2 Bid Schedule.doc
DOC document 95 KB Posted
- Attached to
- PFO JAMES RYEGRASS ALLOTMENT FENCE
- Solicitation number
- 140L6220Q0107
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6220Q0107_Amd_0001.pdf | ||
| 6 02829 End Stress Panels and 3 Post Corners.doc | DOC document | |
| 9 James Ryegrass Project 2018 75K.pdf | ||
| Sol_140L6220Q0107.pdf | ||
| 8 Fence Material specs.doc | DOC document | |
| 3 01009 general.docx | DOCX document | |
| 7 Work Data Sheet.docx | DOCX document | |
| 5 02827 fence removal.docx | DOCX document | |
| 11 James Ryegrass Fence Drawings.pdf | ||
| 10 James Ryegrass Project 2018 24K Map.pdf | ||
| 4 02825 wood fences and gates.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
James Ryegrass Exclosure and Boundary Fence
� EMBED Excel.Sheet.8 ���
_1656502025.xls
BASE BID
Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost
1 01505 Mobilization/Demobilization 1 LS $ $
2 02825 (1) Top Rail, Three Wire Fence Const. 6936 LF $ $
3 02825 (2) Wire Gate 1 EA $ $
6 02827 Fence Removal 2680 LF $ $
7 02829 (1) Fence Stress Panels and Three Post Corners 9 EA $ $
Total Of Items, All or None $
BID ALT 1
Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost
1 02315(011) Topsoil Storing 1,918 CY $ $
2 02315(022) Top soil Placement 1,918 CY $ $
3 02315(12) Embankment (In Place) 10,800 CY $ $
4 02339(04) Water 495 MG $ $
5 02378(12) Class II Riprap 14 CY $ $
6 02640 (02)A 18 Inch Corrugated Metal Pipe 206 LF $ $
7 02640 (02)B 24 Inch Corrugated Metal Pipe 65 LF $ $
8 02640 (02)C 36 Inch Corrugated Metal Pipe 25 LF $ $
9 02640 (101) Remove Existing Corrugated Metal Pipe 30 LF $ $
10 02834 (02) Barbed Wire Fence (4-wire) 6,250 LF $ $
11 02834 (05) Barbed Wire End Panel – Type II 1 Each $ $
12 02834 (06) Barbed Wire Stress Panel 3 Each $ $
13 02834 (07) Three-Post Barbed Wire Corner Panel 2 Each $ $
14 02834 (11) Woven Wire Fence 6,250 LF $ $
15 02834 (13) Woven Wire End Panel – Type II 9 Each $ $
16 02834 (14) Woven Wire Stress Panel 7 Each $ $
17 02834 (15) Three-Post Woven Wire Corner Panel 3 Each $ $
18 02834 (19) Post, Pole and Wire Fence 350 LF $ $
19 02834 (24) Woven Wire Gate 6 Each $ $
20 02890(20) Traffic Signs 7 SF $ $
21 02933(01) Hydraulic Seeding 4 Acre $ $
TOTAL BID (All or None) $
BID ALT 2
Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost
1 02315(011) Topsoil Storing 2,386 CY $ $
2 02315(022) Top soil Placement 2,386 CY $ $
3 02315(12) Embankment (In Place) 11,628 CY $ $
4 02339(04) Water 535 MG $ $
5 02378(12) Class II Riprap 17 CY $ $
6 02640 (02)A 18 Inch Corrugated Metal Pipe 284 LF $ $
7 02640 (02)D 48 Inch Corrugated Metal Pipe 40 LF $ $
8 02640 (101) Remove Existing Corrugated Metal Pipe 71 LF $ $
9 02834 (02) Barbed Wire Fence (4-wire) 4,390 LF $ $
10 02834 (02)A Barbed Wire Fence (5-wire) 1,400 LF $ $
11 02834 (05) Barbed Wire End Panel – Type II 10 Each $ $
12 02834 (06) Barbed Wire Stress Panel 1 Each $ $
13 02834 (07) Three-Post Barbed Wire Corner Panel 7 Each $ $
14 02834 (11) Woven Wire Fence 4,390 LF $ $
15 02834 (13) Woven Wire End Panel – Type II 4 Each $ $
16 02834 (14) Woven Wire Stress Panel 4 Each $ $
17 02834 (15) Three-Post Woven Wire Corner Panel 7 Each $ $
18 02834 (22) Barbed Wire Gate (4-wire) 3 Each $ $
19 02834 (22)A Barbed Wire Gate (5-wire) 2 Each $ $
20 02834 (24) Woven Wire Gate 1 Each $ $
21 02836(02) Drainage Crossing – Type B 2 Each $ $
22 02879(04) Install 24’ Cattle Guard Assembly & Precast Concrete Foundations 1 Each $ $
23 02890(20) Traffic Signs 17 SF $ $
24 02933(01) Hydraulic Seeding 5 Acre $ $
TOTAL BID (All or None) $
BID ALT 3
Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost
2 02315(011) Topsoil Storing 2,259 CY $ $
3 02315(022) Top soil Placement 2,259 CY $ $
4 02315(12) Embankment (In Place) 11,860 CY $ $
5 02339(04) Water 545 MG $ $
6 02378(12) Class II Riprap 19 CY $ $
7 02640 (02)A 18 Inch Corrugated Metal Pipe 130 LF $ $
8 02640 (02)B 24 Inch Corrugated Metal Pipe 143 LF $ $
9 02640 (02)C 36 Inch Corrugated Metal Pipe 8 LF $ $
11 02640 (101) Remove Existing Corrugated Metal Pipe 71 LF $ $
30 02933(01) Hydraulic Seeding 4 Acre $ $
TOTAL BID (All or None) $
BID ALT 4
Item No. Bid Item Number Description Estimated Quantity Unit Unit Cost Total Cost
1 01505(01) Mobilization 1 LS $ $
2 02315(011) Topsoil Storing 6,812 CY $ $
3 02315(022) Top soil Placement 6,812 CY $ $
4 02315(12) Embankment (In Place) 33,622 CY $ $
5 02339(04) Water 1,550 MG $ $
6 02378(12) Class II Riprap 47 CY $ $
7 02640 (02)A 18 Inch Corrugated Metal Pipe 714 LF $ $
8 02640 (02)B 24 Inch Corrugated Metal Pipe 34 LF $ $
9 02640 (02)C 36 Inch Corrugated Metal Pipe 61 LF $ $
10 02640 (02)D 48 Inch Corrugated Metal Pipe 5 LF $ $
11 02640 (101) Remove Existing Corrugated Metal Pipe 255 LF $ $
12 02834 (02) Barbed Wire Fence (4-wire) 5,280 LF $ $
13 02834 (02)A Barbed Wire Fence (5-wire) 15,255 LF $ $
14 02834 (05) Barbed Wire End Panel – Type II 26 Each $ $
15 02834 (06) Barbed Wire Stress Panel 4 Each $ $
16 02834 (07) Three-Post Barbed Wire Corner Panel 30 Each $ $
17 02834 (11) Woven Wire Fence 9,120 LF $ $
18 02834 (13) Woven Wire End Panel – Type II 13 Each $ $
19 02834 (14) Woven Wire Stress Panel 9 Each $ $
20 02834 (15) Three-Post Woven Wire Corner Panel 9 Each $ $
21 02834 (19) Post, Pole and Wire Fence 0 LF $ $
22 02834 (22) Barbed Wire Gate (4-wire) 6 Each $ $
23 02834 (22)A Barbed Wire Gate (5-wire) 7 Each $ $
24 02834 (24) Woven Wire Gate 7 Each $ $
25 02837(01) Remove & Reset Electric Fence 1,100 LF $
26 02836(01) Drainage Crossing – Type A 3 Each $ $
27 02836(02) Drainage Crossing – Type B 0 Each $ $
28 02879(04) Install 24’ Cattle Guard Assembly & Precast Concrete Foundations 5 Each $ $
29 02890(20) Traffic Signs 14 SF $ $
30 02933(01) Hydraulic Seeding 13 Acre $ $
TOTAL BID (All or None) $
Sheet3