SOW for 28ID white diamond window-April30-2024.pdf

PDF 363 KB Posted

Attached to
28-ID CHEX White Beam Diamond Window Assembly
Solicitation number
4-B139-Q-00527-00
Issued by

About this file

This document is a Statement of Work (SOW) for the procurement of three water-cooled diamond window assemblies for the 28-ID CHEX white beam at the Advanced Photon Source (APS) Upgrade 2 project.

The SOW outlines the technical requirements, deliverables, schedule, reporting, quality assurance, and acceptance criteria for the diamond window assembly. Key details include a 4-week fabrication drawing approval period, 20-week delivery timeline after contract award, and specific technical specifications for the diamond window parameters. The SOW is attached to a federal contract opportunity solicitation issued by the Department of Energy Office of Science, with a solicitation number of 4-B139-Q-00527-00. The contract is for the detail design, fabrication, and delivery of the diamond window assemblies.

View the file

Other files

File Type Posted
ANL-70 Request for Quotation.doc DOC document
Appendix D-8-C.pdf PDF
APS_2018473_APSU vacuum policy.pdf PDF
APS Upgrade Project ANL-407 Form.pdf PDF
Appendix A-71COM-13-FEB-2023.pdf PDF
Drawing_A328-wn0200.pdf PDF
Reps and Certs ANL-70A.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28ID CHEX White Beam Diamond Window Assembly

Statement of Work APS Upgrade

2 10

Table of Contents

1. Scope of Work

2. Deliverables

3. Schedule

4. Technical Requirements

5. Reporting

6. Quality Assurance Requirements

7. Acceptance Criteria

8. Attachments

Argonne National Laboratory | 9700 S. Cass Avenue | Argonne, IL 60439

3 10

1. Scope of Work

2. Deliverables

3. Schedule

Item Description Total Weeks

ARO*

Contract Award Project Start 0 Fabrication drawing approval

Contractor to provide fabrication drawings to APS for approval

Window Delivery

Contractor to provide the diamond window with all required QA Documents listed in Deliverables

4 10

4. Technical Requirements

5 10

Table 1 Diamond window specifications

Parameters Specification Comments

6 10

7 10

8 10

APS

Engineering Standard – Vacuum Designs

APS

Engineering Standard – Vacuum Designs

9 10

5. Reporting

Item APS-U Approval Required Report Type/Info

10 10

6. Quality Assurance Requirements

7. Acceptance Criteria

8. Attachments APS Engineering Standard – Vacuum Designs