ANL-70 Request for Quotation.doc
DOC document 253 KB Posted
- Attached to
- 28-ID CHEX White Beam Diamond Window Assembly
- Solicitation number
- 4-B139-Q-00527-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Request for Quotation (RFQ) issued by Argonne National Laboratory (ANL) for the design, fabrication, and delivery of 28-ID CHEX White Beam Diamond Window Assemblies. The RFQ includes a Statement of Work, drawings, quality requirements, and other applicable documentation as attachments.
ANL is seeking firm, fixed-price proposals for 3 diamond window assemblies, model A328-WN0200, including silver-plated bolts and shipping charges. Quotations must be received by June 10, 2024. The contract will be subject to Argonne's terms and conditions and will be exempt from certain taxes. Offerors must provide warranty information, a delivery schedule, and any exceptions or proprietary data. They should also assess potential supply chain impacts and provide secured delivery dates from subcontractors upon award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A-71COM-13-FEB-2023.pdf | ||
| Drawing_A328-wn0200.pdf | ||
| APS Upgrade Project ANL-407 Form.pdf | ||
| Reps and Certs ANL-70A.doc | DOC document | |
| APS_2018473_APSU vacuum policy.pdf | ||
| Appendix D-8-C.pdf | ||
| SOW for 28ID white diamond window-April30-2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANL-70 (February 22, 2013)
UCHICAGO ARGONNE, LLC
OPERATOR OF
ARGONNE NATIONAL LABORATORY
BLDG. 201 OCF, 9700 S. Cass Ave., Lemont, IL 60439
(CONTRACT NO. DE-AC02-06CH11357)
FAX NO. (630)252-4517
REQUEST FOR QUOTATION
| TO ALL OFFERORS |
| THIS IS NOT AN ORDER |
NOTICE:
1. The right is reserved to accept or reject quotations on each item separately unless your quotation states otherwise.
2. The right is reserved to accept minor deviations from specifications herein listed or referenced.
3. Firm prices are requested. If other than firm prices are quoted, conditions of escalation are to be stated.
4. If material is packaged in returnable containers the amount of deposit, if any, is to be stated together with instructions for returning.
5. Terms and Conditions referenced below will apply to any resulting Purchase Order.
| Address Reply To: |
| William E. Guerrero |
| PHONE: |
| (630)252-3318 |
| Date |
| 06/04/2024 |
| Inquiry No. |
| 4-B139-Q-00527-00 |
| Quotation must be received by: |
| 06/10/2024 |
DESCRIPTION
THE ENCLOSED BOOKLET OF Argonne Representations and Certifications FORMDROPDOWN is included as part of this request and must be completed, signed and returned with your quotation.
Please furnish a firm fixed-price proposal, in U.S. dollars, FOB Destination Lemont, Illinois, for the design, fabrication, and delivery (including packaging and shipping) of 28-ID CHEX White Beam Diamond Window Assemblies, in accordance with the Argonne Applicable Documentation, Page (2) of this solicitation, all attached to and hereby made a part of this solicitation.
Only Argonne Terms and Conditions will govern any resultant order.
Any resulting Purchase Order will be subject to the Argonne Terms and Conditions attached hereto and made part of hereof and will be exempt from Illinois Occupation and Use Taxes and from Manufacturers and Retailers Excise Taxes.
We quote you F.O.B. Destination. Shipment can be made in days from receipt of order.
| Cash Terms |
| Net 30 days |
| Will Ship Via* |
Date
*If Shipment will not be made via FedEX, UPS, or USPS, Please provide estimate of weight and volume _________________________________________ cft
COMPLETE AND RETURN ONE COPY
PLEASE MARK “NO BID” IF YOU CANNOT QUOTE
AUTHORIZED SIGNATURE
Quote Each Line - Reference SOW:
| ITEM |
| DESCRIPTION |
| MODEL/PART# |
| QTY |
| UNIT |
| UNIT PRICE |
| EXTENDED PRICE |
| LEAD TIME |
| 1 |
| Diamond Window for White Beam Single Aperture |
| A328-WN0200 |
| 3 |
| Each |
| 2 |
| Silver-Plated Bolts to secure Flanges for shipping |
| N/A |
| 1 |
| Each |
| 3 |
| Shipping charges |
| N/A |
| 1 |
| Each |
Applicable Documentation:
The following documents are attached hereto and made a part hereof:
01. Argonne Statement of Work, 28-ID CHEX White Beam Diamond Window Assembly, dated April 30, 2024.
02. APS Upgrade Project Procurement Quality Requirements Form, ANL-407-APSU, dated May 16, 2024.
03. Drawing Title: 28-ID CHEX White Beam Diamond Window Assembly, Drawing No: A328-WN02000, dated August 05, 2023.
04. APS Engineering Standard Vacuum Designs, dated June 01, 2018.
05. Appendix “A” Terms and Conditions for Commercial Items and Services, ANL-71-COM, dated February 13, 2023.
06. Appendix D-8-C, Intellectual Property Provisions, Commercial Supplies and Services Requiring Delivery of Data, dated July 02, 2020.
07. Evaluation Pre-Award Information (Reps & Certs) – ANL-70A, dated June 06, 2022 - Fill Out and Return
a. Warranty (requirements is 12 months after final acceptance at APS-U) – OFFEROR TO PROVIDE WARRANTY INFORMATION INCLUDING WHAT IS COVERED AND WHAT THE WARRANTY PERIOD IS.
b. Quote to include pricing in accordance with Table above, and Delivery Schedule – REQUIRED
c. Any Exceptions to Clarifications (ANL will negotiate if proposal data is stamped with “proprietary” or “confidential”)
- Our technical evaluation team has signed confidentiality certificates which protects your information to be held within ANL unless DOE requests an audit of the file.
- Foreign Vendors to provide Harmonized Tariff Number
Global Impacts As supply chain issues and the COVID-19 pandemic continue to have global impact, it is important that Offerors provide achievable delivery schedules in response to this Request for Proposal (RFP). ANL expects a committed component delivery schedule based on all external issues to ensure products are delivered with highest quality and within the delivery dates established by the Offeror for this RFP. Offerors shall assess the potential delivery impacts, including supply change issues and sub-tier subcontractor delivery commitments, prior to issuance of delivery due dates/schedules for this RFP. Offeror shall provide any subcontractor dependencies that could create an impact on meeting the delivery due dates. Upon award, the Offeror should provide ANL with secured delivery dates from supplies at all tiers under this subcontract.
BLANK PAGE
PAGE
File details come from the government source that posted it. Updated .