PFO JAMES RYEGRASS ALLOTMENT FENCE
Solicitation number
140L6220Q0107
Issued by

View the file

Other files

File Type Posted
Sol_140L6220Q0107_Amd_0001.pdf PDF
6 02829 End Stress Panels and 3 Post Corners.doc DOC document
9 James Ryegrass Project 2018 75K.pdf PDF
Sol_140L6220Q0107.pdf PDF
8 Fence Material specs.doc DOC document
3 01009 general.docx DOCX document
7 Work Data Sheet.docx DOCX document
5 02827 fence removal.docx DOCX document
11 James Ryegrass Fence Drawings.pdf PDF
10 James Ryegrass Project 2018 24K Map.pdf PDF
4 02825 wood fences and gates.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

James Ryegrass Exclosure and Boundary Fence

� EMBED Excel.Sheet.8 ���

_1656502025.xls

BASE BID

Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost

1 01505 Mobilization/Demobilization 1 LS $ $

2 02825 (1) Top Rail, Three Wire Fence Const. 6936 LF $ $

3 02825 (2) Wire Gate 1 EA $ $

6 02827 Fence Removal 2680 LF $ $

7 02829 (1) Fence Stress Panels and Three Post Corners 9 EA $ $

Total Of Items, All or None $

BID ALT 1

Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost

1 02315(011) Topsoil Storing 1,918 CY $ $

2 02315(022) Top soil Placement 1,918 CY $ $

3 02315(12) Embankment (In Place) 10,800 CY $ $

4 02339(04) Water 495 MG $ $

5 02378(12) Class II Riprap 14 CY $ $

6 02640 (02)A 18 Inch Corrugated Metal Pipe 206 LF $ $

7 02640 (02)B 24 Inch Corrugated Metal Pipe 65 LF $ $

8 02640 (02)C 36 Inch Corrugated Metal Pipe 25 LF $ $

9 02640 (101) Remove Existing Corrugated Metal Pipe 30 LF $ $

10 02834 (02) Barbed Wire Fence (4-wire) 6,250 LF $ $

11 02834 (05) Barbed Wire End Panel – Type II 1 Each $ $

12 02834 (06) Barbed Wire Stress Panel 3 Each $ $

13 02834 (07) Three-Post Barbed Wire Corner Panel 2 Each $ $

14 02834 (11) Woven Wire Fence 6,250 LF $ $

15 02834 (13) Woven Wire End Panel – Type II 9 Each $ $

16 02834 (14) Woven Wire Stress Panel 7 Each $ $

17 02834 (15) Three-Post Woven Wire Corner Panel 3 Each $ $

18 02834 (19) Post, Pole and Wire Fence 350 LF $ $

19 02834 (24) Woven Wire Gate 6 Each $ $

20 02890(20) Traffic Signs 7 SF $ $

21 02933(01) Hydraulic Seeding 4 Acre $ $

TOTAL BID (All or None) $

BID ALT 2

Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost

1 02315(011) Topsoil Storing 2,386 CY $ $

2 02315(022) Top soil Placement 2,386 CY $ $

3 02315(12) Embankment (In Place) 11,628 CY $ $

4 02339(04) Water 535 MG $ $

5 02378(12) Class II Riprap 17 CY $ $

6 02640 (02)A 18 Inch Corrugated Metal Pipe 284 LF $ $

7 02640 (02)D 48 Inch Corrugated Metal Pipe 40 LF $ $

8 02640 (101) Remove Existing Corrugated Metal Pipe 71 LF $ $

9 02834 (02) Barbed Wire Fence (4-wire) 4,390 LF $ $

10 02834 (02)A Barbed Wire Fence (5-wire) 1,400 LF $ $

11 02834 (05) Barbed Wire End Panel – Type II 10 Each $ $

12 02834 (06) Barbed Wire Stress Panel 1 Each $ $

13 02834 (07) Three-Post Barbed Wire Corner Panel 7 Each $ $

14 02834 (11) Woven Wire Fence 4,390 LF $ $

15 02834 (13) Woven Wire End Panel – Type II 4 Each $ $

16 02834 (14) Woven Wire Stress Panel 4 Each $ $

17 02834 (15) Three-Post Woven Wire Corner Panel 7 Each $ $

18 02834 (22) Barbed Wire Gate (4-wire) 3 Each $ $

19 02834 (22)A Barbed Wire Gate (5-wire) 2 Each $ $

20 02834 (24) Woven Wire Gate 1 Each $ $

21 02836(02) Drainage Crossing – Type B 2 Each $ $

22 02879(04) Install 24’ Cattle Guard Assembly & Precast Concrete Foundations 1 Each $ $

23 02890(20) Traffic Signs 17 SF $ $

24 02933(01) Hydraulic Seeding 5 Acre $ $

TOTAL BID (All or None) $

BID ALT 3

Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost

2 02315(011) Topsoil Storing 2,259 CY $ $

3 02315(022) Top soil Placement 2,259 CY $ $

4 02315(12) Embankment (In Place) 11,860 CY $ $

5 02339(04) Water 545 MG $ $

6 02378(12) Class II Riprap 19 CY $ $

7 02640 (02)A 18 Inch Corrugated Metal Pipe 130 LF $ $

8 02640 (02)B 24 Inch Corrugated Metal Pipe 143 LF $ $

9 02640 (02)C 36 Inch Corrugated Metal Pipe 8 LF $ $

11 02640 (101) Remove Existing Corrugated Metal Pipe 71 LF $ $

30 02933(01) Hydraulic Seeding 4 Acre $ $

TOTAL BID (All or None) $

BID ALT 4

Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost

1 01505(01) Mobilization 1 LS $ $

2 02315(011) Topsoil Storing 6,812 CY $ $

3 02315(022) Top soil Placement 6,812 CY $ $

4 02315(12) Embankment (In Place) 33,622 CY $ $

5 02339(04) Water 1,550 MG $ $

6 02378(12) Class II Riprap 47 CY $ $

7 02640 (02)A 18 Inch Corrugated Metal Pipe 714 LF $ $

8 02640 (02)B 24 Inch Corrugated Metal Pipe 34 LF $ $

9 02640 (02)C 36 Inch Corrugated Metal Pipe 61 LF $ $

10 02640 (02)D 48 Inch Corrugated Metal Pipe 5 LF $ $

11 02640 (101) Remove Existing Corrugated Metal Pipe 255 LF $ $

12 02834 (02) Barbed Wire Fence (4-wire) 5,280 LF $ $

13 02834 (02)A Barbed Wire Fence (5-wire) 15,255 LF $ $

14 02834 (05) Barbed Wire End Panel – Type II 26 Each $ $

15 02834 (06) Barbed Wire Stress Panel 4 Each $ $

16 02834 (07) Three-Post Barbed Wire Corner Panel 30 Each $ $

17 02834 (11) Woven Wire Fence 9,120 LF $ $

18 02834 (13) Woven Wire End Panel – Type II 13 Each $ $

19 02834 (14) Woven Wire Stress Panel 9 Each $ $

20 02834 (15) Three-Post Woven Wire Corner Panel 9 Each $ $

21 02834 (19) Post, Pole and Wire Fence 0 LF $ $

22 02834 (22) Barbed Wire Gate (4-wire) 6 Each $ $

23 02834 (22)A Barbed Wire Gate (5-wire) 7 Each $ $

24 02834 (24) Woven Wire Gate 7 Each $ $

25 02837(01) Remove & Reset Electric Fence 1,100 LF $

26 02836(01) Drainage Crossing – Type A 3 Each $ $

27 02836(02) Drainage Crossing – Type B 0 Each $ $

28 02879(04) Install 24’ Cattle Guard Assembly & Precast Concrete Foundations 5 Each $ $

29 02890(20) Traffic Signs 14 SF $ $

30 02933(01) Hydraulic Seeding 13 Acre $ $

TOTAL BID (All or None) $