3-04 BID SET 26-264 Snake Hollow Bike Park Paving and Repairs PLANS.pdf

PDF 34 MB Posted

Attached to
IFB - SNAKE HOLLOW BIKE PARK PAVING AND REPAIRS
Solicitation number
26-264
Issued by
Washington County, Utah

About this file

This is a construction plans document for the City of St. George's Snake Hollow Bike Park Paving and Repairs project, prepared by the City of St. George Park Planning Division. The project, located at 1500 North Lava Flow Drive in St. George, Utah, involves comprehensive repairs and paving of multiple bike park features across five distinct zones: gravity jump trails, progressive drop zones, pump tracks, pump and bump skills loops, and dirt jump zones. The scope of work includes adding 4 inches of cap material (3/8" minus screened mix consisting of 60% sand, 20% clay, 15% silt, and 5% gravel) to dirt trails and features totaling approximately 21,220 to 20,900 square feet in various areas, with a base bid involving 265 to 260 cubic yards of cap material per zone. Additionally, asphalt paving (3 inches of HMA asphalt) is specified for pump tracks covering 14,700 square feet (140 cubic yards) and optional for the dirt jump zone covering 17,000 square feet (160 cubic yards). The qualified contractor must demonstrate a minimum of three years of experience on public projects involving singletrack trails, gravity jump trails, pump tracks, dirt jumps, and other mountain bike trail elements.

General project requirements mandate that all construction comply with St. George City standards, maintain positive drainage away from all trails with no surface water ponding, and achieve 90% modified Proctor density compaction for all trails and features. The contractor is responsible for all required inspections and testing, site disturbance minimization with revegetation of disturbed areas, and designation of an experienced test rider to oversee construction and verify that specifications and design intent are met. Work is restricted to 7:00 AM to 7:00 PM Monday through Friday, with no construction allowed on weekends or city-observed holidays unless approved. A 5% bid bond naming the City of St. George as obligee and a 100% performance bond covering labor and materials are required for all submissions. The contractor must coordinate with utility companies and Blue Stakes 811 a minimum of two working days before any excavation, with the contractor bearing sole responsibility for locating, protecting, and repairing any damaged utilities.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

VE

R

S H

EE

T

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

CV-1

CITY OF ST. GEORGE

SNAKE HOLLOW BIKE PARK PAVING & REPAIRS

BID INQUIRY NO. 26-264

FEBRUARY 2026

BIKE PARK PAVING & REPAIRS SHEET

INDEX

SHEET NO. SHEET TITLE

CV-1 1 COVER SHEET

PN-1 1 PROJECT NOTES

SP-1 1 SITE PLAN - OVERALL & INDEX MAP

SP-2 1 SITE PLAN - GRAVITY JUMP TRAILS

SP-3 1 SITE PLAN - PROGRESSIVE DROP ZONE

SP-4 1 SITE PLAN - PUMP TRACKS

SP-5 1 SITE PLAN - PUMP & BUMP SKILLS LOOP

SP-6 1 SITE PLAN - DIRT JUMP ZONE

SPD-1 1 SITE PLAN DETAILS

ORIGINAL BIKE PARK PLANS SHEET INDEX

SHEET NO. SHEET TITLE

BP1.0 1 OVERALL SITE KEY

BP1.1-BP1.5 6 FEATURE PARK ENLARGEMENT

BP2.1-BP2.6 6 LOOP TRAIL PLAN

BP3.0-BP3.5 6 DETAILS

OWNER & PREPARED BY

61 SOUTH MAIN STREET

ST. GEORGE, UTAH 84770

(435) 627-4000

VICINITY MAP

(N.T.S.)

SNAKE HOLLOW BIKE PARK

(N.T.S.)

PROJECT SITE

TU

W

EA

P

D R

LA

VA

F

LO

W D

R

1800 N.

SANTA CLARA DR. / SUNSET BLVD.

LITTLE LEAGUE DR.

1140 N.

NORTH

NORTH

Know what's below.

before you dig.Call

R

PR

JE

C

T N

O

TE

S

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

PN-1Know what's below.

before you dig.Call

R

GENERAL NOTES:

1. STANDARD DRAWINGS & SPECIFICATIONS: ALL CONSTRUCTION SHALL CONFORM TO ST. GEORGE CITY STANDARDS, UNLESS SPECIFIED OTHERWISE.

2. PROPERTY & CONSTRUCTION LIMITS: ALL CONSTRUCTION WORK INCLUDING VEHICLES, EQUIPMENT, MATERIALS, ETC.

SHALL BE KEPT WITHIN EXISTING RIGHT-OF-WAY AND EASEMENTS OF THE PROJECT BOUNDARIES. ANY WORK BEYOND

CONSTRUCTION LIMITS IS TO BE APPROVED BY OWNER.

3. EXISTING IMPROVEMENTS: CONTRACTOR SHALL TAKE NECESSARY MEASURES TO PRESERVE AND PROTECT EXISTING STRUCTURES, WALLS, DRIVEWAYS, TRAFFIC SIGNS, WATERWAYS, FENCES, LANDSCAPING, TREES, RIPRAP, DITCHES, ASPHALT AND CONCRETE TRAILS, CURB AND GUTTER, MAILBOXES, SIDEWALK, AND OTHER IMPROVEMENTS. ANY SUCH IMPROVEMENTS REMOVED OR DAMAGED BY CONTRACTOR'S ACTIVITY SHALL BE REPLACED OR REPAIRED TO ORIGINAL OR BETTER CONDITION ACCORDING TO THE SPECIFICATIONS OF THE GOVERNMENTAL ENTITY HAVING JURISDICTION, AT

THE SOLE EXPENSE OF THE CONTRACTOR.

4. TESTING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED INSPECTION AND TESTING. WORK CONCEALED WITHOUT THE REQUIRED INSPECTION OR TESTING SHALL BE SUBJECT TO EXPOSURE AT THE

CONTRACTOR'S SOLE EXPENSE.

5. NON-CONFORMING WORK: WORK PERFORMED WHICH IS NOT IN CONFORMANCE WITH THE DRAWINGS AND/OR SPECIFICATIONS OR WITHOUT OWNER APPROVAL SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE

CONTRACTOR'S SOLE EXPENSE.

6. WORK HOURS & CONSTRUCTION NOISE: THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO BETWEEN 7:00 AM AND 7:00 PM ONLY AND NO CONSTRUCTION WORK WILL BE ALLOWED ON SATURDAYS, SUNDAYS, OR HOLIDAYS

OBSERVED BY THE OWNER UNLESS OTHERWISE APPROVED BY THE OWNER.

7. OSHA COMPLIANCE: IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL OSHA REGULATIONS AND STANDARDS ARE COMPLIED WITH ON THE PROJECT SITE DURING THE CONSTRUCTION PERIOD.

8. EPA COMPLIANCE: THE CONTRACTOR SHALL MEET ALL DEPARTMENT OF ENVIRONMENTAL QUALITY AND U.S. EPA

REQUIREMENTS.

9. CONSTRUCTION ACTIVITIES: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM CONSTRUCTION ACTIVITIES PER THE CONTRACT DOCUMENTS. ANY ADDITIONS, DELETIONS, OR MODIFICATIONS SHALL FIRST MEET WITH

THE WRITTEN APPROVAL OF THE OWNER.

10. DISCREPANCIES, OMISSIONS AND CONFLICTS: THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY DISCREPANCIES, OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE DRAWINGS AND/OR SPECIFICATIONS BEFORE

PROCEEDING WITH RELATED WORK.

11. CONSTRUCTION TIMELINE: THE CONTRACTOR RECOGNIZES THAT TIME IS OF THE ESSENCE WITH THIS PROJECT AND SHALL SELECT AND UTILIZE LABOR, EQUIPMENT, AND MATERIALS THAT MINIMIZE THE CONSTRUCTION TIMELINE. THE CONTRACTOR SHALL ALSO REGULARLY APPRISE THE OWNER OF THE ELEMENTS REQUIRING LONG LEAD, INSTALLATION

OR CURE TIMES.

12. INCIDENTAL WORK: WORK INTENDED BY THE DRAWINGS AND SPECIFICATIONS, BUT NOT SPECIFICALLY IDENTIFIED IN A

PARTICULAR BID ITEM SHALL BE CONSIDERED INCIDENTAL TO THE OTHER BID ITEMS.

13. LEGAL DISPOSAL: ANY DEBRIS RESULTING FROM THE PROJECT IS TO BE DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR DISPOSAL SITES AT WHICH DEBRIS MAY BE LAWFULLY WASTED.

14. EXISTING UTILITIES: UTILITIES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION PROVIDED BY OTHERS, AND SHOULD BE CONSIDERED APPROXIMATE AND FOR GENERAL INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE TO LOCATE AND PROTECT ALL UTILITIES IN THE PROJECT AREA, INCLUDING THOSE THAT MAY NOT BE SHOWN OR THAT MAY BE SHOWN INCORRECTLY. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE REPAIR OF ANY UTILITY DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS. RELOCATIONS AND/OR REPLACEMENTS OF EXISTING UTILITIES SHALL BE COORDINATED BY THE CONTRACTOR WITH THE UTILITY OWNER. CONTRACTOR SHALL CONTACT, SCHEDULE, AND ESTABLISH UTILITY SHUT DOWN TIMES AND DETERMINE THE RELOCATION AND/OR

REPLACEMENT REQUIREMENTS OF EXISTING UTILITIES PRIOR TO THE START OF ANY WORK.

BIKE PARK REPAIR NOTES:

1. ALL DIRT TRAILS AND DIRT FEATURES ARE IN NEED OF SOME LEVEL OF REPAIR. TRAIL REPAIR INCLUDES, BUT IS NOT

LIMITED TO:

1.1. TRAIL EROSION REPAIR.

1.2. SMOOTHING OUT ROUGH/CHOPPY DIRT SURFACES ON DIRT BERMS, DIRT ROLLERS, STEP DOWN JUMPS, STEP UP

JUMPS, HIP STEP DOWNS, AND DIRT JUMPS.

1.3. PROVIDING EVEN SURFACE FOR DIRT JUMP LANDINGS, DIRT DROP LANDINGS, DIRT TABLE LANDINGS, DIRT TABLE

TOPS, DIRT PLATFORMS, AND DIRT JUMPS.

2. ALL PREFABRICATED FEATURES ARE IN GOOD CONDITION BUT DIRT APPROACHES & EXITS NEED REPAIR.

3. CONTRACTOR TO PROVIDE CAP MATERIAL FOR DIRT TRAIL AND DIRT FEATURE REPAIRS.

4. WATER IS AVAILABLE VIA QUICK COUPLERS THROUGHOUT EACH BIKE PARK AREA. DISTANCE BETWEEN EACH QUICK

COUPLER IS APPROXIMATELY 100'.

5. IT IS REQUIRED THAT QUALIFIED TRAIL CONTRACTOR MUST HAVE A MINIMUM OF THREE YEARS OF EXPERIENCE OF

WORK ON PUBLIC PROJECTS THAT INCLUDES: SINGLETRACK TRAILS, GRAVITY JUMP TRAILS, PUMP TRACKS, DIRT JUMPS

AND OTHER MOUNTAIN BIKE TRAIL ELEMENTS AND PROVIDE PROOF OF SUCH.

6. ALL TRAIL CONSTRUCTION SHALL COMPLY WITH THE SPECIFICATIONS, DRAWINGS, REQUIREMENTS, AND DESIGN INTENT PRESCRIBED IN THE CONSTRUCTION AND CONTRACT DOCUMENTS. ACCEPTABLE MODIFICATIONS SHALL BE PRESENTED BY THE TRAIL CONTRACTOR TO THE CITY'S REPRESENTATIVE FOR APPROVAL IN WRITING. FIELD FIT MODIFICATIONS ARE ENCOURAGED WHEN NECESSARY TO ENSURE PROPER FLOW AND FUNCTION OF TRAIL FEATURES.

7. CONTRACTOR TO AVOID ANY SITE DISTURBANCE BEYOND THE NECESSARY LIMITS OF CONSTRUCTION TO THE EXTENT POSSIBLE. ANY AREAS DISTURBED DURING CONSTRUCTION ACTIVITIES SHALL BE REVEGETATED AND RESTORED TO

PROFESSIONALLY FINISHED CONDITIONS. MINIMIZE DISTURBANCE TO EXISTING VEGETATION.

8. CONTRACTOR SHALL DESIGNATE AN EXPERIENCED, OBJECTIVE TEST RIDER WITH EXPERT KNOWLEDGE OF THE INTENDED EXPERIENCE TO OVERSEE CONSTRUCTION OF THIS PROJECT. THIS TEST RIDER SHALL THOROUGHLY TEST RIDE ALL TRAILS AND TRAIL FEATURES TO ENSURE THE SPECIFIED RIDING EXPERIENCE, DESIGN, FLOW, RHYTHM, CHARACTER, DIFFICULTY, AND SPECIFICATIONS ARE MET.

9. COMPLETED BIKE PARK REPAIRS SHALL REFLECT PROFESSIONAL WORKMANSHIP IN APPEARANCE, QUALITY, AND ATTENTION TO DETAIL. TRAILS AND FEATURES SHALL BE WELL INTEGRATED INTO SITE, AESTHETICALLY PLEASING IN APPEARANCE, AND WELL-SHAPED, CRAFTED, AND FINISHED ACCORDING TO COMMONLY ACCEPTED BEST PRACTICES FOR HIGH QUALITY AND SUSTAINABLE MOUNTAIN BIKING TRAILS. WORK MUST BE COMPLETED TO THE SATISFACTION OF

THE CITY'S REPRESENTATIVE.

10. THE TRAIL CONTRACTOR SHALL BE RESPONSIBLE FOR FINE GRADING AND POSITIVE DRAINAGE AWAY FROM ALL TRAILS AND TRAIL FEATURES. NO PONDING OF SURFACE WATER SHALL BE ON OR ADJACENT TO TRAIL SURFACE. DURING CONSTRUCTION, ADDITIONAL DRAINAGE METHODS MAY BE NECESSARY BY CONTRACTOR TO PROMOTE POSITIVE SITE DRAINAGE. ALL DRAINAGE METHODS, DEVICES AND LOCATIONS SHALL BE EMPLOYED IN ACCORDANCE WITH

PROFESSIONAL TRAIL BUILDING STANDARDS AND APPROVAL BY THE CITY'S REPRESENTATIVE.

11. THE INTENT OF THE CAP MATERIAL IS TO COVER THE EXISTING TRACK/TRAIL SURFACE WITH A MINIMUM 4" LAYER OF PROFESSIONALLY-FINISHED SURFACE THAT FACILITATES DRAINAGE, COMPACTS WELL, AND ACCOMMODATES RIDERS IN REASONABLY VARIABLE WET AND DRY CONDITIONS. 3/8" MINUS SCREENED MIX CONSISTING OF 60% SAND, 20% CLAY, 15% SILT AND 5% GRAVEL; OR SIMILAR ALTERNATIVE TO BE APPROVED BY CITY'S REPRESENTATIVE.

12. FOR ALL CAP MATERIALS SPECIFIED, IT SHALL BE UNDERSTOOD AND AGREED THAT QUANTITIES LISTED ARE ESTIMATED ONLY AND MAY BE INCREASED OR DECREASED ON A UNIT COST BASIS AS NEEDED TO MEET FEATURE SPECIFICATIONS.

13. ALL TRAILS AND FEATURES SHALL BE COMPACTED TO 90% MODIFIED PROCTOR DENSITY IN A MANNER THAT WILL

SUPPORT THE INTENDED USE.

SI

TE

P

LA

N

O

VE

R A

LL

IN

D

EX

M

A P

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

SHEET SP-2

1 inch = ft.

( IN FEET )

0200 200 400

SP�1

SHEET SP-3

SHEET SP-4

SHEET SP-5

SHEET SP-6

Know what's below.

before you dig.Call

NORTH

Know what's below.

before you dig.Call

R

SI

TE

P

LA

N

G R

A

VI

TY

J

U M

P

TR

A

IL

S

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

1 inch = ft.

( IN FEET )

050 50 100

SP�2NORTH

EROSION IN FRONT OF KICKER RAMP FOR WHALE TAIL.

POOR DRAINAGE IN FRONT OF KICKER RAMPS. TRAIL EROSION.

DIRT BERM SURFACE IS CHOPPY.

NOTES:

1) PHOTOS SHOW SOME OF THE WORST AREAS

IN NEED OF REPAIR.

2) ADDING 4" OF CAP MATERIAL TO ALL DIRT

TRAILS/FEATURES.

3) DO NOT COVER ROCK GARDENS OR

PREFABRICATED FEATURES WITH CAP

MATERIAL.

4) ALL PREFABRICATED FEATURES ARE IN GOOD

CONDITION BUT DIRT APPROACHES & EXITS

NEED REPAIR.

5) REFER TO ORIGINAL BIKE PARK PLANS FOR

DIRT TRAILS/FEATURES LAYOUT AND DETAILS.

6) PROTECT IN PLACE EXISTING VEGETATION.

UNEVEN LANDINGS.

BASE BID:

AREA TO REPAIR

ADDING 4" OF CAP MATERIAL

TO ENTIRE HATCHED AREA

21,220 SF

265 CY

CAP MATERIAL STAGING

AREA. ACCESS FROM 1800 N

AND FOLLOW TRAIL.

REMOVE FENCE TO ACCESS

STORAGE AREA. REPLACE FENCE

AFTER REPAIR WORK COMPLETE.

P

LA

N

PR

O

G R

ES

SI

VE

D

R O

P

ZO

N E

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

SP�3Know what's below.

before you dig.Call

R

1 inch = ft.

( IN FEET )

050 50 100

NORTH

TRAIL EROSION. DIRT APPROACHES TO LADDER DROPS. TRAIL EROSION.

UNEVEN LANDINGS.TRAIL EROSION.

BASE BID:

AREA OF REPAIR

ADDING 4" OF CAP MATERIAL

TO ENTIRE HATCHED AREA

20,900 SF

260 CY

NOTES:

1) PHOTOS SHOW SOME OF THE WORST AREAS IN NEED OF REPAIR.

2) ADDING 4" OF CAP MATERIAL TO ALL DIRT TRAILS/FEATURES.

3) DO NOT COVER ROCK GARDENS OR PREFABRICATED FEATURES

WITH CAP MATERIAL.

4) ALL PREFABRICATED FEATURES ARE IN GOOD CONDITION BUT DIRT

APPROACHES & EXITS NEED REPAIR.

5) REFER TO ORIGINAL BIKE PARK PLANS FOR DIRT TRAILS/FEATURES

LAYOUT AND DETAILS.

6) PROTECT IN PLACE EXISTING VEGETATION.

CAP MATERIAL STAGING

AREA. ACCESS FROM

TUWEAP DRIVE.

P

LA

N

PU

M

P

TR

A C

K S

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

1 inch = ft.

( IN FEET )

030 30 60

SP-4Know what's below.

before you dig.Call

R

NORTH

POOR DRAINAGE BETWEEN DIRT ROLLERS. DIRT ROLLER SURFACE IS CHOPPY. TOP OF DIRT BERM IS UNEVEN.

TRAIL EROSION.DIRT BERM SURFACE IS CHOPPY.

BASE BID:

AREA TO PAVE

ADDING 3" OF

ASPHALT

PAVING TO

ENTIRE

HATCHED AREA

14,700 SF

140 CY

NOTES:

1) PHOTOS SHOW SOME OF THE WORST AREAS IN NEED OF REPAIR.

2) ADDING 4" OF CAP MATERIAL TO ALL DIRT TRAILS/FEATURES.

3) DO NOT COVER ROCK GARDENS OR PREFABRICATED FEATURES

WITH CAP MATERIAL.

4) ALL PREFABRICATED FEATURES ARE IN GOOD CONDITION BUT DIRT

APPROACHES & EXITS NEED REPAIR.

5) REFER TO ORIGINAL BIKE PARK PLANS FOR DIRT TRAILS/FEATURES

LAYOUT AND DETAILS.

6) PROTECT IN PLACE EXISTING VEGETATION.

SEE SHEET SP-5 FOR PUMP

& BUMP SKILLS LOOP

REPAIR.

P

LA

N

PU

M

P

B U

M P

SK

IL

LS

L

O O

P

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

SP-5Know what's below.

before you dig.Call

R

1 inch = ft.

( IN FEET )

050 50 100

NORTH

EROSION IN FRONT AND UNDER A-FRAME. TRAIL EROSION. TRAIL EROSION.

DIRT APPROACH TO SPLIT DECISION.DIRT EXIT TO ROLLER CORNER.

BASE BID:

AREA OF REPAIR

ADDING 4" OF CAP

MATERIAL TO ENTIRE

HATCHED AREA

15,500 SF

192 CY

NOTES:

1) PHOTOS SHOW SOME OF THE WORST AREAS IN NEED OF

REPAIR.

2) ADDING 4" OF CAP MATERIAL TO ALL DIRT TRAILS/FEATURES.

3) DO NOT COVER ROCK GARDENS OR PREFABRICATED

FEATURES WITH CAP MATERIAL.

4) ALL PREFABRICATED FEATURES ARE IN GOOD CONDITION BUT

DIRT APPROACHES & EXITS NEED REPAIR.

5) REFER TO ORIGINAL BIKE PARK PLANS FOR DIRT

TRAILS/FEATURES LAYOUT AND DETAILS.

6) PROTECT IN PLACE EXISTING VEGETATION.

CAP MATERIAL

STAGING AREA.

SEE SHEET SP-4 FOR

PUMP TRACK PAVING

P

LA

N

D

IR

T

JU

M P

ZO

N

E

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/30/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

1 inch = ft.

( IN FEET )

030 30 60

SP�6Know what's below.

before you dig.Call

R

NORTH

TRAIL EROSION. TRAIL EROSION.

POOR DRAINAGE AND TRAIL EROSION IN FRONT OF KICKER RAMPS.

UNEVEN LANDINGS.

POOR DRAINAGE IN FRONT OF KICKER RAMPS & UNEVEN LANDINGS.UNEVEN LANDING.

BASE BID:

AREA TO REPAIR

ADDING 4" OF CAP MATERIAL TO

ENTIRE HATCHED AREA

17,000 SF

210 CY

ADDITIVE ALTERNATE #1:

AREA TO PAVE

ADDING 3" OF ASPHALT PAVING TO

ENTIRE HATCHED AREA

17,000 SF

160 CY

NOTES:

1) PHOTOS SHOW SOME OF THE WORST AREAS IN NEED OF REPAIR.

2) ADDING 4" OF CAP MATERIAL TO ALL DIRT TRAILS/FEATURES.

3) DO NOT COVER ROCK GARDENS OR PREFABRICATED FEATURES

WITH CAP MATERIAL.

4) ALL PREFABRICATED FEATURES ARE IN GOOD CONDITION BUT

DIRT APPROACHES & EXITS NEED REPAIR.

5) REFER TO ORIGINAL BIKE PARK PLANS FOR DIRT

TRAILS/FEATURES LAYOUT AND DETAILS.

6) PROTECT IN PLACE EXISTING VEGETATION.

CAP MATERIAL

STAGING AREA.

VA

IE

S

3" HMA ASPHALT SURFACE

SMOOTH OUT EXISTING

DIRT SURFACE AND

COMPACT IT TO 90%

EXISTING DIRT FEATURE

NATIVE SOIL

VARIES

Know what's below.

before you dig.Call

R

SPD�1

DATE:

DRAWN BY:

CHECKED BY:

NS

MG

01/20/2026

SHEET

C

IT

Y O

F

ST

. G

EO

R G

E

PA

R K

P

LA

N N

IN

G

D

IV

IS

IO

N

N

O R

TH

EA

ST

ST

. G

EO

R

G E, U

TA

H

(4

) 6

-4

R

EV

IS

IO

N S:

N O

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

G :\S ha re d dr iv es

\P ar kP la nn in g\ Pa rk s\

Sn ak e H ol lo w B ik e

Pa rk

\2

6_ Pu m p

Tr ac k

R ep ai rs

\1

C on st ru ct io n Ad m in

\C on st ru ct io n D ra w in gs

\C on st ru ct io n D ra w in gs

\R ep ai rs

_2

6.

dw g 2/

2/

:5

AM

SI

TE

P

LA

N D

ET

A

IL

S

SN

A

K E

H O

LL

O

W B

IK

E

PA

R

K P

A

VI

N G

R

EP

A

IR

S

N O

R

TH

L A

VA

F

LO

W

D R

IV

E

St . G eo rg e, U ta h

SCALE: NO SCALE

ASPHALT DETAILA

363738

3940414243

N O

R

TH

S T

N O

R

TH

S T

N O

R

TH

S T

N O

R

TH

S T

N O

R

TH

S T

N O

R

TH

S T

N O

R

TH

S T

TUWEAP DRIVE

TUWEAP DRIVE

W

ES

T

SU

NS

ET

B O

UL

EV

AR

D

N . S

T

SAND

HOLLOW

AQUATIC

CENTER

SNOW CANYON

HIGH SCHOOL

N. 2400 W. / LAVA FLOW DR

SAND HOLLOW WASH

N O

R

TH

S T

N O

R

TH

C R

N O

R

TH

S T

TUWEAP DRIVE

1750 440

3.30.2018

C I T Y

F

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

OVERALL SITE

KEY

PLAN - OVERALL SITE KEY

FEATURE PARK

PROGRESSIVE DROP ZONE & BEGINNER GRAVITY SKILLS TRAIL

FEATURE PARK

GRAVITY JUMP TRAILS

FEATURE PARK

PUMP TRACKS & PUMP AND BUMP SKILLS LOOP

FEATURE PARK

DIRT JUMP ZONE

TRAIL

XC LOOP

TRAIL

XC LOOP

FEATURE PARK

FREERIDE & TECHNICAL LINE OPTIONS

GENERAL NOTES

1. It is required that Qualified Trail Contractor must have minimum three years experience of work on public projects that includes:

singletrack trails, gravity jump trails, pump tracks, dirt jumps and other mountain bike trail elements.

2. Contractor responsible for field layout of all new improvements. Digital files of the proposed design and base files will be provided upon request in AutoCAD format. Provide stakes at all coordinate locations and every 25 feet along centerline of all pathways for review by Owner's Representative prior to any earthwork operations.

3. All trail construction shall comply with the specifications, drawings, requirements, and design intent prescribed in the construction and contract documents. Acceptable modifications shall be presented by the Trail Contractor to the Owner's Representative for approval in writing. Field fit modifications are encouraged when necessary to ensure proper flow and function of trail features.

4. Contractor to avoid any site disturbance beyond the necessary limits of construction to the extent possible. Any areas disturbed during construction activities shall be revegetated and restored to professionally finished conditions. Minimize disturbance to existing vegetation.

5. Contractor responsible to coordinate delivery, assembly and installation of all materials and furnishings per manufacturer's instructions.

6. Contractor shall designate an experienced, objective Test Rider with expert knowledge of the intended experience to oversee construction of this project. This Test Rider shall thoroughly test ride all trails and trail features to ensure the specified riding experience, design, flow, rhythm, character, difficulty, and specifications are met.

7. Prior to construction, contractor shall contact all utility companies potentially involved in or having facilities on or near the site.

Contractor shall contact Blue Stakes 811 underground service alert program a minimum of two working days in advance of any excavation or grading work. Bike Park Design shall not be held liable for the existence or location of any underground utilities or other buried objects.

8. Completed bike park shall reflect professional workmanship in appearance, quality, and attention to detail. Trails and features shall be well integrated into site, aesthetically pleasing in appearance, and well-shaped, crafted, and finished according to commonly accepted best practices for high quality and sustainable mountain biking trails. Work must be completed to the satisfaction of the Owner's Representative.

9. The Trail Contractor shall be responsible for fine grading and positive drainage away from all trails and trail features. No ponding of surface water shall be on or adjacent to trail surface. During construction, additional drainage methods may be necessary by Contractor to promote positive site drainage. All drainage methods, devices and locations shall be employed in accordance with professional trail building standards and approval by Owner's Representative.

10. Fill needed for construction of trails and features may be generated during trail excavation, borrowed from surrounding landscape where appropriate, borrowed from onsite stockpiles, or imported when necessary. Material shall be uncontaminated and free of organic material, trash, and other objects. Fill material shall be screened to 4”, placed, graded, and compacted by Contractor in a manner that will support the intended use.

11. The intent of the Cap material is to cover the existing Fill soils with minimum 4” layer of professionally-finished surface that facilitates drainage, compacts well, and accommodates riders in reasonably variable wet & dry conditions. 3/8" minus screened mix consisting of 60% sand, 20% clay, 15% silt and 5% gravel; or similar alternative to be approved by Owner's Representative. Refer to soils specifications for additional information.

12. For all Fill & Cap materials specified, it shall be understood and agreed that quantities listed are estimated only and may be increased or decreased on a unit cost basis as needed to meet feature specifications.

13. All trails and features shall be compacted to 90% modified proctor density in a manner that will support the intended use.

14. Imported boulder and rock materials shall be consistent with or match onsite materials. To be approved by Owner's Representative.

TRAIL

LAVA FIELD PATH

XC NICA LOOP TRAIL

SEE: BP2.1

XC NICA LOOP TRAIL

SEE: BP2.2

TRAIL SIGNAGE, TYP

18" HDPE CORRUGATED DRAIN PIPE,

TYP. (APPROX. 46 LF TOTAL)

SEE: 8/BP3.3

30201050 50

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

FEATURE PARK

ENLARGEMENT

NOTES - GRAVITY JUMP TRAILS

FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

1 1 BP3.0 DIRT BERM 4 26 8 12

2 5 BP3.1 STEP DOWN JUMP 4 24 10 45

3 3 BP3.0 DIRT TABLE TOP 4 24 10 -

4 1 BP3.0 DIRT BERM 4 18 8 15

5 3 BP3.4 KICKER RAMP 5 9 4 -

6 4 BP3.1 DIRT TABLE LANDING 5 24 10 -

7 3 BP3.4 KICKER RAMP 5 9 4 -

8 4 BP3.1 DIRT TABLE LANDING 5 24 10 -

9 2 BP3.0 DIRT ROLLER 4 18 8 -

10 3 BP3.4 KICKER RAMP 5 9 4 -

11 4 BP3.1 DIRT TABLE LANDING 5 24 10 -

12 3 BP3.4 KICKER RAMP 5 9 4 -

13 4 BP3.1 DIRT TABLE LANDING 5 24 10 -

14 1 BP3.0 DIRT BERM 5 18 8 15

15 5 BP3.4 KICKER RAMP 6 12 4 -

16 1 BP3.5 WHALE TAIL 8 31 4 -

17 4 BP3.1 DIRT TABLE LANDING 8 24 10 -

18 5 BP3.4 KICKER RAMP 6 12 4 -

19 1 BP3.1 DIRT JUMP LANDING 6 24 18 -

20 4 BP3.5 CURVED WALL RIDE 8 30 4 24

21 5 BP3.4 KICKER RAMP 6 12 4 -

22 3 BP3.4 KICKER RAMP 5 9 4 -

23 1 BP3.1 DIRT JUMP LANDING 5 24 18 -

24 1 BP3.0 DIRT BERM 3 26 8 35

25 2 BP3.0 DIRT ROLLER 3 20 8 -

26 5 BP3.1 STEP DOWN JUMP 3 18 8 -

27 1 BP3.0 DIRT BERM 3 25 8 50

28 3 BP3.0 DIRT TABLE TOP 4 24 8 -

29 1 BP3.0 DIRT BERM 4 30 8 20

30 1 BP3.0 DIRT BERM 4 35 8 16

31 1 BP3.0 DIRT BERM 3 18 8 14

32 1 BP3.4 KICKER RAMP 4 8 4 -

33 4 BP3.1 DIRT TABLE LANDING 8 24 10 -

PLAN - GRAVITY JUMP TRAILS

NOTES - GRAVITY JUMP TRAILS (cont.)

FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

34 1 BP3.4 KICKER RAMP 4 8 4 -

35 1 BP3.0 DIRT BERM 3 14 8 25

36 3 BP3.4 KICKER RAMP 5 9 4 -

37 11 BP3.4 STEP UP BOX 3 21 4 -

38 1 BP3.1 DIRT JUMP LANDING 3 21 10 -

39 3 BP3.4 KICKER RAMP 5 9 4 -

40 1 BP3.0 DIRT BERM 4 15 8 20

41 2 BP3.0 DIRT ROLLER 3 18 8 -

42 3 BP3.0 DIRT TABLE TOP 3 18 8 -

43 1 BP3.0 DIRT BERM 3 26 8 30

44 5 BP3.1 STEP DOWN JUMP 3 22 8 -

45 1 BP3.0 DIRT BERM 4 17 8 20

46 3 BP3.0 DIRT TABLE TOP 3 18 10 -

47 1 BP3.0 DIRT BERM 3 24 8 20

48 3 BP3.0 DIRT TABLE TOP 3 32 8 -

49 5 BP3.2 A-FRAME 2 12 4 -

50 1 BP3.0 DIRT BERM 4 27 8 15

51 3 BP3.0 DIRT TABLE TOP 3 24 10 -

52 3 BP3.0 DIRT TABLE TOP 3 24 10 45

53 5 BP3.1 STEP DOWN JUMP 3 24 10 -

54 1 BP3.0 DIRT BERM 4 33 8 30

55 9 BP3.5 SLANT WALL RIDE 6 25 6 30

56 1 BP3.0 DIRT BERM 4 33 8 22

57 1 BP3.2 KICKER RAMP 3 7 4 -

58 4 BP3.1 DIRT TABLE LANDING 3 24 10 -

59 2 BP3.0 DIRT ROLLER 4 24 10 45

60 1 BP3.4 KICKER RAMP 4 12 4 -

61 4 BP3.1 DIRT TABLE LANDING 4 24 10 -

62 1 BP3.0 DIRT BERM 4 33 8 22

63 1 BP3.4 KICKER RAMP 4 8 4 -

64 1 BP3.1 DIRT JUMP LANDING 4 21 10 -

65 4 - 6 BP3.0 TRAIL, TYP - - - - TBD DEPENDING ON SITE SPECIFIC CONDITIONS

MATERIAL TABULATION

Beginner Trail Length: 1,253'

740 CY fill 150 CY cap

Intermediate Trail Length: 482' 630 CY fill

110 CY cap

Advanced Trail Length: 752' 850 CY fill

120 CY cap

LEGEND

SKILLS AREA

NICA LOOP

XC NICA LOOP TRAIL

SEE: BP2.2

TRAIL SIGNAGE, TYP

30201050 50

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

FEATURE PARK

ENLARGEMENT

NOTES - FREERIDE & TECHNICAL LINE OPTIONS

FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

1 1 BP3.0 DIRT BERM 5 15 3 18

2 9 BP3.1 DOWNHILL ROCK GARDEN - 30 3 -

3 9 BP3.1 DOWNHILL ROCK GARDEN - 30 3 -

4 8 BP3.1 ROCK DROP 7 12 6 -

5 9 BP3.1 DOWNHILL ROCK GARDEN - 26 3 -

6 9 BP3.1 DOWNHILL ROCK GARDEN - 22 3 -

7 8 BP3.1 ROCK DROP 8 12 6 -

8 1 BP3.0 DIRT BERM 5 15 3 25

9 4 - 6 BP3.0 TRAIL, TYP - - - - TBD DEPENDING ON SITE SPECIFIC CONDITIONS

PLAN - FREERIDE & TECHNICAL LINE OPTIONS

MATERIAL TABULATION

Length: 843' 190 CY fill 25 CY cap

LEGEND

34 35

XC NICA LOOP TRAIL

SEE: BP2.2

KIDS / PRACTICE

SKILLS LOOP

PROGRESSIVE

DROP ZONE

BEGINNER GRAVITY

SKILLS TRAIL

30201050 50

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

FEATURE PARK

ENLARGEMENT

PLAN - PROGRESSIVE DROP ZONE & BEGINNER GRAVITY SKILLS TRAIL

NOTES - PROGRESSIVE DROP ZONE & BEGINNER GRAVITY SKILLS TRAIL

FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

1 7 BP3.0 ROCK GARDEN - 20 4 -

2 1 BP3.0 DIRT BERM 3 20 4 10

3 3 BP3.2 90 DEG TURN 4 24 2 -

4 1 BP3.0 DIRT BERM 3 20 4 8

5 2 BP3.0 DIRT ROLLER 2 15 4 -

6 1 BP3.0 DIRT BERM 3 29 4 12

7 1 BP3.0 DIRT BERM 3 27 4 11

8 1 BP3.0 DIRT BERM 3 16 4 15

9 1 BP3.0 DIRT BERM 3 8 4 11

10 1 BP3.0 DIRT BERM 3 13 4 11

11 5 BP3.2 A-FRAME 2 6 2 -

12 1 BP3.0 DIRT BERM 3 24 2 -

13 7 BP3.0 ROCK GARDEN - 20 4 -

14 7 BP3.0 ROCK GARDEN - 20 3 -

15 1 BP3.0 DIRT BERM 6 29 4 12

16 2 BP3.0 DIRT ROLLER 2 10 4 -

17 2 BP3.0 DIRT ROLLER 3 14 4 -

18 7 BP3.3 LOG RIDE - 30 2 -

19 7 BP3.0 ROCK GARDEN - 20 4 -

20 2 BP3.0 DIRT ROLLER 2 10 4 -

21 1 BP3.0 DIRT BERM 3 20 4 14

22 11 BP3.2 SINGLE ROLLER 2 18 2 -

23 1 BP3.0 DIRT BERM 3 11 4 10

24 1 BP3.0 DIRT BERM 3 12 4 26

25 3 BP3.0 DIRT TABLE TOP 3 12 4 -

26 1 BP3.0 DIRT BERM 3 9 4 10

27 3 BP3.0 DIRT TABLE TOP 3 12 4 -

28 1 BP3.0 DIRT BERM 3 13 4 15

29 3 BP3.2 90 TURN 4 24 2 -

30 7 BP3.0 ROCK GARDEN - 14 4 -

NOTES - PROGRESSIVE DROP ZONE & BEGINNER GRAVITY SKILLS TRAIL (cont) FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

31 7 BP3.0 ROCK GARDEN - 14 4 -

32 1 BP3.0 DIRT BERM 4 28 4 10

33 1 BP3.0 DIRT BERM 3 13 4 12

34 1 BP3.0 DIRT BERM 3 16 4 16

35 7 BP3.4 LADDER DROP 3 14 4 -

36 7 BP3.4 LADDER DROP 1 12 4 -

37 7 BP3.1 DROP LANDING 5 22 16 -

38 1 BP3.0 DIRT BERM 4 18 4 18

39 2 BP3.0 DIRT ROLLER 1 14 4 -

40 2 BP3.0 DIRT ROLLER 2 14 4 -

41 3 BP3.0 DIRT TABLE TOP 3 24 10 -

42 2 BP3.0 DIRT ROLLER 2 14 4 -

43 1 BP3.0 DIRT BERM 4 35 4 12

44 2 BP3.0 DIRT ROLLER 2 14 4 -

45 2 BP3.0 DIRT ROLLER 2 12 4 -

46 2 BP3.0 DIRT ROLLER 2 14 4 -

47 9 BP3.4 LADDER DROP 6 14 4 -

48 7 BP3.4 LADDER DROP 2 12 4 -

49 7 BP3.1 DROP LANDING 7 22 16 -

50 1 BP3.0 DIRT BERM 4 18 4 18

51 2 BP3.0 DIRT ROLLER 2 14 4 -

52 3 BP3.0 DIRT TABLE TOP 3 24 10 -

53 4 - 6 BP3.0 TRAIL, TYP - - - - TBD DEPENDING ON SITE SPECIFIC CONDITIONS

MATERIAL TABULATION

Prog Drop Zone Length: 876' 555 CY fill 90 CY cap

Gravity Skills Trail Length: 1,271'

300 CY fill 110 CY cap

LEGEND

11 12 13

'S

D

'S D

'S

D

'S D

'S

D

'S D

'S

D

XC NICA LOOP TRAIL

SEE: BP2.3

30201050 50

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

FEATURE PARK

ENLARGEMENT

PLAN - PUMP TRACKS & PUMP AND BUMP SKILLS LOOP

NOTES - PUMP TRACKS & PUMP AND BUMP SKILLS LOOP

FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

1 9 BP3.2 ROLLER CORNER 2 24 2 -

2 7 BP3.0 ROCK GARDEN - 15 4 -

3 2 BP3.0 DIRT ROLLER 1 14 4 -

4 1 BP3.0 DIRT BERM 2 11 4 15

5 7 BP3.0 ROCK GARDEN - 17 4 -

6 7 BP3.2 DOUBLE ROLLER 1 30 4 -

7 7 BP3.0 ROCK GARDEN - 24 4 -

8 1 BP3.0 DIRT BERM 2 10 4 30

9 7 BP3.3 LOG RIDE 5 30 2 -

10 1 BP3.0 DIRT BERM 2 10 4 30

11 7 BP3.0 ROCK GARDEN - 15 4 -

12 3 BP3.3 SPLIT DECISION 2 47 3 -

13 7 BP3.0 ROCK GARDEN - 15 4 -

14 2 BP3.0 DIRT ROLLER 2 14 4 -

15 2 BP3.0 DIRT ROLLER 2 14 4 -

16 1 BP3.0 DIRT BERM 2 25 4 11

17 7 BP3.0 ROCK GARDEN - 15 4 -

18 1 BP3.0 DIRT BERM 2 18 4 15

19 1 BP3.0 DIRT BERM 3 13 4 15

20 2 BP3.0 DIRT ROLLER 3 14 4 -

21 2 BP3.0 DIRT ROLLER 3 14 4 -

22 5 BP3.2 A-FRAME 3 6 2 -

23 3 BP3.0 DIRT TABLE TOP 2 12 4 -

24 7 BP3.3 LOG RIDE - 25 2 -

25 7 BP3.0 ROCK GARDEN - 20 4 -

26 1 BP3.0 DIRT BERM 2 24 2 -

27 1 BP3.0 DIRT BERM 2 15 4 15

28 1 BP3.3 SNAKE LADDER 2 55 3 -

29 2 BP3.0 DIRT ROLLER 1 14 4 -

30 3 BP3.2 90 DEG TURN 1 24 2 -

31 1 BP3.0 DIRT BERM 2 15 4 20

32 5 BP3.3 ZIG ZAG SHORT 2 22 4 -

33 2 BP3.0 DIRT ROLLERS (2) 1 21 4 -

34 1 BP3.0 DIRT BERM 1 17 4 15

35 2 BP3.0 DIRT ROLLER 3 14 4 -

36 1 BP3.0 DIRT BERM 3 30 4 10

37 2 BP3.0 DIRT ROLLERS (3) 1 30 4 -

38 1 BP3.0 DIRT BERM 3 27 4 10

39 2 BP3.0 DIRT ROLLERS (3) 1 30 4 -

40 8 BP3.0 DIRT PLATFORM 3 30 4 10

NOTES - PUMP TRACKS & PUMP AND BUMP SKILLS LOOP (cont) FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

41 2 BP3.0 DIRT ROLLERS (4) 1 48 4 -

42 1 BP3.0 DIRT BERM 3 14 4 25

43 2 BP3.0 DIRT ROLLERS (3) 1 31 4 -

44 1 BP3.0 DIRT BERM 3 25 4 10

45 2 BP3.0 DIRT ROLLERS (2) 1 24 4 -

46 1 BP3.0 DIRT BERM 3 23 4 10

47 2 BP3.0 DIRT ROLLERS (3) 1 33 4 -

48 8 BP3.0 DIRT PLATFORM 3 - - -

49 2 BP3.0 DIRT ROLLERS (4) 2 50 4 -

50 3 BP3.0 DIRT TABLE TOP 3 20 4 -

51 2 BP3.0 DIRT ROLLERS (2) 2 23 4 -

52 1 BP3.0 DIRT BERM 4 15 4 10

52 2 BP3.0 DIRT ROLLER 2 14 4 -

54 8 BP3.0 DIRT PLATFORM 4 - - -

55 2 BP3.0 DIRT ROLLERS (3) 2 30 4 -

56 1 BP3.0 DIRT BERM 4 20 4 8

57 2 BP3.0 DIRT ROLLERS (2) 2 20 4 -

58 1 BP3.0 DIRT BERM 4 10 4 15

59 1 BP3.0 DIRT BERMS (2) 2 25 4 10

60 2 BP3.0 DIRT ROLLERS (3) 4 30 4 -

61 1 BP3.0 DIRT BERM 4 10 4 15

62 2 BP3.0 DIRT ROLLERS (3) 2 30 4 -

63 2 BP3.0 DIRT ROLLERS (5) 2 56 4 -

64 1 BP3.0 DIRT BERM 4 23 4 10

65 2 BP3.0 DIRT ROLLERS (3) 2 33 4 -

66 1 BP3.0 DIRT BERM 4 25 4 10

67 2 BP3.0 DIRT ROLLERS (2) 2 20 4 -

68 1 BP3.0 DIRT BERM 4 15 4 10

69 2 BP3.0 DIRT ROLLERS (3) 2 40 4 -

70 3 BP3.0 DIRT TABLE TOP 3 24 4 -

71 2 BP3.0 DIRT ROLLERS (2) 2 40 4 -

72 1 BP3.0 DIRT BERM 4 26 4 11

73 1 BP3.0 DIRT BERM 4 22 4 10

74 2 BP3.0 DIRT ROLLERS (2) 2 20 4 -

75 1 BP3.0 DIRT BERM 4 20 4 9

76 2 BP3.0 DIRT ROLLERS (2) 2 20 4 -

77 1 BP3.0 DIRT BERM 4 12 4 10

78 1 BP3.0 DIRT BERM 4 25 4 9

79 2 BP3.0 DIRT ROLLERS (4) 2 50 4 -

80 7 BP3.0 ROCK GARDEN (2) - 24 4 -

81 4 - 6 BP3.0 TRAIL, TYP - - - - TBD DEPENDING ON SITE SPECIFIC CONDITIONS

MATERIAL TABULATION

Beginner Track Length: 431'

435 CY fill 65 CY cap

Intermediate Track Length: 847'

820 CY fill 130 CY cap

Pump & Bump Loop Length: 1,995'

110 CY fill 40 CY cap

LEGEND

+3

+3

+4

+3

10" NON-PERFORATED

DRAIN TILE PIPE, TYP.

(APPROX. 150 LF TOTAL)

SEE: 8/BP3.3

30201050 50

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

FEATURE PARK

GRADING

ENLARGEMENT

GRADING & DRAINAGE PLAN - PUMP TRACKS

LEGEND

8 3

XC NICA LOOP TRAIL

SEE: BP2.3

TRAIL SIGNAGE, TYP

+7

+5

+3

+7

+5

+7

+5

+7

+5

30201050 50

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

FEATURE PARK

ENLARGEMENT

PLAN - DIRT JUMP ZONE

NOTES - DIRT JUMP ZONE

FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

1 2 BP3.0 DIRT ROLLER 2 12 10 -

2 10 BP3.1 HIP STEP DOWN 3 25 10 25

3 1 BP3.0 DIRT BERM 4 15 10 15

4 1 BP3.0 DIRT BERM 3 15 10 15

5 3 BP3.4 KICKER RAMP 5 9 4 -

6 1 BP3.1 DIRT JUMP LANDING 7 28 18 -

7 5 BP3.1 STEP DOWN JUMP 4 25 10 25

8 3 BP3.4 KICKER RAMP 5 9 4 -

9 1 BP3.1 DIRT JUMP LANDING 7 35 18 -

10 1 BP3.0 DIRT BERM 3 15 10 15

11 10 BP3.1 HIP STEP DOWN 5 25 10 25

12 5 BP3.4 KICKER RAMP 6 12 4 -

13 1 BP3.1 DIRT JUMP LANDING 7 28 18 -

14 5 BP3.4 KICKER RAMP 6 12 4 -

15 1 BP3.0 DIRT BERM 4 20 10 15

16 1 BP3.1 DIRT JUMP LANDING 7 28 18 -

17 1 BP3.0 DIRT BERM 3 15 10 15

18 1 BP3.0 DIRT BERM 4 28 4 15

19 1 BP3.0 DIRT BERM 3 25 10 -

20 3 BP3.1 DIRT JUMP 4 25 10 -

21 3 BP3.1 DIRT JUMP 4 12 4 -

22 1 BP3.4 KICKER RAMP 4 12 4 -

23 2 BP3.0 DIRT ROLLER 3 13 10 -

24 3 BP3.4 KICKER RAMP 5 9 4 -

25 3 BP3.4 KICKER RAMP 5 9 4 -

26 1 BP3.2 KICKER RAMP 3 7 4 -

27 3 BP3.1 DIRT JUMP 3 12 4 -

28 3 BP3.1 DIRT JUMP 3 12 4 -

29 1 BP3.2 KICKER RAMP 3 7 4 -

30 1 BP3.2 KICKER RAMP 3 7 4 -

NOTES - DIRT JUMP ZONE (cont) FEATURE # DETAIL # SHEET # TYPE HEIGHT (FT) LENGTH (FT) WIDTH (FT) RADIUS (FT) NOTES

31 1 BP3.1 DIRT JUMP LANDING 4 28 18 -

32 1 BP3.2 KICKER RAMP 3 7 4 -

33 1 BP3.1 DIRT JUMP LANDING 4 28 18 -

34 1 BP3.0 DIRT BERM 4 15 10 15

35 1 BP3.0 DIRT BERM 3 15 10 15

36 1 BP3.4 KICKER RAMP 4 8 4 -

37 1 BP3.1 DIRT JUMP LANDING 4 28 18 -

38 1 BP3.4 KICKER RAMP 4 8 4 -

39 1 BP3.1 DIRT JUMP LANDING 3 28 18 -

40 1 BP3.0 DIRT BERM 3 28 4 15

41 7 BP3.0 ROCK GARDENS - 60 4 -

42 4 - 6 BP3.0 TRAIL, TYP - - - - TBD DEPENDING ON SITE SPECIFIC CONDITIONS

MATERIAL TABULATION

Beginner Line Length: 778'

565 CY fill 45 CY cap

Intermediate Line Length: 392'

610 CY fill 65 CY cap

Advanced Line Length: 446'

775 CY fill 90 CY cap

LEGEND

N O

R

TH

S T

XC NICA LOOP TRAIL

XC FLOW / TECH LOOP TRAIL

6040200 100

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

LOOP TRAIL

PLAN

PLAN - XC FLOW / TECH LOOP TRAIL (ZONE 1)

M

AT

C H

LI

N

E

- S

EE

B

P2 .2

FEATURE PARK

GRAVITY JUMP TRAILS

SEE: BP1.1

LEGEND

SS

SS

SS

W

W

W

'S

D

'S D

'S

D

XC NICA LOOP TRAIL

XC FLOW / TECH LOOP TRAIL

6040200 100

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

LOOP TRAIL

PLAN

PLAN - XC FLOW / TECH LOOP TRAIL (ZONE 2)

M

AT

C H

LI

N

E

- S

EE

B

P2 .1

M

AT

C H

LI

N

E

- S

EE

B

P2 .3

FEATURE PARK

PROGRESSIVE DROP ZONE & BEGINNER GRAVITY SKILLS TRAIL

SEE: BP1.3

FEATURE PARK

PUMP TRACKS & PUMP AND BUMP SKILLS LOOP

SEE: BP1.4

FEATURE PARK

GRAVITY JUMP TRAILS

SEE: BP1.1

FEATURE PARK

FREERIDE & TECHNICAL LINE OPTIONS

SEE: BP1.2

LEGEND

N O

R

TH

S T

N. 2400 W. / LAVA FLOW DR

XC NICA LOOP TRAIL

XC NICA LOOP TRAIL

6040200 100

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

LOOP TRAIL

PLAN

PLAN - XC FLOW / TECH LOOP TRAIL (ZONE 3)

M

AT

C H

LI

N

E

- S

EE

B

P2 .2

M

AT

C H

LI

N

E

- S

EE

B

P2 .4

FEATURE PARK

DIRT JUMP ZONE

SEE: BP1.5

FEATURE PARK

PUMP TRACKS & PUMP AND BUMP SKILLS LOOP

SEE: BP1.4

LEGEND

N O

R

TH

S T

TUWEAP DRIVE

SAND

HOLLOW

AQUATIC

CENTER

SAND HOLLOW WASH

XC NICA LOOP TRAIL

XC NICA LOOP TRAIL

6040200 100

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

LOOP TRAIL

PLAN

PLAN - XC FLOW / TECH LOOP TRAIL (ZONE 4)

M

AT

C H

LI

N

E

- S

EE

B

P2 .3

M

AT

C H

LI

N

E

- S

EE

B

P2 .5

LEGEND

NICA LOOPMATCHLINE - SEE BP2.6

W

ES

T

SU

NS

ET

B O

UL

EV

AR

D

SAND

HOLLOW

AQUATIC

CENTER

N O

R

TH

S T

TUWEAP DRIVE

XC NICA LOOP TRAIL

EXISTING CULVERT

6040200 100

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

LOOP TRAIL

PLAN

PLAN - XC FLOW / TECH LOOP TRAIL (ZONE 5)

M

AT

C H

LI

N

E

- S

EE

B

P2 .4

LEGEND

SKILLS AREA

MATCHLINE - SEE BP2.6

SAND

HOLLOW

AQUATIC

CENTER

N. 2400 W. / LAVA FLOW DR

XC NICA LOOP TRAIL

6040200 100

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

LOOP TRAIL

PLAN

PLAN - XC FLOW / TECH LOOP TRAIL (ZONE 5)

LEGEND

SKILLS AREA

NICA LOOP

MATCHLINE - SEE BP2.4 M

AT

C H

LI

N

E

- S

EE

B

P2 .5

NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL DISTURBED AREAS.

TRAIL RADIUS VARIES PER PLAN

TRAIL EDGE , TYP.

MAX SLOPE = 1:1

SECTION

TRAIL SURFACING MIX PER SPECS

VARIES - PER PLAN.

PLAN VIEW

1 TRAIL SURFACING MIX PER SPECS

NATIVE SEED MIX ON UN-COMPACTED TOPSOIL

3 COMPACTED CLEAN FILL

4 NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL DISTURBED AREAS.

MAX SLOPE = 1:1

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

SECTION VIEW

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

LENGTH VARIES - PER SCHEDULE

RADIUS

VARIES

4"

SECTION VIEW

MA

X

SL

OP

E

1:1

MAX SLOPE = 1:1

SECTIONVA

RI

ES

PE

R

PL

AN

PLAN VIEW

FEATURE HEIGHT VARIES PER SCHEDULE

NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL DISTURBED AREAS.

TRAIL EDGE , TYP.

TRAIL SURFACING MIX PER SPECS

MA

X

SL

OP

E

1:1

MAX SLOPE = 1:1

FEATURE HEIGHT VARIES PER SCHEDULE

NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL DISTURBED AREAS.

TRAIL EDGE , TYP.

SECTION

TRAIL SURFACING MIX PER SPECS

VA

RI

ES

PE

R

PL

AN

PLAN VIEW

LENGTH VARIES - PER SCHEDULE

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

RADIUS

VARIES

SECTION VIEW

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

4"

WIDTH VARIES -

PER PLAN

2% SLOPE

4" 1'

1 TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

3 REVEGETATE ALL DISTURBED AREAS

1 TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

3 REVEGETATE ALL DISTURBED AREAS

WIDTH VARIES -

PER PLAN

2% SLOPE4"

1'

EL

EV

AT

ED

HE

IG

HT

VA

RI

ES

4 EXISTING GRADE

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL3

REVEGETATE ALL DISTURBED AREAS

EXISTING GRADE

2% SLOPE

1' 4"

MAX WIDTH VARIES -

PER PLAN

WIDTH VARIES -

PER PLAN

VA

RI

ES

PE

R

PL

AN

WIDTH VARIES -

PER PLAN

6" 1'

SE

CT

IO

N

1 TRAIL SURFACING MIX PER SPECS

CLUSTERED BOULDERS SET IN TRAIL - VARYING HEIGHTS & SIZES

3 REVEGETATE ALL DISTURBED AREAS

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

WIDTH VARIES - PER PLAN

REVEGETATE ALL DISTURBED AREA AND NATURALIZED

SLOPES

1MAX

4" - 6" AMENDED TOPSOIL

1 DIRT BERM

DETAILS:

TYPICAL TRAIL

FEATURES

4 TRAIL SECTION TYP - AT GRADE

2 DIRT ROLLER 3 DIRT TABLE TOP

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

5 TRAIL SECTION TYP - ELEVATED 6 TRAIL SECTION TYP - CUT & FILL

7 ROCK GARDEN

8 DIRT PLATFORM

MA

X

SL

OP

E

1:1

MAX SLOPE = 1:1

SECTIONVA

RI

ES

PE

R

PL

AN

PLAN VIEW

FEATURE HEIGHT VARIES PER SCHEDULE

NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL DISTURBED AREAS.

TRAIL EDGE , TYP.

TRAIL SURFACING MIX PER SPECS

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

4"

SECTION VIEW

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

LENGTH VARIES - PER SCHEDULE

RADIUS

VARIES

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

LENGTH VARIES - PER SCHEDULE

PLAN VIEW

MA

X

SL

OP

E

1:1

MAX SLOPE = 1:1

FEATURE HEIGHT VARIES PER SCHEDULE

NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL DISTURBED AREAS.

TRAIL EDGE , TYP.

TRAIL SURFACING MIX PER SPECS

SECTION

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

LENGTH VARIES - PER SCHEDULE

RADIUS

VARIES

SECTION VIEW

LENGTH VARIES - PER SCHEDULE

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

RADIUS

VARIES

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

LENGTH VARIES - PER SCHEDULE

KICKER RAMP PER NOTES3

LENGTH VARIES - PER SCHEDULE

TRAIL SURFACING MIX PER SPECS

COMPACTED CLEAN FILL

SECTION VIEW

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

4"

KICKER RAMP PER NOTES3

LADDER DROP

TRAIL SURFACING MIX PER SPECS

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

COMPACTED CLEAN FILL3

LENGTH VARIES - PER SCHEDULE

EXISTING CLIFF BAND FEATURE

TRAIL SURFACING MIX PER SPECS

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

COMPACTED CLEAN FILL3

IMPROVE TRAIL TREAD TRANSITION TO ROCK4

LENGTH VARIES - PER SCHEDULE

EXISTING BOULDERS POSITIONED

FOR ROLLABLE DESCENT

TRAIL SURFACING MIX PER SPECS

SECTION VIEW

4"

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

COMPACTED CLEAN FILL3

IMPROVE TRAIL TREAD TRANSITION TO ROCK4

EXISTING CLIFF BAND FEATURE5

LENGTH VARIES - PER SCHEDULE

LENGTH VARIES - PER SCHEDULE

HE

IG

HT

V

AR

IE

S

PE

R

SC

HE

DU

LE

DIRECTION OF BIKE RIDER1

2 REVEGETATE ALL DISTURBED

AREA AND NATURALIZED

SLOPES

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

2 DIRT DOUBLE ROLLER

DETAILS:

TYPICAL TRAIL

FEATURES

4 DIRT TABLE TOP LANDING

3 DIRT JUMP

6 STEP UP JUMP5 DIRT STEP DOWN JUMP

1 DIRT JUMP LANDING

7 DIRT DROP LANDING 8 ROCK DROP 9 DOWNHILL ROCK GARDEN 10 HIP STEP DOWN - PERSPECTIVE DIAGRAM

3.30.2018

I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

1 KICKER RAMP (3') - VIEW

DETAILS:

PREFAB FEATURES

2 KICKER RAMP (3') - DETAIL 3 90 TURN - VIEW 4 90 TURN - DETAIL

5 A-FRAME - VIEW 6 A-FRAME - DETAIL 7 DOUBLE ROLLER - VIEW 8 DOUBLE ROLLER - DETAIL

9 ROLLER CORNER - VIEW 10 ROLLER CORNER - DETAIL 11 SINGLE ROLLER - VIEW 12 SINGLE ROLLER - PLAN

SECTION SECTION - LONGITUDINAL

HARDWOOD TIMBER SAWN FLAT ON TOP AND BOTTOM.

SCORE TOP SURFACE FOR TRACTION.

COMPACTED CRUSHED 1" GRAVEL BASE2

NATURALLY FEATHER FEATURE EDGE TO BLEND WITH

SURROUNDING TERRAIN. REVEGETATE ALL

DISTURBED AREAS.

COMPACTED CLEAN FILL4

LENGTH VARIES - PER SCHEDULE12" MIN

6"

J-HOOK REBAR GROUND STAKES5

6"

TRAIL SURFACING MIX PER SPECS6

DRAIN PIPE PER PLAN

ROCK ARMORING AROUND PIPE INLET AND OUTLET

SECTION VIEW

RIPRAP CATCHMENT BASIN WITH

ANGULAR, INTERLOCKING 6-24" DIAMETER ROCK

3.30.2018

C I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

1 SNAKE LADDER - VIEW

DETAILS:

PREFAB FEATURES

2 SNAKE LADDER - DETAIL 3 SPLIT DECISION - VIEW 4 SPLIT DECISION - DETAIL

5 6ZIG-ZAG SHORT - VIEW ZIG-ZAG SHORT - DETAIL 7 LOG RIDE

8 DRAIN PIPE

I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

1 KICKER RAMP (4') - VIEW

DETAILS:

PREFAB FEATURES

2 KICKER RAMP (4') - DETAIL 3 KICKER RAMP (5') - VIEW 4 KICKER RAMP (5') - DETAIL

5 6 7 LADDER DROP (2') - VIEW 8 LADDER DROP (2') - DETAIL

9 10 11 STEP UP BOX - VIEW 12 STEP UP - DETAIL

KICKER RAMP (6') - VIEW KICKER RAMP (6') - DETAIL

LADDER DROP (6') - VIEW LADDER DROP (6') - DETAIL

I

S

T

G

E O

R G

E

B i c y c l e

S k i l l s

P a r k

L a y o u t a n d

D e s i g n

S t

G e o r g e

U t a h www.FlowRideConcepts.com

St. George 175 East 200 North

St. George, UT 84770 435-627-4000

BID SET

1 WHALE TAIL - VIEW

DETAILS:

PREFAB FEATURES

2 WHALE TAIL - DETAIL 3 WHALE TAIL - VIEW 2 4 CURVED WALL - DETAIL

5 CURVED WALL - DETAIL 6 HAMMOCK FEATURE - VIEW 1 7 HAMMOCK FEATURE - VIEW 2 8 HAMMOCK FEATURE - DETAIL

9 SLANT WALL - VIEW 10 SLANT WALL - DETAIL

Sheets and Views
Repairs_2026-CV-1
f8299822-2555-4c3f-a8f1-e7f46dfd4a37.pdf
Sheets and Views
Repairs_2026-PN-1
32f17980-bd68-4560-9bd9-0635c65370ed.pdf
Sheets and Views
Repairs_2026-SP-1
41e190bc-5796-4b14-bb79-372b1e3ae66b.pdf
Sheets and Views
Repairs_2026-SP-2
63467605-0de0-4135-8973-80e5842aea29.pdf
Sheets and Views
Repairs_2026-SP-3
4d456823-e5b4-46e0-bf13-84bd98b553c0.pdf
Sheets and Views
Repairs_2026-SP-4
9f84a1b0-9b20-405d-a5d3-584f9441ff4d.pdf
Sheets and Views
Repairs_2026-SP-5
8371812c-d4f4-4e97-ad3e-26f2aa5f8864.pdf
Sheets and Views
Repairs_2026-SP-6
70007d40-09b4-4328-825b-d5c27f5315c1.pdf
Sheets and Views
Repairs_2026-SPD-1
64703950-b68b-4250-b5f9-8ec18d3af6af.pdf
Sheets and Views
CV-1
Repairs_2023-PN-1.pdf
Sheets and Views
PN-1
Repairs_2023-SP-6.pdf
Sheets and Views
SP-6
Repairs_2023-SP-5.pdf
Sheets and Views
SP-5
Repairs_2023-SP-4.pdf
Sheets and Views
SP-4
Repairs_2023-SP-3.pdf
Sheets and Views
SP-3
Repairs_2023-SP-2.pdf
Sheets and Views
SP-2
Repairs_2023-SP-1.pdf
Sheets and Views
SP-1
FlowRide Concepts_3-30-2018.pdf
BP1.0
BP1.1
BP1.2
BP1.3
BP1.4
BP1.4a
BP1.5
BP2.1
BP2.2
BP2.3
BP2.4
BP2.5
BP2.6
BP3.0 - DETAILS
BP3.1 - DETAILS
BP3.2 - DETAILS
BP3.3 - DETAILS
BP3.4 - DETAILS
BP3.5 - DETAILS