This document is a civil engineering plan and profile drawing for the Hamilton Township Municipal Authority's Commerce Street Interceptor Replacement Project, prepared by GHD Inc. in December 2024. The project involves the replacement of existing manholes (M02003-M02007) and installation of approximately 579.14 linear feet of 21" PVC sewer pipe along Commerce Street, with varying pipe slopes ranging from 0.30% to 7.27%. The drawing includes detailed plan and profile views, showing the proposed infrastructure changes, existing utilities, test pit locations, and flood plain considerations.

The engineering drawing provides technical specifications for the sewer line replacement, including precise elevations at key points along the project route (ranging from 593.77 to 614.0), and indicates the replacement of multiple existing manholes with new infrastructure. The project appears to be part of a municipal infrastructure improvement initiative, with careful consideration given to existing site conditions, including flood plain boundaries and utility interactions. The drawing is marked "NOT FOR BIDDING PURPOSES" and includes detailed civil engineering design elements such as inlet protection, horizontal and vertical scales, and comprehensive mapping of the proposed infrastructure modifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100-YEAR FLOOD PLAIN

0-

YE

AR

F

LO

O D

P

LA

IN

FL

O

O D

W

AY

SAN

SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN

SAN SAN SAN SAN SAN SAN SAN

SAN SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

0+50.77

1+52.66

4+23.18

6+70.38

10+39.90

0+00

1+00

2+00

3+00

4+00 5+00

6+00 7+00

8+00 9+00

10+0011+00

S.R. 4010

SEGMENT - 0240

OFFSET - 32+94

EX. MH M02007

(TO BE REPLACED)

21"

EX. MH M02006

(TO BE REPLACED)

EX. MH M02005

(TO BE REPLACED)

21"

NEW

MH M02004

21"

NEW

MH M02004B

NEW

MH M02003

21"

21"

0+001+002+003+004+005+006+007+008+009+0010+0011+0012+00

EX. M02004

(TO BE ABANDONED)EX. M02003

(TO BE ABANDONED)

EX. MH M02007

(TO BE REPLACED)

45.80LF of 21" PVC @ 1.59%

97.02LF of 21" PVC @ 7.27%

EX. MH M02006

(TO BE REPLACED)

EX. MH M02005

(TO BE REPLACED)

265.52LF of 21" PVC @ 0.30%

NEW

MH M02004

242.21LF of 21" PVC @ 0.30%364.53LF of 21" PVC @ 0.30%

NEW

MH M02004B

NEW

MH M02003

219.41LF of 21" PVC @ 0.30%

593.77(NW)

590.89(E) 596.96(W) 0+00.00

605.7

594.60(NW)

594.50(SE)

0+50.77 606.0

601.75(NW)

601.65(SE)

1+52.66 608.6

602.63(NW)

602.53(SE)

4+23.18 616.0

603.45(NW)

603.35(SE)

6+70.38 620.0

604.66(NW)

604.56(SE)

10+39.90

614.0

Project

Client

0 1"

Bar is one inch on original size sheet

IssueNo. Checked Approved Date Author Drafting Check

Designer Design Check

Project Manager

Project Director

Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com Conditions of Use

Sheet No.

Title

ARCH D

Size

Sheet

Status Code of

Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00201.dwgPlotted By: Brad Anderson9 April 2025 - 8:33 PM

DECEMBER 2024

HAMILTON TOWNSHIP

COMMERCE STREET INTERCEPTOR

12653834 -

M. COLLINS

AS NOTEDC. ANGLE

B. ANDERSON

J. HAMSHER

S. MATTHEWS

A. WHITTLE

MUNICIPAL AUTHORITY

REPLACEMENT PROJECT

GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

CIVIL

PLAN AND PROFILE

CI-201

PLAN

SCALE: 1" = 40'

N

0 80'40'20'

1 PROFILE

SCALE: H 1" = 40', V 1" = 10'

0 20'10'

0 80'40'20'

MA

TC

HL

IN

E

SE

E

DR

AW

IN

G

INLET

PROTECTION

(TYP.)

TEST

PIT #3 TEST

PIT #4 TEST

PIT #5

http://www.ghd.com http://www.ghd.com/ nbragunier Arrow nbragunier Callout Water main was located 18" east of the marks on the ground (see thick blue line). Found line still within PA One Call tolerance zone.

macollins Text Box

NOT FOR BIDDING PURPOSES.

Sheets and Views
CI-201

File details come from the government source that posted it. Updated .