About this file
This is a project plan document for the City of Fort Worth, Texas Parks and Recreation Department detailing athletic field improvements across four municipal parks: Gateway Park, Rolling Hills Soccer Complex, Rockwood Park, and Northwest Community Park. The project encompasses multiple work units including rehabilitation of six softball infields at Gateway Park with infield clay replacement (approximately 9,895 square yards total), removal and reinstallation of irrigation components, electrical system upgrades for field lighting controllers, soccer field electrical improvements at Rolling Hills Complex involving Musco lighting control systems, softball infield restoration at Rockwood Park (1,490 square yards), irrigation modifications, electrical metering and control upgrades, and installation of four cantilever shade structures over existing bleachers at Northwest Community Park. The project is identified as City Project Numbers 105169, 105170, and 105868, with plans prepared in June 2026 by LAN (Lockwood, Andrews & Newnam, Inc.), a Texas registered engineering firm. Construction activities are limited to 7:00 AM to 6:00 PM, Monday through Friday, unless otherwise approved, with contractors required to submit shop drawings for city review and provide pre-construction meetings with Parks and Recreation Department field operations staff on a minimum 72-hour notice.
The work is funded through general capital project funds for the 2024/2025 fiscal year and is performed on city-owned parkland requiring compliance with Fort Worth Parks and Recreation Department protocols including parkland protection fencing, tree preservation measures per the City Forester's requirements, erosion control adherence to state and local ordinances, and restoration of all disturbed areas to pre-construction conditions or better. All contractors must obtain utility locating services through Texas 811, contact specific utility providers 48 hours prior to excavation, notify affected property owners and schools of construction activities, and maintain documentation including pre-construction videography of impacted areas and monthly landscape maintenance reports. Material certifications for soil, sod, seeding, and irrigation installations must be provided to Parks and Recreation Department upon request, and a two-year warranty and maintenance bond are required for all planting materials and irrigation systems.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
BLUE MOUND RD
E HARMON RD
PROJECT LOCATION
N UNIVERSITY DR
JACKSBORO HWY
I-30/TOM LANDRY FWY
PROJECT LOCATION PROJECT LOCATION MANSFIELD HWY
C
AM
PU
S
D R
THE CITY OF FORT WORTH, TEXAS
MATTIE PARKER
MAYOR
JESUS "JAY" CHAPA
CITY MANAGER
XXXXXX
CARLOS M. GONZALEZ, PARK PLANNER
PARK & RECREATION DEPARTMENT
DATE:
CITY PROJECT NO. 105169, 105170 & 105868
ATHLETIC FIELD IMPROVEMENTS AT:
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
PREPARED BY:
COUNCIL DISTRICTS: No. 11
MICHAEL OWEN, P.E., CITY ENGINEER
TRANSPORTATION & PUBLIC WORKS DEPARTMENT
DATE:
TERESA J. THOMASON, DEPUTY DIRECTOR
PARK & RECREATION DEPARTMENT
DATE:
JUNE 2026
X X
X X
X
X X
SHEET INDEX
DESCRIPTIONSHEET NO.
UNIT I: GATEWAY PARK IMPROVEMENTS
EXISTING CONDITIONS & SURVEY CONTROL
REMOVALS
SOFTBALL FIELD IMPROVEMENTS
IRRIGATION SHEETS
ELECTRICAL SHEETS
5-6 7-8 9-10
11-12 13-14
COVER SHEET
GENERAL NOTES & LEGEND
QUANTITY SHEET
2-3
P \1
-1
-0
\4
-0 -P ro d u ct io n -W o rk in g \4
-1 -B
IM
-C
A D
\C iv il\ S h e e ts
\1 -1
-0
-C
O V
E R
.d w g
-0
-2
H
A g u ila r
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
A
TH
LE
TI
C
FI
EL
D
IM
PR
O V
EM
EN
TS
A
T:
SHEET: OF
FILE NO.
RO
CK
W O
O D
, R O
LL
IN
G H
IL
LS
N
O
RT
H W
ES
T
CO
M
M U
N
IT
Y , A
N D
G A
TE
W
A Y
P A
RK
S
PARK SITE: ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, GATEWAY
FUNDED BY: GENERAL CAPITAL PROJECT FUNDS 2024/2025
1 29
UNIT 2: ROLLING HILLS SOCCER COMPLEX IMPROVEMENTS
EXISTING CONDITIONS & ELECTRICAL PLAN SHEETS15-16
UNIT 3: ROCKWOOD PARK IMPROVEMENTS
EXISTING CONDITIONS & SURVEY CONTROL
REMOVALS
SOFTBALL FIELD IMPROVEMENTS
IRRIGATION SHEET
ELECTRICAL PLAN SHEET
UNIT 4: NORTHWEST COMMUNITY PARK IMPROVEMENTS
EXISTING CONDITIONS
SHADE STRUCTURE PLAN & DETAILS
DETAIL SHEET
ROCKWOOD IRRIGATION DETAILS
ROCKWOOD ELECTRICAL DETAILS
27-29
LOCATION MAP
1" = 3000'
LOCATION MAP
1" = 3000'
LOCATION MAP
1" = 3000'
LOCATION MAP
1" = 3000'
TEXAS REGISTERED ENGINEERING FIRM F-2614
1300 SUMMIT AVENUE, SUITE 300
FORT WORTH, TX 76102
(817)820-0420
GATEWAY PARK
751 Beach St
ROLLING HILLS PARK
2525 Joe B Rushing Rd
NORTHWEST COMMUNITY PARK
8375 Blue Mound Rd
ROCKWOOD PARK
701 N University Dr
STA
TE OF TEXAS
L ICENSED
PROFESS IONAL ENG IN
EE
R
ADAM T. GIBLIN
137032
06/10/2026
07/13/2026
JY
JY
SP
SP
Joel McElhany
Teresa Thomason (Jul 15, 2026 10:21:35 CDT) Teresa Thomason Teresa.Thomason@fortworthtexas.gov
07/16/2026 https://fortworthtexas.na1.adobesign.com/verifier?tx=CBJCHBCAABAATxnDC-JZX6fBs808I2P7ViIcXpJb2ss8 https://fortworthtexas.na1.adobesign.com/verifier?tx=CBJCHBCAABAATxnDC-JZX6fBs808I2P7ViIcXpJb2ss8 https://fortworthtexas.na1.adobesign.com/verifier?tx=CBJCHBCAABAATxnDC-JZX6fBs808I2P7ViIcXpJb2ss8 https://fortworthtexas.na1.adobesign.com/verifier?tx=CBJCHBCAABAATxnDC-JZX6fBs808I2P7ViIcXpJb2ss8 https://fortworthtexas.na1.adobesign.com/verifier?tx=CBJCHBCAABAATxnDC-JZX6fBs808I2P7ViIcXpJb2ss8 https://fortworthtexas.na1.adobesign.com/verifier?tx=CBJCHBCAABAATxnDC-JZX6fBs808I2P7ViIcXpJb2ss8
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P
\1
-1
-0
\4 -0
-P ro d u ct io n -W o rk in g
\4 -1
-B
IM
-C A
D \C iv il\
S h e e ts \1
-1
-0
G
E N
E R
A L
N O
T E
S .d w g
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GENERAL
JUNE 2026 2LAN
LAN
DIVISION 01 - GENERAL REQUIREMENTS
GENERAL:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES, WHETHER PUBLIC OR PRIVATE, PRIOR TO EXCAVATION. THE INFORMATION AND DATA SHOWN WITH RESPECT TO EXISTING UNDERGROUND FACILITIES AT OR CONTIGUOUS TO THE SITE IS APPROXIMATE AND BASED ON INFORMATION FURNISHED BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR ON PHYSICAL APPURTENANCES OBSERVED IN THE FIELD. THE CITY AND ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH INFORMATION OR DATA, FOR LOCATING ALL UNDERGROUND FACILITIES, FOR COORDINATION OF THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES DURING CONSTRUCTION AND FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. THIS WORK SHALL BE CONSIDERED AS A SUBSIDIARY ITEM OF WORK, THE COST OF WHICH SHALL BE INCLUDED IN THE PRICE BID IN THE PROPOSAL FOR VARIOUS BID ITEMS. THE CONTRACTOR SHALL NOTIFY ANY AFFECTED OWNERS (UTILITY COMPANIES) OR AGENCIES IN
WRITING AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
A. NOTIFY TEXAS 811 (1-800-DIG-TESS OR WWW.TEXAS811.ORG) TO LOCATE EXISTING UTILITIES PRIOR TO CONSTRUCTION.
B. CAUTION! BURIED ELECTRIC LINES MAY EXIST ALONG THIS PROJECT. CONTACT ELECTRICAL PROVIDERS 48 HOURS PRIOR TO EXCAVATION:
· ONCOR ELECTRIC DELIVERY 817-512-6422
· TRI-COUNTY-ELECTRIC COOPERATIVE 817-444-3201
· UNITED COOPERATIVE SERVICES 817-447-9292
C. CAUTION! BURIED GAS LINES MAY EXIST ALONG THIS PROJECT. CONTACT {GAS COMPANY} 48 HOURS PRIOR TO EXCAVATION, AND WITHIN TWO (2) HOURS
OF ENCOUNTERING A GAS LINE (LISA DEESE: 888-286-6700)
D. CAUTION! BURIED COMMUNICATION CABLES MAY EXIST ALONG THIS PROJECT. CONTACT COMMUNICATION COMPANIES 48 HOURS PRIOR TO EXCAVATION:
· AT&T 682-229-8410
· SPECTRUM 866-874-2389
· FRONTIER COMMUNICATIONS 817-394-0953
E. CAUTION! WHEN DOING WORK WITHIN 200 FEET OF ANY SIGNALIZED INTERSECTION, THE CONTRACTOR SHALL NOTIFY TRAFFIC MANAGEMENT DIVISION OF CITY OF FORT WORTH T/PW, 72 HOURS PRIOR TO EXCAVATION (REPRESENTATIVE'S NAME: XXX-XXX-XXXX). THE CONTRACTOR SHALL PROTECT EXISTING SIGNAL HARDWARE, GROUND BOXES, DETECTION LOOPS, AND UNDERGROUND CONDUIT AT SIGNALIZED INTERSECTIONS. ANY DAMAGES AT SIGNALIZED INTERSECTIONS SHALL BE REPLACED AT THE EXPENSE OF THE CONTRACTOR. THE CONTRACTOR SHALL CONTACT THE CITY AT 817-392-8100 TO PERFORM CONDUIT LINE LOCATES AT SIGNALIZED INTERSECTIONS 72 HOURS PRIOR TO COMMENCING WORK AT THE INTERSECTION.
F. THE CONTRACTOR SHALL NOTIFY THE CITY OF FORT WORTH PROJECT MANAGER 48 HOURS PRIOR TO THE START OF ANY EXCAVATION (ANTHONY RUIZ:
817-392-5700)
2. THE LOCATION OF ALL DRIVEWAYS, RETAINING WALLS, STRUCTURES, ETC. WHICH MAY BE SHOWN ON THESE PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE EXACT SIZE, LOCATION, ELEVATION, AND CONFIGURATION OF ALL STRUCTURES PRIOR TO CONSTRUCTION.
3. PROTECT CONCRETE CURB AND GUTTER, DRIVEWAYS, AND SIDEWALKS THAT ARE NOT DESIGNATED FOR REMOVAL. REMOVAL AND REPLACEMENT OF
THESE ITEMS SHALL BE AS DESIGNATED IN THE DRAWINGS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE GENERAL SAFETY AT AND ADJACENT TO THE PROJECT AREA, INCLUDING THE PERSONAL SAFETY OF PUBLIC AND PRIVATE PROPERTY. CONTRACTOR SHALL PROVIDE TEMPORARY SANITARY SEWER FACILITIES TO AFFECTED PROPERTY OWNERS, IF NECESSARY PER SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS. NOT A SEPARATE PAY ITEM.
5. CONTRACTOR'S PERSONNEL SHALL HAVE IDENTIFYING CLOTHING, HATS OR BADGES AT ALL TIMES WHICH IDENTIFY THE CONTRACTOR'S NAME, LOGO OR
COMPANY.
6. THE CONTRACTOR SHALL DISTRIBUTE NOTICES (DOOR HANGER) TO ALL AFFECTED PROPERTY OWNERS PRIOR TO BEGINNING WORK ON EACH PROPERTY
PER SECTION 01 35 13.
7. THE CONTRACTOR SHALL VIDEO ALL POTENTIALLY IMPACTED PRIVATE PROPERTY AREAS PRIOR TO WORK. VIDEOS SHALL INCLUDE DATE, NOTATION, AND AUDIO IDENTIFICATION OF PROPERTY ADDRESS AND MAIN/LATERAL NAME AND STATION NUMBER. THIS PRE-CONSTRUCTION VIDEO OF IMPACTED PROPERTIES
SHALL BE CONSIDERED SUBSIDIARY WORK PER SECTION 01 32 33 PRECONSTRUCTION VIDEO.
8. CONTRACTOR'S PERSONNEL SHALL HAVE IDENTIFYING CLOTHING OR HATS AT ALL TIMES. THE CONTRACTOR SHALL ALSO HAVE IDENTIFICATION ON ALL
VEHICLES.
9. CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 6:00 PM MONDAY THRU FRIDAY UNLESS APPROVED OR DIRECTED BY THE CITY.
AT THE PRE-CONSTRUCTION MEETING, THE CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH SECTION 01 32 16, AND PROVIDE MONTHLY UPDATES ALONG WITH THE PROGRESS PAYMENT PER GENERAL CONDITIONS, SECTION 00 72 00, ARTICLE 6.04. ANY PROPOSED WORK BEYOND REGULAR WORKING HOURS WILL REQUIRE WRITTEN REQUEST BY THE CONTRACTOR PER GENERAL CONDITIONS, SECTION 00 72 00, ARTICLE 6.02.
10. SHOP DRAWINGS SHALL BE SUBMITTED TO THE CITY INSPECTOR, CITY PROJECT MANAGER AT THE PRE-CONSTRUCTION MEETING FOR REVIEW. ANY CONSTRUCTION ACTIVITY, MATERIALS, ETC. THAT ARE IDENTIFIED BY THE CITY AS NON-COMPLIANT WITH THE STANDARD DETAILS AND SPECIFICATIONS SHALL BE REMOVED AND REPLACED WITH MATERIALS THAT CONFORM WITH THE STANDARD DETAILS AND SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
REFERENCE SECTION 01 33 00 SUBMITTALS AND SECTION 01 60 00 PRODUCT REQUIREMENTS, AND THE GENERAL CONDITIONS.
11. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND SIDEWALKS ADJACENT TO PROJECT FREE OF MUD AND DEBRIS FROM THE CONSTRUCTION PER SECTION 01 74 23. WORK ASSOCIATED WITH THIS ITEM IS CONSIDERED SUBSIDIARY TO VARIOUS ITEMS BID.
12. THE CONTRACTOR SHALL CLEAN UP AND RESTORE THE AREA OF OPERATIONS TO A CONDITION AS GOOD AS OR BETTER THAN THAT WHICH EXISTED PRIOR
TO WORK, PER SECTION 01 74 23.
13. PRIOR TO SCHEDULING THE PROJECT FINAL, THE CONTRACTOR SHALL PROVIDE REDLINES, CUT SHEETS, ELECTRONIC FILES (PDF, DWG, ETC.), CCTV VIDEO/REPORTS, LINER RESULTS, ETC., PIPE REPORT AND SERVICE REPORT PER SECTIONS 01 77 19, 01 78 39, AND 33 01 31 TO THE CITY FOR REVIEW, REVISIONS, AND FINAL ACCEPTANCE.
14. WHEN IT IS REQUIRED THAT A CONTRACTOR WORK OR ENTER PRIVATE PROPERTY, THE CONTRACTOR SHALL CONTACT THE PROPERTY OWNER 48 HOURS PRIOR TO CONSTRUCTION PER SECTION 01 11 00. EQUIPMENT OR MATERIALS SHALL NOT BE STORED ON PRIVATE PROPERTY UNLESS AND UNTIL THE SPECIFIED APPROVAL OF THE PROPERTY OWNER HAS BEEN SECURED IN WRITING BY THE CONTRACTOR AND A COPY FURNISHED TO THE CITY.
15. THE CONTRACTOR SHALL REMOVE FROM THE PROJECT AREA ALL SURPLUS MATERIAL. THIS SHALL BE INCIDENTAL AND NOT A SEPARATE PAY ITEM.
SURPLUS MATERIALS FROM EXCAVATION INCLUDING DIRT, TRASH, ETC. SHALL BE PROPERLY DISPOSED OF AT A SITE ACCEPTABLE TO THE CITY'S FLOOD PLAIN ADMINISTRATOR IF WITHIN THE CITY LIMITS. IF THE LOCATION IS NOT WITHIN THE CITY LIMITS, THE CONTRACTOR SHALL PROVIDE A LETTER STATING SO.
SURPLUS MATERIAL MAY NOT BE PLACED IN NATURAL DRAINAGE WAY WITHOUT WRITTEN PERMISSION FROM THE AFFECTED PROPERTY OWNER AND THE CITY'S FLOOD PLAIN ADMINISTRATOR. IF THE CONTRACTOR PLACES EXCESS MATERIAL IN THE AREAS WITHOUT WRITTEN PERMISSION, CONTRACTOR SHALL RESPONSIBLE FOR ALL DAMAGE RESULTING FROM SUCH FILL AND SHALL REMOVE THE MATERIAL AT THEIR OWN COST.
16. COSTS ASSOCIATED WITH PROPOSED CONNECTIONS TO EXISTING FACILITIES SHALL BE INCLUDED IN EACH RESPECTIVE BID ITEM, IF NO SPECIFIC BID ITEM IS INCLUDED. NO SEPARATE PAY, EXCEPT AS SPECIFICALLY INDICATED WITHIN THESE PLANS OR THE CONTRACT DOCUMENTS, SHALL BE CONSIDERED.
17. CONTRACTOR SHALL CONTACT LOCAL SCHOOLS PRIOR TO BEGINNING CONSTRUCTION TO INFORM PRINCIPALS AND ADMINISTRATORS OF CONSTRUCTION IN THE AREA. A NOTE ON THE SCHOOL MARQUEE IS SUGGESTED TO INFORM PARENTS AND STUDENTS OF CONSTRUCTION, CONSTRUCTION DURATION, AND POSSIBLE ALTERNATIVE ROUTES AROUND CONSTRUCTION SITES. ONE LANE SHALL REMAIN OPEN AT ALL TIMES, AND ALL LANES OF TRAFFIC SHALL BE OPEN UP AT THE END OF EACH WORKDAY. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL SAFETY MEASURES IN THE VICINITY OF SCHOOL ZONES FOR THE
DURATION OF THE CONSTRUCTION PERIOD.
18. STREET USE PERMIT SHALL BE SUBMITTED PER SECTION 01 55 26 TO THE CITY INSPECTOR AND TPW FOR WORK IN CITY ROW.
19. THE CONTRACTOR SHALL REMOVE ALL FENCES, LOCATED WITHIN EASEMENTS, INTERFERING WITH CONSTRUCTION OPERATION AND PROVIDE TEMPORARY FENCING DURING CONSTRUCTION. REMOVED FENCES, WOODEN OR CHAIN LINK, SHALL BE REPLACED WITH A NEW FENCE OR UNDAMAGED ORIGINAL FENCING.
ALL AFFECTED PROPERTY OWNERS SHALL BE NOTIFIED PRIOR TO CONSTRUCTION. REMOVAL AND REPLACEMENT OF EXISTING AND TEMPORARY FENCES PER SECTION 01 11 00 SUMMARY OF WORK, SHALL BE CONSIDERED SUBSIDIARY TO THE PROJECT COST AND REFLECTED IN THE UNIT BID PRICES FOR VARIOUS
ITEMS LISTED IN THE PROPOSAL.
DIVISION 01 - GENERAL REQUIREMENTS
PARK & RECREATION DEPARTMENT NOTES:
THE CITY OF FORT WORTH PARK & RECREATION DEPARTMENT (PARD) PROVIDES GUIDELINES FOR WORK CONDUCTED WITHIN OR ADJACENT TO CITY PARKLAND AND LAND MAINTAINED BY PARD INCLUDING RIGHTS-OF-WAY, MEDIANS, ROUNDABOUTS, CORNER CLIPS, PARKWAYS, AND CITY FACILITIES.
CITY PARKS (FIELD OPERATIONS SUPPORT 817-392-6796)
1. PARKLAND CONVERSION: ANY PROPOSED UTILITY IMPROVEMENTS OUTSIDE OF RECORDED EASEMENTS WITHIN PARKLAND NECESSITATES A PARKLAND
CONVERSION IN ACCORDANCE WITH CHAPTER 26 OF THE TEXAS PARKS AND WILDLIFE CODE.
2. CONSTRUCTION ACTIVITIES: CONSTRUCTION EQUIPMENT, STAGING AREAS, MATERIAL STORAGE, AND MATERIALS TESTING ARE PROHIBITED ON PARKLAND
WITHOUT PRIOR WRITTEN APPROVAL FROM PARD.
3. PRE-CONSTRUCTION MEETING: BEFORE COMMENCING WORK ON PARKLAND, A MINIMUM 72-HOUR NOTICE IS REQUIRED TO SCHEDULE AN ON-SITE MEETING WITH FIELD OPERATIONS SUPPORT AT 817-392-6796 TO IDENTIFY PARD UTILITIES, TREE PROTECTION MEASURES, AND PARKLAND FENCING REQUIREMENTS.
4. PARKLAND PROTECTION: INSTALL FENCING ALONG THE PARK PROPERTY LINE TO SAFEGUARD THE PARKLAND THROUGHOUT THE CONSTRUCTION PERIOD.
REMOVE FENCING UPON PROJECT COMPLETION.
5. SITE RESTORATION: ALL DISTURBANCES TO EXISTING SOIL, VEGETATION, IRRIGATION SYSTEMS, OR EQUIPMENT MUST BE RESTORED TO
PRE-CONSTRUCTION CONDITIONS OR BETTER AT NO ADDITIONAL COST TO PARD.
6. SOIL REQUIREMENTS: THE SOIL MUST BE FREE OF CONSTRUCTION DEBRIS AND ROCKS 1 INCH OR LARGER. BACKFILL WITH CLEAN SOIL BEFORE SEEDING OR SODDING (REFER TO FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 32 91 19 - TOPSOIL, 32 92 13 - SODDING, AND 32 92 14 -
NON-NATIVE SEEDING).
7. TURF INSTALLATION: TURF INSTALLATION MUST ADHERE TO THE CITY OF FORT WORTH (CFW) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 32
92 13 - SODDING AND/OR 32 92 14 - NON-NATIVE SEEDING.
8. MATERIAL CERTIFICATIONS: UPON REQUEST, THE CONTRACTOR MUST PROVIDE PARD WITH COPIES OF CERTIFICATIONS FOR SOIL, SOD, SEEDING, AND HYDROMULCHING PRIOR TO INSTALLATION, ALONG WITH THE DELIVERY TICKET (REFER TO FORT WORTH STANDARD CONSTRUCTION SPECIFICATION
DOCUMENTS 32 92 13 AND 32 92 14).
9. EROSION CONTROL REMOVAL: ALL EROSION CONTROL MATERIALS AND FENCING, INCLUDING SILT FENCE AND TREE PROTECTION, MUST BE REMOVED
UPON PROJECT COMPLETION.
CITY TREES (CITY FORESTER 817-392-5729 OR 817-392-5739)
10. PER CHAPTER 33, PARK & RECREATION-FORESTRY SECTION (PARD-FORESTRY) HAS JURISDICTION OVER TREES ON CITY-OWNED PROPERTY INCLUDING RIGHT-OF-WAY. APPROVAL OF PLANS DOES NOT CONSTITUTE APPROVAL TO PROCEED WITH WORK UNTIL CORRESPONDING PERMIT HAS BEEN ISSUED.
PERMITS FOR REMOVAL, PLANTING OR PRUNING OF CITY-OWNED TREES SHALL BE OBTAINED FROM PARD-FORESTRY. PRUNING REQUIRED FOR PRECONSTRUCTION PURPOSES REQUIRES THE UTILIZATION OF AN ISA-CERTIFIED ARBORIST, AS STATED IN THE PERMIT, AT NO EXPENSE TO PARD. CONTACT PARD-FORESTRY: WWW.FORTWORTHTEXAS.GOV/DEPARTMENTS/PARKS/SERVICES/FORESTRY OR CITYTREEPERMITS@FORTWORTHTEXAS.GOV OR
817-392-5729 OR 817-392-5739.
A. TREE PROTECTION SHALL BE PUT IN PLACE BEFORE GRADING/CONSTRUCTION BEGINS, BE INSPECTED BY CITY FORESTER AND REMAIN UNTIL COMPLETION
OF THE PROJECT.
I. 4-FOOT TALL, CHAIN LINK FENCING INSTALLED AT THE TREE DRIPLINE WITH BILINGUAL SIGN ON PROTECTIVE FENCING IN ENGLISH AND SPANISH THAT READS, “KEEP OUT, TREE PROTECTION AREA” (!NO ENTRE, ÁREA DE PROTECCIÓN DE ÁRBOLES!).
II. NO ENTRY, GRADING, EXCAVATION, PARKING OR STORING OF EQUIPMENT OR SUPPLIES INSIDE THE PROTECTIVE TREE FENCING WITHOUT CITY FORESTER
APPROVAL.
III. ALL WORK INSIDE PROTECTIVE TREE FENCING TO BE DONE BY HAND, UNLESS PRIOR APPROVAL GIVEN BY CITY FORESTER.
IV. ROOTS 2-INCH OR LARGER SHALL NOT BE CUT WITHOUT CITY FORESTER APPROVAL. ROOTS SHALL BE CLEAN CUT WITH A SAW.
V. ALL CUTS ON OAK TREES, INCLUDING ROOTS, SHALL BE PAINTED WITH GENERAL PURPOSE SPRAY PAINT WITHIN 30 MINUTES OF EXPOSURE TO PREVENT
OAK WILT SPREAD.
B. ASSESSMENT OF DAMAGES TO TREES
I. THE CONTRACTOR WILL CHECK TREES IN THE CONTRACT AREA BEFORE CONTRACT WORK BEGINS, ANY DAMAGE WILL BE NOTED AND REPORTED TO THE
CONTRACT ADMINISTRATOR.
II. THE CONTRACT ADMINISTRATOR WILL CONDUCT RANDOM CHECKS OF THE TREES DURING THE CONTRACT PERIOD.
III. A CHECK OF ALL TREES MAY BE MADE AT THE END OF THE CONTRACT PERIOD. CITY FORESTER, CONTRACT ADMINISTRATOR, AND CONTRACTOR WILL
ATTEND THE INSPECTION.
IV. DAMAGES SHALL BE DOCUMENTED BY MEMO TO THE CITY FORESTER WITH COPY TO CONTRACT FILE AND THE CONTRACTOR.
V. CONTRACTOR MAY HAVE THE OPTION OF REPLACEMENT OR PAYMENT FOR SEVERELY DAMAGED TREES AT A LOCATION TO BE DESIGNATED BY PARD.
REPLACEMENT SHALL BE MADE ON A CALIPER INCH PER CALIPER INCH BASIS WITH A MINIMUM SIZE OF REPLACEMENT TREE OF 2-INCH IN CALIPER FOR TREES DAMAGED OR REMOVED WHICH ARE LESS THAN 30-INCH DBH AND 2-INCH PER INCH FOR TREES WHICH ARE 30-INCH DBH OR GREATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PLANTING, WATERING, MULCHING AND MAINTENANCE OF REPLACEMENT TREES FOR A PERIOD OF NOT LESS THAN 2-YEARS.
ANY TREE THAT DOES NOT SURVIVE THE 2-YEAR ESTABLISHMENT PERIOD SHALL BE COMPENSATED FOR BY THE CONTRACTOR TO TREE FUND AT A RATE OF
$200 PER CALIPER INCH.
VI. SLIGHT DAMAGE SHALL BE DEFINED, IN THE OPINION OF THE CITY FORESTER, AS DAMAGE THAT MAY COMPARTMENTALIZE. EXAMPLES INCLUDE BUT ARE NOT LIMITED TO: SCARRING OF THE TRUNK INTO THE CAMBIAL LAYER Y ' TO 2-INCH IN WIDTH, BUT LESS THAN 1/3 TRUNK CIRCUMFERENCE; OR BREAKING OF LIMBS LESS THAN 2-INCH IN DIAMETER OR LIMBS LESS THAN 1 /3 TRUNK CALIPER, WHICHEVER IS LESS. SLIGHT DAMAGE SHALL ALSO INCLUDE: REMOVAL OR LAYING DOWN OF PROTECTIVE TREE FENCING PRIOR TO END OF CONSTRUCTION; STORING EQUIPMENT OR SUPPLIES WITHIN THE CRITICAL ROOT ZONE (CRZ);
OR DISPOSING OF PAINT OR CONCRETE WITHIN THE CRZ, BUT NOT CLOSER TO THE TRUNK THAN 50% RADIUS OF THE CRZ. SLIGHT DAMAGE TO TREES SHALL BE ASSESSED AT A RATE OF $100.00 FOR EACH INSTANCE. EACH DAY TREE FENCING IS NOT PROPERLY PLACED, EQUIPMENT OR SUPPLIES ARE STORED WITHIN
CRZ, OR FILL IS STORED WITHIN THE CRZ SHALL BE CONSIDERED ONE INSTANCE.
VII. MODERATE DAMAGE SHALL BE DEFINED, IN THE OPINION OF THE CITY FORESTER, AS DAMAGE THAT CONTRIBUTES TO THE POOR HEALTH AND REDUCED LONGEVITY OF THE TREE. EXAMPLES INCLUDE, BUT ARE NOT LIMITED TO: SCARRING OF THE TRUNK INTO THE CAMBIAL LAYER GREATER THAN 2-INCH, BUT LESS THAN 1/3 THE TRUNK CIRCUMFERENCE; OR BREAKING OF LIMBS MORE THAN 2-INCH IN DIAMETER, BUT LESS THAN 1/3 TRUNK CALIPER. MODERATE DAMAGE SHALL ALSO INCLUDE: COMPACTION OF SOIL; GRADING OR FILLING IN 20% OF THE CRZ ON 1 OF 4 SIDES, BUT OUTSIDE THE 50% RADIUS OF THE CRZ; OR DISPOSING OF PAINT OR CONCRETE WITHIN 50% RADIUS OF THE CRZ. MODERATE DAMAGES SHALL BE CALCULATED AT A RATE OF % THE ASSESSED VALUE OF
THE TREE PER EACH INSTANCE OF DAMAGE.
VIII. SEVERE DAMAGE OR REMOVAL OF TREES IS SUBJECT TO PENALTY OF $200 PER DIAMETER INCH OF TREES REMOVED OR DAMAGED FOR TREES LESS THAN 30-INCH DBH OR $400 PER DIAMETER INCH FOR TREES 30-INCH DBH OR GREATER. SEVERE DAMAGE OR REMOVAL SHALL INCLUDE, BUT IS NOT LIMITED TO:
SCARRING OF THE TRUNK TO THE CAMBIAL LAYER GREATER THAN 1/3 THE TRUNK CIRCUMFERENCE; UPROOTING OR CAUSING A TREE TO LEAN; OR DAMAGE TO A SCAFFOLDING BRANCH OR ANY BRANCH GREATER THAN 1/3 OF TRUNK CALIPER. SEVERE DAMAGE SHALL ALSO INCLUDE: COMPACTION OF SOIL, GRADING OR FILLING MORE THAN 20% OF THE CRZ, OR WITHIN 50% RADIUS OF THE CRZ, OR ON MORE THAN ONE OF 4 SIDES. CUTTING 1/3 OF THE BUTTRESS ROOTS WITHIN 3 TIMES THE DISTANCE OF THE DBH OF THE TRUNK, OR CUTTING 4 ROOTS 4-INCH OR GREATER IN DIAMETER WITHIN 4-FEET OF THE TRUNK SHALL ALSO BE
CONSIDERED SEVERE DAMAGE.
IX. BRANCHES SHALL BE MEASURED AT THE POINT OF ATTACHMENT OR AT THE LATERAL TO WHICH THE BRANCH WOULD BE PRUNED BACK TO ACCORDING TO ANSI STANDARDS. TREES CALIPER SHALL BE MEASURED ACCORDING TO ACCEPTED INDUSTRY STANDARDS. TREES GREATER THAN 6-INCH IN CALIPER SHALL BE MEASURED USING DIAMETER AT BREAST HEIGHT (DBH). TREES THAT MUST BE REMOVED DUE TO DAMAGE CAUSED BY THE CONTRACTOR SHALL BE REMOVED BY THE FORESTRY SECTION'S TREE REMOVAL CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
X. ALL DAMAGES SHALL BE PAID TO THE CITY TREE FUND. FAILURE TO REPLACE OR PAY FOR DAMAGED TREES SHALL RESULT IN A BREACH OF CONTRACT AND THE CONTRACTOR WILL BE AUTOMATICALLY ASSESSED DAMAGES. DAMAGES AS DESCRIBED HEREIN SHALL BE DEDUCED FROM PAYMENTS OTHERWISE
DUE THE CONTRACTOR.
RIGHT-OF-WAY (INCLUDING PARKWAYS, MEDIANS, CORNER CLIPS, ROUNDABOUTS) MAINTAINED BY PARD (PARK PLANNER 817-392-5479)
GENERAL NOTES & LEGEND 1 OF 2
06/10/2026
CP
T
WM
W
WV
FH
CO
G
TV
CROSS WALK SIGN
DEAD END SIGN
DO NOT ENTER SIGN
DIP AHEAD SIGN
EB
EV
E
FDC
FLAG POLE
GM
G
GTS
HCAP SIGN
HWAY SIGN
SD
MB
WW
MH
MONUMENT FOUND
MW
NAIL FOUND
NO DUMPING SIGN
NO OUTLET SIGN
NO PARKING SIGN
ONE WAY SIGN
PB
RR SIGN
SB
S
SIGNAL
SPEED LIMIT SIGN
WWWWMH
STOP SIGN
SCHOOL ZONE SIGN
TEMP BM
TP
VT
FAUCET
X-CUT FOUND
CROSSING SIGN
Y-CUT FOUND
YARD LIGHT
YIELD SIGN
EXISTING LEGEND:
SYMBOLS
BUSH
CLEANOUT
CONTROL POINT
CABLE TELEVISION PEDESTAL
CROSS WALK SIGN
DEAD END SIGN
DO NOT ENTER SIGN
DIP AHEAD SIGN
EASEMENT INFO.
ELECTRIC BOX
ELECTRIC METER
ELECTRIC MANHOLE
FIRE DEPT. CONNECTION
FIRE HYDRANT
FLAG POLE
GAS METER
GAS MANHOLE
GAS TEST STATION
GUY WIRE
GAS VALVE
HANDICAP SIGN
HIGHWAY SIGN
IRRIGATION CONTROL VALVE
STORM DRAIN INLET LID
LIGHT POLE
MAIL BOX
UTILITY MANHOLE
MONUMENT FOUND
MONITORING WELL
NAIL FOUND
NO DUMPING SIGN
NO OUTLET SIGN
NO PARKING SIGN
ONE WAY SIGN
PULL BOX
POST
POWER POLE
PROPERTY INFO.
RAILROAD SIGN
SIGNAL BOX
STORM DRAIN MANHOLE
SPRINKLER HEAD
SIGNAL POLE
SPEED LIMIT SIGN
SIGN
WASTEWATER MANHOLE
STOP SIGN
SPRINKLER VALVE
SCHOOL ZONE SIGN
LINEWORK
BUILDING OUTLINE
CABLE TELEVISION LINE
FIBER OPTIC LINE
TELEPHONE LINE
BARB WIRE FENCE
CHAINLINK FENCE
CHAINLINK FENCE GATE
WROUGHT IRON FENCE
NATURAL GAS LINE
UNDERGROUND ELECTRIC LINE
OVERHEAD ELECTRIC LINE
PROPERTY BUFFER LINE
EASEMENT LINE
PROPERTY LOT LINE
RIGHT-OF-WAY LINE
PROPERTY SETBACK LINE
ASPHALT PAVEMENT EDGE
PAVEMENT CENTER LINE
CHAINLINK FENCE
BRICK PAVEMENT
TEMPORARY BENCHMARK
TELEPHONE MANHOLE
TELEPHONE PEDESTAL
UTILITY VAULT
WATER FAUCET
WATER METER
WATER MANHOLE
WATER VALVE
X-CUT FOUND
CROSSING SIGN
Y-CUT FOUND
YARD LIGHT
YIELD SIGN
No.
No.
ICV
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P
\1
-1
-0
\4 -0
-P ro d u ct io n -W o rk in g
\4 -1
-B
IM
-C A
D \C iv il\
S h e e ts \1
-1
-0
G
E N
E R
A L
N O
T E
S .d
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GENERAL
GENERAL NOTES & LEGEND 2 OF 2
JUNE 2026 3LAN
LAN
LANDSCAPING AND IRRIGATION ON ROADWAY RIGHT-OF-WAY DEVELOPER PROJECTS (PARK PLANNER 817-392-5479) THE FORT WORTH PARK & RECREATION DEPARTMENT (PARD) DOES NOT MAINTAIN IRRIGATION SYSTEMS, TREE GRATES, NON-GRASS/TREE PLANT MATERIAL, OR AMENITIES (E.G., TRASH CANS, BIKE RACKS, BENCHES) INSTALLED IN THE PUBLIC RIGHT-OF-WAY (ROW) BY PRIVATE PROPERTY OWNERS TO MEET
DEVELOPMENT SERVICES' ZONING REQUIREMENTS.
11. AGREEMENTS: THESE INSTALLATIONS REQUIRE EITHER AN ENCROACHMENT AGREEMENT (ADJACENT PROPERTY OWNER OWNS AND MAINTAINS THE ITEMS IN THE ROW) OR A MAINTENANCE AGREEMENT (CITY OWNS THE ITEMS AFTER ACCEPTANCE, BUT THE ADJACENT PROPERTY OWNER MAINTAINS THEM).
12. APPLICATIONS: APPLICATION MUST BE SUBMITTED BEFORE THE PRE-CONSTRUCTION MEETING TO AVOID PROJECT DELAYS AT THE FINAL APPROVAL
STAGE.
13. CONTACT: DEVELOPMENT SERVICES' CONTRACT MANAGEMENT OFFICE DEVCFA_PROJECTS@FORTWORTHTEXAS.GOV HTTPS://WWW.FORTWORTHTEXAS.GOV/DEPARTMENTS/DEVELOPMENT-SERVICES/CONTRACT-MANAGEMENT-OFFICE
CITY CAPITAL PROJECTS (PARK PLANNER 817-392-5734)
14. TURF INSTALLATION: SEE ROW NOTES.
15. MAINTENANCE AND WARRANTY: ALL PLANTING MATERIALS ON CITY CAPITAL PROJECTS REQUIRE A TWO-YEAR WARRANTY. A MAINTENANCE BOND IS REQUIRED FOR ALL LANDSCAPING MATERIALS, INCLUDING HARDSCAPES, IRRIGATION, AND PLANTINGS (EXCLUDING TURF).
16. INSPECTION: PLANT IDENTIFICATION TAGS MUST REMAIN ON ALL PLANT MATERIALS FOR PARD INSPECTION. CONTACT PARD 72 HOURS IN ADVANCE TO
SCHEDULE INSPECTIONS OF TREES AND LANDSCAPE PLANTINGS.
17. REPORTS: SUBMIT MONTHLY LANDSCAPE AND IRRIGATION MAINTENANCE REPORTS TO THE CITY PROJECT MANAGER. REPORT SHOULD INCLUDE
MAINTENANCE ACTIVITIES, INSPECTIONS, AND PHOTOS.
18. IRRIGATION: IRRIGATION SYSTEMS MUST ADHERE TO THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) TITLE 30, TEXAS ADMINISTRATIVE CODE (TAC) CHAPTER 344, RULES FOR LANDSCAPE IRRIGATION AND FORT WORTH ORDINANCE NUMBER 18444-01-2009.
A. ANY IRRIGATION SYSTEM CONNECTED TO A PUBLIC OR PRIVATE POTABLE WATER SUPPLY REQUIRES AN APPROVED BACKFLOW PREVENTION ASSEMBLY, WHICH MUST BE TESTED UPON INSTALLATION OR REPAIR BY A LICENSED BACKFLOW PREVENTION ASSEMBLY TESTER (BPAT) REGISTERED WITH THE CITY OF FORT WORTH WATER DEPARTMENT. CONTACT DEVELOPMENT SERVICES CUSTOMER SERVICES AT 817-392-2222.
B. INSTALLATION OF TREES AND PLANTING MATERIALS CAN COMMENCE ONLY AFTER IRRIGATION LINES HAVE BEEN INSPECTED, APPROVED, AND A "GREEN
TAG" HAS BEEN ISSUED.
C. IF AN EXISTING MEDIAN IS ALTERED, CONTACT PARD 72 HOURS BEFORE IRRIGATION INSTALLATION TO SCHEDULE INSPECTION OF ALL IRRIGATION LINES, DEPTH, AND PRESSURE BEFORE BACKFILLING.
DIVISION 02 - EXISTING CONDITIONS
1. NO SEPARATE PAY ITEM WILL BE MADE FOR THE REMOVAL AND DISPOSAL OF EXISTING PUBLIC FACILITIES (PIPES, VALVES, ETC.) WITHIN A PROPOSED UTILITY TRENCH UNLESS OTHERWISE INDICATED WITHIN THE PROJECT SPECIFICATIONS. ITEMS TO BE REMOVED OR ABANDONED OUTSIDE OF A PROPOSED
UTILITY TRENCH SHALL BE PAID AS A SEPARATE PAY ITEM PER SECTION 02 41 14.
2. CONTRACTOR SHALL PROTECT CONCRETE CURB AND GUTTER, DRIVEWAYS, AND SIDEWALKS THAT ARE NOT DESIGNATED FOR REMOVAL. REMOVAL AND
REPLACEMENT OF THESE ITEMS SHALL BE AS DESIGNATED.
3. THE CONTRACTOR SHALL PRESERVE AND PROTECT OR REMOVE AND REPLACE WHEN SHOWN ON THE PLANS (WITH PRIOR APPROVAL OF CITY PARKS AND COMMUNITY SERVICES AND/OR AFFECTED PROPERTY OWNERS) ALL TREES, SHRUBS, HEDGES, RETAINING WALLS, LANDSCAPING, BUILDINGS, WALKS, ETC. IN OR NEAR PROPOSED CONSTRUCTION AREA. IF SPECIFIC BID ITEM(S) ARE NOT INCLUDED, THIS WORK SHALL BE CONSIDERED INCIDENTAL AND NOT A
SEPARATE PAY ITEM.
4. WHERE APPLICABLE, TWO (2) PERMANENT PAINTED DRIVE ADDRESSES MUST BE INSTALLED AT THE BASE OF THE CURB ON EACH SIDE OF EVERY DRIVEWAY. ADDRESS SIGNS SHALL BE POSTED IN A POSITION TO BE PLAINLY VISIBLE AND LEGIBLE. NUMBERS SHALL BE AT LEAST 3-INCHES IN HEIGHT AND
CONTRAST.
5. CONTRACTOR SHALL NOT CRACK, BREAK, MAR, OR OTHERWISE DAMAGE TILE STREET NAME MARKERS. IN THE EVENT A TILE STREET NAME MARKER IS LOCATED IN AN AREA OF CONSTRUCTION AND CANNOT BE PROTECTED, CONTRACTOR SHOULD REMOVE THE SECTION OF CURB AND GUTTER CONTAINING THE FULL TILE STREET NAME MARKER. CONTRACTOR SHALL REPLACE THE FULL SECTION OF THE CURB AND STREET MARKER.
DIVISION 03 - CONCRETE
1. HORIZONTAL BLOCKING FOR WATER LINES HAS BEEN OMITTED FOR CLARITY. HOWEVER, BLOCKING SHALL BE CONSTRUCTED AND SHOP DRAWINGS
SUBMITTED TO THE CITY INSPECTOR FOR REVIEW, IN ACCORDANCE WITH SECTION 03 30 00.
2. CONTRACTOR SHALL PROVIDE A TEMPORARY CONCRETE WASHOUT BASIN FOR SAFELY AND RESPONSIBLY DISPOSING OF SURPLUS CONCRETE FROM MIXING TRUCKS, PUMPS AND CHUTES WITHOUT HARMING THE ENVIRONMENT OR VIOLATING CONSTRUCTION REGULATIONS.
DIVISION 31 - EARTHWORK
1. THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON
REQUEST.
2. EROSION CONTROL MEASURES MAY ONLY BE PLACED IN FRONT OF INLETS, OR IN CHANNELS, DRAINAGE WAYS, OR BORROW DITCHES AT RISK OF CONTRACTOR. CONTRACTOR SHALL REMAIN LIABLE FOR ANY DAMAGE CAUSED BY THE MEASURES, INCLUDING FLOODING DAMAGE, WHICH MAY OCCUR DUE TO BLOCKED DRAINAGE. AT THE CONCLUSION OF ANY PROJECT, ALL CHANNELS, DRAINAGE WAYS, AND BORROW DITCHES IN THE WORK ZONE SHALL BE DREDGED OF ANY SEDIMENT GENERATED BY THE PROJECT OR DEPOSITED AS A RESULT OF EROSION CONTROL MEASURES.
3. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. THE CONTRACTOR SHALL USE SEDIMENT FILTERS OR OTHER MEASURES APPROVED BY THE ENGINEER AND CONSTRUCTION MANAGER TO PREVENT SILT AND CONSTRUCTION DEBRIS FROM CLOGGING STORM SEWER PIPES OR PROPOSED OR EXISTING INLETS, OR FROM BEING TRANSPORTED TO ADJACENT PROPERTIES AND STREET RIGHT-OF-WAYS. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED PRIOR TO SITE DISTURBANCE AND SHALL REMAIN IN PLACE UNTIL FINAL GRADING AND
PAVING IS COMPLETE AND PERMANENT SOIL STABILIZATION IS ACHIEVED.
4. CONSTRUCTION OPERATIONS SHALL BE MANAGED SO THAT AS MUCH OF THE SITE AS POSSIBLE IS LEFT COVERED WITH EXISTING TOPSOIL AND
VEGETATION.
5. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH. SODDING OR SEEDING SHALL BE PER SECTIONS 32 92 13 “SODDING”
OR 32 92 14 “NON-NATIVE SEEDING”, RESPECTIVELY.
6. CONTRACTOR SHALL CONSTRUCT A STABILIZED CONSTRUCTION ENTRANCE AT ALL PRIMARY POINTS OF ACCESS. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL CONSTRUCTION TRAFFIC UTILIZES THE STABILIZED ENTRANCE AT ALL TIMES FOR INGRESS AND EGRESS TO THE SITE.
7. SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A CONDITION WHICH SHALL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADWAYS. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ON A PUBLIC ROADWAY SHALL BE REMOVED IMMEDIATELY. WHEN WASHING IS REQUIRED TO REMOVE SEDIMENT PRIOR TO ENTRANCE TO A PUBLIC ROADWAY, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. ALL FINES IMPOSED FOR TRACKING ONTO PUBLIC ROADS SHALL BE PAID BY THE CONTRACTOR.
8. CONTRACTOR IS RESPONSIBLE FOR PROPER MAINTENANCE OF THE REQUIRED EROSION CONTROL DEVICES THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS. EROSION CONTROLS SHALL BE REPAIRED OR REPLACED AS INSPECTION DEEMS NECESSARY, OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
ACCUMULATED SILT IN ANY EROSION CONTROL DEVICE SHALL BE REMOVED AND SHALL BE DISTRIBUTED ON SITE IN A MANNER NOT CONTRIBUTING TO ADDITIONAL SILTATION. THE CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ANY EROSION CONTROL DEVICE WHICH IS DISTURBED.
9. BEFORE ANY EARTHWORK IS DONE, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF CONSTRUCTION AND OTHER ITEMS ESTABLISHED BY THE PLANS. THE CONTRACTOR SHALL PROTECT AND PRESERVE CONTROL POINTS AT ALL TIMES DURING THE COURSE OF THE PROJECT. THE GRADING CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO EARTHWORK.
10. CONTRACTOR STAGING AREA TO BE AGREED UPON BY OWNER PRIOR TO BEGINNING CONSTRUCTION.
11. TAKE APPROPRIATE MEASURES TO PRESERVE WILDLIFE IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL GUIDELINES.
DIVISION 32 - EXTERIOR IMPROVEMENTS
GENERAL:
1. AT LOCATIONS WHERE THE CURB AND GUTTER ARE TO BE REPLACED, THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR THE RE-ESTABLISHMENT OF EXISTING STREET AND GUTTER GRADES. IF BID ITEM FROM CONSTRUCTION STAKING IS NOT INCLUDED, ESTABLISHMENT OF GRADES SHALL BE CONSIDERED AS A SUBSIDIARY ITEM OF WORK, THE COST OF WHICH SHALL BE INCLUDED IN THE PRICE BID IN THE PROPOSAL FOR VARIOUS BID
ITEMS.
2. ALL DRIVEWAYS, WHICH ARE OPEN CUT, SHALL HAVE AT LEAST A TEMPORARY DRIVING SURFACE AT THE END OF EACH DAY. THE TEMPORARY SURFACE SHALL BE CONSIDERED AS A SUBSIDIARY ITEM OF WORK. THE COST OF WHICH SHALL BE INCLUDED IN THE PRICE BID IN THE PROPOSAL FOR VARIOUS BID
ITEMS.
CONTRACTOR SHALL VERIFY WITH CITY PROJECT MANAGER THE LOCATION OF ALL CITY OWNED PARKLAND ASSOCIATED WITH AND ADJACENT TO THE PROJECT AND CITY OWNED LAND THAT IS MAINTAINED BY PARD. ADDITIONALLY, THE CONTRACTOR MAY NEED A SEPARATE AGREEMENT IN ORDER TO ACCESS CITY PARKLAND FOR STAGING AND/OR CONSTRUCTION. CONTACT PARK PLANNER AT 817-392-5764 TO VERIFY NEED FOR SEPARATE AGREEMENT.
SIDEWALKS AND CURB RAMPS:
1. THE CURB RAMP STANDARD DETAILS ARE INTENDED TO SHOW TYPICAL LAYOUTS FOR THE CONSTRUCTION OF THE CURB RAMPS. THE INFORMATION SHOWN ON THE STANDARD DETAILS MEET THE REQUIREMENTS SHOWN IN THE “2012 TEXAS ACCESSIBILITY STANDARDS” (TAS) AND THE “2010 ADA STANDARDS
FOR ACCESSIBLE DESIGN” BY THE DEPARTMENT OF JUSTICE.
2. THE CONTRACTOR MAY NOT MAKE CHANGES TO THE SIDEWALK AND CURB RAMP LAYOUT WITHOUT APPROVAL OF THE CITY. THE CONTRACTOR MAY PROPOSE CHANGES TO THE SIDEWALK AND CURB RAMP LAYOUT DUE TO FIELD CONDITIONS, BUT ANY PROPOSED CHANGES MUST BE APPROVED BY THE CITY.
3. LANDINGS SHALL BE PROVIDED AT THE TOP OR BOTTOM OF CURB RAMPS, AS SHOWN ON DRAWINGS. THE LANDING CLEAR LENGTH SHALL BE 5 FEET MINIMUM FROM THE END OF RAMP. THE LANDING CLEAR WIDTH SHALL BE AT LEAST AS WIDE AS THE CURB RAMP, EXCLUDING FLARES. THE LANDING SHALL
HAVE A MAXIMUM SLOPE OF 2% IN ANY DIRECTION.
4. COUNTER SLOPES OF ADJOINING GUTTERS AND ROAD SURFACES IMMEDIATELY ADJACENT TO THE CURB RAMP SHALL NOT BE STEEPER THAN 5% (20:1) IN
ANY DIRECTION.
5. CONTRACTOR SHALL PROTECT CONCRETE CURB AND GUTTER, DRIVEWAYS, AND SIDEWALKS THAT ARE NOT DESIGNATED FOR REMOVAL. REMOVAL AND REPLACEMENT OF THESE ITEMS SHALL BE AS DESIGNATED. AT LOCATIONS WHERE THE CURB AND GUTTER ARE TO BE REPLACED, THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR THE RE-ESTABLISHMENT OF EXISTING STREET AND GUTTER GRADES. ESTABLISHMENT OF GRADE SHALL BE PERFORMED PRIOR TO CONSTRUCTION AND IS NOT A SEPARATE PAY ITEM, BUT SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT PRICE.
6. ALL DRIVEWAYS, SHALL HAVE AT LEAST A TEMPORARY RIDING SURFACE AT THE END OF EACH DAY. THE TEMPORARY SURFACE WILL BE CONSIDERED A
NON-PAY ITEM.
7. CONTRACTOR SHALL SAW CUT EXISTING CURB AND GUTTER, PAVEMENT, DRIVEWAYS, SIDEWALKS AT AREAS WHERE PAVEMENT OR CONCRETE IS TO BE
REMOVED. SAW CUTTING SHALL BE CONSIDERED SUBSIDIARY TO THE ITEM BEING INSTALLED.
CONTRACTOR SHALL PROVIDE COMPACTED SUBGRADE AS NEEDED TO REPAIR DAMAGED DRIVES, STREETS, WALKS, AND PATIOS.
CITY PROJECT # 105169, 105170 & 105868
P
\1
-1
-0
\4 -0
-P ro d u ct io n -W o rk in g
\4 -1
-B
IM
-C A
D \C iv il\
S h e e ts \1
-1
-0
G
E N
E R
A L
N O
T E
S .d
-2
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GENERAL
QUANTITY SHEET
JUNE 2026 4LAN
LAN
PROJECT
SCHEDULE
NUMBER
SPECIFICATION PLAN QTY UNIT DESCRIPTION
GENERAL
1 01 70 00 1 LS Mobilization
UNIT 1 - GATEWAY PARK IMPROVEMENTS
1 32 92 13 800 SY
Remove & Replace Block Sod Turf Grass
(Contingent)
2 32 11 23 9,895 SY Remove Existing Infield Mix 3" Depth
3 32 11 23 9,895 SY Install Pro Play Classic Infield Clay Mix 3" Depth
4 32 92 13 800 SY Install 5' Wide Block Sod Turf Strip 5 32 80 00 1 LS Irrigation Improvements 6 26 56 68 SF 1 LS Electrical Improvements
UNIT 2 - ROLLING HILLS SOCCER COMPLEX IMPROVEMENTS
1 26 56 68 SF 1 LS Electrical Improvements
UNIT 3 - ROCKWOOD PARK IMPROVEMENTS
1 32 92 13 50 SY
Remove & Replace Block Sod Turf Grass
(Contingent)
2 32 11 23 1,490 SY Remove Existing Infield Mix 3" Depth
3 32 11 23 1,490 SY Install Pro Play Classic Infield Clay Mix 3" Depth
4 32 92 13 205 SY Install 5' Wide Block Sod Turf Strip 5 32 80 00 1 LS Irrigation Improvements 6 26 56 68 SF 1 LS Electrical Improvements
UNIT 4 - NORTHWEST COMMUNITY PARK IMPROVEMENTS
1 99 99 00 4 EA Install Shade Structure
06/25/2026
CONTROL POINT TABLE - GATEWAY PARK
POINT #
RAW DESCRIPTION
X
X
X
X
60D
X
60D
ELEVATION
512.150
512.120
509.680
512.190
508.770
512.210
508.520
NORTHING
6961688.9800
6961628.6430
6961624.3470
6961582.5490
6961275.2840
6961629.5150
6961629.7900
EASTING
2344245.7310
2344183.8370
2343847.1290
2344246.3590
2344235.7670
2344298.6290
2344632.4730
E
F
GRS
S
EV
SOFTBALL FIELD 1 SOFTBALL
FIELD
SOFTBALL
FIELD
3 SOFTBALL FIELD 4
509 50 9 510
512 513
508 50 8509 509 509
51051 051051
508 50 8509 50 9 509510 51051 1 511
51251
509 50951
511 51
508 50 8 50850
509 509
508508
8508508
7 507 507 50
8 508 508
509 50 9 509
509 509
51151 1511512
PLAYERS PKWY
PLAYER
S PKW
Y
CP#403
X-CUT FOUND
CP#404
X-CUT FOUND
CP#406
X-CUT FOUND
CP#408
X-CUT FOUND
SOFTBALL FIELD 1 SOFTBALL
FIELD
SOFTBALL
FIELD
3 SOFTBALL FIELD 4
60'∅1'-4"' 3'-7"'
CP#XXX
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P \1
-1
-0
\4
-0 -P ro d u ct io n -W o rk in g \4
-1 -B
IM
-C
A D
\C iv il\ S h e e ts
\1 -1
-0
L
A Y
O U
T
C O
N T
R O
L .d w g
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GRAPHIC SCALE IN FEET
FULL SIZE SCALE: 1"=50'
HALF SIZE SCALE: 1"=100'
0 50 100
N
GATEWAY PARK
JUNE 2026LAN
LAN
MATCH LINE (SEE SHEET 6)
EXISTING CONDITIONS & SURVEY CONTROL 1 OF 2
LEGEND
EXISTING OUTFIELD TURF
PROPOSED INFIELD CLAY
CONTROL POINT
CONTROL POINT TABLE - GATEWAY PARK
RAW DESCRIPTION
60D
ELEVATION
520.500
509.610
NORTHING
6962436.6100
6962024.8920
EASTING
2344218.2540
2344242.4340
60'∅1'-4"' 3'-7"'
CP#XXX
E
T
SOFTBALL FIELD 5 SOFTBALL
FIELD
509 50951051051 0510510510
509 51051
510510
51151
51251
513513
516 516
516 51
518519
511 512 513 514 515 516 517 518 519 520
513514 515 516 517 518519520
509 509
514 514
514515516517 518519520
512 514
PL
AY
ER
S
PK
W
Y
CP#402
X-CUT FOUND
SOFTBALL FIELD 5 SOFTBALL
FIELD
REFER TO ELECTRICAL
PLAN SHEET 14
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P \1
-1
-0
\4
-0 -P ro d u ct io n -W o rk in g \4
-1 -B
IM
-C
A D
\C iv il\ S h e e ts
\1 -1
-0
L
A Y
O U
T
C O
N T
R O
L .d w g
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GRAPHIC SCALE IN FEET
FULL SIZE SCALE: 1"=50'
HALF SIZE SCALE: 1"=100'
0 50 100
N
EXISTING CONDITIONS & SURVEY CONTROL 2 OF 2
JUNE 2026 6LAN
LAN
MATCH LINE (SEE SHEET 5)
GATEWAY PARK
LEGEND
EXISTING OUTFIELD TURF
PROPOSED INFIELD CLAY
E
F
GRS
S
EV
SOFTBALL FIELD 1 SOFTBALL
FIELD
SOFTBALL
FIELD
3 SOFTBALL FIELD 4
SOFTBALL FIELD 1 SOFTBALL
FIELD
SOFTBALL
FIELD
3 SOFTBALL FIELD 4
PLAYERS PKWY
PLAYER
S PKW
Y
PLAYER
S PKW
Y
REMOVE 1,645 SY OF THE EXISTING
INFIELD MIX TO THE TOP OF THE
EXISTING SUBGRADE, APPROX. 3" DEEP.
FOLLOW CURRENT PRO PLAY CLASSIC
INFIELD MIX SPECIFICATION.
REPLACE 210 SY OF BLOCK SODDING AS
NEEDED FOR CONSTRUCTION ACCESS
TO MATCH EXISTING GRASS
REPLACE 295 SY OF BLOCK SODDING AS
NEEDED FOR CONSTRUCTION ACCESS
TO MATCH EXISTING GRASS
REMOVE 1,665 SY OF THE EXISTING
INFIELD MIX TO THE TOP OF THE
EXISTING SUBGRADE, APPROX. 3" DEEP.
FOLLOW CURRENT PRO PLAY CLASSIC
INFIELD MIX SPECIFICATION.
REMOVE 1,685 SY OF THE EXISTING
INFIELD MIX TO THE TOP OF THE
EXISTING SUBGRADE, APPROX. 3" DEEP.
FOLLOW CURRENT PRO PLAY CLASSIC
INFIELD MIX SPECIFICATION.
REMOVE 1,620 SY OF THE EXISTING
INFIELD MIX TO THE TOP OF THE
EXISTING SUBGRADE, APPROX. 3" DEEP.
FOLLOW CURRENT PRO PLAY CLASSIC
INFIELD MIX SPECIFICATION.
REFER TO ELECTRICAL
PLAN SHEET 13
135 SY STRIP OF 5'
TURF TO BE REMOVED
135 SY STRIP OF 5'
TURF TO BE REMOVED
130 SY STRIP OF 5'
TURF TO BE REMOVED
130 SY STRIP OF 5'
TURF TO BE REMOVED
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P \1
-1
-0
\4
-0 -P ro d u ct io n -W o rk in g \4
-1 -B
IM
-C
A D
\C iv il\ S h e e ts
\1 -1
-0
D
E M
O L
IT
IO
N
E
R O
S
IO
N C
O N
T R
O L .d w g
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GRAPHIC SCALE IN FEET
FULL SIZE SCALE: 1"=50'
HALF SIZE SCALE: 1"=100'
0 50 100
N
JUNE 2026 7LAN
LAN
MATCH LINE (SEE SHEET 8)
GATEWAY PARK
REMOVALS & CONSTRUCTION ACCESS 1 OF 2
LEGEND
EXISTING OUTFIELD TURF
OUTFIELD TURF TO BE REMOVED
EXISTING INFIELD CLAY TO BE
REMOVED
BLOCK SODDING
CONSTRUCTION ACCESS
NOTES
1. ALL PATHWAYS TO BE FILMED AND
PHOTOGRAPHED PRIOR TO
CONSTRUCTION AND ALL DAMAGE
REPLACED AT CONTRACTORS EXPENSE.
GATEWAY PARK
T
SOFTBALL FIELD 5 SOFTBALL
FIELD
6SOFTBALL FIELD 5 SOFTBALL
FIELD
DISPOSAL RD
PLAYERS PKWY
PLAYERS PKWY
PLAYER
S PKW
Y
REPLACE 295 SY OF BLOCK SODDING AS
NEEDED FOR CONSTRUCTION ACCESS
TO MATCH EXISTING GRASS
REMOVE 1,640 SY OF THE EXISTING
INFIELD MIX TO THE TOP OF THE
EXISTING SUBGRADE, APPROX. 3" DEEP.
FOLLOW CURRENT PRO PLAY CLASSIC
INFIELD MIX SPECIFICATION.
REMOVE 1,640 SY OF THE EXISTING
INFIELD MIX TO THE TOP OF THE
EXISTING SUBGRADE, APPROX. 3" DEEP.
FOLLOW CURRENT PRO PLAY CLASSIC
INFIELD MIX SPECIFICATION.
REFER TO ELECTRICAL
PLAN SHEET 14
ACCESS BY EXISTING GATE
FROM PARKING LOT
135 SY STRIP OF 5'
TURF TO BE REMOVED 135 SY STRIP OF 5'
TURF TO BE REMOVED
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P \1
-1
-0
\4
-0 -P ro d u ct io n -W o rk in g \4
-1 -B
IM
-C
A D
\C iv il\ S h e e ts
\1 -1
-0
D
E M
O L
IT
IO
N
E
R O
S
IO
N C
O N
T R
O L .d w g
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GRAPHIC SCALE IN FEET
FULL SIZE SCALE: 1"=50'
HALF SIZE SCALE: 1"=100'
0 50 100
N
GATEWAY PARK
JUNE 2026 8LAN
LAN
MATCH LINE (SEE SHEET 7)
REMOVALS & CONSTRUCTION ACCESS 2 OF 2
NOTES
1. ALL PATHWAYS TO BE FILMED AND
PHOTOGRAPHED PRIOR TO
CONSTRUCTION AND ALL DAMAGE
REPLACED AT CONTRACTORS EXPENSE.
LEGEND
EXISTING OUTFIELD TURF
OUTFIELD TURF TO BE REMOVED
EXISTING INFIELD CLAY TO BE
REMOVED
BLOCK SODDING
CONSTRUCTION ACCESS
PLAYERS PKWY
GRS
ICV
ICV
ICVICV
ICV
ICV
ICV
ICV
ICVICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICV
ICVICV
ICV
S
EV
SOFTBALL FIELD 1 SOFTBALL
FIELD
SOFTBALL
FIELD
3 SOFTBALL FIELD 4
9 510
512 513
509 509 509
51051 051051
508 50
9 509510 51051 1 511
51251
509 51
511 51
508 50
508508
7 507 507 50
8 508 50850 9 509
51151 1511512
SOFTBALL FIELD 1 SOFTBALL
FIELD
SOFTBALL
FIELD
3 SOFTBALL FIELD 4
INSTALL 1,645 SY OF PRO PLAY
CLASSIC INFIELD MIX AND DIAMOND
PRO RED INFIELD CONDITIONER
INSTALL 1,665 SY OF PRO PLAY
CLASSIC INFIELD MIX AND DIAMOND
PRO RED INFIELD CONDITIONER
INSTALL 1,685 SY OF PRO PLAY
CLASSIC INFIELD MIX AND DIAMOND
PRO RED INFIELD CONDITIONER
INSTALL 1,620 SY OF PRO PLAY CLASSIC
INFIELD MIX AND DIAMOND PRO RED
INFIELD CONDITIONER
135 SY STRIP OF 5'
TURF REPLACEMENT
135 SY STRIP OF 5'
TURF REPLACEMENT
130 SY STRIP OF 5'
TURF REPLACEMENT 130 SY STRIP OF 5'
TURF REPLACEMENT
REFER TO ELECTRICAL
PLAN SHEET 13
REFER TO DETAILS SHEET
25 FOR SOFTBALL FIELD
LAYOUT DETAIL (TYP.)
THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO
EXCAVATING AT EACH LOCATION:
CITY PROJECT # 105169, 105170 & 105868
P
\1
-1
-0
\4 -0
-P ro d u ct io n -W o rk in g
\4 -1
-B
IM
-C A
D \C iv il\
S h e e ts \1
-1
-0
S
O F
T B
A L
L F
IE
L
D I
M P
R O
V E
M E
N T
S .d
-0
-2
H
A g u ila r
CITY OF FORT WORTH, TEXAS
ATHLETIC FIELD IMPROVEMENTS AT
ROCKWOOD, ROLLING HILLS, NORTHWEST COMMUNITY, AND GATEWAY PARKS
SHEET:DATE:SCALE:
NO.
DESCRIPTION DATE
REVISIONS
CONTACT INFORMATION
C
PN
9, AT
H
LE
TI
C
F
IE
LD
IM
PR
O
VE
M
EN
TS
A T
R O
C
KW
O O
D , R
O
LL
IN
G
H
IL
LS
, N
O R
TH
W
ES
T
C O
M M
U N
IT
Y, A N
D G
AT
EW
AY
P
AR
KS
X -X
XX
XX
, K -X
XX
X
DRAWN: AS SHOWN
DESIGNED:
TEXAS REGISTERED ENGINEERING FIRM
NO. F-2614
1300 SUMMIT AVENUE
SUITE 300
FORT WORTH, TEXAS 76102
WWW.LAN-INC.COM
(817) 820-0420
X - XXXXX
K - XXXX
HORIZONTAL & VERTICAL CONTROL
AT&T
FORT WORTH WATER DEPT.-FIELD OPERATIONS
FORT WORTH T&PW
ONCOR GAS & ELECTRIC
TXU ENERGY
ATMOS ENERGY
SPECTRUM
FRONTIER
FORT WORTH PARKS & COMMUNITY SERVICES DEPT.
ALL OTHER FACILITIES
1-800-878-8711
(817) 392-8296
(817) 392-8100
(817) 215-6214 1-800-233-2133
(817) 215-4366 1-855-707-7328 1-800-921-8101
(817) 392-5700
1-800-DIG-TESS (811)
REFER TO SURVEY CONTROL SHEET FOR CONTROL POINTS, BENCHMARKS, COORDINATES, &
SURVEY NOTES.
PROJECT CONTROL WAS SET BY ARS ENGINEERS, INC PROJECT NO. 106060 DATED 09/12/2025.
STATE OF TEXAS
L ICENSED
PROFESS I ONA L ENG I N
EE
R
ADAM T. GIBLIN
137032
GRAPHIC SCALE IN FEET
FULL SIZE SCALE: 1"=40'
HALF SIZE SCALE: 1"=80'
0 40 80
N
SOFTBALL FIELD IMPROVEMENTS 1 OF 2
JUNE 2026 9LAN
LAN
GATEWAY PARK
MATCH LINE (SEE SHEET 10)
LEGEND
EXISTING OUTFIELD TURF
PROPOSED TURF REPLACEMENT
STRIP
PROPOSED INFIELD CLAY
NOTES
1. TREATMENT OF SUBGRADE BENEATH
INFIELD MIX TO BE DONE BY METHOD OF
TILL AND LASER GRADE OF CLAY SURFACE.
2. PLAYING INFIELD TO BE REPLACED WITH
PRO PLAY CLASSIC INFIELD MIX OR
APPROVED EQUAL.
3. PLAYING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .