31 30
SEE
SPECIFICATION
33 31 30
SEE
SPECIFICATION
33 31 30
12" (TYP)
CONTINUOUS
WELD (TYP)
ARCTIC 11.25 DEGREE GRAVITY FITTINGA1 1" = 1'-0"
ARCTIC 45 DEGREE GRAVITY FITTINGA3 1" = 1'-0"
ARCTIC 22.5 DEGREE GRAVITY FITTINGB1 1" = 1'-0"
ARCTIC 90 DEGREE GRAVITY FITTINGB3 1" = 1'-0"
ARCTIC WYE GRAVITY FITTINGC1 1" = 1'-0"
ARCTIC LONG RADIUS 90 DEGREE GRAVITY FITTINGC3 1" = 1'-0"
ARCTIC GRAVITY PIPED1 1" = 1'-0"
CONTINUOUS
WELD (TYP)
12" (TYP)
R
X
Y
PIPE JACKET X Y R
3" 12.9" 34.6" 23.5" 10.5" 4" 12.9" 34.6" 23.5" 13.5" 6" 12.9" 34.6" 23.5" 19.9"
Y
X
PIPE JACKET X Y R
3" 12.9" 35.7" 35.7" 10.5" 4" 12.9" 35.7" 35.7" 13.5" 6" 12.9" 35.7" 35.7" 19.9"
12" (TYP)
R
X
Y
PIPE JACKET X Y R
3" 12.9" 26.3" 15.3" 10.5" 4" 12.9" 26.3" 15.3" 13.5" 6" 12.9" 26.3" 15.3" 19.9"
12" (TYP)
R
X
Y
PIPE JACKET X Y R
3" 12.9" 28.0" 17.5" 10.5" 4" 12.9" 28.0" 17.5" 13.5" 6" 12.9" 28.0" 17.5" 19.9"
CONTINUOUS
WELD (TYP)
X
Y
PIPE JACKET X Y
3" 12.9" 42.3" 40.5" 4" 12.9" 42.3" 40.5" 6" 12.9" 42.3" 40.5"
Y
PIPE JACKET X Y
3" 12.9" 20' 12.9" 4" 12.9" 20' 12.9" 6" 12.9" 20' 12.9"
X
12" (TYP)
CONTINUOUS
WELD (TYP)
R
Y
X PIPE JACKET X Y R
3" 12.9" 47.1" 47.1" 32.0" 4" 12.9" 47.1" 47.1" 32.0" 6" 12.9" 47.1" 47.1" 32.0"
R
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTAGPF.dwg LAYOUT: SSSD-200 ARCTIC GRAVITY PIPE AND FITTINGS PRINTED: 4/18/2024 3:58:17 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-200
1 1
A R
C
TI
C G
R A
VI
TY
P
IP
E A
N D
FI
TT
IN
G
S
1.0
9 OF 37 TOTAL SHEETS
05/01/2024
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
12" (TYP)
A
12" (TYP)
12" (TYP)
ARCTIC 11.25 DEGREE PRESSURE FITTINGA1 1" = 1'-0"
ARCTIC 45 DEGREE PRESSURE FITTINGA3 1" = 1'-0"
ARCTIC 22.5 DEGREE PRESSURE FITTINGB1 1" = 1'-0"
ARCTIC 90 DEGREE PRESSURE FITTINGB3 1" = 1'-0"
ARCTIC TEE PRESSURE FITTINGC1 1" = 1'-0"
ARCTIC WYE PRESSURE FITTINGC3 1" = 1'-0"
ARCTIC PRESSURE PIPED1 1" = 1'-0"
ARCTIC TIGHT RADIUS 90 DEGREE PRESSURE FITTINGD3 1" = 1'-0"
12" (TYP)
R
RR
R
X
R
Y
Y
X
Y
X
X
Y
X
Y
X
Y
X
Y
Y
X; 40' - 0" OPTIONAL
A
PIPE JACKET X Y R
2" 2.2" 3" 12.9" 24.9" 24.9" 3.2" 4" 12.9" 24.9" 24.9" 4.1" 6" 12.9" 24.4" 24.9" 6" 8" 7.8"
PIPE JACKET X Y A
2" 45° 3" 12.9" 42.3" 30.6" 45° 4" 12.9" 42.3" 30.6" 45° 6" 12.9" 42.3" 30.6" 45°
PIPE JACKET X Y R
2" 7.1" 3" 12.9" 35.7" 35.7" 10.5" 4" 12.9" 35.7" 35.7" 13.5" 6" 12.9" 35.7" 35.7" 19.9" 8" 25.9"
PIPE JACKET X Y R
2" 7.1" 3" 12.9" 34.6" 23.5" 10.5" 4" 12.9" 34.6" 23.5" 13.5" 6" 12.9" 34.6" 23.5" 19.9" 8" 25.9"
PIPE JACKET X Y R
2" 7.1" 3" 12.9" 26.3" 15.3" 10.5" 4" 12.9" 26.3" 15.3" 13.5" 6" 12.9" 26.3" 15.3" 19.9" 8" 25.9"
PIPE JACKET X Y R
2" 7.1" 3" 12.9" 28.0" 17.5" 10.5" 4" 12.9" 28.0" 17.5" 13.5" 6" 12.9" 28.0" 17.5" 19.9" 8" 25.9"
PIPE JACKET X Y A
2" 90° 3" 12.9" 36.9" 26.9" 90° 4" 12.9" 36.9" 26.9" 90° 6" 12.9" 36.9" 26.9" 90°
PIPE JACKET X Y
2" 3" 12.9" 20' 12.9" 4" 12.9" 20' 12.9" 6" 12.9" 20' 12.9" 8"
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTAPPF.dwg LAYOUT: SSSD-201 ARCTIC PRESSURE PIPE FITTINGS PRINTED: 4/18/2024 3:58:28 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-201
1 1
A R
C
TI
C P
R
ES
SU
R
E
PI
PE
F
IT
TI
N G
S
1.0
10 OF 37 TOTAL SHEETS
05/01/2024
WASHER
OD
WASHER
ID
2"
FLEXIBLE CLOSED CELL FOAM
INSULATION
6" (TYP) 6" (TYP)
COUPLING BAND METAL JACKET
ARCTIC PIPE
16 GAUGE MIN
THICKNESS, SINGLE
PIECE ALUMINUM
COUPLING BAND
1/2" x 6" CADMIUM-PLATED
CARRIAGE BOLT WITH
SHOULDERED NUT (TYP OF 3)
2" x 2" x 3/16" ALUMINUM ANGLE
ATTACHED TO BAND WITH
CONTINUOUS WELD (TYP)
COUPLING BAND
INSTALL INSULATION
WASHER EACH JOINT
METAL JACKET
ARCTIC PIPE
NOTES:
1. WATER MAIN JOINTS WILL BE INSTALLED A MINIMUM OF 10 FEET FROM
SEWER MAIN JOINTS.
2. IF POSSIBLE CENTER WATER MAIN AT THE SEWER MAIN CROSSING TO
MAXIMIZE JOINT SPACING.
3. FUSION JOINTS AT SEWER CROSSING WILL BE VISUALLY INSPECTED
BEFORE AND AFTER TO ENSURE JOINTS ARE FUSED PROPERLY.USE
FUSION JOINTS AT SEWER CROSSING TO PROVIDE SECONDARY
CONTAINMENT. RECORD INFORMATION IN JOINT FUSION LOG.
4. BUTT FUSION JOINTS ARE THE RECOMMENDED METHOD OF JOINING.
5. ELECTROFUSION COUPLINGS ARE NOT TO BE USED UNLESS
ABSOLUTELY NECESSARY.
6. WRAP JOINT WITH INSULATION HALF SHELL, CUT TO FIT, AND SEAL
WITH VISCOTAQ WRAP IN SATURATED AREAS.
7. ALL INSULATION DIMENSIONS ± 1/8".
2'-0"
NOMINAL
WASHER
DIMENSIONS
ID OD
2" 2 3/8" 8"
3" 3 1/2" 12"
4" 4 1/2" 12"
6" 6 5/8" 12"
8" 8 5/8" 16"
2" OVERLAP AT MAX BAND ID
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTCONS.dwg LAYOUT: SSSD-202 ARCTIC PIPE CONNECTIONS PRINTED: 4/18/2024 3:58:37 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-202
1 1
A R
C
TI
C P
IP
E
C O
N N
EC
TI
O N
S
1.0
ARCTIC GRAVITY PIPE COUPLING BANDB3 1 1/2" = 1'-0"
ARCTIC GRAVITY PIPE CONNECTION - COUPLING BANDC3 1 1/2" = 1'-0"
GRAVITY PIPE INSULATION WASHERA3 1 1/2" = 1'-0"
11 OF 37 TOTAL SHEETS
05/01/2024
SEWER SERVICE - ARCTIC PIPEB1 1" = 1'-0"
10 GAUGE ALUMINUM
CAP WITH INSULATION
ATTACH TO ARCTIC
PIPE WITH 3 x 1/2" SELF
TAPPING SHEET METAL SCREWS
PULL ROPE ON
FROST PLUG
FLAT WASHER WITH KNOT
RUBBER JIM CAP
ON 4" ARCTIC PIPE
13"
12"
6"
TO SEPTIC TANK
OR SEWER MAIN
ARCTIC LATERAL TEE II
CARRIER PIPE
COUPLING BAND (TYP)
EXISTING
GROUND
INSULATION
WASHER (TYP)
ALUMINUM CAP
FROM HOUSE
(IF SINGLE)(BOTH IF DOUBLE)
ARCTIC LATERAL TEE I
2'-0"
FINISHED
FLOOR
WALL
CRAWLSPACE
OPTION 2:
4" PVC SCH 40 THROUGH
STEM-WALL PENETRATION
OPTION 3:
RUN SEWER SERVICE
LINE UNDER FOUNDATION
WALL AND FOOTER
OPTION 1:
USE ARCTIC BOX IF
SEWER CONNECTION
IS ABOVE GRADE
HOUSE
CONCRETE BLOCK
SEE SEWER SERVICE
TRENCH DETAILS
FOR BEDDING AND
BACKFILL REQUIREMENTS 4'-0" MIN
CRAWL
SPACE
WIDTH
VARIES
CONCRETE
STEM WALL
WOOD AND CONCRETE STEM WALL PENETRATION NOTE:
LOCATION OF STEM WALL PENETRATION SHALL BE APPROVED BY HOME OWNER AND FIELD VERIFIED TO ENSURE PROPER LOCATION.
PENETRATION TO BE CLEANLY CORED OR DRILLED.
ELASTOMERIC SEAL
ELEMENT LS MODEL
(C, L, S-316, O, OS-316, T)
(LINK SEAL)
LINK SEAL W/ BOLTS
CAST/CORE
DRILLED HOLE
SPRAYED
LOW-EXPANDING
URETHANE
INSULATION
INSULATE
WITH
SPRAYED
URETHANE
INSULATION
STEM WALL - CONCRETEA4 3" = 1'-0"
STEM WALL - WOODA3 3" = 1'-0"
BITUTHANE SHEET
COVED AROUND
PIPE, SEAL WITH
VISCOTAQ WRAP
SPRAYED
LOW-EXPANDING
URETHANE
INSULATION
1/2" PLYWOOD
CRAWL
SPACE
ALUMINUM CAPA1 3" = 1'-0"
4"x12" ARCTIC
PIPE (12.75"Ø, 10
GAUGE ALUMINUM
SPIR-L-LOCK JACKET)
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTSSWR.dwg LAYOUT: SSSD-300 SEWER SERVICE AND CLEANOUT - ARCTIC PIPE PRINTED: 4/18/2024 3:58:49 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-300
1 1
SE
W
ER
S
ER
VI
C E
A N
D C
LE
A
N O
U T
A
R C
TI
C
P
IP
E
1.0
12 OF 37 TOTAL SHEETS
05/01/2024
2X6
(TYP)
2X4
(TYP)
15° BEVEL
8" x 50 MIL NEOPRENE
RUBBER ACROSS FULL WIDTH OF LID
24" SS CONTINUOUS
PIANO HINGE ATTACHED WITH
#10 x 3/4" PAN HEAD SS SCREWS
3/8"-16 x 4" HEX
HEAD CAP SCREW
3/8"-16 T-NUT
1'-0"
1'-11"
1'-11"
2' -4
1'-8"
2' -0
"1'-11 5/8"
2' -0
/1
6"
2'-5"
2'-3 1/4"
2" RIGID INSULATION (TYP)
1 1/2" RIGID INSULATION (TYP)
SIDE PANEL
SIDEPANEL
REMOVABLE
FRONT PANEL
LID
4" 1'
-5
1' -1
7/
8"
4 7/8"
DRILL 7/16" SLOT HOLES
FOR 3/8" x 2" HEADLESS
HANGER SCREWS WITH
HEX NUTS AND WASHERS
FOR REMOVABLE FRONT
PANEL OR USE WOOD TO
METAL DOWEL SCREWS WITH
WING NUTS (4 EA) ADD
HINGE TO BOTTOM OF
REMOVABLE FRONT PANEL
FOR DROP DOWN ACCESS
DRILL 7/16" HOLE
FOR 3/8" x 4" BOLTS
FOR LID TIE DOWN
BOX BOTTOM INSULATION
SHALL BE FIELD CUT FOR
PIPE PENETRATION
BEVEL LID AND UPPER
FRAMING MEMBERS 15°
26 GAUGE ALUMINUM
SHEATHING WITH A 3/4"
LIP ON 3 SIDES SO IT
CAN BE SLIPPED ONTO
THE LID (BOTH IN FRONT
OF AND BEHIND THE HINGE)
1'-11"
11 1/2"
11 1/2"
1 1/2" ALUMINUM THRESHOLD
ATTACHED WITH #10 x 3/4"
PAN HEAD SS SCREWS, @ 4" OC
BOTTOM PANEL
FOR WATER SERVICE
BOTTOM PANEL
FOR SEWER SERVICE
RIGHT SIDE PANEL
LID
CAULK BETWEEN HOUSE
AND BOX, PROVIDE BACKER
ROD FOR GAPS GREATER
THAN 3/16"
2'-0 1/4"
1'-11"
1'-11"
11 1/2"
9"
9"
8"
1'-11"
1' -1
0" 1' -6
/4
3 1/8"
2'-7 1/4"
1 3/8"
2' -6
/8
2'-1"
2' -6
/8
1'-11"
BACK
PANEL
5" FASTENMASTER HEADLOCK
SCREWS TOP AND BOTTOM
INTO HOUSE FRAMING WALL
STUD AND BOTTOM PLATE ON
EACH SIDE (TYP)
NOTES:
1. ALL BOX FRAMING HEM-FIR #2 OR BETTER.
2. BOX FRAMING IS ASSEMBLED WITH WOOD GLUE AND 3" DECK SCREWS.
3. BOX VERTICAL SHEATHING 5/8" T1-11 SIDING.
4. ATTACH BOX VERTICAL SHEATHING TO FRAMING WITH WOOD GLUE
AND 1 5/8" DECK SCREWS.
5. BOX LID, BOTTOM, AND BACK 5/8" EXTERIOR PLYWOOD.
6. ATTACH BOX BOTTOM TO FRAMING WITH WOOD GLUE AND 1 5/8"
DECK SCREWS.
7. LINE BOX WITH 2 LAYERS OF RIGID INSULATION 1 LAYER 1 1/2" AND 1
LAYER 2".
8. THE ARCTIC BOX COMPONENTS, BOTH THE WOOD FRAMING AND T1-11
SIDING, SHOULD BE SEALED AND PROTECTED FROM MOISTURE. BOTH
THE EXTERIOR AND INTERIOR OF THE BOX SHALL RECEIVE TWO
COATINGS OF THE SEALANT. THE SEALANT CAN HAVE A CLEAR FINISH,
SUCH AS CLEAR POLYURETHANE, OR THE BOX CAN BE SEALED WITH
PRIMER AND PAINTED WITH A WEATHERPROOF EXTERIOR GRADE
PAINT THAT MATCHES THE EXISTING HOUSE SIDING. IF THE BOXES ARE
MANUFACTURED AND SEALED OFF-SITE, THEY NEED TO BE
RE-TOUCHED UP IN THE FIELD AFTER INSTALLATION.
9. VERTICALLY LOCATE BOX TO ENSURE HOUSE PIPING PENETRATION
ALLOWS CONNECTION TO SERVICE LINE.
10. SEAL ALL JOINTS IN INSULATION WITH SILICONE CAULK.
11. AFTER COMPLETING ARCTIC BOX PLUMBING CONNECTIONS FILL VOID
SPACE IN BOX WITH FIBERGLASS BATT INSULATION SEALED IN PLASTIC
BAGS.
ADD HINGE FOR DROP
DOWN ACCESS TO FRONT
PANEL AND CLEAN OUT
UTILITY BOX REAR FRAMINGA1 1" = 1'-0"
LID TIE DOWN SECTIONA2 3" = 1'-0"
UTILITY BOX SECTIONA3 3" = 1'-0"
UTILITY BOX ISOMETRICB1 NTS
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: MCYANDELL PRODUCT: Autodesk Civil 3D 2021 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTABOX.dwg LAYOUT: SSSD-304 SERVICE UTILITY BOX PRINTED: 4/18/2024 3:59:08 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-304
1 1
SE
R
VI
C
E U
TI
LI
TY
B
O X
1.0
13 OF 37 TOTAL SHEETS
05/01/2024
ARCTIC SEWER SERVICE - BELOW FINISHED FLOORA2 1 1/2" = 1'-0"
OPTION 1B
EXISTING GROUND
3" ABS DWV SPIGOT
CLEANOUT INSERTS, 2 EACH
3" ABS DWV
DOUBLE SANITARY TEE
3" ABS DWV PIPE
3" FERNCO FLEXIBLE
COUPLING 1056 x 33
TO 3" TURBO SLEEVE (TYP)
ARCTIC SERVICE BOX
FILL SPACE WITH
BAGGED FIBERGLASS
BATTING INSULATION
FINISHED FLOOR
18" ALUMINUM
COUPLING
(TYP EACH JOINT)
4" ARCTIC LONG RADIUS
90° GRAVITY FITTING
INSULATION
WASHER AT
JOINTS (TYP)
PROVIDE THREE WRAPS
OF 6 MIL POLYETHYLENE
SHEETING ON VERTICAL
SECTION (TYP)
ARCTIC BOOT WITH
FLANGE ADAPTER
RING (TO INCLUDE
6" OF EXPANSION /
C0NTRACTION SLACK)
FLEXIBLE FOAM
INSULATION
WASHER (4 EACH)
1/2" STAINLESS
STEEL HOSE CLAMP (TYP)
6"
4" HDPE ARCTIC PIPE
3" SILICONE TURBO SLEEVE
- MIN 12" INSERTION
GREASE OR LUBRICATE
PIPE COLD TEMP GREASE
SLOPE 2% MIN TO SEWER
MAIN OR SEPTIC TANK
BURY DEPTH
4'-0" MIN
4" ARCTIC PIPE
(INSULATED AND
JACKETED 4" HDPE
PIPE) WITH 12" OD
INTERIOR
OF HOME
CRAWLSPACE
SEAL PENETRATIONWITH SILICONE
CAULKING TO MAINTAIN INTEGRITY
OF HOUSE WRAP AND VAPOR RETARDER
4" (2EA-2") RIGID
BOARDSTUCK INSULATION
(3 SIDES TYP)
CONNECT TO
EXISTING WASTEWATER
DRAIN PIPING
3/4" PRESSURE
TREATED PLYWOOD
3/4" PRESSURE
TREATED PLYWOOD
UTILIDOR SECTIOND1 1" = 4'
CONTINUE AS ARCTIC
PIPE OR TRANSITION
TO UNINSULATED PVC
OR ABS PIPE
MOUNT TO
FLOOR JOISTS
PIPEHANGER
4" ABS PIPE
HEAT TRACE
FLOOR
2" EXTRUDED POLYSTYRENE
RIGID INSULATION (4" TOTAL)
2" X 4" FIR LUMBER
1/2" PRESSURE
TREATED PLYWOOD
1'-9 1/2"
1'-6"
1/2" x 4"
LAG SCREWS
FLOOR PENETRATION
NOTE: LENGTH OF
UTILIDOR WILL BE
DEPENDENT ON
INDIVIDUAL HOUSE
AND DISTANCE TO
PLUMBING
PENETRATION
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTSSVC.dwg LAYOUT: SSSD-306 PRINTED: 4/18/2024 3:59:17 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U R
AC
Y
O R
C O
M
PL
ET
EN
ES
S
O F
SC
AN
N
ED
C O
PI
ES
O F
TH
IS
P
LA
N S
H
EE
T.
T
H
IS
D R
AW
IN
G H
AS
BE
EN
P
R
EP
AR
ED
B Y
AN
TH
C A
S
AN
IN
ST
R U
M
EN
T O
F
SE
R
VI
C E
AN
D
S H
AL
L
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
AN
TH
C . A
N
TH
C S
H
AL
L R
ET
AI
N A
LL
C
O M
M O
N L
AW
, S
TA
TU
TO
R
Y
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
, I
N C
LU
D
IN
G
C O
PY
R
IG
H
T
TH
ER
ET
O
STANDARD
DETAIL
VERSION
SSSD-306
1 1
SE
R
VI
C
E U
TI
LI
TY
B
O X
SE
W
ER
H
O U
SE
B
EL
O W
F
IN
IS
H
ED
F
LO
O
R
1.0
3" ABS
14 OF 37 TOTAL SHEETS
05/01/2024
NOTES:
1. SEE SPECIFICATION FOR ADDITONAL EARTHWORKS REQUIREMENTS.
2. SEE SPECIFICATION FOR SEEDING REQUIREMENTS.
3. 4" MIN GRAVEL LEVELING COURSE, COMPACTED, IN DRIVEWAYS AND
ROADWAYS ONLY.
4. 12" TOPSOIL OVER COMPACTED FILL, 12" OVER SURROUNDING GRADE,
RAKED SMOOTH, MOUNDED AND LANDSCAPED WITH GRADE AND
FERTILIZED, EXCEPT NEAR HOME. MOUND SHOULD SLOPE WATER AWAY
FROM HOME.
5. LIMITS OF EXCAVATION, TYP. MINIMUM SLOPE OR PROTECTIVE SYSTEM AS
REQUIRED BY OSHA - BASED ON SOIL TYPE AND CONDITIONS 1 1/2 :1
SHOWN FOR TYPE C SOILS FOR REFERENCE.
6. WHERE DRIVEWAY IS IMPACTED FROM CONSTRUCTION ACTIVITIES,
REPLACE WITH 4" OF D1 SPECIFIED GRAVEL AND GEOGABRIC AND
COMPACT AND LEVEL
6" MIN
(TYP ALL SIDES)
4'-0" MIN
CLEAN
COMPACTED
BACKFILL
6" WIDE
HAZARD TAPE
3/4" MINUS GRAVEL OR SAND PIPE BEDDING,
SEE SPECIFICATIONS
NATIVE MATERIAL
2'-0"
ARCTIC PIPE, 4" x 12"
1.5
(2) 2" THICK x 24" WIDE BOARDSTOCK
1.5
4" PVC. SCH 40 PIPE OR 4" ABS PIPE
6" MIN
(TYP ALL SIDES)
4'-0" MIN
CLEAN
COMPACTED
BACKFILL
6" WIDE HAZARD TAPE
3/4" MINUS GRAVEL OR SAND PIPE BEDDING,
SEE SPECIFICATIONS
NATIVE MATERIAL
2'-0"
1.5
1.5
3 4
3 4
OPTION 1:
EXISTING DRIVEWAY, SIDEWALK, OR PATHWAY
OPTION 2:
YARD AND NON-PAVED AREA
OPTION 1:
EXISTING DRIVEWAY, SIDEWALK, OR PATHWAY
OPTION 2:
YARD AND NON-PAVED AREA
SEWER TRENCH DETAIL - ABS OR PVC PIPEA1 3/4" = 1'-0"
SEWER TRENCH DETAIL - ARCTIC PIPEC1 3/4" = 1'-0"
6" MIN
6" MIN
4"
1" PEX HEAT TRACE CARRIER PIPE
SHEET OF
4500 Diplomacy Drive Anchorage, Alaska 99508
(907) 729-3600
D
A
B
C
1 2 3 4
Division of Environmental Health and Engineering
BAR IS ONE INCH ON
ORIGINAL DRAWING, IF NOT
ADJUST SCALES ACCORDINGLY
USER: JEELLORIN PRODUCT: Autodesk Civil 3D 2023 - English FILE: P:\_Eng_Ref\z_Restricted_Access\_Scattered_Sites_Library\SSD-C-DTRNC.dwg LAYOUT: SSSD-400 SEWER SERVICE LINE TRENCH PRINTED: 4/18/2024 3:59:28 PM
0 1"
TH
E
R
EG
IS
TE
R
ED
E N
G
IN
EE
R
F O
R T
H E
PR
O
JE
C
T
IS
R
ES
PO
N
SI
BL
E
FO
R T
H E
PR
O
PE
R
A
PP
LI
C
AT
IO
N A
N D
IN
TE
G R
AT
IO
N O
F
TH
ES
E
D
ET
AI
LS
A N
D A
N Y
M O
D
IF
IC
AT
IO
N
S
SH
O W
N . T
H E
AL
AS
KA
N
AT
IV
E
TR
IB
AL
H
EA
LT
H
C O
N
SO
R
TI
U M
(A N
TH
C
) O R
IT
S
AG
EN
TS
O
R E
M
PL
O
YE
ES
S
H
AL
L N
O T
BE
H
EL
D
R
ES
PO
N
SI
BL
E
FO
R T
H E
AC
C
U…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .