About this file
This document is a comprehensive set of bid documents for the Hamilton Township Municipal Authority's Commerce Street Interceptor Replacement Project located in Hamilton Township, Franklin County, Pennsylvania. The project involves replacing approximately 1.6 miles of existing sanitary sewer infrastructure along Commerce Street (State Route 4010), with work spanning from offset 0+00 to 32+94. The project includes replacing existing manholes, installing new 21-inch PVC sanitary sewer pipes, reconnecting existing service laterals, abandoning old sewer lines, and performing associated roadway restoration. The project is scheduled for November 2025, with construction activities requiring careful coordination with PennDOT and local utilities, including multiple underground utility providers like West Penn Power, Chambersburg Borough, and Comcast.
The bid documents include detailed engineering plans, erosion and sediment control specifications, traffic control and detour plans, and extensive technical specifications for construction methods. The project will require adherence to Pennsylvania's Underground Utility Line Protection Act, with specific requirements for utility notification and protection. Construction will involve trench excavation, pipe installation, manhole replacements, and comprehensive restoration of roadways and rights-of-way. The project appears to be funded through the municipal authority, with work to be completed under strict regulatory compliance, including PennDOT Publication 408 specifications and Franklin County Conservation District guidelines. The total project budget and specific funding sources are not explicitly stated in the provided documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAMILTON TOWNSHIP MUNICIPAL AUTHORITY
COMMERCE STREET
INTERCEPTOR REPLACEMENT PROJECT
HAMILTON TOWNSHIP
FRANKLIN COUNTY, PENNSYLVANIA
BID DOCUMENTS
NOVEMBER 2025
PROJECT No. 12653834
LOCATION MAP
PROJECT
LOCATION
PROJECT SITE
NOT TO SCALE
VICINITY MAP
HARRISBURG
YORK
LANCASTER
PHILADELPHIA
PITTSBURGH
ERIE
STATE COLLEGE
WILLIAMSPORT
SCRANTON
CHAMBERSBURG
PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE
FOR CONSTRUCTION PHASE AND 10 WORKING
DAYS IN DESIGN STAGE - STOP CALL
PENNSYLVANIA ONE CALL SYSTEM, INC.
1-800-242-1776 OR 811
POCS SERIAL NUMBERS:
20252953094 (HAMILTON TWP)
20252953093 (CHAMBERSBURG)
CALL BEFORE YOU DIG
THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THE PENNSYLVANIA GENERAL ASSEMBLY UNDERGROUND UTILITY LINE PROTECTION ACT, PA ACT 287 OF 1974, AS AMENDED BY ACT 50 OF 2017, 73 P.S. § 176 ET SEQ., FOR NOTIFICATION OF UTILITIES BEFORE EXCAVATION IN THE CONTRACT AREA. THE ONE UNDERGROUND UTILITIES CALL NUMBER IS 800-242-1776 OR 811.
INDIVIDUAL LOCAL UTILITIES ARE AS FOLLOWS:
UNDERGROUND UTILITIES ACT:
COMPANY: HAMILTON TOWNSHIP FRANKLIN COUNTY
ADDRESS: 1270 CROTTLESTOWN RD
CHAMBERSBURG, PA. 17202-9435
CONTACT: JEFFREY ROCKWELL
EMAIL: hamiltontwp@comcast.net
COMPANY: HAMILTON TOWNSHIP MUNICIPAL AUTHORITY
ADDRESS: 1270 CROTTLESTOWN RD
CHAMBERSBURG, PA. 17202
CONTACT: SHARON PURNELL
EMAIL: spurnell@htmapa.com
COMPANY: BEAR VALLEY FRANKLIN COUNTY PA JT AUTH
ADDRESS: 218 SCHOOLHOUSE RD
ST THOMAS, PA. 17252
CONTACT: DOUG WESTOVER
EMAIL: bvwmanager@comcast.net
COMPANY: WEST PENN POWER
ADDRESS: 800 CABIN HILL DR
ROOM B100N
GREENSBURG, PA. 15601
CONTACT: ROBERT PAINTER
EMAIL: rpainte@firstenergycorp.com
COMPANY: CHAMBERSBURG BOROUGH
ADDRESS: 100 S 2ND ST PO BOX 1009
CHAMBERSBURG, PA. 17201
CONTACT: KENNETH WEAVER
EMAIL: kweaver@chambersburgpa.gov
COMPANY: COMCAST CABLE COMMUNICATIONS INC
ADDRESS: C/O USIC LOCATING SERVICES INC
13085 HAMILTON CROSSING BLVD STE 200 CARMEL, IN. 46032
CONTACT: USIC OFFICE PERSONNEL
COMPANY: LUMEN/CENTURYLINK
ADDRESS: 200 TECHNOLOGY DRIVE
PITTSBURGH, PA. 15219
CONTACT: DAN SHENTO
EMAIL: DAN.SHENTO@LUMEN.COM
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date
Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\General\12653834-GHD-00-DRG-00-GN-001.dwgPlotted By: Brad Anderson28 October 2025 - 10:20 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
GENERAL
COVERSHEET
GN-001 1
SHEET INDEX
SHEET
COUNT
DRAWING
NUMBER SHEET TITLE
GENERAL
1 G-001 COVERSHEET
CIVIL
2 CI-101 KEYPLAN, LEGEND AND GENERAL NOTES
3 CI-201 PLAN AND PROFILE
4 CI-202 PLAN AND PROFILE
5 CI-203 PLAN AND PROFILE
6 CI-501 DETAILS
7 CI-502 DETAILS
8 CI-503 DETAILS
9 CI-701 EROSION AND SEDIMENT CONTROL AND RESTORATION PLAN - NOTES
10 CI-702 EROSION AND SEDIMENT CONTROL AND RESTORATION PLAN - DETAILS
11 CI-801 PENNDOT HOP - ENCROACHMENT CHART, NOTES AND DETAILS
12 CI-802 PENNDOT HOP - DETAILS
13 CI-803 PENNDOT HOP - DETOUR PLAN
http://www.ghd.com http://www.ghd.com/
SAN SAN SAN SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN
SA
N
SAN
SAN
SAN
SAN
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com Conditions of Use
Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00101.dwgPlotted By: Brad Anderson5 November 2025 - 11:08 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
KEYPLAN, LEGEND
AND GENERAL NOTES
CI-101 2
GENERAL NOTES: (APPLIES TO ENTIRE JOB)
1. CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF ACT 187 WITH PROVISIONS FOR NOTIFICATION OF UTILITIES AND PROTECTION OF
EXISTING UNDERGROUND UTILITIES IN THE VICINITY OF THE PROJECT. THE ONE UNDERGROUND UTILITIES LOCATION CALL NUMBER IS (800) 242-1776.
2. IMPLEMENT EROSION AND SEDIMENTATION CONTROLS SHOWN ON DRAWINGS BEFORE STARTING CONSTRUCTION.
3. MAINTENANCE OF TRAFFIC CONTROL DEVISES SHALL COMPLY WITH PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATIONS 213
AND 408, SECTIONS 107.11 AND 900 RESPECTIVELY.
4. THE LOCATION, DEPTH, SIZE, AND TYPE OF EXISTING UTILITIES (ELECTRIC, GAS, TELEPHONE, TV CABLE, WATER, SANITARY SEWERS, STORM SEWERS, ETC.) SHOWN ON THE DRAWINGS MAY NOT BE ACCURATE. IN MANY CASES, THE ACTUAL LOCATION AND INVERT OF THESE UTILITIES IS NOT KNOWN. INDIVIDUAL UTILITY SERVICES FOR HOUSES AND BUILDINGS MAY NOT BE SHOWN. EXACT LOCATIONS AND DEPTHS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. THE CONTRACTOR SHALL TEST PIT, AS REQUIRED, TO ESTABLISH THE LOCATION OF THESE FACILITIES SO APPROPRIATE ADJUSTMENT TO THE PROPOSED SANITARY SEWER DESIGN MAY BE MADE, IF NECESSARY.
5. MANHOLE TOP ELEVATIONS SHOWN ARE APPROXIMATE.
6. MANHOLES ARE TO BE SET AT GRADE IN IMPROVED AREAS AND PRIVATE YARDS, UNLESS OTHERWISE NOTED. MANHOLES IN WOODED AND/OR SECLUDED AREAS SHALL BE SET ONE-FOOT ABOVE GRADE WHEN INDICATED ON THE DRAWINGS OR WHEN DIRECTED BY THE
ENGINEER.
7. NO TREES SHALL BE REMOVED/CLEARED FROM OUTSIDE OF THE PERMANENT SANITARY SEWER OR DRAINAGE EASEMENT UNLESS
OTHERWISE NOTED.
8. AT THE END OF EACH WORK DAY, THE EXCAVATED TRENCHES SHALL BE COMPLETELY BACKFILLED AND/OR STEEL PLATES SHALL BE PLACED
OVER THE EXCAVATION.
9. TRENCH RESTORATION SHALL INCLUDE BUT NOT LIMITED TO; MISCELLANEOUS DRIVEWAY RESTORATION, SEEDING, SHOULDER RESTORATION, SHRUBBERY, MAIL BOXES, FENCES (INCLUDING BURIED DOG FENCES), PLANTERS, GUARD RAILS, HEAD AND END WALLS, LAWN ORNAMENTS, MISCELLANEOUS LANDSCAPING DECOR, ETC.
10. CONTRACTOR RESPONSIBLE FOR BYPASS PUMPING OF SEWERAGE WHEN REPLACING AND/OR CONNECTING EXISTING SANITARY SEWER SYSTEMS. CONTRACTOR SHALL PROVIDE DIESEL POWERED AUTOMATIC SELF-PRIMING UNITS, PIPING, VALVING, AND ALL NECESSARY APPURTENANCES. A STAND-BY UNIT SHALL ALSO BE PROVIDED FOR EACH SETUP IF APPLICABLE.
11. CONTRACTOR WILL BE RESPONSIBLE FOR PERMANENT PAVING OF STREET.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING SURFACE OF THE STREET FROM CONTRACTOR'S EQUIPMENT.
13. CONTRACTOR SHALL TEST PIT ALL KNOWN EXISTING UTILITY CROSSINGS PRIOR TO INSTALLING ANY SANITARY SEWER PIPE TO VERIFY
EXISTING HORIZONTAL AND VERTICAL ELEVATIONS TO ASSURE NO CONFLICT.
14. SOIL TYPES SHOWN ARE FROM U.S. DEPARTMENT OF ASCS. THEY ARE SHOWN FOR GENERAL INFORMATION PURPOSES ONLY. SOIL TYPES
ENCOUNTERED MAY BE DIFFERENT.
15. PIPE LENGTH AND PIPE SLOPE SHOWN ON PROFILE ARE CALCULATED BASED ON DISTANCE FROM INSIDE FACE OF MANHOLE TO INSIDE FACE
OF MANHOLE.
16. SEE PENNBID SUPPLEMENTAL SECTION FOR ANY SUE DATA THAT WAS PERFORMED BY HTMA.
CI-203
CI-202
CI-201
KEYPLAN
SCALE: 1" = 120' 0 240'120'
N
S.R. 4010
SEGMENT - 0240
OFFSET - 0+00
S.R. 4010
SEGMENT - 0240
OFFSET - 32+94
EX. EDGE OF WATER
SOIL TYPE (TYP.)
(APPROXIMATE)
SOIL TYPE BOUNDARY
G G
EX. WATER
EX. GAS
EX. PROPERTY LINE
EX. STORM SEWER
EX. SANITARY SEWER
EX. EXISTING RIGHT-OF-WAY
NEW SANITARY SEWER
(ACTUAL WIDTH)
EX. INDEX CONTOUR
EX. INTERMEDIATE CONTOUR
EX. EDGE OF ROAD
EX. OVERHEAD WIRE
LEGEND:
EX. BUILDINGS AND STRUCTURES
MILL/OVERLAY AREA
STREAM CROSSING
CFSCFS
INLET PROTECTION
COMPOST FILTER SOCK
LOD LOD LOD
TEMPORARY CONSTRUCTION EASEMENT
LIMIT OF DISTURBANCE
100-YEAR FLOOD PLAIN BOUNDARY (FEMA)(DETAILED)
FLOODWAY BOUNDARY (FEMA)
FEMA DATA:
FEMA FLOOD PLAIN AND FLOODWAY BOUNDARIES FROM FEDERAL
EMERGENCY MANAGEMENT AGENCY DIGITAL FLOOD INSURANCE
RATE MAP DATABASE OF FRANKLIN COUNTY, PENNSYLVANIA
100-YEAR FLOOD PLAIN BOUNDARY (FEMA)(NON-DETAILED)
SURVEY NOTES:
1. EXISTING TOPOGRAPHIC CONDITIONS ON THIS PLAN HAVE BEEN ESTABLISHED THROUGH FIELD SURVEY
PERFORMED BY HONOR ENGINEER CO. IN DECEMBER, 2024.
2. THIS SURVEY HORIZONTALLY REFERENCES THE NORTH AMERICAN DATUM OF 1983 (NAD
83-2011)(EPOCH:2010:0000) PENNSYLVANIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE (3702) GRID, ESTABLISHED VIA KEYNET NETWORK GNSS.
3. CONTOURS SHOWN ARE FROM FIELD SURVEY. THE VERTICAL DATUM REFERENCED IS THE NORTH AMERICAN
VERTICAL DATUM OF 1988 (NAVD 88) ESTABLISHED VIA KEYNET NETWORK GNSS.
4. THIS PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND MAY BE SUBJECT TO EASEMENTS AND OTHER RESTRICTIONS, EITHER RECORDED OR UNRECORDED. THE SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR EASEMENTS OF RECORD, ENCUMBRANCES, RESTRICTIVE COVENANTS, OWNERSHIP TITLE EVIDENCE OR ANY OTHER FACTS THAT AN ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE OTHER
THAN WHAT IS SHOWN ON THIS PLAN.
5. THE LOCATIONS OF UTILITIES AS SHOWN HEREON ARE BASED ON ABOVEGROUND FEATURES, FIELD OBSERVATIONS/SURVEY, AND RECORD DRAWINGS PROVIDED BY UTILITY COMPANIES. LOCATIONS OF UNDERGROUND UTILITIES/STRUCTURES MAY VARY FROM LOCATIONS SHOWN HEREON. ADDITIONAL BURIED UTILITIES/STRUCTURES MAY BE ENCOUNTERED. NO EXCAVATIONS WERE MADE DURING THE PROCESS OF THIS SURVEY TO LOCATE BURIED UTILITIES/STRUCTURES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION AND DEPTH OF ALL UTILITY LINES PRIOR TO THE START OF ANY CONSTRUCTION
ACTIVITIES.
6. IN COMPLIANCE WITH PENNSYLVANIA ACT 50 OF 2017 (EFFECTIVE APRIL 28, 2018) ALL UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE A COMPILATION OF ACTUAL FIELD LOCATIONS AND DATA FURNISHED FROM INFORMATION SUPPLIED BY OTHERS. HONOR ENGINEER CO. ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF ANY UNDERGROUND UTILITIES AS DEPICTED ON THIS DRAWING. ANY REQUESTS FOR ADDITIONAL UNDERGROUND UTILITY INFORMATION SHOULD BE DIRECTED TO THAT RESPECTIVE UTILITY COMPANY. PA ONE
CALLS WERE PERFORMED PRIOR TO FIELD SURVEYING:
CHAMBERSBURG BOROUGH, FRANKLIN COUNTY - SERIAL #20243303142
HAMILTON TOWNSHIP, FRANKLIN COUNTY - SERIAL #20243303143
7. THE LEGAL RIGHT-OF-WAY LINES SHOWN HEREON ARE FROM INFORMATION PROVIDED BY PENNDOT DISTRICT 8, SPECIFICALLY SLD FOR LR 28006 (SR 4010), SHEET 3 OF 3. DIRECTION WAS PROVIDED BY PENNDOT DISTRICT 8 FOR THAT PORTION OF SR 4010 WITHIN CHAMBERSBURG BOROUGH THAT THE GRADED ROAD WIDTH WAS THE RIGHT-OF-WAY. USING EVIDENCE COLLECTED IN THE FIELD, SUCH AS ROAD SIGNS, THE SURVEYOR DETERMINED
THAT A 33-FOOT WIDE RIGHT-OF-WAY SHOULD BE APPLIED.
EX. UNDERGROUND ELECTRIC
FLOODWAY BOUNDARY (50' OFFSET)
Uu
W
UhB
UbB
100-YEAR FLOOD PLAIN
0-
YE
AR
F
LO
O D
P
LA
IN
FL
O
O D
W
AY
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN SAN SAN SAN SAN SAN SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
NSA
N
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SA
N
0+50.77
1+52.66
4+23.18
6+70.38
10+39.90
LODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LO
D
LO
D
LOD
LOD
0+00
1+00
2+00
3+00
4+00 5+00
6+00 7+00
8+00 9+00
10+0011+00
S.R. 4010
SEGMENT - 0240
OFFSET - 32+94
EX. MH M02O07
(TO REMAIN,
TO BE CORED
AND TO BE LINED)
21"
EX. MH M02O06
(TO BE REPLACED)
(WTFC)
EX. MH M02O05
(TO BE REPLACED)
(WTFC)
21"
NEW
MH M02O04
21"
NEW
MH M02O04A
NEW
MH M02O03
21"
21"
0+001+002+003+004+005+006+007+008+009+0010+0011+0012+00
EX. M02O04
(TO BE ABANDONED)
EX. M02O03
(TO BE ABANDONED)
45.79LF of 21" PVC @ 1.05%
96.99LF of 21" PVC @ 5.88%
EX. MH M02O06
(TO BE REPLACED)
(WTFC)
EX. MH M02O05
(TO BE REPLACED)
(WTFC)
265.52LF of 21" PVC @ 0.49%
NEW
MH M02O04
242.21LF of 21" PVC @ 0.29% 364.53LF of 21" PVC @ 0.30%
NEW
MH M02O04A
NEW
MH M02O03
219.42LF of 21" PVC @ 0.48%
593.77(NW)
0+00.00
605.7
594.60(NW)
594.25(SE)
0+50.77 606.0
600.65(NW)
600.30(SE)
1+52.66 608.6
602.05(NW)
601.95(SE)
4+23.18 616.0
602.85(NW)
602.75(SE)
6+70.38 620.0
604.05(NW)
603.95(SE)
10+39.90
614.0
MI
N.
18"
MIN.
" M
I.
MI
N.
EX. MH M02O07
(TO REMAIN,
TO BE CORED,
AND TO BE LINED)
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com Conditions of Use
Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00201.dwgPlotted By: Brad Anderson5 November 2025 - 11:16 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
PLAN AND PROFILE
CI-201 3
PLAN
SCALE: 1" = 40'
N
0 80'40'20'
1 PROFILE
SCALE: H 1" = 40', V 1" = 10'
0 20'10'
0 80'40'20'
MA
TC
HL
IN
E
SE
E
DR
AW
IN
G
CI
-2
INLET
PROTECTION
(TYP.)
INSTALL NEW WYE
BRANCH CONNECTION
AND RECONNECT TO
EXISTING LATERAL
(TYP.)
EX. MH M02O04
(TO BE ABANDONED)
EX. SANITARY SEWER MAIN
(TO BE ABANDONED AND
FILLED W/ FLOWABLE FILL)
EX. SANITARY
SEWER LATERAL (TO BE
ABANDONED AND FILLED
W/ FLOWABLE FILL)
EX. MH M02O03
(TO BE ABANDONED)
EX. SANITARY SEWER
(TO BE CAPPED)
(TYP.)
EXTEND EXISTING
SANITARY SEWER
LATERAL TO NEW
MAIN
NEW 21" PVC
SANITARY SEWER
(TYP.)
EX. 14" AC
SANITARY SEWER
(TO BE REPLACED
W/ NEW 21" PVC)
(TYP.)
NOTES:
1. ALL NEW MANHOLES SHALL BE 5-FEET IN DIAMETER UNLESS
OTHERWISE NOTED.
2. ALL NEW MANHOLES TO BE LINED AFTER PASSING VACUUM
TESTING.
- MILL/OVERLAY AREA
SINGLE LANE
MILL/OVERLAY
INSTALL NEW WYE
BRANCH CONNECTION
AND RECONNECT TO
EXISTING LATERAL
(TYP.)
BkC
UbB
WeD Uu
SAN
SAN
SAN
SAN SAN SAN SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN
SA
N
12+64.31
14+61.65
17+06.13
18+97.12
15+63.87
16+06.40
20+28.20
23+63.70
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
CFS
CF
S
CFS
CFS
12+00
13+00
14+00
15+00
16+00
17+0018+00
19+0020+00 21+00
22+00
23+00
S.R. 4010
SEGMENT - 0240
OFFSET - 15+00 NEW
MH M02O02
21"
NEW
MH M02O01
21"
21"
EX. MH M02A01
(TO BE REPLACED)
(WTFC)
21"
EX. MH M02A02
(TO BE REPLACED)
21"
NEW
MH M02A03
(WTFC)
21"
NEW
MH M02A03A
(WTFC)
21"
EX. MH M02A04
(TO BE REPLACED)
EX. MH M02O01
(TO BE REMOVED)
EX. MH M02A03
(TO BE ABANDONED)
CFS
CF
S
CFS
CFS
13+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+00
EX. MH M02O02
(TO BE REMOVED)EX. MH M02O01
(TO BE REMOVED)
EX. M02A03
(TO BE ABANDONED)
NEW
MH M02O02
192.35LF of 21" PVC @ 0.47%
NEW
MH M02O01
94.72LF of 21" PVC @ 0.48%
NEW
METERING CHAMBER
35.04LF of
21" PVC
@ 0.43%
EX. MH M02A01
(TO BE REPLACED)
(WTFC)
94.73LF of 21" PVC @ 0.48%
EX. MH M02A02
(TO BE REPLACED)
186.00LF of 21" PVC @ 0.46%
NEW
MH M02A03
(WTFC)
126.59LF of 21" PVC @ 0.43%
NEW
MH M02A03A
(WTFC)
331.01LF of 21" PVC @ 0.44%
605.20(NW)
605.10(SE)
12+64.31
617.3
606.20(N)
606.10(SE)
14+61.65
614.0
606.85(N) 606.65(S) 15+63.87
616.2
607.10(W) 607.00(S) 16+06.40
617.4
607.65(NW)
607.55(E) 17+06.13
615.9
608.60(NW)
608.50(SE)
18+97.12
619.8
609.25(NW)
609.15(SE)
20+28.20
620.3
610.80(NW)
610.70(SE)
23+63.70
618.7
219.42LF of 21" PVC @ 0.48%
EX. MH M02A04
(TO BE REPLACED)
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com Conditions of Use
Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00201.dwgPlotted By: Brad Anderson28 October 2025 - 11:26 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
PLAN AND PROFILE
CI-202 4
PLAN
SCALE: 1" = 40'
N
MA
TC
HL
IN
E
SE
E
DR
AW
IN
G
CI
-2
0 80'40'20'
1 PROFILE
SCALE: H 1" = 40', V 1" = 10'
0 20'10'
0 80'40'20'
MA
TC
HL
IN
E
SE
E
DR
AW
IN
G
CI
-2
NEW
METERING
CHAMBER
18" COMPOST
FILTER SOCK
(TYP.)
EX. MH M02O02
(TO BE REMOVED)
NEW 21" PVC
SANITARY SEWER
(TYP.)
EX. 14" AC
SANITARY SEWER
(TO BE REPLACED
W/ NEW 21" PVC)
(TYP.)
EXISTING SANITARY
SEWER MAIN TO BE
ABANDONED AND FILLED
WITH FLOWABLE FILL
(TYP.)
NEW 21" PVC
SANITARY SEWER
(TYP.)
NOTES:
1. ALL NEW MANHOLES SHALL BE 5-FEET IN DIAMETER UNLESS
OTHERWISE NOTED.
2. ALL NEW MANHOLES TO BE LINED AFTER PASSING VACUUM
TESTING.
3. UTILIZE EXISTING PAVED AREA AS STABILIZED CONSTRUCTION
ENTRANCE. PAVED AREA TO BE RESTORED UPON COMPLETION.
4. REMOVE EXISTING WOODEN BOLLARDS AND INSTALL NEW
STEEL SAFETY BOLLARDS.
5. EXISTING CONCRETE ENCASEMENT TO BE REMOVED.
- MILL/OVERLAY AREA
SINGLE LANE
MILL/OVERLAY
SINGLE LANE
MILL/OVERLAY
FULL WIDTH
MILL/OVERLAY
SEE NOTE 3
SEE NOTE 4
SEE NOTE 5
BkC
BkB BrBUbB
UbB
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SA
N
SA
N
SA
N
SA
N
32+91.60
24+81.98
27+92.27
31+93.70
32+86.78
LODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD
32+92
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00 32+00
S.R. 4010
SEGMENT - 0240
OFFSET - 0+00
21"
EX. M02A05
(TO BE REPLACED)
21"
EX. MH M02A06
(TO BE REPLACED)21"
EX. MH M02A07
(TO BE REPLACED)
18"
NEW
MH M02A08
25+0026+0027+0028+0029+0030+0031+0032+0033+0034+00
EX. MH M02A08
(TO BE REMOVED)
113.29LF of 21" PVC @ 0.44%
EX. MH M02A05
(TO BE REPLACED)
305.32LF of 21" PVC @ 0.66%
EX. MH M02A06
(TO BE REPLACED)
396.43LF of 21" PVC @ 0.62%
EX. MH M02A07
(TO BE REPLACED)
(INSIDE DROP)
(6' DIA.)
88.10LF of 18" PVC @ 1.45%
NEW
MH M02A08
611.40(NW)
611.30(SE)
24+81.98
619.5
613.50(NW)
613.40(SE)
27+92.29
629.0
625.22(NW)
616.81(SW)
615.95(SE)
31+93.70
632.5
626.30(NW)
626.50(SE)
32+86.78
632.7
18"
MIN.
" M
IN
18"
MIN.
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com Conditions of Use
Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00201.dwgPlotted By: Brad Anderson5 November 2025 - 11:49 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
PLAN AND PROFILE
CI-203 5
PLAN
SCALE: 1" = 40'
N
MA
TC
HL
IN
E
SE
E
DR
AW
IN
G
CI
-2
0 80'40'20'
1 PROFILE
SCALE: H 1" = 40', V 1" = 10'
0 20'10'
0 80'40'20'
EX. MH M02A08
(TO BE REMOVED)
STREAM CROSSING
(PERMIT: GP112803225-006)
STREAM
CROSSING
INLET
PROTECTION
(TYP.)RECONNECT TO
EXISTING
RECONNECT
TO EXISTING
REPLACE LATERAL AND
INSTALL NEW OBSERVATION
TEE. RECONNECT TO
EXISTING BUILDING SEWER.
NEW 21" PVC
SANITARY SEWER
(TYP.)
NEW 21" PVC
SANITARY SEWER
(TYP.)
NOTES:
1. ALL NEW MANHOLES SHALL BE 5-FEET IN DIAMETER UNLESS
OTHERWISE NOTED.
2. ALL NEW MANHOLES TO BE LINED AFTER PASSING VACUUM
TESTING.
FLOODWAY
(50' OFFSET
FROM T.O.B.)
(TYP.)
- MILL/OVERLAY AREA
SINGLE LANE
MILL/OVERLAY
TO BE USED ONLY IN ROW AREAS. NOT TO BE USED IN PAVED AREAS.
NOTES:
1.
4" (M
IN
SECTION
30"
6" (M
IN
STREET
SECTION
TO BE USED ONLY IN PAVED AREAS. NOT TO BE USED IN ROW AREAS.
NOTES:
1.
TYPE 1
TYPE 2
END VIEW
END VIEW
PLAN
PIPE
PLAN
PIPE
RUBBER WEDGE
SECTION
MANHOLE
SECTION
MANHOLE
GASKET
MANHOLE
MANHOLE FRAME AND COVER
HEAVY DUTY SELF SEALING DETAIL
NO SCALE
LEVELING RINGS, CONCRETE RISER
AND BOLTED FRAME DETAILS
NO SCALE
7 MANHOLE PIPE GASKETS
NO SCALE
3/4" DIA. STAINLESS
STEEL STUD W/NUT
AND WASHER: 4" MIN.
(4 BOLTS REQ'D)
6-#4 x 8" EQUALLY
SPACED AROUND
PERIMETER
MANUFACTURED ANCHORING
SYSTEM (HILTI HY-150 OR
APPROVED EQUAL)
POURED CONCRETE RISER (MIN
3,500 PSI, 28 DAY STRENGTH)
APPLY EPOXY BONDING
COMPOUND TO PRECAST
CONCRETE SECTION
APPLY BITUMASTIC SEALER
AROUND PERIMETER OF JOINT
(TYP.)
DOUBLE APPLICATION OF
PREFORMED FLEXIBLE
PLASTIC JOINT SEALANT
THREADED INSERT CAST
INTO TOP SECTION
6" MAXIMUM ALLOWABLE
LEVELING RING ADJUSTMENT
3/4" DIA. STAINLESS STEEL
STUD W/NUT AND WASHER:
4" MIN. (4 BOLTS REQ'D)
WHOLE PRECAST CONCRETE
OR RUBBERLEVELING RINGS
(VARIED THICKNESS)
FLEXIBLE CONNECTOR WITH KORBAND
AND TWO STAINLESS STEEL CLAMPS
RUBBER GASKET CAST INTO
PRECAST PIPE OPENINGS
6" MIN.
5" MIN.
VA
RI
ES
MI
N.6"
(TYP.)
VA
RI
ES
R=1'-0"
3/4
1/2"/FT.
12" CENTERS
5'-0", 6'-0"
(TYP.)
SPACED ON
NO. 8 OR NO. 57 COARSE
O.
D.
AGGREGATE, TAMPED
BASE WITH RISER SECTION
PRECAST REINFORCED CONCRETE
(SEE MANHOLE GASKET DETAIL)
JOINTS SEALED WATERTIGHT
SECTION
CAST INTO TOP
THREADED INSERT
3'- 0"
M
IN
STANDARD ASPHALT
WITH ONE COAT OF
WASHER, AND NUT COATED
STAINLESS STEEL STUD,
MATCH PAVEMENT/GRADE
AND SLOPE AS DIRECTED
BOLTED FRAME DETAIL)
(SEE LEVELING RINGS AND
3 1/2" MIN. TO 4" MAX.
MANHOLE STEPS
SEALED WATERTIGHT
FRAME AND LEVELING RINGS
30"
18" MAX. TO TOP STEP
CONCRETE
PLAN
SECTION
ALL STONE GRADATIONS ARE AASHTO
PIPES SHALL PROTRUDE 2" INSIDE
MANHOLE WALL.
CLASSIFICATION.
BOLTING OF MANHOLE FRAME AND
NOTES:
1.
2.
3.
COVER NOT REQUIRED FOR MANHOLES
INSTALLED IN PAVED SURFACES.
EMBEDMENT
CHANNEL
4" MIN. 3/4" DIA.
INSTALLATION
WITH PREFORMED PLASTIC GASKET
MANHOLE FRAMES SHALL BE SET
RESTORATION TO PREVENT
4.
FILTRATION.
(RUB-R-NEK) PRIOR TO
ANTI-FLOTATION
COLLAR ON MANHOLES
(TYP.)
6" MIN.
PRECAST CONCRETE MANHOLE WITH
PRECAST CONCRETE BASE DETAIL
NO SCALE
VA
RI
ES
GASKETS DETAIL)
6" MI
N.
WITH RUBBER GASKET.
(SEE MANHOLE PIPE
PIPE CONNECTION MADE
VA
RI
ES
5" MIN. (TYP.)
SECTION
6" MIN. NO. 8 OR NO. 57 COARSE
AGGREGATE, TAMPED
BASE WITH RISER SECTION
PRECAST REINFORCED CONCRETE
JOINTS SEALED WATERTIGHT
(SEE MANHOLE GASKET DETAIL)
(TYP.)
MAX.
5'-0"
12" CENTERS
SPACED ON
5'-0", 6'-0"
3 5/8"
INTO TOP SECTION
THREADED INSERT CAST
3'- 0"
M
IN
MATCH PAVEMENT/GRADE
AND SLOPE AS DIRECTED
COATED WITH ONE COAT
OF STANDARD ASPHALT AFTER
STEEL STUD, WASHER, AND NUT
4" MIN. 3/4" DIA. STAINLESS
INSTALLATION
(SEE LEVELING RINGS AND
BOLTED FRAME DETAIL)
3 1/2" MIN. TO 4" MAX. EMBEDMENT
SEALED WATERTIGHT
MANHOLE STEPS
FRAME AND LEVELING RINGS
30"
PLAN
ANTI-FLOTATION
COLLAR ON MANHOLES
(TYP.)
6" MIN.
PRECAST CONCRETE MANHOLE WITH
PRECAST CONCRETE BASE DETAIL
NO SCALE
HEAVY DUTY WATER TIGHT
MANHOLE FRAME AND COVER DETAIL
NO SCALE
DETAIL
SEE ENLARGEMENT
COVER PICK HOLE
(SEE DETAIL)
2 REQ'D. EQUALLY SPACED
MANHOLE
7"
COMPOUND BETWEEN
BETWEEN FRAME AND
PLASTIC SEALING
USE PREFORMED
3/4"
28-3/16"
1"
3/8
LETTERS
1" DIA. CORED HOLE
ON 32-3/4" DIA. BOLT CIRCLE
FLUSH COVER W/
RECESSED PATTERN
FRAME BOLT HOLE
INSERT ANCHORS
USE 3/4" THREADED
4 REQ'D. - EQUALLY SPACED
3/4"
1/4"
3/4" MIN.
NEOPRENE GASKET IN COVER
AS PER PROJECT MANUAL.
(GASKET NOT SHOWN)
CIRCUMFERENTIAL GROOVE
MACHINED FOR 'O' RING
PLAN
1 1 /2" 1/2
COVER PICK HOLE
SECTIONAL ELEVATION
SECTIONAL ELEVATION
HOLE THRU COVER
5/8" DIA. BOLT
FRAME FOR 1/2"
DRILL AND TAP
DIA. BOLT THREAD
CLEARANCE
2" RAISED
(SEE DETAIL)
NOTE 1
TAPER
RIBS PLAN
5/3 2"
MI
N.
1 3 /8"
1 1 /2"
PLAN
7/8" MIN.
7/32"
3/16" MAX.
AND LOCK WASHER
HEX HEAD BOLT
1/2" DIAMETER
STAINLESS STEEL
COVER BOLT HOLE-FOR WATERTIGHT COVERS
4 REQ'D. EQUALLY SPACED-NOT REQUIRED
WHEN USING STANDARD COVERS
COVER BOLT HOLE
SECTIONAL ELEVATION
NOTES:
ENLARGEMENT DETAIL
(FLAT GASKETS PROHIBITED)
3'-0"
1-1/2"
24"
26-1/4"
INTO TOP SECTION
THREADED INSERT CAST
JOINT SEALANT
FLEXIBLE PLASTIC
OF PREFORMED
DOUBLE APPLICATION
LEVELING RING ADJUSTMENT
6" MAXIMUM ALLOWABLE
(VARIED THICKNESS)
OR RUBBER LEVELING RINGS
WHOLE PRECAST CONCRETE
4" MIN. (4 BOLTS REQ'D)
W/NUT AND WASHER:
STAINLESS STEEL STUD
3/4" DIA.
SECTION
NOTES:
5" MIN. (TYP.) 5'-0" (MIN.)
30"
GASKETS DETAIL)
WITH RUBBER GASKET.
(SEE MANHOLE PIPE
PIPE CONNECTION MADE
PIPE COUPLING
DROP BOWL W/
STAINLESS STEEL
ANCHORS
INSIDE
90° PVC BEND
FLUSH TO MANHOLE
CHANNEL
EXPANSION
BAND W/ S.S.
STAINLESS STEEL
ANCHORS BANDS
TO BE SPACED
EVERY 16"
SECTION
SDR 35 PVC PIPE
REFERENCE SECTION
02605 - MANHOLE
(8" MIN.)
ANTI-FLOTATION
COLLAR ON MANHOLES
(TYP.)
6"
MIN.
1. LETTERING SHALL BE "SANITARY SEWER".
2. ALL MANHOLE FRAMES AND COVERS SHALL BE FOR HEAVY
DUTY TRAFFIC, AASHTO HIGHWAY LOADING CLASS HS-20.
3. MANUFACTURER: EAST JORDAN IRON WORKS: FRAME - NO.
1045ZPT; COVER - NO. 1040APT (4 BOLT).
4. FRAME AND COVER TO HAVE BLACK ASPHALTIC COATINGS.
3 INSIDE DROP MANHOLE DETAIL
NO SCALE
LEVELING RINGS AND BOLTED FRAME
DETAILS
NO SCALE
1. TO BE USED ONLY IN ROW AREAS.
NOT TO BE USED IN PAVED AREAS.
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date
Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00501.dwgPlotted By: Brad Anderson28 October 2025 - 11:32 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
DETAILS
CI-501 6
PLAN REINFORCED PLASTIC
SECTIONAL ELEVATION
INSIDE FACE
OF MANHOLE
STEEL BAR
#3 DEFORMED
10"
6 3/4"
1 3 /4"
1"
MI
N.
1"
1"
1/2"
(TYPICAL)
IF ANGLES ARE LESS THAN 90 DEGREES
NOTE:
1.
A 5 FOOT OR LARGER DIAMETER MANHOLE
WILL BE USED.
KOR-N-SEAL DETAIL
STRUCTURE
S.S. PIPE CLAMP
SEWER PIPE
PROPOSED ADAPTER
CONCRETE MANHOLE
EXISTING PRECAST
2" MIN.
GROUT
NON-SHRINK
(TW0)
POURED CONCRETE
EXISTING
BASE
KOR-N-SEAL
CORE DRILL OPENING
EXTENDED THROUGH
EXISTING BASE TO FORM NEW
CHANNEL
NOTE:
1. NEW PIPE CHANNEL RECONSTRUCTION IN ACCORDANCE WITH
AUTHORITY REQUIREMENTS.
WALL SLEEVE TO BE 2" GREATER THAN THE DIAMETER OF BUILDING SEWER PIPE AND SEALED WATER TIGHT.
ANY PIPE LESS THAN 3 FEET OF COVER SHALL BE DUCTILE IRON.
LOCATE CURB CLEANOUT BETWEEN CURB AND SIDEWALK, BUT NOT UNDERNEATH ANY CURB SIDE UTILITIES.
CLEANOUT/TEST TEE SPACING IS 90' MAXIMUM.
PIPE SIZES AND MATERIALS TO BE IN ACCORDANCE WITH AUTHORITY REQUIREMENTS.
4" SDR-35 AT 2% MIN. SLOPE
4" SDR-35 PVC
(T
YP
LIMITS OF LATERAL
5.
4.
3.
2.
1.
NOTES:
SERVICE LATERAL DETAIL
REFERENCE APPROPRIATE
4"
SEE NOTE 2
TEST TEE
RISER PIPE
TEE
(TYP.)
5' +/-
LIMITS OF SERVICE LATERAL
2-WAY CLEANOUT
4"x4"x4" SDR-35 PVC
(SEE NOTE 3)
SEWER MAIN
CURB
ELEVATION
BUILDING
WALL
OUTSIDE
NEAR BUILDING
TEST TEE/CLEANOUT
90' MAX.
(TYP.)
NOTE 4
AGGREGATE BEDDING MATERIAL
NO. 8 OR NO. 57 COURSE
MIN. 6" ALL AROUND
LIMITS OF BUILDING SEWER
THERE SHALL BE A 10 FOOT HORIZONTAL SEPARATION BETWEEN WATER SERVICE AND SERVICE LATERAL / BUILDING SEWER.6.
3' MAX.
IF THERE IS NO CURB, LOCATE CLEANOUT AT EDGE OF RIGHT-OF-WAY.
TO INSIDE OF BLDG.
MUST BE AS PER
PIPE FROM CLEANOUT
INTERNATIONAL
PLUMBING CODE
POSSIBLE
SIDEWALK
GRADE
FINISHED
4" RISER PIPE
3'
MI
N.
INTERMEDIATE CLEANOUT,
SET FLUSH WITH FINAL GRADE
(IF NEEDED)(SEE NOTE 7)
OBSERVATION TEE CAP
PROTECTION CASTING, SET
FLUSH WITH FINAL GRADE
PROTECTION CASTING IS ONLY REQUIRED FOR INTERMEDIATE CLEANOUTS LOCATED WITHIN PAVED AREAS OR AREAS7.
CAST IRON (PANELLA TYPE) PUSH-ON CLEANOUT
COVER (TYP.)
(BUILDING CLEANOUT, SET ABOVE FINAL GRADE)
WITH VEHICLE LOADS.
7 MANHOLE STEPS DETAIL
NO SCALE
1 TYPICAL PLAN OF MANHOLE CHANNELS DETAIL
NO SCALE
6 MANHOLE PIPE ADAPTERS DETAIL
NO SCALE
3 BUILDING SEWER DETAIL
NO SCALE
SECTION
PLAN
S
11"
10"
9 1/4"
11 3/16"
16"
8"
1"
OPEN PICKHOLE
GROOVE
JOINT SEALANT
FLEXIBLE PLASTIC
PREFORMED TONGUE
SECTION
SECTION
COUNTERSUNK NUT
BRASS CAP WITH
FINAL
CAST IRON
BODY
4" PIPE
RUBBER
GASKET
GRADE
NOTE:
1. ONLY THE BUILDING CLEANOUT COVER SHALL BE ABOVE FINAL GRADE. ALL INTERMEDIATE
CLEANOUT AND OBSERVATION TEE COVERS SHALL BE SET FLUSH WITH FINAL GRADE.
REFER TO APPR0PRIATE DWG'S. FOR CLEANOUT CAP DETAILS.
2.
1.
NOTES:
PLAIN END AND
4" PIPE
CAP PROTECTION CASTING DETAIL
REFERENCE CLEANOUT/OBSERVATION TEE
SEWER/SERVICE
ELEVATION
SWEEPING TEE
SEE PIPE
EXISTING OR NEW
4" BUILDING SEWER
RECONNECTION
DETAIL
PLAIN END
4" RISER
LATERALSEWER
BUILDING
4" EXISTING
PLAIN END PIPE
TO SEWER
MAIN
DETAIL
RECONNECTION
SEE PIPE
TEST CONNECTION/
THREADED CAP
DOUBLE
LOCATE OBSERVATION TEE 5'-0" (MAX.) FROM CURB, OR AT THE CONNECTION POINT BETWEEN SEWER LATERAL
AND BUILDING SEWER IF KNOWN.
5 MANHOLE GASKET DETAIL
NO SCALE
CLEANOUT/OBSERVATION TEE CAP
PROTECTION CASTING DETAIL
NO SCALE
CAST IRON (PANELLA TYPE)
PUSH-ON CLEANOUT COVER DETAIL
NO SCALE
4 OBSERVATION TEE DETAIL
NO SCALE
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date
Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00501.dwgPlotted By: Brad Anderson28 October 2025 - 11:33 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
DETAILS
CI-502 7
PROVIDE MASONRY
SUPPORTS AS REQUIRED
TO PREVENT PIPE MOVEMENT
SECURE PIPE USING NO.5
STEEL REINFORCING RODS
WITH WIRE, SPACED AS
REQUIRED TO PREVENT
PIPE FLOTATION
MI
N.
6" 6"
1'-0"
PENNDOT
CLASS A (3000 PSI)
CONCRETE
UNDISTURBED
4'
MI
NI
MU
M
DE
PT
H
VA
RI
ES
6" MIN.
O.
D.
6" M
IN
12"12"
AASHTO NO. 8 OR NO. 57
AGGREGATE BEDDING
LIM
IT
O F
PI
PE
BE
DD
IN
G
MIN.
O.D.
MIN.
1'
MA
X.
PA NO. 2A COARSE AGG.
TRENCH BACKFILL MACHINE
AG
GR
EG
AT
E
TAMPED BACKFILL IN 8" LAYERS
EARTH OR ROCK
PAVING RESTORATION SHALL BE IN ACCORDANCE WITH TOWNSHIP REQUIREMENTS.
NOTES:
1.
UNDISTURBED SUBGRADE
4'
MI
NI
MU
M
OF
C
OV
ER
6" MIN.
O.
D.
6" M
IN
FINISH GRADE
12"12"
AASHTO NO. 8 OR NO. 57
AGGREGATE BEDDING
LIM
IT
O F
PI
PE
BE
DD
IN
G
MIN.
O.D.
MIN.
1'
MA
X.
6" TOPSOIL (MIN.) IN ALL DISTRUBED AREAS
COMMON FILL MATERIALS
COMPACTED IN 8" LAYERS
AG
GR
EG
AT
E
SANITARY SEWER
TO
DE
TE
CT
IO
N
TA
PE
6" (MIN.)
O.
D.
12"12"
AASHTO NO. 8 OR NO. 5
COARSE AGGREGATE BEDDING
LIM
IT
O F
PI
PE
BE
DD
IN
G
MIN.
O.D.
MIN.
8" M
IN
DEPTH AS REQUIRED
R-3 BEDDING
EARTH OR ROCK
STABLE UNDISTURBED
TA
PETO
DE
TE
CT
IO
N
SANITARY SEWER
EXISTING DRIVEWAY
6" 2A STONE
NOTE:
HMA WEARING COURSE PG64-22
0.3 MILLION TO < 3 MILLION ESAL'S
9.5mm, 1-1/2" DEPTH, SRL-L
WIDTH VARIES
FULL DEPTH SAWCUT,
SEAL WITH PG64-22
SEALANT MATERIAL
(TYP.)
SUPERPAVE ASPHALT MIXTURE DESIGN,
SUPERPAVE ASPHALT MIXTURE DESIGN,
HMA BASE COURSE, PG64-22,
25mm, 4" DEPTH
(SEE NOTE)
PAVEMENT DEPTHS SHOULD BE AS CALLED OUT OR
MATCH EXISTING WHICHEVER IS GREATER.
EXISTING ROAD
1'
CUTBACK
1'
CUTBACK
AGGREGATE BACKFILL
NO. 2A COARSE
TRENCH WIDTH
6" 2A SUBBASE
TACK COAT
(TYP.)
FULL DEPTH SAWCUT,
SEAL WITH PG64-22
SEALANT MATERIAL
FINAL SAWCUT FOR
FOR TRENCHING
INITIAL SAWCUT
1' CUT BACK
SUPERPAVE ASPHALT MIXTURE DESIGN,
HMA BASE COURSE, PG64-22,
0.3 MILLION TO < 3 MILLION ESAL'S
25mm, 5" DEPTH
2A COARSE AGGREGATE
EXISTING GROUND
AND/OR PAVEMENT
TRENCH
WIDTH
PAVING MATERIAL (COLD PATCH)
3" (COMPACTED) 2P OR 3P
6" COMPACTED SUBBASE
SUPERPAVE ASPHALT MIXTURE DESIGN,
HMA BASE COURSE, PG64-22,
0.3 MILLION TO < 3 MILLION ESAL'S
19mm, 3" DEPTH
OR
6" MIN.
AGGREGATE
SUPERPAVE ASPHALT MIXTURE DESIGN,
HMA WEARING, PG64-22,
0.3 MILLION TO < 3 MILLION ESAL'S
9.5mm, 1-1/2" DEPTH, SRL-H
DETECTION TAPE
(8" MIN. ABOVE PIPE)
DETECTION TAPE
(8" MIN. ABOVE PIPE)
DETECTION TAPE
(8" MIN. ABOVE PIPE)
9 TRENCH DETAIL IN PAVED AND SIDEWALK AREAS
NO SCALE
10 CONCRETE ENCASEMENT DETAIL
NO SCALE
5 TRENCH DETAIL IN RIGHT-OF-WAY
NO SCALE
6 TEMPORARY PAVING RESTORATION DETAIL
NO SCALE
1 UNSUITABLE MATERIAL EXCAVATION
NO SCALE
2 ASPHALT DRIVEWAY RESTORATION DETAIL
NO SCALE
3 TOWNSHIP ROAD TRENCH RESTORATION DETAIL
NO SCALE
(COMMERCE STREET, SR 4010, SEGMENT 0240)
PENNDOT TRENCH PAVING RESTORATION DETAIL
NO SCALE
6"(MIN.)
FOR BACKFILL REQUIREMENTS
SEE APPROPRIATE TRENCH DETAIL
SEWER PIPE
EXISTING SANITARY
PVC TO ACP CONNECTION USE MECHANICAL JOINT COUPLING
PVC TO CAST IRON CONNECTION USE MECHANICAL JOINT COUPLING
NEW PVC SANITARY SEWER PIPE
UNDISTURBED
SUBGRADE
PVC TO PVC CONNECTION USE PVC REPAIR SLEEVE
PVC TO TCP/VCP CONNECTION USE S.S. ANTI-SHEAR COLLAR RUBBER ADAPTER
DIP/CIP TO DIP/CIP CONNECTION USE MECHANICAL JOINT COUPLING
NOTES:
1. RECONNECTIONS TO BE AIR TESTED IN ACCORDANCE WITH SPECIFICATIONS.
2. MECHANICAL JOINT COUPLINGS TO BE SMITH-BLAIR OR APPROVED EQUAL
NO. 8 OR PA NO. 2A. COARSE
AGGREGATE PIPE BEDDING
MATERIAL, COMPACTED IN 4" LIFTS.
7 PIPE RECONNECTION DETAIL
NO SCALE
50 LB. BAG OF CONCRETE
CENTERED BENEATH JOINT
(NOT REQUIRED IN ROCK
EXCAVATION)
TOP ELEV=±616.5
FINISHED GRADE
PLAN
SECTION
12'-0" 6"6"
INV=___.__INV=___.__
12'-0"
8'- 0"
6" TYP.
LADDER W/ SAFETY BAR
4"
FLOW FLOW
FILL CONCRETE
2'
MI
N.
PRECAST CONCRETE METER CHAMBER DETAIL
(8'-0" x 12'-0" INSIDE DIMENSIONS)
NO SCALE
6" GOOSE NECK VENT
W/ INSECT SCREEN 2'-0"x2'-0" DOUBLE LEAF
ALUMINUM ACCESS HATCH
W/ GUTTER TYPE FRAME (2
PIECE SPRING ASSIST.)
1-1/2"° PVC
HATCH DRAIN
MANHOLE STEPS
3-1/2" MIN. TO 4" MAX.
EMBEDMENT
MODULAR SEAL
OR PIPE GASKET
(TYP.)
SLOPE TO DRAIN
TO OPEN PIPE
SPACED ON
CENTERS
12" MIN. 16"
MAX. (TYP.)
MODULAR SEAL
OR PIPE GASKET
(TYP.)
2'-0"x2'-0" DOUBLE LEAF
ALUMINUM ACCESS HATCH
W/ GUTTER TYPE FRAME (2
PIECE SPRING ASSIST.)
LADDER W/ SAFETY BAR
2 CUBIC
YARDS #57
NEW CLEANOUT
CASTING PROTECTION
19" MIN.
3"
NEW 4" PVC NEW 4" PVC
6" THICK CONCRETE COLLAR
3"
2A STONE
BACKFILL
S19 " M
IN
3"
6" THICK
CONCRETE COLLAR
PLAN
ELEVATION
PUSH-ON COVER
CONCRETE COLLAR FOR
CLEANOUTS/TEES IN PAVED AREAS DETAIL
NO SCALE
REMOVE TOP OF PIPE
12"12" 10'-0"
REMOVE
TOP OF PIPE
1'-0"
MIN.
TRENCH
MIN.
1'-0"
BITUMINOUS TACK COAT
INITIAL SAWCUT
FOR TRENCHING
FINAL SAWCUT FOR
1' CUT BACK
NO. 2A COARSE
AGGREGATE BACKFILL
BITUMINOUS TACK COAT
FINAL RESTORATION
SEE MILL/OVERLAY DETAIL
10" TOTAL DEPTH
(TOP 2" TO BE
MILLED/OVERLAYED)
SPAV, WMA, BASE COURSE,
PG 64S-22, 10.0 TO < 30.0 MILLION ESALS,
25.0 MM, 5" DEPTH (2 LIFTS) OR MATCH
EXISTING, WHICHEVER IS GREATER
Project
Client
0 1"
Bar is one inch on original size sheet
IssueNo. Checked Approved Date
Author Drafting Check
Designer Design Check
Project Manager
Project Director
Project No. Date ScaleThis document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use Sheet No.
Title
ARCH D
Size
Sheet of
Plot Date: Path and Filename: G:\564\12653834\Digital_Design\ACAD\Sheets\Civil\12653834-GHD-00-DRG-00-CI-00501.dwgPlotted By: Brad Anderson5 November 2025 - 11:58 AM
11-06-25MCBABID DOCUMENTS0
NOV. 2025
HAMILTON TOWNSHIP
COMMERCE STREET INTERCEPTOR
12653834 13
M. COLLINS
AS NOTEDJ. HAMSHER
B. ANDERSON
M. COLLINS
B. ANDERSON
M. SMITH
MUNICIPAL AUTHORITY
REPLACEMENT PROJECT
GHD Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com
CIVIL
DETAILS
CI-503 8
SOIL DESCRIPTION:
THERE ARE NO KNOWN NATURALLY OCCURRING GEOLOGIC FORMATIONS THAT MAY HAVE THE POTENTIAL TO CAUSE POLLUTION DURING EARTH DISTURBANCE ACTIVITIES.
APPROXIMATE BOUNDARIES OF THE SOIL-MAPPING UNITS ARE SHOWN ON THE ATTACHED DRAWINGS. THIS INFORMATION WAS OBTAINED FROM THE USDA NRCS ONLINE WEB SOIL SURVEY
(HTTP://WEBSOILSURVEY.NRCS.USDA.GOV/APP/).
SOILS FOUND WITHIN THE PROJECT AREA ARE CLASSIFIED AS FOLLOWS:
SOIL LIMITATION RESOLUTIONS:
—SLOPE LIMITATIONS WILL BE ADDRESSED BY LIMITING THE AMOUNT OF THE SOIL THAT IS EXPOSED. DAILY TRENCH EXCAVATION WILL BE LIMITED TO THE LENGTH OF PIPE PLACEMENT AND BACKFILLING THAT CAN BE COMPLETED IN THE SAME DAY. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED USING TEMPORARY SEEDING. AN EROSION CONTROL BLANKET WILL BE USED ON
ALL SLOPES 3:1 OR GREATER.
—DEPTH TO HARD BEDROCK AND LARGE STONE LIMITATIONS WILL BE ADDRESSED BY USE OF ROCK BREAKER, IF NECESSARY, AND ONLY PERFORMED WHEN APPROVED BY THE OWNER AND PENNDOT.
—DEPTH TO SATURATED ZONE AND FLOODING LIMITATIONS WILL BE ADDRESSED BY USE OF A PUMPED WATER FILTER BAG IF NECESSARY. PUMPED WATER FILTER BAGS MUST BE PLACED AT LEAST 50
FEET FROM ANY STREAM BANKS IN WELL VEGETATED, FLAT AREAS.
· CONTRACTOR IS REQUIRED BY LAW TO FOLLOW OSHA REQUIREMENTS; THIS WILL ADDRESS ANY LIMITATIONS ASSOCIATED WITH UNSTABLE EXCAVATION WALLS OR UNSTABLE URBAN SOILS.
· DUSTY/DROUGHTY LIMITATIONS FOR LANDSCAPING WILL BE ADDRESSED BY SUPPLEMENTAL WATERING IF NECESSARY.
· HYDRIC SOILS OR HYDRIC INCLUSIONS: A WETLAND DELINEATION WAS CONDUCTED AND DETERMINED WETLANDS ARE ABSENT IN THE PROJECT AREA.
EROSION AND SEDIMENTATION BEST MANAGEMENT PRACTICES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED
DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. FRANKLIN COUNTY CONSERVATION DISTRICT MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND
APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED
AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BEST MANAGEMENT PRACTICES (BMPS) SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR
PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY
MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER. FOR THIS PROJECT, AREAS USED FOR STORAGE AND DISPOSAL OF EXCESS EXCAVATED MATERIAL WILL BE
DETERMINED BY THE CONTRACTOR IN CONSULTATION WITH THE TOWNSHIP.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE
OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE FRANKLIN COUNTY CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING
ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
14. VEHICLES AND EQUIPMENT SHALL NOT ENTER OR LEAVE THE PROJECT AREA UNLESS THROUGH AN APPROVED ENTRANCE/EXIT DESIGNED TO CONTROL SEDIMENT TRACKED OFF SITE SUCH AS A ROCK
CONSTRUCTION ENTRANCE.
15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT (E&S) BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
16. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE
AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
17. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
18. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
19. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
20. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
21. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
22. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF
SATISFACTORY FILLS.
23. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
24. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
25. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
26. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED.
SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
27. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT
STABILIZATION SPECIFICATIONS.
28. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
29. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL
CONSERVATION DISTRICT OR THE DEPARTMENT.
30. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION
DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
31. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
32. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION
DISTRICT TO SCHEDULE A FINAL INSPECTION.
33. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR
CRIMINAL PENALTIES FOR EACH VIOLATION.
34. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL OR IS OTHERWISE AUTHORIZED FOR USE ON THE PROJECT SITE. FORM FP-001, CERTIFICATION OF CLEAN FILL, MUST BE COMPLETED AND SUBMITTED TO DEP (ELECTRONICALLY ON THE DEP WEBSITE) PRIOR TO MOVEMENT OF CLEAN FILL TO THE RECEIVING SITE. FORM FP-001 MUST BE COMPLETED AND SUBMITTED REGARDLESS OF WHETHER SAMPLING AND ANALYSIS ARE PERFORMED AS PART OF ENVIRONMENTAL DUE DILIGENCE. BOTH THE DONOR SITE AND THE RECEIVING SITE MUST RETAIN COPIES OF THE COMPLETED FORM FP-001 FOR A PERIOD OF FIVE (5) YEARS.
GENERAL STAGING OF CONSTRUCTION ACTIVITIES:
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE FRANKLIN COUNTY CONSERVATION DISTRICT PRIOR TO IMPLEMENTATION. EACH STAGE SHALL BE COMPLETED AND IMMEDIATELY STABILIZED BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING, GRUBBING AND TOPSOIL STRIPPING SHALL BE LIMITED ONLY TO THOSE AREAS DESCRIBED IN EACH STAGE.
AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND GRUBBING), THE OWNER AND/OR OPERATOR SHALL INVITE ALL…