5-05B BID SCHEDULE BASE BID.xls

XLS spreadsheet 23 KB Posted

Attached to
IFB - SNAKE HOLLOW BIKE PARK PAVING AND REPAIRS
Solicitation number
26-264
Issued by
Washington County, Utah

About this file

This is a Bid Schedule from the City of St. George, Utah for the IFB - Snake Hollow Bike Park Paving and Repairs project. The project encompasses multiple work items including mobilization, environmental protection measures, and traffic control on a lump sum basis. The primary work involves 3-inch asphalt paving for a pump track totaling 14,700 square feet, removal and replacement of 60 feet of split rail fence, and repair of four distinct dirt jump and skills areas using 4-inch cap material in quantities of 265 cubic yards for gravity jump trails, 260 cubic yards for the progressive drop zone, 192 cubic yards for the pump and bump skills loop, and 210 cubic yards for the dirt jump zone. The bid schedule also includes a lump sum item for owner staff training. All work items are clearly defined with their respective quantities and units of measurement for bidder estimation purposes.

The project requires all bidders to submit a bid bond equivalent to 5 percent of their total bid amount, issued by a surety company licensed in the State of Utah and on a form acceptable to the City of St. George. Upon award, contractors must provide a 100 percent performance bond covering both labor and materials for the duration of project completion. The City of St. George reserves the right to reject any or all submissions or waive any formality or technicality in proposals at its discretion. No specific response deadline, contract term, or award date information is provided in this bid schedule document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID-SCHEDULE

ItemQuantity RequiredUnit of Measurement
MOBILIZATION1LUMP
ENVIRONMENTAL PROTECTION1LUMP
TRAFFIC CONTROL1LUMP
3" ASPHALT PAVING, VOIDLESS MIX (PUMP TRACK)14,700SQ FT
REMOVE AND REPLACE SPLIT RAIL FENCE60FEET
4" CAP MATERIAL (REPAIR GRAVITY JUMP TRAILS)265CU YD
4" CAP MATERIAL (REPAIR PROGRESSIVE DROP ZONE)260CU YD
4" CAP MATERIAL (REPAIR PUMP & BUMP SKILLS LOOP)192CU YD
4" CAP MATERIAL (REPAIR DIRT JUMP ZONE)210CU YD
OWNER STAFF TRAINING1LUMP

File details come from the government source that posted it. Updated .