5 02827 fence removal.docx
DOCX document 21 KB Posted
- Attached to
- PFO JAMES RYEGRASS ALLOTMENT FENCE
- Solicitation number
- 140L6220Q0107
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6220Q0107_Amd_0001.pdf | ||
| 6 02829 End Stress Panels and 3 Post Corners.doc | DOC document | |
| 9 James Ryegrass Project 2018 75K.pdf | ||
| Sol_140L6220Q0107.pdf | ||
| 8 Fence Material specs.doc | DOC document | |
| 3 01009 general.docx | DOCX document | |
| 7 Work Data Sheet.docx | DOCX document | |
| 2 Bid Schedule.doc | DOC document | |
| 11 James Ryegrass Fence Drawings.pdf | ||
| 10 James Ryegrass Project 2018 24K Map.pdf | ||
| 4 02825 wood fences and gates.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02827
FENCE REMOVAL
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Removing existing four barbed wire fence, including all wood, Tee posts, stress and end panels and drainage crossings. .
B. Requirements: Access roads shall not be constructed along fence lines or to the jobsite unless written approval is granted by the Contracting Officer. Cross-country travel with wheeled or tracked vehicles shall be only to and along fence lines.
C. Do not damage adjoining pasture fences. Leave any posts shared by adjoining fences.
PART 2: PRODUCTS
2.1 MATERIALS
A. Requirements: Furnish labor and equipment required to remove fences.
PART 3: EXECUTION
3.1 REMOVAL
A. Removal of Existing Fence: Completely remove all fencing as shown on the Work Data Sheet.
B. Disposal of debris shall be according to Section 01009 – General Information and Requirements.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: Fence removal will be measured and paid for by the linear foot removed as measured along the ground surface next to the fence prior to removal, including distance across gate openings, end, stress, and corner panels and drainage crossings.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
02827 Fence Removal Linear Foot
END OF SECTION 02827
James Ryegrass Exclosure & Boundary Fence FENCE REMOVAL
02827 -
File details come from the government source that posted it. Updated .