SOW for 28ID white diamond window-April30-2024.pdf
PDF 363 KB Posted
- Attached to
- 28-ID CHEX White Beam Diamond Window Assembly
- Solicitation number
- 4-B139-Q-00527-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Statement of Work (SOW) for the procurement of three water-cooled diamond window assemblies for the 28-ID CHEX white beam at the Advanced Photon Source (APS) Upgrade 2 project.
The SOW outlines the technical requirements, deliverables, schedule, reporting, quality assurance, and acceptance criteria for the diamond window assembly. Key details include a 4-week fabrication drawing approval period, 20-week delivery timeline after contract award, and specific technical specifications for the diamond window parameters. The SOW is attached to a federal contract opportunity solicitation issued by the Department of Energy Office of Science, with a solicitation number of 4-B139-Q-00527-00. The contract is for the detail design, fabrication, and delivery of the diamond window assemblies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ANL-70 Request for Quotation.doc | DOC document | |
| Appendix D-8-C.pdf | ||
| APS_2018473_APSU vacuum policy.pdf | ||
| APS Upgrade Project ANL-407 Form.pdf | ||
| Appendix A-71COM-13-FEB-2023.pdf | ||
| Drawing_A328-wn0200.pdf | ||
| Reps and Certs ANL-70A.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28ID CHEX White Beam Diamond Window Assembly
Statement of Work APS Upgrade
2 10
Table of Contents
1. Scope of Work
2. Deliverables
3. Schedule
4. Technical Requirements
5. Reporting
6. Quality Assurance Requirements
7. Acceptance Criteria
8. Attachments
Argonne National Laboratory | 9700 S. Cass Avenue | Argonne, IL 60439
3 10
1. Scope of Work
2. Deliverables
3. Schedule
Item Description Total Weeks
ARO*
Contract Award Project Start 0 Fabrication drawing approval
Contractor to provide fabrication drawings to APS for approval
Window Delivery
Contractor to provide the diamond window with all required QA Documents listed in Deliverables
4 10
4. Technical Requirements
5 10
Table 1 Diamond window specifications
Parameters Specification Comments
6 10
7 10
8 10
APS
Engineering Standard – Vacuum Designs
APS
Engineering Standard – Vacuum Designs
9 10
5. Reporting
Item APS-U Approval Required Report Type/Info
10 10
6. Quality Assurance Requirements
7. Acceptance Criteria
8. Attachments APS Engineering Standard – Vacuum Designs