5-1-MP27009-27323210 Solicitation.pdf

PDF 447 KB Posted

Attached to
DFCM Construction - VBS Consultant Services - Design - Bridgerland Technical College - Main Building Renovation - 27323210
Solicitation number
MP27009
Issued by
Utah

About this file

This Request for Proposals solicitation is issued by the State of Utah Division of Facilities Construction and Management (DFCM) in partnership with Bridgerland Technical College (BTECH) for professional architectural design services. The project involves renovation and adaptive reuse of approximately 11,720 gross square feet in the Main Building at Bridgerland Technical College's Logan campus to establish an advanced Automation Technology and Control Systems & Robotics instructional center. The scope includes flexible lab space accommodating 52 students, a robotics and control systems lab for 20 students, a specialized danger lab for 20 students with dedicated exhaust systems, academic support spaces with remote broadcast capability, and departmental storage. A mandatory meeting is scheduled for November 24, 2026 at 1:00 PM at 1301 N 600 W, Logan, Utah, with attendance required for all prime consultants wishing to propose. The proposal documents deadline is December 10, 2026 at 12:00 noon through the U3P website, with a questions deadline of November 30, 2026 and an addendum deadline of December 2, 2026. The Selection Committee will make final selections by December 17, 2026, with announcement of the selected consultant on December 18, 2026. Project substantial completion is targeted for June 30, 2028, utilizing a Design/Bid/Build delivery method.

The construction cost estimate is $2,337,000.00, with the design services budget exceeding $150,000. The selection process is value-based and will evaluate proposals on 225 total points, comprised of Statement of Qualifications (90 points), Management Plan (85 points), and Past Performance References (50 points). Consultants must submit the DFCM Termination or Debarment Form and, if applicable, the Health Insurance Statement of Compliance Form (required for design professional contracts of $2,000,000 or greater aggregate amount). The selected consultant will be the highest-scoring firm, subject to fee negotiation; if negotiations fail, DFCM will proceed with the second-highest-scoring consultant. Proposals are limited to 12 pages for Sections 1-5, with font minimum size 12 and standard 0.5-inch margins. Project-specific risks include structural alterations to existing concrete tilt-up panels, roof structural capacity issues, complex code compliance requirements, integration with aging electrical infrastructure, acoustic isolation needs, and work adjacent to occupied space. The design team must comply with DFCM Design Requirements, System Design Criteria, High Performance Building Standards, and applicable Utah codes and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Facilities Construction and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor

Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270

Value Based Selection for Consultant Services Design Services

Budget for the specified services is over $150,000

November 17, 2026

Main Building Renovation Bridgerland Technical College

Logan, Utah

DFCM Project #27323210 U3P Reference # MP27009

DFCM VBS Design - Request for Proposals, 3.3.2026 DFCM Form 3c 2

Solicitation Summary The State of Utah Division of Facilities Construction and Management (DFCM) is requesting proposals for Design services for the following project:

Main Building Renovation Bridgerland Technical College Logan, Utah DFCM Project #27323210 | U3P Reference # MP27009

Communication during the selection process shall be directed to the DFCM Representatives below only.

DFCM Project Manager: Brad DeMond DFCM VBS Coordinator: dfcm_vbs@utah.gov

Brief Project Description: The State of Utah (DFCM) and Bridgerland Technical College (BTECH) are seeking design services to remodel approximately 11,720 GSF of existing space in the campus Main Building into an advanced Automation Technology and Control Systems & Robotics facility. The project will consolidate and expand hands on instructional labs, a robotics lab, a specialized danger lab, faculty support spaces, and high demand MEP infrastructure to alleviate current capacity constraints. The project will modernize the space to meet rapid regional manufacturing workforce demands.

Project Substantial Completion Prior To: June 30, 2028 Construction Cost Estimate: $2,337,000.00 Energy Incentives: Yes ☐ No ☒

Solicitation Schedule Event Date Time Location

Solicitation Posting Tuesday, November 17, 2026 3:00 PM U3P

Mandatory Meeting Tuesday, November 24, 2026 1:00 PM

☒In person: 1301 N 600 W, Logan Utah. Meet at the front entrance of the main building

Questions Deadline Monday, November 30, 2026 3:00 PM U3P

Addendum Deadline Wednesday, December 2, 2026 3:00 PM U3P

Proposal Documents Deadline Thursday, December 10, 2026 12:00 NOON U3P

Selection Committee: Final Selection Thursday, December 17, 2026 5:00 PM

Announcement of Selected Consultant Friday, December 18, 2026 5:00 PM U3P mailto:dfcm_vbs@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities

DFCM Form 3c 3

Project Details Detailed Project Description:

The State of Utah – Division of Facilities Construction and Management in partnership with Bridgerland Technical College (BTECH), is soliciting professional architectural design services for the Bridgerland Technical College Automation Technology Remodel located at the Logan Main Campus.

This project entails the renovation and adaptive reuse of approximately 11,720 gross square feet of existing interior space within the campus Main Building to establish a consolidated, advanced instructional center for Automation Technology and Control Systems & Robotics. Driven by regional manufacturing workforce demands growing at nearly 40% annually and existing program space utilization operating at 216% of capacity, this renovation will relocate programs currently housed in the West Building to form a modernized core alongside related trades.

Key Programmed Spaces Include:

• Flexible Lab Space (~5,780 GSF): High-bay, open layout active learning environment accommodating 52 students, equipped with 46 flexible workstations, standing desks, overhead Unistrut utility distribution for compressed air drops and cord reels, and integrated AV/display systems.

• Robotics & Control Systems Lab (~1,950 GSF): Specialized clean lab environment for 20 students featuring articulated robotic arms, PLC trainers, industrial networking, and vision inspection systems.

• Danger Lab (~1,860 GSF): Specialized industrial equipment shop accommodating 20 students, housing hydraulic pumps, mechanical trainers, motor control benches, and laser/cutting tools; engineered with dedicated roof-mounted exhaust systems maintaining continuous negative air pressure relative to adjacent areas.

• Academic Support, Teaching Stations & Offices (~1,480 GSF): Dedicated faculty drop-in suites, private offices, and instructional tech spaces equipped for remote broadcast capability to BTECH’s Brigham City branch campus, 3D printing stations with dedicated local exhaust, and conference zones.

• Departmental Storage (~550 GSF): High capacity, heavy duty pallet accessible storage suite.

Project delivery method: Design / Bid / Build.

Applicable Standards and Guidelines The design team and all subconsultants must comply with the latest adopted editions of codes, regulations, and institutional guidelines including:

• State of Utah DFCM Standards:

o DFCM Design Requirements and System Design Criteria.

o DFCM High Performance Building Standards (HPBS)

Project Risk Factors:

• Structural Alterations to Existing Concrete Tilt-Up Panels

• Roof Structural Capacity & Existing Lateral Bracing Interference

• Complex Code Compliance & Building Fire Separation

• Integration with Aging Electrical Infrastructure

• Acoustic Isolation between Industrial Labs and Instructional Spaces

• Active Facility Phasing & Work Adjacent to Occupied Space

Project Requirements:

- DFCM Approved Fabricator List

- DFCM Design Management Documents

- DFCM Roofing Design Requirements

- State of Utah High Performance Building Standard and all appendixes https://dfcm.utah.gov/construction-management/building-official/inspections-and-testing/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/roofing-program/ https://dfcm.utah.gov/construction-management/high-performance-building-program/

DFCM Form 3c 4

Solicitation Documents The solicitation documents consist of all documents listed below and referenced within this solicitation.

Solicitation Documents and Forms The following project specific documents and standard documents and forms can be accessed in the U3P procurement posting for this solicitation under ‘Supporting Documentation’:

Project specific documents:

- Request for Proposals Solicitation

- Programming Document

Standard documents and forms:

- DFCM Performance References Form

- DFCM Termination or Debarment Form

DFCM Construction Management Standard Reference Documents All DFCM standard documents referenced in this solicitation can be accessed by visiting the DFCM Construction Management – Standard Documents page of the DFCM website.

DFCM General Conditions The DFCM General Conditions (“General Conditions”) and all Supplemental General Conditions (“also referred to as General Conditions”) are available on the DFCM Construction Management – Standard Documents page of the DFCM website and made part of this solicitation by reference.

https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ http://www.dfcm.utah.gov/

DFCM Form 3c 5

Procurement Process This solicitation is a Request for Proposals in which the intent of the Selection Committee is to select the Consultant who provides the best value to the State based on the information provided in their proposals and according to the selection criteria listed in this solicitation and as determined by the Selection Committee..

Individual Consultants or alliances between two or more Consultants are allowed to form a team. However, one Consultant must be declared as the lead Consultant representing the team. If the Consultant team is short listed, the State will only enter into a contract with the lead Consultant. The lead Consultant must be licensed by the State of Utah and comply with and require all of its Subconsultants to comply with the license laws as required by the State of Utah.

1. Mandatory Meeting A mandatory meeting will be held on the date and time and at the location specified on the Solicitation Schedule. All prime Consultants wishing to propose on this project must attend and sign in. Consultants not in attendance at this meeting are ineligible to propose on this project. Subconsultants and suppliers are invited to attend this meeting, but it is not mandatory.

During the mandatory meeting, a presentation will be made describing the project and overall scope of work. Interested Consultants may ask questions and request clarification about the project and the procurement process.

2. Requests for Information, Questions and Addendum All project related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. An addendum in response will be posted on the U3P website no later than the time and date specified on the Solicitation Schedule. All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Consultant’s proposal.

3. Proposal Documents Deadline All proposals must be submitted through the U3P website no later than the time and date specified on the Solicitation Schedule. Late proposals will not be accepted.

Consultants attempting to submit a proposal through U3P website after the proposal deadline has passed will not be successful and therefore not consideration for award of this project. It is the sole responsibility of the Consultant to confirm their proposal is successfully submitted into U3P prior to the proposal deadline. Technical questions related to U3P should be directed to u3padmin@utah.gov.

4. Proposal Requirements for Business Confidential Information A Consultant wishing to claim that information in a proposal is 1) a "trade secret" as that term is defined in Utah Code 63G-2-305; or 2) protected commercial information; or 3) non-individual financial information, shall submit with the proposal:

a) the Claim of Business Confidentiality Form, which can be found on the DFCM website - Construction Management - Standard Documents page, and a concise statement of the reasons supporting the claim for business confidentiality on the Claim of Business Confidentiality Form; and

b) in addition to the Consultant's unredacted proposal, a copy of the Consultant's proposal with the confidential business information redacted.

Provided that a Consultant complies with the requirements of Utah Code 63G-2-309 and UAR R23-1-703 for protecting confidential business information, in the event of a request for the Consultant's proposal under 63G-2-204, DFCM will provide the requestor with a copy of the Consultant's redacted proposal. Provided that a Consultant complies with the requirements of Utah Code 63G-2-309 and UAR R23-1-703 for protecting confidential business information, in the event of a request for the Consultant's proposal under Utah Code 63G-2-204, DFCM will not provide the requestor with a copy of the Consultant's unredacted proposal without notification to the Consultant as provided in Utah Code 63G-6a-309 and then only as provided in Utah Code 63G-2-309.

Failure to provide a Claim of Business Confidentiality Form or redacted proposal with the proposal shall result in the Consultant's proposal being classified as an unprotected public record. In the event proposal documents are GRAMA https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:u3padmin@utah.gov

DFCM Form 3c 6 requested, DFCM will not contact Consultants to provide a second opportunity to submit a redacted proposal. If the Consultant has chosen not to submit a redacted version of their proposal with their non-redacted proposal, the non-redacted version will be released as required by law.

Pricing may not be classified as business confidential and will be considered public information. An entire proposal may not be designated as "PROTECTED", "CONFIDENTIAL" or "PROPRIETARY".

5. The Selection Committee The Selection Committee may be composed of individuals from DFCM, the User Agency/Institution, and representatives from the design or construction disciplines. The Selection Committee is responsible for the following, as the events apply to the solicitation:

- Evaluating and scoring proposal documents

- Short listing Contractors and Consultants

- Interviewing and scoring or ranking Contractors and Consultants for selection of the awarded Contractor or

Consultant

To maintain the fair and equitable treatment of everyone, Consultants shall not unduly contact or offer gifts or gratuities to DFCM employees, State of Utah Agency/Institution employees, Selection Committee members or any others involved with this project to influence the selection process or in a manner that gives the appearance of influencing the selection process. This prohibition applies before the solicitation is issued and extends through the award of a contract. Failure to comply with this requirement may result in a disqualification in the selection process. Consultants should be aware that Selection Committee members will be required to certify that they have not been contacted by any Consultants to influence the selection process.

The Selection Committee members for this project are:

- Brad DeMond, DFCM

- Emily Hobbs, Bridgerland Technical College

- Frank Murdock, Design Industry

6. Selection of the Awarded Consultant DFCM intends to enter into a Contract with the Prime Consultant providing the best value to the State based on the information contained within the proposal documents, as determined by the Selection Committee, and in accordance with the selection criteria.

7. Fee Negotiation and Contract Following selection of a Consultant by the Selection Committee, and prior to the award of the Contract, DFCM will negotiate the final Contract fee with the highest scoring Consultant. Should the DFCM be unable to agree to a satisfactory fee with the Consultant that DFCM determines to be fair and reasonable to the State, discussions with that Consultant shall be formally terminated. Negotiations will then be entered into with the second highest scoring Consultant.

At the conclusion of negotiations, DFCM will only enter into a Professional Services Contract with the selected Consultant. After satisfactory completion of the programming, DFCM may award the Design Contract to the Programming Consultant.

8. Withdrawal of Proposals Consultants may withdraw their proposals by written request to dfcm_vbs@utah.gov up until the Award Notification is issued.

9. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the best interest of the State.

10. Licensure https://dfcm.utah.gov/construction-management/standard-documents/

DFCM Form 3c 7

The Consultant shall comply with and require all subconsultants to comply with the license laws as required by the State of Utah.

11. Financial Responsibility of Consultants, Subconsultants, and Sub-Subconsultants Consultants shall respond promptly to any inquiry by the DFCM to any concern of financial responsibility of the Consultant, subconsultant, or sub-subconsultant.

DFCM Form 3c 8

Selection Criteria and Additional Requirements The following selection criteria will be used in evaluating each proposal. Each criterion is assigned a point value and weighed accordingly. The Selection Committee will consider all selection criteria in performing a comprehensive evaluation of the proposals. DFCM intends to enter into a Contract with the Prime Consultant providing the best value to the State as determined by the Selection Committee and according to the selection criteria.

Selection Criteria Points Summary Statement of Qualifications 90

Management Plan 85 Past Performance References 50

Total Possible Points 225

A. Statement of Qualifications | 90 Points The Statement of Qualifications describes the experience and qualifications of the Consultant, and the project team members identified in the proposal. Include sufficient information in the Statement of Qualifications addressing each of the following selection criteria:

30 points | Project Team Experience: show the overall experience of the project team members in relation to projects of similar scope and cost. Provide specifics for the submitted projects. Identify years of experience and years of experience with current firm.

25 points | Design Architect Experience: Describe the experience of relevant past projects. Consider availability, years of experience, and years of experience with current firm.

15 points | Team Experience with Agency/Institution: Describe the experience the project team has on successful past projects with the Agency/Institution.

20 points | Team Member Availability & Commitment to the Project: Show the percentage of commitment level of the team members based on an average work week during each of the phases of the project. For example, if the project manager commits 100% of their time during design, then the Owner would expect that PM to dedicate their work week solely to the project during said phase.

B. Management Plan | 85 Points The Management Plan describes how the project will be managed. Include sufficient information about the proposed Management Plan addressing each of the following selection criteria:

30 points | Project Specific Experience: Demonstrate your team’s design experience with similar projects in scope and size. Describe the process your team will utilize to maximize space and efficiencies in order to prepare a successful design for this project. Provide specific tools and techniques that will allow the team to capitalize on the project goals.

20 points | Project Communication Plan and Change Control Plan: Show how the team will identify and communicate with the Stakeholders (Owner, User and Contractor) and manage and control RFIs, ASIs, PRs, PCOs and change order pricing.

25 points | Overall Understanding of Project: Show the overall understanding of the project, the user, risks, and project specific needs including site conditions and plans.

10 points | Schedule: Provide a detailed Schedule that includes activities, activity durations, activity start/finish dates, and milestones.

C. Past Performance References | 50 Points DFCM Performance Ratings DFCM rates the performance of each Contractor on a scale of 1 (low) to 5 (high). Ratings for completed DFCM projects over the past five years will be averaged and used in the selection scoring matrix.

DFCM Form 3c 9

It is the Contractor’s responsibility to confirm and review for accuracy their DFCM performance ratings prior to the proposal deadline. Changes made to DFCM ratings resulting from discrepancies found after the proposal deadline will be reflected in future selections.

DFCM performance ratings are available for review upon request by contacting the DFCM VBS Coordinator via email at dfcm_vbs@utah.gov.

Non-DFCM Performance References If a Contractor does not have a minimum of three active DFCM performance ratings, they are required to submit references for non-DFCM projects of comparable type, scope, size, and completed within the past five years that will supplement any of the Contractor’s DFCM performance ratings. All references must be for projects in which the Contractor was the prime Contractor.

Complete and accurate information for non-DFCM references must be provided on the DFCM Performance References Form. The form requires a minimum of five references. Incomplete reference information or the inability for DFCM to acquire a rating from a provided reference may result in the Contractor being disqualification from the selection process.

How does DFCM rate non-DFCM projects?

To obtain a minimum of three collective performance ratings for each Contractor, references provided for non- DFCM projects will be contacted at random and asked a series of predetermined questions. The reference will be asked to rate the Contractor on a scale of 1 (low) to 5 (high) for each question. The ratings will be averaged and result in a performance rating for the corresponding project. DFCM will only contact references until a collective total of three performance ratings for non-DFCM and DFCM projects are obtained. The three performance ratings will be averaged and used in the selection scoring matrix. Contractors that fail to meet this requirement or a minimum of three collective ratings may be disqualified from the selection process.

Additional Requirements The following documents are not part of the selection criteria but are requirements that, if not met, may disqualify the Consultant from the selection process or award of the Contract if not submitted.

D. DFCM Termination or Debarment Form The Consultant must sign and submit the provided DFCM Termination or Debarment Form certifying that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from soliciting work by any government agency. This form also certifies that neither they nor their principals have been terminated during the performance of a contract or withdrew from a contract to avoid termination. If the Consultant cannot certify these two statements, the form provides a section for a written explanation of the circumstances to be provided for review by DFCM. Although this form is not part of the selection criteria, it is a required proposal document. Proposals submitted without this form may lead to Consultant disqualification.

E. Health Insurance Statement of Compliance Form (applicable to the awarded Consultant only) The Health Insurance Statement of Compliance Form applies to: (i) a prime Contractor (and design professional) if the prime contract (or design professional contract) is in the aggregate amount of $2,000,000 or greater; and

(ii) applies to a subcontractor (and subconsultant of design professional) if the subcontract is in the aggregate amount of $1,000,000 or greater. For benchmark information, please visit Health Insurance Statement of Compliance Benchmark Information.

If applicable to this project, the awarded Contractor must submit the Health Insurance Statement of Compliance Form to DFCM via email at dfcmcontracts@utah.gov before the Construction Contract Notice to Proceed will be issued. The form can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.

http://www.health.utah.gov/chip/PDF/2016Benchmark.pdf http://www.health.utah.gov/chip/PDF/2016Benchmark.pdf mailto:dfcmcontracts@utah.gov

DFCM Form 3c 10

Proposal Documents The proposal documents consist of all requirements in the sections listed below. Proposals must address all selection criteria detailed in the Selection Criteria section of this solicitation.

Proposals exceeding the total page limit, the section page limits, or not following the formatting requirements may be considered non-responsive and may not be evaluated. Do not include any additional pages such as section dividers or blank pages.

Please note: U3P has a 1 GB size limit for any individual upload.

Proposals shall be organized as follows: Section Page Limits

Section One: Cover Page. Include the project name and project number as well as the prime Contractor’s name. The cover page may have a picture on it with a brief description. The cover page must include the name of the Contractor’s primary contact for this project, phone number, address, and email.

Section Two: Letter of introduction. 1

Section Three: Organizational chart, including team member roles and responsibilities. Resumes are required.

8 Statement of Qualifications. Address all items listed in the ‘Statement of Qualifications’ section of the Selection Criteria.

Management Plan. Address all items listed in the ‘Management Plan’ section of the Selection Criteria.

Section Four: Project Schedule. Indicate critical dates and other information in sufficient detail for the Selection Committee to determine if the time frames are reasonable.

Section Five: Proposal Summary Page(s). Include in these page(s) a summation of Section Three, above.

Contractor may utilize an 11x17 size page(s).

Total Page Limit for Sections 1 - 5: 12 Proposal documents listed in Sections 1 – 5 above must be combined and uploaded as one PDF document.

Hyperlinks to additional pages and external sources are not allowed and will not be assessed as part of the proposal.

DFCM Termination or Debarment Form:

The DFCM Termination or Debarment Form shall be uploaded independent of Sections 1

– 4 and the DFCM Past Performance References Form.

DFCM Past Performance References Form:

The DFCM Past Performance References Form shall be uploaded independent of Sections 1 – 4 and the DFCM Termination or Debarment Form.

Only required if Contractor does not have three or more past performance ratings on record for DFCM projects. Contact dfcm_vbs@utah.gov to verify.

Proposal Document Formatting Requirements:

Font Size: 12 minimum Page Size: 8.5 x 11, margins no smaller than 0.5” (excludes Project Schedule)

Proposal Documents

File details come from the government source that posted it. Updated .