This is a pricing sheet exhibit for a construction project submitted to the River Authority for the Spirit Reach Contemplative Path in San Antonio, Texas. The project involves construction of approximately 3,200 linear feet of concrete trail, 1,400 linear feet of natural surface trail, and 1,400 linear feet of stream restoration work. The scope encompasses four primary sections: general site work, stream channel improvements, trail improvements, and landscape improvements. General site work includes mobilization, demobilization, insurance and bonds, site preparation, grading, traffic control, and plant maintenance. Stream channel improvements consist of channel excavation, bed material work, various stone sizes, filter fabric, bank protection, erosion control matting, and temporary seeding. Trail improvements include ADA parking, electrical work, concrete pathways, plazas, bridges (including a 70-foot pedestrian bridge), elevated walkways, signage, stairs, handrails, lighting, and drainage systems. Landscape improvements cover large and small trees, shrubs, groundcover mixes, and irrigation systems. The respondent must provide mobilization and final completion schedules, with total calendar days calculated and matching the submitted construction schedule.
The pricing sheet is structured as a lump sum bid with unit pricing collected for evaluation purposes. Respondents must complete all pricing sections without modifying the format provided. The document includes a base bid total covering Sections 1 through 4, followed by four add alternates: Alternate 1 addressing reduced landscape and signage scope, Alternate 2 including additional concrete pathway details and drainage work, Alternate 3 for the Gate of Mercy gateway and wall, and Alternate 4 for bridge laser-cut artwork side panels and gate. The engineer's estimate for the overall project is $4.98 million. All pricing must include labor, supervision, equipment, and materials unless specifically noted otherwise in the plans or specifications. The respondent must identify their company name, principal place of business, and provide a grand total reflecting the base bid plus all four add alternates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-00326-5 Exhibit 5 Geotechnical Report.pdf | ||
| 4-00326-4 Exhibit 4 Plans Drawings.pdf | ||
| 1-00326-0 CSP Spirit Reach 0805.docx | DOCX document | |
| 6-00326-2 Exhibit 2 Sample Contract.docx | DOCX document | |
| 3-00326-3 Exhibit 3 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| Exhibit 1 | ||
| CSP 00326 - Pricing Sheet for Construction of Spirit Reach (Contemplative Path) | ||
| The respondent shall complete the following section, which directly corresponds to the specifications. Prices shall include all labor, supervision, equipment and materials (excluding any items specifically noted in the Plans or Specifications). The contractor shall not make changes to this format. | ||
| This is a LUMP SUM Bid - unit pricing is collected for evaluatIon purposes. | ||
| I | Respondent's Name: | |
| II | Principal Place of Business (City and State) | |
| III | Total calendar days after Notice to Proceed to mobilization: | |
| IV | Total calendar days after completion of mobilization to Final Completion: | |
| V | Total Calendar Days (III+IV=V) | |
| The total calendar days calculated here shall match the total days presented in submitted schedule. | 0 |
| Section 1_General Site | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 1 | 1 | LS | Mobilization (to include field office) | $ - 0 | $ - 0 | |
| 2 | 1 | LS | Demobilization (to include field office) | $ - 0 | $ - 0 | |
| 3 | 1 | LS | Insurance and Bonds | $ - 0 | $ - 0 | |
| 4 | 1 | LS | Preparing Right of Way | $ - 0 | $ - 0 | |
| 5 | 1 | LS | Tree Protection Fencing (Level IIB) | $ - 0 | $ - 0 | |
| 6 | 1 | LS | Tree Pruning & Root Protection | $ - 0 | $ - 0 | |
| 7 | 1 | LS | Temporary Sediment Control Fence (Install & Removal) | $ - 0 | $ - 0 | |
| 8 | 1 | LS | Temporary Construction Fencing (Install & Removal) | $ - 0 | $ - 0 | |
| 9 | 1 | LS | Construction Entrance (Install & Removal) | $ - 0 | $ - 0 | |
| 10 | 1 | LS | Pavement Demo & Removal | $ - 0 | $ - 0 | |
| 11 | 1 | LS | Site Prep & Rough Grading | $ - 0 | $ - 0 | |
| 12 | 1 | LS | Fine Grading | $ - 0 | $ - 0 | |
| 13 | 1 | LS | Structural Excavation | $ - 0 | $ - 0 | |
| 14 | 1 | LS | Traffic Control | $ - 0 | $ - 0 | |
| 15 | 1 | LS | Plant Maintenance & Warranty | $ - 0 | $ - 0 | |
| 16 | 1 | LS | Supplemental Watering | $ - 0 | $ - 0 | |
| SECTION 1 TOTAL | $ - 0 | |||||
| Section 2_Stream Channel Improvements | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 17 | 1 | LS | Stream Channel Excavation | $ - 0 | $ - 0 | |
| 18 | 1 | LS | Bed Material Excavation | $ - 0 | $ - 0 | |
| 19 | 1 | LS | Boulders Bank Protection | $ - 0 | $ - 0 | |
| 20 | 1 | LS | 3/4" Stone | $ - 0 | $ - 0 | |
| 21 | 1 | LS | 2" Stone | $ - 0 | $ - 0 | |
| 22 | 1 | LS | 6" Stone | $ - 0 | $ - 0 | |
| 23 | 1 | LS | 12" Stone | $ - 0 | $ - 0 | |
| 24 | 1 | LS | 18" Stone | $ - 0 | $ - 0 | |
| 25 | 1 | LS | Filter Fabric | $ - 0 | $ - 0 | |
| 26 | 1 | LS | Bank Protection (Graded Slope) | $ - 0 | $ - 0 | |
| 27 | 1 | LS | Bank Protection (Soil Lift) | $ - 0 | $ - 0 | |
| 28 | 1 | LS | Misc. Erosion Control Matting (Coir) | $ - 0 | $ - 0 | |
| 29 | 1 | LS | Pump-around Operation | $ - 0 | $ - 0 | |
| 30 | 1 | LS | Special Stilling Basin | $ - 0 | $ - 0 | |
| 31 | 1 | LS | Temporary Seeding | $ - 0 | $ - 0 | |
| 32 | 1 | LS | Mulch | $ - 0 | $ - 0 | |
| 33 | 1 | LS | Soil Choked Riprap | $ - 0 | $ - 0 | |
| SECTION 2 TOTAL | $ - 0 | |||||
| Section 3_Trail Improvements | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 34 | 1 | LS | ADA Parking (LH1.01, LH1.03 & LH1.05) | $ - 0 | $ - 0 | |
| 35 | 1 | LS | Electrical (Meter and Connection) | $ - 0 | $ - 0 | |
| 36 | 1 | LS | Concrete Beneath Hildebrand (LH4.12) | $ - 0 | $ - 0 | |
| 37 | 1 | LS | Concrete Pathway (LH4.01) | $ - 0 | $ - 0 | |
| 38 | 1 | LS | Concrete Pathway - 1' Wide Cheek Wall (Detail 8/LH4.01) | $ - 0 | $ - 0 | |
| 39 | 1 | LS | Concrete Pathway - 1' Wide Turn Down (Detail 7/LH4.01) | $ - 0 | $ - 0 | |
| 40 | 1 | LS | Natural Surface Trail (Detail 1/LH4.22) | $ - 0 | $ - 0 | |
| 41 | 1 | LS | Plaza Area Concrete Paving (Detail 2/LH4.05) | $ - 0 | $ - 0 | |
| 42 | 1 | LS | Seat Wall (Detail 4/LH4.05) | $ - 0 | $ - 0 | |
| 43 | 1 | LS | Trinity Plaza (LH4.02) | $ - 0 | $ - 0 | |
| 44 | 1 | LS | Compass Plaza (LH4.04) | $ - 0 | $ - 0 | |
| 45 | 1 | LS | Blue Hole - Well (LH4.06 & LH4.07) | $ - 0 | $ - 0 | |
| 46 | 1 | LS | Blue Hole - Art Wok (LH4.08A, LH4.08B & LH4.08C) | $ - 0 | $ - 0 | |
| 47 | 1 | LS | Blue Hole - Stone Maintenance Band (Detail 7/LH4.05) | $ - 0 | $ - 0 | |
| 48 | 1 | LS | Sacred Waters Over Look Superstep and Bench (LH4.13) | $ - 0 | $ - 0 | |
| 49 | 1 | LS | Bridge - 70' Long 8' Wide Pedestrian Bridge (LH4.17) | $ - 0 | $ - 0 | |
| 50 | 1 | LS | Bridge - Corten Flat Sheet Bridge Deck (LH4.20A) | $ - 0 | $ - 0 | |
| 51 | 1 | LS | Bridge - 2 Bridge Abutments with Walls (LH4.18A&B) | $ - 0 | $ - 0 | |
| 52 | 1 | LS | Elevated Walkway (12' Wide) at Hildebrand (LH4.11) | $ - 0 | $ - 0 | |
| 53 | 1 | LS | Elevated Walkway (8' Wide) (LH4.09 & LH4.10) | $ - 0 | $ - 0 | |
| 54 | 1 | LS | Elevated Walkway - Guardrail (LH4.14) | $ - 0 | $ - 0 | |
| 55 | 1 | LS | Elevated Walkway - Curb (LH4.09) | $ - 0 | $ - 0 | |
| 56 | 1 | LS | Wayfinding Signage (LH4.15) | $ - 0 | $ - 0 | |
| 57 | 1 | LS | Project Signage (LH4.15) | $ - 0 | $ - 0 | |
| 58 | 1 | LS | Stairs (Detail 1/LH4.16) | $ - 0 | $ - 0 | |
| 59 | 1 | LS | Handrails on Stairs (Detail 2/LH4.16) | $ - 0 | $ - 0 | |
| 60 | 1 | LS | Bench (Detail 2/LH4.22) | $ - 0 | $ - 0 | |
| 61 | 1 | LS | Riprap (Detail 2/LH4.23) | $ - 0 | $ - 0 | |
| 62 | 1 | LS | Removable Bollard (SF.3 on LH2.05) | $ - 0 | $ - 0 | |
| 63 | 1 | LS | Lighting - Pole Light (LH5.00) | $ - 0 | $ - 0 | |
| 64 | 1 | LS | Lighting - Wall Pack (LH5.00) | $ - 0 | $ - 0 | |
| 65 | 1 | LS | Lighting - Bollard (LH5.00) | $ - 0 | $ - 0 | |
| 66 | 1 | LS | Drainage - 12" x 12" Inlet | $ - 0 | $ - 0 | |
| 67 | 1 | LS | Drainage - 6" PVC Pipe | $ - 0 | $ - 0 | |
| SECTION 3 TOTAL | $ - 0 | |||||
| Section 4_Landscape Improvements | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 68 | 1 | LS | Large Trees | $ - 0 | $ - 0 | |
| 69 | 1 | LS | Small Ornamental Trees | $ - 0 | $ - 0 | |
| 70 | 1 | LS | Big Shrub | $ - 0 | $ - 0 | |
| 71 | 1 | LS | Small Shrub | $ - 0 | $ - 0 | |
| 72 | 1 | LS | Mix 1: Low Groundcover Mix | $ - 0 | $ - 0 | |
| 73 | 1 | LS | Mix 2: Understory Shade Mix | $ - 0 | $ - 0 | |
| 74 | 1 | LS | Mix 3: Tall Grass Mix | $ - 0 | $ - 0 | |
| 75 | 1 | LS | Mix 5: Riparian Mix | $ - 0 | $ - 0 | |
| 76 | 1 | LS | Mix 6: Riparian Mix for Bank Stabilization | $ - 0 | $ - 0 | |
| 77 | 1 | LS | Temporary Irrigation System | $ - 0 | $ - 0 | |
| 78 | 1 | LS | Temporary Irrigation Connection | $ - 0 | $ - 0 | |
| 79 | 1 | LS | River Rock | $ - 0 | $ - 0 | |
| SECTION 4 TOTAL | $ - 0 | |||||
| TOTAL BASE BID: | $ - 0 | |||||
| Add Alternate 1 Pricing: | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 80 | 1 | LS | Insurance and Bonds | $ - 0 | $ - 0 | |
| 81 | 1 | LS | Tree Protection Fencing (Level IIB) | $ - 0 | $ - 0 | |
| 82 | 1 | LS | Tree Pruning & Root Protection | $ - 0 | $ - 0 | |
| 83 | 1 | LS | Temporary Sediment Control Fence (Install & Removal) | $ - 0 | $ - 0 | |
| 84 | 1 | LS | Pavement Demo & Removal | $ - 0 | $ - 0 | |
| 85 | 1 | LS | Concrete Pathway (LH4.01) | $ - 0 | $ - 0 | |
| 86 | 1 | LS | Wayfinding Signage (LH4.15) | $ - 0 | $ - 0 | |
| 87 | 1 | LS | Mix 1: Low Groundcover Mix | $ - 0 | $ - 0 | |
| 88 | 1 | LS | Mix 2: Understory Shade Mix | $ - 0 | $ - 0 | |
| 89 | 1 | LS | Mix 3: Tall Grass Mix | $ - 0 | $ - 0 | |
| ADD ALTERNATE 1 TOTAL: | $ - 0 | |||||
| Add Alternate 2 Pricing: | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 90 | 1 | LS | Insurance and Bonds | $ - 0 | $ - 0 | |
| 91 | 1 | LS | Tree Protection Fencing (Level IIB) | $ - 0 | $ - 0 | |
| 92 | 1 | LS | Tree Pruning & Root Protection | $ - 0 | $ - 0 | |
| 93 | 1 | LS | Temporary Sediment Control Fence (Install & Removal) | $ - 0 | $ - 0 | |
| 94 | 1 | LS | Concrete Pathway (LH4.01) | $ - 0 | $ - 0 | |
| 95 | 1 | LS | Concrete Pathway - 1' Wide Cheek Wall (Detail 8/LH4.01) | $ - 0 | $ - 0 | |
| 96 | 1 | LS | Concrete Pathway - 1' Wide Turn Down (Detail 7/LH4.01) | $ - 0 | $ - 0 | |
| 97 | 1 | LS | Plaza Area Concrete Paving (Detail 2/LH4.05) | $ - 0 | $ - 0 | |
| 98 | 1 | LS | Seat Wall (Detail 4/LH4.05) | $ - 0 | $ - 0 | |
| 99 | 1 | LS | Wayfinding Signage (LH4.15) | $ - 0 | $ - 0 | |
| 100 | 1 | LS | Drainage - 12" x 12" Inlet | $ - 0 | $ - 0 | |
| 101 | 1 | LS | Drainage - 6" PVC Pipe | $ - 0 | $ - 0 | |
| 102 | 1 | LS | Mix 3: Tall Grass Mix | $ - 0 | $ - 0 | |
| 103 | 1 | LS | Mix 4: Tall Grass Mix Overseeded w/ Pollinator | $ - 0 | $ - 0 | |
| ADD ALTERNATE 2 TOTAL: | $ - 0 | |||||
| Add Alternate 3 Pricing: | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 104 | 1 | LS | Insurance and Bonds | $ - 0 | $ - 0 | |
| 105 | 1 | LS | Gate of Mercy - Gateway (LH4.21A & LH4.21B) | $ - 0 | $ - 0 | |
| 106 | 1 | LS | Gate of Mercy - Wall (LH4.21A & LH4.21B) | $ - 0 | $ - 0 | |
| ADD ALTERNATE 3 TOTAL: | $ - 0 | |||||
| Add Alternate 4 Pricing: | ||||||
| Item | QTY | Unit | Description | Unit Price | Total | |
| 107 | 1 | LS | Insurance and Bonds | $ - 0 | $ - 0 | |
| 108 | 1 | LS | Bridge - Lasercut Artwork Side Panels (LH4.20A & LH4.20B) | $ - 0 | $ - 0 | |
| 109 | 1 | LS | Bridge - Gate (LH4.20A & LH4.20B) | $ - 0 | $ - 0 | |
| ADD ALTERNATE 4 TOTAL: | $ - 0 | |||||
| Base Bid Total (Section 1 & 2 & 3 & 4) | $ - 0 | |||||
| Base Bid Plus Four Add Alternates Total (GRAND TOTAL) | $ - 0 | |||||
| ERROR:#REF! |
*NOTE: PLEASE SAVE THIS EXHIBIT 1 AS AN EXCEL FILE AND SUBMIT ELECTRONICALLY
Page &P of &N
File details come from the government source that posted it. Updated .