5-2022 Bond Year 3 Contract 13 - Final Construction Plans.pdf

PDF 92 MB Posted

Attached to
PW 2022 Bond Year 3 Contract 13, City Project No. 104311
Solicitation number
26-0308
Issued by
Tarrant County, Texas

About this file

Summary

This is a Final Construction Plans document for PW 2022 Bond Year 3 Contract 13 (City Project No. 104311), a public works infrastructure project in Texas. The project encompasses comprehensive street and utility improvements including approximately 4,000 linear feet of 8-inch water pipe installation, 5,500 linear feet of 8-inch sewer pipe installation, 9,000 square yards of pulverization and asphalt overlay, 20,800 square yards of concrete pavement, 30,000 square feet of concrete sidewalk, and 33,000 square feet of concrete driveway. The final construction plans document provides detailed specifications and technical requirements necessary for contractors to prepare accurate bids and execute the work according to municipal engineering standards.

The document serves as the definitive technical reference for all construction activities and establishes the baseline specifications that bidders must follow. This plan document is essential for contractors to understand site conditions, material requirements, construction sequencing, and all technical specifications required to complete the infrastructure improvements. The plans enable accurate cost estimation and ensure consistency between the bidding phase and actual construction execution for this multifaceted municipal improvement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .